You are on page 1of 15

The Effect of TQM & SOP (Total Quality Management

and Standard Operating Procedure) to Build Core


Management Framework for Optimization: A Literature
Research Study
Bahrul Fauzi Rosyidi1, Muhammad Halimi2, Sufitri3
1 Universitas Gadjah Mada (UGM) – Applied Financial Management Department; Universitas Gadjah Mada (UGM) – Centre
of Economic and Public Policy Study (CEPPS)
2 Universitas Gadjah Mada (UGM) – Applied Marketing Management Department
3 Universitas Gadjah Mada (UGM) – Applied Financial Management Department

 put forward today.


Abstract—Optimization problem is not an easy task. To Total Quality Management (TQM) is a management
achieve an optimal performance, organization or company philosophy, diffused all over the world with the objective of
must strive to empower intrapreneurs optimal power (potential improving the operative and business performance of the
resources from internal sources) and entrepreneur optimal organizations by offering a systemic approach to continually
power (potential resources from external sources) optimally improve the operative activities to continually fulfill customer’s
and maximally for company and organization. Mathematically, requirements (Agus, 2005; Powell, 1995). The TQMs philosophy
we have to achieve optimal value of the company by following is particularly attractive because of the focus on quality, which
the total value of the = total revenue – total cost. Strategically, offers the promise of improvement of an organization’s
to attain optimal value for the company we have to involve performance. However, until 1993, only one third of the 500
different strategies which do not only rely on product and price largest companies in the United States declared having perceived
under Marketing Department but also require a combination benefits of TQM implementation (Ahire, Waller, & Golhar, 1996).
of a number of strategic issues in Operating and Production The poor results could be related to a bad design or to not taking
Department, Human Resources Department, and Financial into account certain variables that could be relevant for the success
Department. Total Quality Management and Standard of this implementation (Tata & Prasad, 1998).
Operating Procedure Approach (TQM & SOP Approach) is Standard Operating Procedure (SOP) is supporting features
the efforts to achieve the optimal value by involving entire that becomes the origin of business excellence models which is
compounds of a companyunder one common mission and used to categorize and present business improvement. SOP is
vision. Realization of effective and efficient work processes can "process driven", rather than "founder driven" that document
be delivered by competent human resource with high processes to ensure services and/or products are delivered
discipline, high loyalty, high intelligent work, and high value consistently every time so as standard processes. SOPs can indicate
orientation which hopefully altogether will increase compliance with organizational policies and it is can be used as a
productivity performance to lead for optimal satisfactory part of a personnel training program, since they should provide
organizational motives. Organizational productivity formula is detailed work instructions. SOPs will minimize opportunities for
= Effectiveness + Efficiency + Stakeholder Satisfaction. miscommunication and can address safety concerns. When
Keywords: Total Quality Management, Standard Operating historical data are being evaluated for current use, SOPs can also
Procedure, Optimization, Satisfaction, Sustainability Progress. be valuable for reconstructing project activities when no other
references are available. Basically, processes and procedures
described in the SOPs will ensure that policy is followed.
I. INTRODUCTION
The SOPs also provides standardization and control over
Excellence management is a form of short term and long term business processes and operations. However, the SOP allows
investment of the company. Investment is the commitment of a employees to function with little supervision and increases
number of funds or other resources (Intrapreneur; potential accountability since all employees have access to the SOPs and
resources from internal sources and Entrepreneur; potential should be similarly well-informed. The SOPs is generally wider in
resources from external sources), performing in present with scope to provide direction, influence behavior and ensure that
objective to earn some profits in the future time (Tandelilin, standard tasks are completed in alignment with policy. The SOPs,
2001:1). A good stakeholder gives more interest their company in combination with policy, defines the organization. The SOPs
managerial. Paying more attention to their managerial means that will work to ensure that policy concerning processes and
stakeholders have invested in buying the company’s prospects. If procedures is followed.
the company’s prospects improve, the price visualizes support that In this study, we argue that element values of TQMs (context
will increase the price level of the stock or value of the firm in an of the organization, leadership, planning, support, competence,
effective wayand an efficient method. operation, performance evaluation, and improvement) is effective
Excellence management is outstanding practices in managing when supported by SOPs element (design task appropriate,
the organization and achieving results, all are based on a set of placement of the right people, appropriate performance
eight fundamental concepts, these being: a). result orientation; b). measurement, and suggestion appropriate work) for achieving high
customer focus; c). leadership and constancy of purpose; d). optimization (achieving value of the firm = maximally profit and
management by processes and facts; e). people development and satisfaction achieving). And I think, this scenario is very critical for
involvement; f). continuous learning; g). innovation and organization.
improvement; h). partnership development; and i). public Existing research provides only TQMs element evidence for
responsibility”. This definition serves as a typical example of those quality. And the same is also true with SOPs, just provides only
SOPs element evidence for quality. There is no any idea research
or paradigm to combine two strategic scenarios to achieve a high

1
quality more efficient effective. The framework of this research is D. Standard Operating Procedure (SOP)
expecting to achieve high value of the firm (scenarios TQMs In today’s business environment, SOPs must take bottom-line
realization performance + ideal standardized SOPs integration =
economic sense, especially if we invest in time and energy to
maximal value of formula output theory of optimization).
develop and implement effective total quality management
(TQMs). Why? Because: a). Business need consistency to achieve
II. PROBLEM IDENTIFICATION top performance. We are talking about consistency in routines not
Based on introduction case and problem above, the following mind numbing boredom; b). Identify the key areas of concern for
are formulated research questions: our operation where SOPs might be useful; c). Using the list from
a) How to find the best quality? step one, identify the top one or two priority areas for attention; d).
b) How to establish the best quality? Focusing on the selected top priority areas from step two, identify
c) How to establish the excellence management? all the processes, functions or operations that occur within each of
d) How to get the best quality to achieve the organizational these areas; e). Group together and combine or subdivide further
competitive advantages for creating maximal value of the (which ever makes sense for our operation) all important processes,
firm? functions or operations within each area, then prioritize them for
SOP development; and the last is f). Identify the best individual to
III. THEORITICAL FRAMEWORK lead the development effort for each SOPs and assign a
development team of employees, managers, agribusiness
A. What is Quality representatives, consultants and anyone else who can bring
Quality is the ability of a products and services in fulfilling relevant expertise to the effort.
the customer needs. Quality is also the level and standard of a good So, what exactly is standard operating procedure (SOP)?
or standard of a bad something created. Its term is widely used in Standard operating procedure (SOP) is a set of instructions having
business, engineering, and manufacturing in conjunction with the force as an instruction or directive. This includes things from
engineering concepts to products quality improvement and services operations that have a plan or standardized procedure without loss
quality improvement such as Six Sigma, Kaizen, etc. of effectiveness. Any good quality management system is always
based on the SOP. Well-written standard operating procedures
B. Excellence Management (SOPs) provide direction, improve communication, reduce training
Excellence management is outstanding practices in managing time, and improve work consistency.
the organization and achieving results, all based on a set of eight The SOP development process is an excellent way for
fundamental concepts, these being: a). Result orientation; b). managers, workers, and technical advisers to cooperate for
Customer focus; c). Leadership and constancy of purpose; d). everyone’s benefit. A very positive sense of teamwork arises when
Management by processes and facts; e). People development and these parties work together toward common goals. Standard
involvement; f). Continuous learning; g). Innovation and operating procedures used in combination with planned training
improvement; h). Partnership development; and i). Public and regular performance feedback lead to an effective and
responsibility. motivated workforce. Producing a high-quality product at a profit
depends on the consistent operation of all systems within the dairy.
C. Total Quality Management (TQM) To develop the SOPs, there are many different approach, such
Total Quality Management (TQMs) is a management strategy as: a). The first, name the SOP using descriptive action word, tips:
which aims to instill awareness of quality in all processes within If we are developing SOPs for several different areas of our
the organization. In accordance with the definition of the ISO, operation processes, give area an identifying code the number the
TQMs is "a management approach for an organization centered on SOPs within it, example: in Marketing Efectivity, SOPs M-1, M-2,
quality, based on the participation of all its members and aims for M-3…in the Operation area, O-1, O-2, O-3…for Financial
long-term success through customer satisfaction and provide efectivity, F-1, F-2, F3…for Human resources security and
benefits to all members in the organization and the discipline, HR-1, HR-2, HR-3…This will make it easier to file the
community." Short definition, TQMs is customer focus and SOPs, refer to them in related SOPs and for an employee to find a
company-wide by doing: a). The activity system approach; and b). specific SOP for reference later. Keep them filed in one or more
Activities of scientific approaches. notebooks accessible to the employees. Include the date the SOP
The basic philosophy of TQMs is "organization can took effect, any revision dates and the authors’ names; b). The
experience success and it is effects of customer satisfaction”. second, write a scope for the SOP; c). The third, develop an overall
TQMs is a management philosophy oriented to increasing task description (number of people required, skill levels, equipment
operating and business results of an organization through activities and supplies required, personal protective, and etc); d). The fourth,
of continuous improvement (Agus, 2005; Antony, Leung, describe each task in detail as specific order in which activities are
Knowles, & Gosh, 2002; Krumwiede & Lavelle, 2000; Noronha, don, timing sequences and times allowed, materials or tools used
2002; Powell, 1995; Prajogo, 2005). and how they are used, reward and bonus consideration, safety
As such, the philosophy is composed of principles, models consideration, healthy consideration, references to other associated
and practices: practices are the observable actions that illustrate the Sops, and etc; e). The five, define terms and concepts when
underlying principles, while principles are the beliefs or dogmas needed, people can’t remember more than 10 or 12 steps, so they
(Boaden 1997; Powell, 1995). Models are conceptual frameworks tend to have difficulty with long SOPs. If our SOP goes beyond 10
developed from the TQM principles that have been adapted to steps, either break it into logical sub-task SOPs or write a second
changes in the atmosphere of business. Examples of the TQM shortened form at job site listing in mainly step, remember: not
models include ISO 9001:2015, Malcolm Baldrige, Six Sigma, and detailed explanations of the steps. Help to ensure that an important
the European Foundation for Quality Management (EFQM) items are not missed; f). The sixth, get everyone on board by ask
excellence model. The principles constitute the deepest and most several experienced employees to be involved in drafting the initial
constant part of the management philosophy; however, researchers SOP; have trained employees check the written procedures against
have not yet reached a consensus on the TQM principles and actual practices before implementation, make revisions if
whether the principles are universal (Powell, 1995; Samson & necessary; talk with all employees to gain agreement that
Terziovski, 1999; Zeitz, Johannesson, & Ritchie, 1997). procedures and expectations are appropriate and achievable; inform
everyone about the written SOP; train them on the SOPs content

