SL NO. LOCATION
Common
Kitchen Area
Bed Room
Bed Room
Balcony
Balcony
Balcony
Balcony
Study Room
Bed Room-2
Kitchen
Utility Balcony
Study Room
Kitchen
Utility
Hall
Study Room
Toilet
Bed Room
Bathroom
Kitchen
Utility
Hall
Study Room
Bed Room
Bathroom
Study Room
Bed Room
Toilet
Kitchen
Utility
Hall
Balcony
Study Room
Bed Room
Toilet-1
Toilet
Kitchen
Utility
Hall
Balcony
Study Room
Lobby Area
Bed Room
Bathroom
Kitchen
Utility
Study Room
Bed Room
Toilet
Kitchen
Utility
Study Room
Toilet
Bed Room
Toilet-2
Balcony
Study Room
Master Bed Room
Toilet-1
Bed Room-1
Toilet-2
Kitchen
Utility
Balcony
Study Room
Master Bed Room
Bed Room
Balcony
Study Room
Master Bed Room
Bathroom
Toilet
Bed Room
Bathroom
Kitchen
Balcony
Study Room
Bed Room
Bathroom
Kitchen
Utility
Study Room
Bed Room-1
Bathroom
Bed Room-2
Toilet
Study Room
Bed Room-1
Bathroom
Bed Room-2
Toilet
C1 & C2
SNAG POINTS STATUS
UPVC Cleaning & Refixing
Toilet Tile Grove Filling
Replace Broken Tile
Panting Touch up @ Electrical
Toilet Single Grouting/ Grove Filling
MS Grill Touch Up
UPVC Window Cleaning by Air Blower
Common Area & Stair Case Cleaning
GI line Clamping & Painting
Raceway Cover Removal
Aluminum Portion Sealent Filling
Common Area Beam Touch Up & Reparing
Stair Case Hand Rail Cleaning
Handle Cleaning in all Floors
Ciling Paint C-2 (03 Room)
Kitchen Wall Tile (Near Sink ) (2 Tile ) Flooring 1 Tile ) Room 1
Door Danarge in C-2
Skrting Repair work
Floor Tile Repair 3 Nos
Toilet Window Corner reparing & Touch Up
Second Floor
SL NO. LOCATION SNAG POINTS
Hall Cleaning for Mesh DoorC452
Mesh Door is not Fixed Properly
Cleaning for Flooring
Flash Door Sliding bolt to be repaired
10 Tiles to be Removed dut to Undulated
Grill Painting
UPVC Window Cleaning
Ashlar Stone Cleaning
Balcony Flash Door Shutter to be removed due to scratch
Mess Door Shutter cleaned properly
03 Tiles to be Removed
Grouting for Tiles
S.S. Handrail Cleaning & buffing
Study Room Grill Painting
UPVC Window Cleaning , Grouting for Ashlar Tiles
Tiles grouting for Skirting Also
Master Bed Room 03 Different Colour tiles & 3 Damaged Tiles
to be Replaced
Grill Painting
Proper Welding of Grill to be Done
Window Ashlar Stone Cleaning & Grouting
Undulation of Ceiling to be Rectified
Bathroom Proper finishing of Window ashlar Stone
UPVC Cleaning, Grill Painting Should be done properly
Mirror to be fixed
Wash basin fixing is not proper
Tiles grouting to be done
02 Floor Tiles to Removed
Bed Room Cleaning of Flush Door
01 Different Colour Tile
02 Undulated tiles are to be replaced
Proper Grouting & Skirting to be done
Grill Painting
UPVC Window & ashlar Stone Cleaning
Proper Cleaning & Grating to be done
Bathroom 02 Tiles are properly fixed
02 Tiles Broken
Electrical Hole to be Packed
Broken Threshold to be replaced
Kitchen 02 Tiles to be Removed
Grill Painting
UPVC Window & ashlar Stone Cleaning
Aldrop & Handle Cleaning
Utility 02 Broken tiles to be replaced
Proper Cleaning of Stone
Coping stone Should be Cleaned
Grill Painting & Proper Fixing to be Done
Toilet Deep Cleaning to be Done
Block C7- Ground Floor
Ground Floor-1
SL NO. LOCATION SNAG POINTS
Hall Deep Cleaning to be Done
Status of Tiles cannot to checked due to Deep Cleaning work not