2
and tell them where they can find it for future references, be aware minimum or maximum value of a real function. To achieve the
that all our employees may not be able to read that (SOPs); and the optimal value of the minimum or maximum, the value of
last is g). The seventh, set up a system to monitor the SOP systematically conducted elections integer or real variables which
regularly. will provide an optimal solution. There are many methods used in
Benefits of SOPs are: a). SOPs will reduce system variation determining the optimal decision making. However, in this section
which is the enemy of production efficiency and quality control; we will learn the following techniques: a). Marginal analysis
b). SOPs can help in conducting performance evaluations, they technique; and b). Derivative technique. The basics form of the
provide a common understanding for what needs to be done and problem is to identify the alternative means of achieving a given
shared expectations for how tasks are completed; and the last is c). objective and to select the alternative that accomplishes the
Employee can coach and support each other if there is objective in the most efficient manner, subject to constrains on the
documentation available on exactly how various tasks must be means. In programming terminology, the problem is optimizing the
done and everyone knows what their co-workers are supposed to value of some objective function, subject to any resource and/or
be doing. This can also help generate a more cooperative team other constraints such as legal, input, environment, and behavioral
approach to getting all the daily tasks done correctly, everyday. restriction. Mathematically, we can represent the problem as:
How presenting the SOP? Presenting the SOP are must be a
simple steps and most likely a checklist, hierarchical steps, linier Optimize y = f(X1 . X2 … Xn ) … … … … … … … (C. 1)
flow chart, annotated pictures, and branching flowchart. The SOP ≤
development process is critical to successful implementation of Subject to g j (X1 . X2 … Xn ) {=}bj j = 1,2, … , m … … … … … … … (C. 2)

SOPs. It should be an inclusive process that considers the input of Where equation C.1 is the objective function and equation C.2
everyone with an interest in the procedure’s success. Managers constitutes the set of constraints imposed on the solution. The X j
who write procedures without input from workers or technical variables, X1, X2,…,Xn, represent the set of decision variables.
advisers run the risk of upsetting workers and producing a poorly Depending on the nature of the problem, the term optimize means
written SOP. Managers who enlist the talents of workers and either maximize the value of the objective function. As indicated in
technical advisers will increase buy-in and produce better SOPs. equation C.2, each constraint can take the form of an equity (=) or
Most importantly, they will take advantage of an important an inequity (≤ or ≥) relationship.
opportunity to foster teamwork among workers, managers, and
advisers. Human nature dictates that people support what they help E.1. Basic Roles
create. E.1.1. Marginal Analysis Technique
Important notes: it is important to realize that developing Marginal analysis was introduced as one of the fundamental
useful and effective SOPs requires time and commitment from all concepts of economic decision making. In the marginal analysis
management and employee levels. Once the development task is framework, resource-allocation decisions are made by comparing
complete three important steps still remain, are: a). Educate the marginal benefits of a change in the level of an activity with the
employees about the new SOP; b). Control “procedural drift” by marginal costs of the change. A change should be made as long as
ensuring that the SOP is followed consistently over time; and the the marginal benefits exceed the marginal costs. By following this
last is c). Establish an evaluation and review system to be certain basic rule, resources can be allocated efficiently and profits or
that over time all the steps of an SOP are still correct and shareholder wealth can be maximized. In the profit-maximization,
appropriate for the production system flow and role. the application of the marginal analysis principles required that the
The SOP development process is an excellent way for relationship between the objective (profit) and the decision variable
managers, workers, and technical advisers to cooperate for (output level) be expressed in either tabular or graphic form. This
everyone’s benefit. A very positive sense of teamwork arises when framework, however can become cumbersome when dealing with
these parties work together toward common goals. Standard several decision variables or with complex relationship between
operating procedures used in combination with planned training the decision variables and criterion can be expressed in algebraic
and regular performance feedback lead to an effective and form, the more powerful concepts of differential calculus can be
motivated workforce. Producing a high-quality product at a profit used to find optimal solutions to these problems.
depends on the consistent operation of all systems within the dairy.
E. Optimization E.1.1.1. Relationship Between Marginal Analysis and
Differential Calculus
Normative economic decision analysis involves determining
Initially, let us assume that the objective we are seeking to
the action that best achieves a desired goal or objective. This
optimize, Y, can be expressed algebraically as a function of one
means finding the action that optimizes (that is, maximizes or
decision variable, X.
minimizes) the value of an objective function. For example, in a
Y = f(X) … … … … … … … (C. 3)
price-output decision-making problem, we may be interested in
Recall that marginal profits is defined as the change in profit
determining the output level that maximizes profits. In a
resulting from a one-unit change in output. In general, the marginal
production problem, the goal may be to find the combination of value of any variable Y, which is a function of another variable X,
inputs (resources) that minimizes the cost of producing a desired is defined as the change in the value of Y resulting from a one-unit
level of output. In a capital budgeting problem, the objective may change in X. the marginal value of Y, M., can be calculated from
be to select those projects that maximize the net present value the change in Y, ΔY, that occurs as the result of a given change in
(NPV) of the investments chosen. There are many techniques for X, ΔX as follow:
solving optimization problem such as these. This focus ∆Y
(optimization) focuses on the ise of differential calculus to solve My = … … … … … … … (C. 4)
∆X
certain types of optimization problem. In technique of linier When calculated with this expression, different estimates for
programming, used in solving constrained optimization problems, the marginal value of Y may be obtained, depending on the size of
are examined. Optimization techniques are a powerful set of tools the change in X that we use in the computation. The true marginal
that are important in efficiently managing an enterprise’s resources value of a function (e.g., an economic relationship) is obtained
and thereby maximizing shareholder wealth. from equation C.4 when ΔX is made as small as possible. If ΔX
Optimization is a process to achieve the ideal or optimal can be thought of a continuous (rather than a discrete) variable that
(effective value that can be achieved). In the mathematical
discipline refers to study of optimization problems trying to find a

3
can takeon fractional value1, then in calculating Myby equation derivative of a constant function is equal to zero.
C.4, we can let ΔX approach zero. In concept, this is the approach dY
taken in differential calculus. The derivative or more precisely, = 0 … … … . . … … … . . … … (C. 11)
dX
first derivative, dY/dX of a function is defined as the limit of the E.1.1.3.2. Power Functions;
ratio ΔY/ΔX as ΔAX approaches zero, that is: Y = aX b … … … … … … … … … (C. 12)
Where a and b are constants. The derivative of a power
dY ΔY functions is equal to b times a, times X raised to the (b – 1) power:
= limit … … … … … … … (C. 5) dY
dX ∆X→0 ΔX
If we describe to the graphic, the first derivative of a function = b. a. X b−1 … … … … … … … (C. 13)
dX
will represent the slope of the curve at a given point on the curve.
The definition of a derivative as the limit of the change in Y (that E.1.1.3.3. Sums of Function;
is, ΔY) as ΔX approaches zero. Suppose we are interested in the Suppose a function Y = f(X) represents the sum of two (or
derivative of the Yj = f(X) function at the point X0. The derivative more) separate functions, f1 (X), f2 (X), that is:
dY/dX measures the slope of the tangent line ECD. An estimate of
this slope, albeit a poor estimate, can be obtained by calculating the Y = f1 (X) + f2 (X) … … … … … … (C. 14)
marginal value of Y over the interval X0 to X2. Using equation C.4 The derivative of Y with respect to X is found by
a value of: differentiating each of the separate functions and then adding the
∆Y Y2 − Y0 results:
Myt = = … … … … … … … (C. 6)
∆X X2 − X0 dY df1 (X) df2 (X)
is obtained for the slope of the CA line. Now let us calculate = + … … … … (C. 15)
dX dX dX
the marginal value of Y using a smaller interval, for example X 0 to
X1. The slope of the line C to B which is equal to: E.1.1.3.4. Product of Two Functions;
Suppose the variable Y is equal to the product of two separate
∆Y Y1 − Y0 functions f1(X) and f2(X):
Myt = = … … … … … … … (C. 7)
∆X X1 − X0
gives a much better estimate of the true marginal value as Y = f1 (X). f2 (X) … … … … … … … (C. 16)
represented by the slope of the ECD tangent line. Thus we see that In this case the derivative of Y with respect to X is equal to
the smaller the ΔX value, the better the estimate of the slope of the the sum of the first function times the derivative of the second, plus
cure. Letting ΔX approach zero allows us to find the slope of the Y the second function times the derivative of the first.
= f(X) curve at point C. as shown illustrated in graph analysis, the
slope of the ECD tangent line (and the Y = f(X) function at point dY df2 (X) df1 (X)
C) is measured by the change in Y, or rise, ΔY, divided by the = f1 (X). + f2 (X). … … … … … … … (C. 17)
dX dX dX
change in X, or run, ΔX.
E.1.1.3.5. Quotient of Two Functions;
E.1.1.2. Process of Differentiation Suppose the variable Y is equal to the quotient of two separate
The process of differentiation – that is, finding the derivative functions f1(X) and f2(X):
of a function – involves determining the limiting value of the ratio
ΔY/ΔX approaches zero. Example: Taking limit of equation: 𝑓1 (X)
Y= … … … … … … … … … . … … (C. 18)
𝑓2 (X)
∆π 140∆Q − 20Q∆Q − 10(∆Q)2 For such a relationship the derivative of Y with respect to X is
= … … … … … … … (C. 8)
∆Q ∆Q obtained as follows:
= 140 – 20Q - 10ΔQ
Taking the limit of equation C.8 as ΔQ approaches zero yield df1 (X) df2 (X)
dY f2 (X). dX
− f1 (X).
dX
the expression for the derivative of company profit (value of the = … … … … … … … (C. 19)
firm) is: dX (f2 (X))2
dY ΔY
= limit … … … … … … … (C. 9) E.1.1.3.6. Functions of a Function (Chain Rule).
dX ∆X→0 ΔX Suppose Y is a function of the variable Z, Y = f1 (Z); and Z is
= 140 – 20Q
in turn a function of the variable X, Z = f2(X). the derivative of Y
with respect to X can be determined by first finding dY/dZ and
If we are interested in the derivative of the profit function at a
dZ/dX and then multiplying the two expressions together:
particular value of Q, equation C.8 can be evaluated for this value.
For example: suppose we want to know the marginal profit, or dY dY dZ
slope of the profit function, at Q = 3 units. Substituting Q = 3 in = .
equation C.9 yields: dX dZ dX
dπ df1 (Z) df2 (X)
Marginal Profit = = 140 − 20(3) = $80 per − unit = . … … … … … … … (C. 20)
dQ dZ dX
E.1.1.3. Roles of Differentiation E.1.2. Derivative Technique
Fortunately, we do not need to go through this lengthy process This involves the use of calculus in solving maximization and
every time we want the derivative of a function. A series of general minimization problems.
rules, derived in a manner similar to the process just described, E.1.2.1. Basic Rule
exist for differentiating various types of function, these are: Because the derivative is a limit, many of the rules of limits
E.1.1.3.1. Constant Functions; apply to the derivative:
Y = a … … … … … … … … . … (C. 10) 1. (cf (x))' = c(f'(x)) where c is a constant. This says that
Where a is a constant (that is, Y is independent of X). This the derivative of a scalar multiple of a function is
equal to the derivative of the function multiplied by
the scalar multiple;
1
For example: if X a continuous variable measured in feet, pounds, and 2. (f (x) + g(x)) = f'(x) + g'(x) . The derivative of a sum of
so on, then ΔX can in theory take on fractional values such as 0,5, 0,10, two functions is equal to the sum of the individual
0,05, 0,001, 0,0001 or pounds. When X is a continuous variable, ΔX can be derivatives.
made as small as desired.

4
IV. RESEARCH MODEL AND FRAMEWORK DEVELOPMENT

Analysis & Evaluation


Management Review Performance
Monitoring Evaluation
Measurement Design Tasks Stabilizations
Internal Audit Placement of The Right People
Appropriate Performance Measurement SOPs
Internal Issues Context Suggestion Appropriate Work
External Issues

Direct Customers
Suppliers Interest Parties Context of
Distributors Organization
Retailers
Value of The Firm =
Maximally Profit &
Process Sequences Scopeof Quality
TQMs Organization Satisfaction
= Optimization
Method Mgt System

Management Commitment
Policy
Leadership
Organization Roles
Responsibility & Authority