done
Undulation of Ceiling to be Rectified
UPVC window cleaning
Grill painting Rectification
Cleaning of Ashlar Stone
Bolcony RWP area clamp missing near UPVC pipe
L stone Crack to be Replaced
Pointing Work to be rectified
Study Room UPVC Window Cleaning
Window Ashlar Stone Cleaning & Grouting
Grill Painting & Proper Fixing to be Done
Master Bed Room Ceiling Undulation
Ashlar Stone Painting
Grill Painting
Undulation of Painting for walls
Electrical Junction box to be repaired
Bed Room Undulation of Ceiling to be Rectified
Grouting of Window
UPVC window Cleaning
UPVC Proper Fixing not done @ handle area
Bathroom Seepage
Painting for Walls
White cement to be fixed for one Tile
Undulation In Ceiling
Utility MS Grill Not in Proper should be changed
Pointing to be done for window stone
Bathroom Painting to be done
02 Dado tiles to be changed
Chowkat to be checked & rectified
Kitchen Wall & Ceiling Painting
01 wall tile
Sink top to be changed
Mesh door jali to be rectified
Block C7- Ground Floor
Ground Floor-2
SL NO. LOCATION SNAG POINTS
Hall Deep Cleaning to be Done
Tile is not checked due to deep cleaning
Upvc Cleaning
Grill Painting
Balcony Mesh door to be rectified
Defective wood work & Mesh door
Pointing to be done properly
Buffing to be done for S.S.
Clamp Missing PVC area
Preforated Cover Missing
Study Room Painting to be done
UPVC window cleaning
Ashlar Stone Cleaning
Master Bed Room Undulation in Slab to be rectified
Wall & Ceiling Painting
Grill Painting
UPVC window cleaning
handle to be rectified
Ashlar Stone Cleaning
Bed Room Wall Painting to be done
Painting of Grill
Proper fixing of Grill
UPVC window cleaning
Ashlar stone to be rectified
UPVC window not functionery properly
Undulation in ceiling
Bathroom Mirror to be Placed
UPVC window cleaning , Grill painting
Window Ashlar Stone Cleaning & Grouting
Leakage of wash basin area to be rectified
Chowkat to be checked & rectified
Below wash basin wall dada to be rectified
Bathroom 05 wall dado to be changed
Gril paint upvc cleaning
Grating for wall dado
Kitchen Wall dado to be changed 05
ceiling painting to be rectified
Wall Painting to be done
stone door frame to be Repy
Ground Floor-3
SL NO. LOCATION SNAG POINTS
Hall Deep Cleaning to be Done
Mesh door to be rectified
ceiling painting to be rectified
Kitchen Dado Tiles to be Changed
wall& Ceiling Painting to be done
Mesh door to be rectified
Flush door to be rectified
Utility Big Cock Missing
ceiling painting to be rectified
Proper fixing of MS Grill & Painting
Painting for Walls
Painting for CR
Flush door area painting shall be rectified
Master Bed Room Wall, Ceiling, Grill Painting
Undulation to be rectified
Bathroom 02 wall Dado
Painting for wall, ceiling to be done
Study Room UPVC window cleaning, Grill Painting
Broken Ashlar Stone to be removed
Bed Room Ceiling Undulation to rectified
Grill Painting UPVC Window Cleaning
Bathroom Tiles Grouting
03 tiles to be rectified dado
Grill Painting
UPVC Window cleaning
Ashlar Stone Cleaning
Ground Floor-4
SL NO. LOCATION SNAG POINTS
Hall UPVC Window to be rectified
Grill Paint
Ashlar Stone Cleaning
Balcony Mesh Door Shutter to be replaced