Organization
Product
Planning
Process
Workforce

Resources Support

Input
Process Operation
Output

Continual Improvement
Noncorformity & Corrective Improvement
Action

Figure 1. Research Model

5
Internal Issues c). suppliers, distributors, retailers or others involved in the supply
Management review required the monitoring of internal chain; d). regulators; and e). any other relevant interested parties.
issues. The organization must consider issues related to product
and service offerings, value, organizational structure, performance Process Sequences
and knowledge, assets (e.g., facilities, property, equipment and The organization shall determine the sequences and
technology), capabilities, understood in terms of resources and interactions of these processes. Include: a). Resource management
knowledge (e.g., capital, time, people, and process), information (people and infrastructure), product and service realization
systems, information flows, decision making process (both formal (purchasing from suppliers, actual production, customer services
and informal), and relationships of the staff/volunteers/members delivery, etc), management activities (planning, system review,
and internal stakeholders. document control), measurement, analysis and improvement
(customer complaints, corrective and preventive actions). The
External Issues standard contains a generic model
Management review required the monitoring of external
issues. The organization must consider issues related to value, Method
culture knowledge and performance of the organization for Determine methods needed to check our processes for
understanding of external issues. The organization must consider implement the organization (company) quality management
issues related to arising from legal, technological, competitive, system.
market, cultural, social, and economic environments, whether
international, national, regional or local for understanding of Scope of Quality
external context. The quality management system scope should include: a).
Physical location, example: maybe only manufacturing but not
Context sales locations; b). Products and/or services controlled by the
The organizations must determine external and internal issues quality management system, example: manufacturing but not
relevant to its purpose and that affect its ability to achieve the installation; c). Processes within the quality management system,
intended outcomes of its QMS2. In addition monitor information example: accounting maybe left out. Therefore, the scope of the
about impact changes in context of our organization’s quality quality management system should be repaired, such as: a).
management system. Determine the processes that our quality management system
needs; b). Determine process sequences and interactions; c).
Direct Customers Determine methods needed to manage processes; d). Determine
Customer service is the service provided to customers before, resources needed to support processes; e). Determine process
during and after purchasing and using goods and services. Good responsibilities and authorities; f). Determine risks and
customer service an experience that meets customer expectations. opportunities for each process; g). Determine methods needed to
It produces satisfied customers. Bad customer service can generate check our processes; h). Determine opportunities to improve our
complaints. It can result in lost sales, because consumers might processes; i). Support our process with based quality management
take their business to a competitor. Customer service is must system (QMS); and j). Improve our process based quality
consider to direct customer service. Repeat buying and positive management system.
customer feedback is two point indicator achieve loyalty of the
customer. Therefore organization must attract and retain customers Context of the Organization
by offering products services that meet their needs along with Context of the organization is one of the new concepts and
providing excellent customer service. differences between the ISO 9001:2008 and its younger brother
the ISO 9001:2015. It pretty much changes the concept and
Suppliers application. The context of the organization as described in the ISO
Suppliers provide organizations with the resources they need 9001:2015 requires you to define influences of various elements
to carry out their activities. If a supplier provides bad service, this on the organization and how they reflect on the quality
affects the way organization operates. Close supplier relationships management system; the company’s culture, objectives and goals,
are an effective way to retain competitive and secure the resources complexity of products, flow of processes of and information, size
needed. of the organization, markets, defines customers etc. It is also a
mean to detect risks and opportunities regarding the business
Distributors context. Context of the organization requires the organization to
A distributor owns the energy infrastructure – the poles, wires evaluate itself and its context. The output of this context evaluation
and meters that supply energy to us (company, organization). We will be determination of the scope of its quality management
may not need a traditional distributor, we may need a logistical system. The context quality that require by organization must be:
specialist. To determine the appropriate distributors, effectively we a). As quality context; b). Interested parties; c). Scope of quality
may joining an industry association and attending trade shows to management system; and the last d). Must be in quality
find out how similar companies – the competition – move their management system.
products (distributors gather in herds). Organizations (companies)
need to recognize that their business is now interdependent with Analysis and Evaluation
that of the distributor, because the distributor is not our customer. The organization must determine and provide analysis and
evaluation needed for the quality management system, the steps
Retailers are: a). Analyze and evaluate our monitoring and measurement
Determine an appropriate retailers is a great way to expand results by analyze and evaluate the data and information we have
company (organization) sales channel and increase the profits. collected, and use analytical results and evaluations to generate
relevant outputs with use outputs to show that requirements are
Interest Parties being met, to demonstrate that our plans are working, to asses
The organization must determine: a). interested parties performance, compliance, and effectiveness, to identify quality
relevant to the quality management system, and; b). the management system improvement needs and opportunities, to
requirements of these interested parties. List of interested parties evaluate the performance of our quality management system
the organization must consider: a). direct customers; b). end users; processes, and the last is use outputs to provide inputs for
management review process.
2
QMS is quality management system;

6
Management Review management system; b). Demonstrate a commitment to our quality
The organization must determine and provide management management system; c). Ensure that a quality policy is developed;
review needed for the quality management system, the steps are: d). Ensure that quality objectives are established; e). Ensure that
a). Plan and perform management reviews at planned interval by requirements are built into processes; f). Ensure that our QMS
plan our management review activities with schedule quality achieves all intended results. The method communicate our
management system reviews at planned intervals, and review our commitment to the quality management system are: a). Explain
why quality management is important; b). Expect managers to be
organization’s quality management system at regular intervals by
accountable for their quality management system; c). Encourage
review quality management system suitability, adequacy, and
our personnel to support their quality management system; d).
effectiveness; b). Generate management review outputs and Promote an awareness of the process approach. The methods
document results by generate suitable management review outputs, provide leadership by encouraging a focus on customers are: a).
and document the results of our management reviews. Expect personnel to focus on customers; b). Expect personnel to
manage all relevant requirements; c). Expect personnel to provide
Monitoring compliant products and services; d). Expect personnel to manage
The organization must determine and provide monitoring relevant risks and opportunities; and e). Expect personnel to focus
needed for the quality management system, the steps are: a). Plan on enhancing customer satisfaction.
how we’re going to monitor, measure, analyze and evaluate by
plan how to monitor, measure, analyze, and evaluate our quality Policy
management system with monitor, measure, analyze, and evaluate In quality management system, a quality policy is a document
our organization’s quality management system by monitoring, jointly developed by management and quality experts to express
measuring, analyzing, and evaluating the performance and the quality objectives of the organization, the acceptable level of
effectiveness of our quality management system. quality and the duties of specific department to ensure quality.
Quality policy management is a long term strategic issue and often
Measurement has a 10 year scope. Well defined quality policy that is
The organization must determine and provide measurement communicated and understand within an organization.
needed for the quality management system, the steps are: a). Therefore, the quality policy of the quality management
Obtain customer information and monitor customer satisfaction by system should be repaired, such as: a). Develop an appropriate
establish methods for obtaining and using customer information, quality policy; and b). Formulate our organization’s quality policy.
obtain information about the opinions and perceptions of The method develop an appropriate quality policy is a). Make
customers, and monitor the perceptions, opinions, and attitudes of sure that it supports our organization’s purpose; b). Make sure that
our customers. it deals with our organization’s context; and c). Makes sure that it
can be used to set quality objectives. The method formulate our
Internal Audit organization’s quality policy is a). Make a commitment to satisfy
The organization must determine and provide internal audit applicable requirements; b). Make a commitment to continual
needed for the quality management system, the steps are: a). Audit quality management system improvement.
our quality management system at planned intervals by conduct
internal quality management system audits at planned intervals Organization Roles
with find out if our organization’s quality management system A new wording is produced the top management shall ensure
meets requirements, and examine the effectiveness of our that process interact with each other instead of only established
organization’s quality management system; b). Develop an internal implanted and maintained. This comes from the new process
audit program for our organization by plan the development of our approach. In the practice the organization will have to prove that
internal audit program with develop a program that can find out if inputs and outputs of processes are defined, produces in the right
quality management system meets requirements and develop a
moment and delivered to the appropriate process according to
program that can determine if our quality management system is
process flow. Therefore, the organizational role of the quality
effective. And then establish our organization’s internal audit
program by establish internal audit responsibilities, planning management system should be repaired, such as: a). Assign quality
requirements, reporting requirements, schedules, and last must management system roles; and b). Communicate quality
establish internal audit methods. management system roles must also be considerable.