Study Room Painting for wall, Ceiling & Grill to be done
Proper Dscing of Grill
Ashlar Stone Cleaning & Grouting
Master Bed Room Flush door to be rectified
Chowkat to be checked & rectified
UPVC Window need Cleaning & Reparing
Ceiling Undulation
Bed Room Grill, Ashlar stone ,Paint, UPVC Window not Properly
Bathroom 02 wall Dado
Grill, UPVC, Cleaning & Painting
Kitchen Cleaning of Grill & Painting
Ashlar Stone Cleaning
Utility CR to be Changed
Grill Proper Fixing
Proper Oblignment of MS Grill to be done
Grouting of L stone to be done
Shaft door to be rectified
Pointng of CR to Rectified
First Floor-02
SL NO. LOCATION SNAG POINTS
03 Mesh Door not Properly
Flush Door Sliding bolt to be checked
UPVC Window Should be Rectified
Balcony Flush door to be Checked
Cleaning of S.S. Railing
UPVC 05 Points
Growting of Chowkat
L- Stone to removed
Clamp Missing PVC area
Study Room 05 points window
Master Bed Room 05 points window
Bathroom 05 points window
Proper FInishing near Exhaust Fan to be rectified
Bed Room 05 points window
Utility Grill To be Rectified
Shaft to be rectified
Kitchen 02 tiles to be rectified
First Floor-02
SL NO. LOCATION SNAG POINTS
Hall Flush door to be rectified
05 points of window
Balcony Flush door to be rectified
Cleaning of CR
Ashlar stone to be rectified
Cleaning of SS
L- Stone Cleaning
Mesh door shutter to be removed due to edge moulding not good
Study Room 05 points of window
Master Bed Room 05 points of window
Ceiling Undulation to be rectified
Bathroom 01 Tile dado change
05 points of window
Junction hole to be closed
Bed Room Ceiling Undulation to be rectified
Bathroom not Checked 05 Points to be rectifie
Flush doorto be rectified
Kitchen 05 points of window
2 wall Dado
Mesh door to be rectified
Utility Fastener to be changed
Pointing of CR & Cleaning
First Floor-04
SL NO. LOCATION SNAG POINTS
Flush door to be rectified
05 points of window
Undulation in Slab
Balcony Grating for Mesh Door Gap
Pointing of CR & Cleaning
Clamp for PVC
Study Room 05 points of window & Stone
Shaved to removed
Handle Screaw Missing
Bed Room GAP of Flash Door
Chowkat was to be changed due to broken
Undulation in Slab
05 points of window + Gap
Bathroom Seepage
05 points of window
02 Dado tiles to be changed
Junction hole to be Rectified
Bed Room 05 points of window
Bathroom 02 Wall tiles to be changed
Kitchen Mesh Door to be Checked
Utility Shaft Door to be Checked
05 points of window
Block C7-Second Floor
Second Floor-1
SL NO. LOCATION SNAG POINTS
Hall Mesh door to be rectified
Flush Door to be rectified Gap
05 points of window
Undulation in Slab
Balcony Mesh door to be rectified (Crack)
S.S. Cleaning
PVC Clamp
Pointing of CR & Cleaning
Ashlar stone to be Removed
Study Room 05 Tiles for different shade
05 points of window
Bed Room 05 points of window of Different
Undulation in ceiling
Bathroom 05 points of window
Seepage
01 dado to be changed
Bed Room Undulation in ceiling
05 points of window
Grouting in Walls
Seepage in Walls
01 Different shade Tile
Kitchen 05 points of window
Utility Handle Should be rectified
Grill to be checked
Aluminum Shaft Missing
STATUS
STATUS
STATUS
STATUS
STATUS
STATUS
STATUS
STATUS
STATUS
STATUS