Performance Evaluation Responsibility and Authority


There are three methodologies to evaluate performance of A part of the management responsibility is to appoint an
quality, are: a). monitoring, measurement, analysis and evaluation; authority that will have the task of importing the quality policy and
b). Internal audit; and the last is c). Management reviews. expectations of top management to the organization on one hand,
and to receive feedback regarding the statue and performance of
Management Commitment the quality management system on the other hand. While the ISO
Top management shall provide evidence of its commitment to 9001:2008 requires only that the top management shall assign a
the development and implementation of the quality management representative responsible for the quality management system, the
system and continually improving its effectiveness by: a). ISO 9001:2015 requires that the top management itself shall be
Communicating to the organization the importance of meeting
account for the effectiveness of the quality management system.
customer as well as statuary and regulatory requirement; b).
Establishing the quality policy; c). Conducting management
reviews, and; d). Ensuring the availability of resources. Leadership
Therefore, the management commitment of the QMS should Top management must demonstrate leadership and
be repaired, such as: a). Provides leadership by focusing on quality commitment with respect to the quality management system, by:
and customers; and b). Provides leadership by encouraging a focus a). Ensuring the integration of the quality management system
on customers. requirements into the organization’s business processes; b).
The method to provide leadership by focusing on quality and Promoting awareness of the process approach; c). Supporting other
customers is a). Provide leadership by encouraging a focus on relevant management roles to demonstrate their leadership as it
quality; and b). Provide leadership by encouraging a focus on applies to their areas of responsibility. Top management must
customers. The method to provide leadership by encouraging a demonstrate leadership and commitment with respect to customer
focus on quality is a). Accept responsibility for our quality focus.

7
Organization by ensuring that people are competent; c). Support our quality
Organization provides size, structure, responsibilities and management system by explaining how people can help; d).
accountability, and etc Support our quality management system by managing our
communications; and e). Support our quality management system
Product by controlling documentation information.
Product provides quality, performance, reliability,
Input
maintainability, design technology and innovation, demand, mix,
The organization must plan, implement and control the
packaging, pricing, warranty, support, and etc.
processes needed to meet requirements and to implement the
actions determined in actions to address risk and opportunities by:
Process a). Establishing criteria for those processes; b). Implementing the
Processes provides facility, capability, capacity, technology, control of the processes in accordance with the criteria; c). Keeping
reliability, and quality. sufficient documented information to demonstrate the processes
have been carried out as planned. The organization must control
Workforce planned and review the consequences of unintended changes,
Workforce provides labor availability, competence, mix, taking action to mitigate any adverse effects, are necessary. In
utilization, compensation, health and safety, and etc. addition, the organization must ensure the operation of a function
or process of the organization by an external provider is controlled
Planning (outsourcing).
In order to start planning, we need to determine what our
goals are for and define actions to manage risks and address Process Operation
opportunities, set quality objectives and develop plans to achieve The organization must determine and provide the operational
them, in addition control changes to our QMS. planning process needed for the quality management system by
three step, are: a).Plan the implementation and control of
Resources operational processes; b). Prepare operational process
The organization must determine and provide the resources implementation and control plans; c). Use our plans to implement
needed for the quality management system (establishment, and control operational processes; d). Control planned operational
implementation, maintenance and improvement of the quality process changes and modifications; and the last e). Retain suitable
management system). Resources may include: a). Provide internal operational process documents and records.
and external resources for our quality management system by
determine the resources that our quality management system needs, Output
and provide the resources that our quality management system The organization must determine and provide the release of
needs; b). Provide suitable people for our quality management goods and services needed for the quality management system by
system and our processes by provide the people that our quality three step, are: a).Establish planned arrangements to verify
management system needs to be effective, the step to ensure that is: products at each stage by verify that product requirements were
the first provide the people that we need in order to be sure that our met at appropriate stages; and b). Establish planned arrangements
organization is capable of meeting customer requirement on a to verify services at each stage by verify that service requirements
consistent basis; the second provide the people that we need in were met at appropriate stages.
order to be sure that our organization is capable of meeting all
applicable statutory and regulatory requirements on a consistent Operation
basis. b). Provide the infrastructure that our processes must have by The organization must determine and provide the ideal quality
determine the infrastructure that our processes need with identify operations for the quality management system by three step, are:
the infrastructure that our organization needs in order to support a). Operational planning and control; b). Determination of market
process operations and to achieve conformity of products and needs and interaction with customers; c). Operational planning
services, and the second by providing the infrastructure that our process; d). Control of external provisions of goods and services;
processes need; c). Provide the appropriate environment for our e). Development of goods and services; f). Production of goods and
processes by determine the environment that our processes need provision of services; g). Release of goods and services; and h).
with identify the environment that our organization needs in order Non-conforming goods and services.
to support process operations and to achieve conformity of
products and services, and the second provide the environment that Continual Improvement
our processes need; d). Provide suitable monitoring and measuring The organization must determine and provide continual
resources by determine monitoring and measuring resource improvement needed for the quality management system by four
requirements with identify the monitoring and measuring resources steps, are: a). Consider evaluation, analytical, and management
that we need in order to be sure that we can provide products and review outputs; b). Use outputs to confirm that QMS improvement
services that meet all relevant requirements, and the second by opportunities exist; c). Select methodologies to analyze causes and
determine our measurement traceability requirements with identify support improvement; and the last d). Improve the suitability,
the measurement traceability resources that customers and adequacy, and effectiveness of our QMS (quality management
interested parties expect we to have and identify the measurement system).
traceability resources that governmental agencies expect we to
have; and the last is e). Provide knowledge to facilities process Nonconformity and Corrective Action
operations by determine the knowledge that our organization needs The organization must determine and provide the non-
to have, acquire the knowledge that our organization needs to have, conformity and corrective action needed for the quality
make organizational knowledge available to the extent necessary, management system by two steps, are: a). Determine improvement
monitor relevant trends and changes in knowledge and opportunities and make improvements by consider ways of
information, and the last is maintain the organizational knowledge enhancing customer satisfaction with consider opportunities to
that has been acquired. support innovation, to take corrective action, to transform our
operations, and to make incremental changes. And also meet
Support customer requirements and enhance satisfaction; b). Control non-
Top management must accordance support, such as: a). conformities and take appropriate corrective action by correct non-
Support our quality management system by providing the conformities and address causes and consequences with react to
necessary resources; b). Support our quality management system our organization’s non-conformities, control and correct our non-

8
conformities, evaluate the need to eliminate causes, develop provides checking references, evaluation based interview
corrective actions to address causes, implement corrective actions (behavioral based interview, work interest based interview, work
to address causes, and review the effectiveness of our corrective experience, and skill based interview); and c). Third, select the best
actions. And also, document our non-conformities and the actions person.
that are taken by document our organization’s non-conformities, Developing a talent profile will help us explain the job and
document the actions taken to address non-conformities, and the our organization to applicants for selecting the best people. The
last is document our organization’s corrective action results.
points to consider as we develop our one-page talent profile, are:
a). Don’t delegate this work to someone else; b). Always start by
Improvement
asking ourselves whether this position is really needed. Is there
The organization shall continually improve the effectiveness
of the quality management system through the use of the quality some way to combine tasks or positions in a more effective way,
policy, quality objectives, audit results, analysis of data, corrective and thereby free up financial resources for other uses?; c). Think
and preventive actions and management review. about people who are or have been successful in this particular
role. If possible, talk to them about their work, what they like about
Total Quality Management it and why. Find out what skills they use most. Ask what they look
Total quality management provides management strategy for in their employer and co-workers; d). Consider what type of
which aims to instill awareness of quality in all processes within person will fit into our current work environment; e). Think about
the organization. According to ISO 9001:2015, total quality our personal and team skill gaps.
management adopts a number of indicator management such as Here the steps to identify the expertise, experience, and other
context of the organization, performance evaluation, leadership, qualities we want in team, whether they are permanent employees
planning, support, operation, and improvement of the organization. or temporary resources, are: a). Confirm that the work we’ll assign
to the new employee is critical to achieving the goals of our
Design Tasks Appropriate and Stabilizations organization; b). Define primary roles and responsibilities; c).
Design tasks appropriate and stabilization provides Define the critical skills and characteristics required (basic skills,
management strategy that: a). Design process of analyzing and specific job-related skills, technical skills, interpersonal and
articulating the kind of learning that we expect tile employees to communications skills, personal characteristics and values); d).
know how to perform. b). Decide the dimensions of performance Identify preferred or required previous experience and achievement
(vertical axis) or the essential elements that must be evident in high level.
quality work. c).Decide the levels of employee achievement:
number and type (horizontal axis). Examples of mastery are: Appropriate Performance Measurement
competent, exemplary, proficient, marginal, unacceptable, Appropriate performance measurement provides develop a
accomplished. basic result chain, identify and select performance indicators, set
e). Avoid having too many dimensions of performance or performance targets or benchmarks, draft a performance
levels employee of achievement. Overly Marking Guides complex measurement plan, capture and analyze the performance
reduce the effectiveness and the efficiency of the approach. f). For information, interpret the findings and take corrective action as
each dimension of performance, first distinguish between necessary, and the last is communicate the result.
acceptable and unacceptable (failing) performance: write the All measurement process above also must be considerate by a
criteria for unacceptable performance clearly and unambiguously. good program management process, constructing a basic results
g). For each dimension of performance, write clear performance chain, and matrix for a performance measurement plan.
descriptors (criteria) at each achievement level (see below). State
(if possible) the consequences of performing at each level. For Suggestion Appropriate Work
example, the standard of the work would (or would not) be Suggestion appropriate work provides all suggestion that
accepted by the profession or a business or a professional journal. indicate the cleans work (all material finish as instruction),
h). Add the marking scheme you will use and apply any weighting. assessment and works without breaking or tearing work materials,
Decide if marks will be awarded for work below the minimum tools, or supplies, exhibits appropriate safety behaviors, around
standard. Include the criteria for ‘failure’. i). Evaluate and revise materials, equipment, and supplies, continues working during
accordingly. Few Marking Guides will be constructed perfectly the distractions, works on acquired job/parts of jobs without direct
first time. They are developmental tools and need to be critically supervision, works steadily at assigned job, responds appropriately
evaluated after use. j). Differentiating performance levels. k). to corrections/feedback, and appropriately follows instructions.
Performance criteria (excellent, good, need improvement, and
unacceptable). Standard Operating Procedure
The organization shall continually develop the The SOP development process is an excellent way for
progressiveness of the quality management system through the use managers, workers, and technical advisers to cooperate for
of the domain of designing authentic performance tasks to be use everyone’s benefit. A very positive sense of teamwork arises when
or have been used, activity analysis, learning analysis, subject these parties work together toward common goals. Standard
matter/content analysis, job/procedural analysis, and cognitive task operating procedures used in combination with planned training
analysis, quality performance (achievement levels), dimensions of and regular performance feedback lead to an effective and
performance, criteria describing elements of performance at each motivated workforce. Producing a high-quality product at a profit
level, differentiating performance levels, and performance criteria depends on the consistent operation of all systems within the dairy.
(excellent, good, need improvement, and unacceptable). Standard operating procedure provides design task
appropriate, placement of the right people, appropriate
Placement of the Right People performance measurement, and suggestion appropriate work.
Having and keeping the right people on our team makes all Benefits of SOPs are: a). SOPs will reduce system variation
the difference in running a productive and successful cultural which is the enemy of production efficiency and quality control;
organization. The key factors in making successful hiring b). SOPs can help in conducting performance evaluations, they
(placement) decisions is by a). First, define appropriate skill and provide a common understanding for what needs to be done and
talent profile requirement. b). Second, attract the right people, shared expectations for how tasks are completed; and the last is c).

9
Employee can coach and support each other if there is Performance evaluation, the International Standard for
documentation available on exactly how various tasks must be Quality Management (ISO 9001:2015) measure it by: Monitoring,
done and everyone knows what their co-workers are supposed to measurement, analysis and evaluation; Internal audit; and
be doing. This can also help generate a more cooperative team Management review.
approach to getting all the daily tasks done correctly, everyday; d). Improvement, the International Standard for Quality
SOPs will achieve top performance consistency (answer the Management (ISO 9001:2015) measure it by: Nonconformity and
corrective action; and continual improvement.
business need consistency).

VI. DISCUSSION AND RESULT


V. RESEARCH METHODOLOGY
Sample Characteristics
Research operational framework for this research are below:
Indicator quality performance of total quality management
A. Dependent Variable (TQM) based ISO 900:2015 and appropriate standard operating
procedure approach we used as basis data for our study. An
Dependent variable (Y) of this research is optimization (value
of the firm = maximally profit and organizational satisfaction). objective of risk or uncertainty situation is internal issues and
Optimization = value of the firm = maximally profit and external issues (context). The combination TQM and SOP play an
organizational satisfaction was measured by Martin J & Osborne important role as basis solution of holes problem in high
(2013). managerial performance of optimization (value of the firm =
maximally profit and organization satisfaction) in reviewing
B. Independent Variable control structures, quality structures, and recommending stable
Independent variable (X) of this research is: Total Quality term to control any context uncontrolled risks. Furthermore, the
Management (context of the organization, leadership, planning, combination TQM and SOP model can provide a relatively
support, competence, operation, performance evaluation, and objective, stable, and organizational smart improvement. The
improvement). And variable support is: Standard Operating design of our TQM and SOP is very much take problem road-
Procedure (design task appropriate, placement of the right people, mapping and solution from people, system, supporting facilities,
appropriate performance measurement, and suggestion appropriate technology and error feedback of the organization (company’s
work). upstream till downstream area with in independently assessment).
Context of the organization, the International Standard for
Thus, the TQM and SOP is one of the best moderating strategy in
Quality Management (ISO 9001:2015) measure it by: Context (the
assessing value of the firm or maximally profit and organization
organization must determine external and internal issues relevant to
its purpose), Interest parties (such: a. direct customers; b. end satisfaction (optimization).
users; c. suppliers, distributors, retailers or others involved in the The research found that TQM based on ISO 9001:2015
supply chain; d. regulators; and e. any other relevant interested has 7 indicator analysis with 22 variable substitution analysis will
parties), Scope of Quality Management System (such: physical be good parameter for determine the best performance quality.
location, product and service controlled, determine process Thus with SOP which has 4 indicator analysis by 4 success level
sequences and interactions, methods needed to manage, resources scenario. 7 indicator analysis of TQM is performance evaluation,
needed, process responsibilities and authorized, opportunities to context of organization, leadership, planning, support, operation,
improve process, and improve process based standard). and improvement. The 22 variable substitution analysis of TQM is
Leadership, the International Standard for Quality analysis and evaluation, management review, monitoring,
Management (ISO 9001:2015) measure it by: Management measurement, internal audit, context, interest parties, scope of
commitment, Policy, Organizational roles, responsibility and quality management system, management commitment, policy,
authority.
organization rules, responsibility and authority, organization,
Planning, the International Standard for Quality Management
product, process, workforce, resource, input, process, output,
(ISO 9001:2015) measure it by: Actions to address risks and
opportunities;Objectives and plans to achieve them (such: a. continual improvement, nonconformity and corrective action. Thus
Markets: share and growth, customer base and diversification, with 4 indicator analysis of SOP and scenario, are: design task
competitor information, pricing, sales, and etc; b. Organization: stabilizations, placement of the right people, appropriate
size, structure, responsibilities and accountability, and etc; c. performance measurement, and suggestion appropriate work.
Product: quality, performance, reliability, maintainability, design
technology and innovation, demand, mix, packaging, pricing, Table 1. Demographic Characteristic
warranty, support, and etc; d. Processes: facility, capability, A Case Understanding Frequency Percentage
capacity, technology, reliability, and quality; e. Supplier Focus Here 1: Performance
management: quality, delivery, price, consistency, and flexibility; - -
Evaluation
f. Workforce: labor availability, competence, mix, utilization, Focus Here 2: Context of
- -
compensation, health and safety, and etc; g. Capital: sourcing, Organization
availability, cost, prioritization of use, return, and etc; h. Other: Focus Here 3: Leadership - -
environment, regulatory issues, governmental policies, Focus Here 4: Planning - -
communications, and etc), and Planning of changes (such: consider
Focus Here 5: Support - -
the purpose of the changes we intend to make, consider
responsibilities and authorities whenever we make changes; and Focus Here 6: Operation - -
consider the consequences that changes could potentially produce). Focus Here 7: Improvement - -
Support, the International Standard for Quality Management B Measurement and Measures
(ISO 9001:2015) measure it by: Resources; Competence; - -
Design Task Stabilizations
Awareness; Communication; and Documented information.
Placement of The Right People - -
Operation, the International Standard for Quality Management
(ISO 9001:2015) measure it by: Operational planning and control; Appropriate Performance
- -
Measurement
Determination of market needs and interaction with customers;
Suggestion Appropriate Work - -
Control of external provisions of goods and services; Development
of goods and services; Production of goods and provision of
services; Release of goods and services; and Non-conforming
goods and services.

10
Table 1 indicates that there are 7 superior element analysis very competitor information, pricing, sales, and etc; organization: size,
probable to change ‘quality performance3’ of the organization structure, responsibilities and accountability, and etc; product:
(company), based current study literature analysis. The mean quality, performance, reliability, maintainability, design
design task stabilizations (or appropriate design task), placement of technology and innovation, demand, mix, packaging, pricing,
the right people, appropriate performance measurement, and warranty, support, and etc; processes: facility, capability, capacity,
suggestion appropriate work in measurement and measures is technology, reliability, and quality; supplier management: quality,
moderating and advance step to manage the powerful output from delivery, price, consistency, and flexibility; workforce: labor
TQM that 7 element above (performance evaluation, context of availability, competence, mix, utilization, compensation, health
organization, and etc) to create more excellence output of and safety, and etc; capital: sourcing, availability, cost,
optimization (value of the firm = maximally profit and prioritization of use, return, and etc; other: environment, regulatory
organization satisfaction) in the organization. issues, governmental policies, communications, and etc. Fifth is
support that focus on resources, competence, awareness,
Structural Equation Modelling communication, and documented information. Sixth is operating
The structural equation modelling of this research is used that focus on operational planning and control, determination of
TQM and SOP was used to test optimization (value of the firm = market needs and interaction with customers, control of external
maximally profit and organization satisfaction) hypotheses provisions of goods and services, development of goods and
proposed in the model. services, production of goods and provision of services, release of
Table 2. Critical Weights of Variables goods and services, and nonconforming goods and services. And
Dependent
Independent Variable
Hypothesize the last (seventh) is improvement that focus on nonconformity and
Variable Sign corrective action, and continual improvement.
Optimization Performance Evaluation + I think enough, we close case for discussing quality
(value of the
Context of Organization + management (TQM). We upgrade into advance level (SOP) that
firm =
maximally Leadership + maintaining that quality performance into sustainability process
profit and
Planning + and progress.
organization I (researcher) believe that to establish a good quality
satisfaction) Support +
management system is always based on the SOP. Well-instruction
Operation + of standard operating procedures (SOPs) provide direction,
Improvement + improve communication, reduce training time, and improve work
Design Task Stabilizations + consistency. The SOP development process is an excellent way for
managers, workers, and technical advisers to cooperate for
Placement of The Right People +
everyone’s benefit. A very positive sense of teamwork arises when
Appropriate Performance + these parties work together toward common goals. Managers who
Measurement
Suggestion Appropriate Work + enlist the talents of workers and technical advisers will increase
buy-in and produce better SOPs. That’s statement answer question
why a good SOPs is very control in routine successfully activities.
In this research, I (researcher) analyze that critical dimensions Managers who write procedures without input from workers or
to build core management framework for optimization of the technical advisers run the risk of upsetting workers and producing
company or organization is to build an appropriate of total quality a poorly written SOP. Answers this case, I (researcher) give our
management (TQM) and standard operating procedure (SOP). And structural idea and recommendation below:
if there is question how about creating optimization its self?
Answers: optimization (value of the firm = maximally profit and
organization satisfaction) is just consequences of excellence
performance of TQM and SOP in an organization or company.
When TQM and SOP walk in a good progresses, surely the final
numbers of optimization (value of the firm = maximally profit and
organization satisfaction) is positive (high/ mostly achieved).
As the design created, to maintain best quality performance
and excellence people is; firstly, performance evaluation, that focus
on monitoring, measurement, analysis and evaluation, internal
audit, and management review. Secondly, context of organization
that focus on organizational context (the organization must
determine external and internal issues relevant to its purpose),
interest parties (such: a. direct customers; b. end users; c. suppliers,
distributors, retailers or others involved in the supply chain; d.
regulators; and e. any other relevant interested parties), scope of
quality management system (such: physical location, product and
service controlled, determine process sequences and interactions,
methods needed to manage, resources needed, process
responsibilities and authorized, opportunities to improve process,
and improve process based standard). Thirdly, leadership that focus
on management commitment, policy, organizational roles,
responsibility and authority. Fourth, planning that focus on
markets: share and growth, customer base and diversification,

3
Quality performance referee to creating the best quality management or
excellence management

11
Scenario of Productive SOPs for Organization

ORGANIZATIONAL ORGANIZATIONALISM PRIDE IN THE


ACHIEVEMENT
ROLE OF
ORIENTATION
PARTICIPATION

Performance
Evaluation

Context of (1). Design tasks appropriate


Organization

Leadership (2). Placement of the right people


Planning PRODUCTI-
VITY
Support
SOPs (3). Appropriate performance
measurement
Operation
(4). Suggestions appropriate work
Improvement

Figure 2.
Framework and Architecture of Scenario on Productive SOPs
for Organization

The organization shall continually develop the Think about our personal and team skill gaps. Here the steps to
progressiveness of the quality management system through the use identify the expertise, experience, and other qualities we want in
of the domain of designing authentic performance tasks to be use team, whether they are permanent employees or temporary
or have been used, activity analysis, learning analysis, subject resources, are: a). Confirm that the work wel assign to the new
matter/content analysis, job/procedural analysis, and cognitive task employee is critical to achieving the goals of our organization; b).
analysis, quality performance (achievement levels), dimensions of Define primary roles and responsibilities; c). Define the critical
performance, criteria describing elements of performance at each skills and characteristics required (basic skills, specific job-related
level, differentiating performance levels, and performance criteria skills, technical skills, interpersonal and communications skills,
(excellent, good, need improvement, and unacceptable). personal characteristics and values); d). Identify preferred or
As we know above (design productive flow and scenario), to required previous experience and achievement level. Thirdly,
maintain best flexible SOP for sustainability in excellency appropriate performance measurement that must focus on variable
management is; firstly, appropriate design task, that must focus on focus of appropriate performance measurement is develop a basic
design process, dimensions of performance (vertical axis), result chain, identify and select performance indicators, set
employee achievement: number and type (horizontal axis), overly performance targets or benchmarks, draft a performance
marking guides complex reduce the effectiveness and the measurement plan, capture and analyze the performance
efficiency of the approach, write the criteria for unacceptable information, interpret the findings and take corrective action as
performance clearly and unambiguously, write clear performance necessary, and the last is communicate the result. All measurement
descriptors (criteria) at each achievement level (see below), decide process above also must be considerate by a good program
if marks will be awarded for work below the minimum standard; management process, constructing a basic results chain, and matrix
include the criteria for ‘failure’, evaluate and revise accordingly, for a performance measurement plan. Fourth (the last), suggestion
differentiating performance levels, and performance criteria appropriate work that must focus on variable focus of suggestion
(excellent, good, need improvement, and unacceptable). Secondly, appropriate work is work provides all suggestion that indicate the
placement of the right people that must focus on variable focus of cleans work (all material finish as instruction), assessment and
placement of the right people is define appropriate skill and talent works without breaking or tearing work materials, tools, or
profile requirement, give attract the right people, provides checking supplies, exhibits appropriate safety behaviors, around materials,
references, evaluation based interview (behavioral based interview, equipment, and supplies, continues working during distractions,
work interest based interview, work experience, and skill based works on acquired job/parts of jobs without direct supervision,
interview), and select the best person. Developing a talent profile works steadily at assigned job, responds appropriately to
will help us explain the job and our organization to applicants for corrections/feedback, and appropriately follows instructions.
selecting the best people. The points to consider as we develop our By those consideration above, here we build a special concept
one-page talent profile, are: a). delegate this work to someone else; and scenario producing appropriate productivity based smart
b). Always start by asking ourselves whether this position is really indicator of people, process, product, and productivity it selves:
needed. Is there some way to combine tasks or positions in a more
effective way, and thereby free up financial resources for other
uses?; c). Think about people who are or have been successful in
this particular role. If possible, talk to them about their work, what
they like about it and why. Find out what skills they use most. Ask
what they look for in their employer and co-workers; d). Consider
what type of person will fit into our current work environment; e).

12
Chain Scenario of Producing Appropriate Productivity Based Smart Indicator of People, Process, Product, and Productivity It Self

PEOPLE

(Is responsible for: Skill, Experience,


Knowledge, Attitude, And Ability)

PRODUCT

PRODUCTIVITY (Is responsible for: Right On


Quality, Right On Quantity, Right
(Is responsible for: Efficient, Effective, On Price, Right On Place, And
Satisfaction, Sustainability Progress) Right On Time)

PROCESS

(Is responsible for: SOPs, Task


Design, Supporting Facilities, and
Technology)

Figure 3. Chain Scenario of Productivity and Excellence Performance

Organization must analyze and evaluate generate relevant buy-in and produce better SOPs. That’s statement answer question
outputs to show that performance requirements are being met. why a good SOPs is very control in routine successfully activities.
Internal and external resources must provide suitable people to be Managers who write procedures without input from workers or
effective. Therefore why we need a right people, a right technical advisers run the risk of upsetting workers and producing
capabilities, a right time, price, place, and a right quantity. To a poorly written SOP.
provide the people that we need are capable, we need to be sure The organization shall continually develop the
progressiveness of the quality management system through the use
(confirmatory) too that our organization is capable of meeting all
of the domain of designing authentic performance tasks to be use
applicable statutory and regulatory requirements on a consistent
or have been used, activity analysis, learning analysis, subject
basis. Why we must detail in first analysis, because concept of matter/content analysis, job/procedural analysis, and cognitive task
quality is revolution. Management frame is must meet 'quality analysis, quality performance (achievement levels), dimensions of
criteria'. When we brought huge teams on specific stages, all must performance, criteria describing elements of performance at each
necessarily complete. Therefore why organization (company) must level, differentiating performance levels, and performance criteria
oversee the quality of performance and rectifying of errors (to (excellent, good, need improvement, and unacceptable).
'catch' defects) and any deviation of management system that must To maintain best quality performance, management must
be analyzed and corrected. consider performance evaluation-by monitoring, measurement,
VII. SUMMARY, CONTRIBUTION AND analysis and evaluation, internal audit, and management review.
LIMITATION
Secondly, context of organization by determine external and
This study literature examined empirically correlation internal issues relevant to its purpose, consider of interest parties
between performance evaluation, context of organization, (such: a. direct customers; b. end users; c. suppliers, distributors,
leadership, planning, support, operation, improvement, and design retailers or others involved in the supply chain; d. regulators; and e.
task stabilizations, placement of the right people, appropriate any other relevant interested parties), scope of quality management
performance measurement, suggestion appropriate work to build system (such: physical location, product and service controlled,
optimal output in number of optimization (value of the firm = determine process sequences and interactions, methods needed to
maximally profit and organization satisfaction). Other factors that manage, resources needed, process responsibilities and authorized,
influenced the level of excellence management performance and opportunities to improve process, and improve process based
optimization were also examined. Normatively, we take 11 standard). Thirdly, leadership by management commitment, policy,
indicators that examined and give respond to our quality organizational roles, responsibility and authority. Fourth, planning
organizational performance. 11 indicators is taken 7 on TQM and 4 by markets: share and growth, customer base and diversification,
for moderating strategy on SOP. And the result of this research is competitor information, pricing, sales, and etc; organization: size,
all variable in quality management (TQM) and give significantly structure, responsibilities and accountability, and etc; product:
influence for the company or organization in case of value of the quality, performance, reliability, maintainability, design
firm or maximally profit and organization satisfaction or technology and innovation, demand, mix, packaging, pricing,
optimization output number. Another factor that emerged as salient warranty, support, and etc; processes: facility, capability, capacity,
was report format. technology, reliability, and quality; supplier management: quality,
This should really come as no surprise, for it is well in-line delivery, price, consistency, and flexibility; workforce: labor
with many other studies that have shown the importance of quality availability, competence, mix, utilization, compensation, health
activities (TQM element) is must to maintain with an ideal and and safety, and etc; capital: sourcing, availability, cost,
flexible SOP to achieve maximally performance of optimization. I prioritization of use, return, and etc; other: environment, regulatory
(researcher) note that to establish a good quality management issues, governmental policies, communications, and etc. Fifth is
system is always based on the SOP. Well-instruction of standard support by resources, competence, awareness, communication, and
operating procedures (SOPs) provide direction, improve documented information. Sixth is operating that focus on
communication, reduce training time, and improve work operational planning and control, determination of market needs
consistency. The SOP development process is an excellent way for and interaction with customers, control of external provisions of
managers, workers, and technical advisers to cooperate for goods and services, development of goods and services, production
everyone’s benefit. A very positive sense of teamwork arises when of goods and provision of services, release of goods and services,
these parties work together toward common goals. Managers who and nonconforming goods and services. And the last (seventh) is
enlist the talents of workers and technical advisers will increase improvement by nonconformity and corrective action, and

13
continual improvement. Organization must analyze and evaluate works on acquired job/parts of jobs without direct supervision,
generate relevant outputs to show that performance requirements works steadily at assigned job, responds appropriately to
are being met. Internal and external resources must provide corrections/feedback, and appropriately follows instructions.
suitable people to be effective. Therefore why we need a right There are some limitations that should be highlighted when
people, a right capabilities, a right time, price, place, and a right interpreting the study’s results. First, this research is based on
quantity. To provide the people that we need are capable, we need literature study that no exactly tested significantly in practice level.
to be sure (confirmatory) too that our organization is capable of Second, there are some issues of structural equation modeling
meeting all applicable statutory and regulatory requirements on a design.
consistent basis. Why we must detail in first analysis, because To our knowledge, this study is the first to explicitly consider
concept of quality is revolution. Management frame is must meet the link between performance evaluation, context of organization,
'quality criteria'. When we brought huge teams on specific stages, leadership, planning, support, operation, improvement (TQM
all must necessarily complete. Therefore why organization element), and SOP element that design task stabilizations,
(company) must oversee the quality of performance and rectifying placement of the right people, appropriate performance
of errors (to 'catch' defects) and any deviation of management measurement, suggestion appropriate work to build optimal output
system that must be analyzed and corrected. in number of optimization (value of the firm = maximally profit
For managers, this study also points to a number of initiatives and organization satisfaction). Previous studies much considered
they might undertake to create a good and appropriate SOP, by; just into TQM or just into optimization. There is no research that
firstly, appropriate design task, that must focus on design process, focusing optimization by good TQM and combination of SOP
dimensions of performance (vertical axis), employee achievement: model approach. I think it is very good and we hope will give
number and type (horizontal axis), overly marking guides complex much benefit for the organization, company, or any other element
reduce the effectiveness and the efficiency of the approach, write stakeholders.
the criteria for unacceptable performance clearly and
unambiguously, write clear performance descriptors (criteria) at REFERENCES
each achievement level (see below), decide if marks will be
(Book style)
awarded for work below the minimum standard; include the
criteria for ‘failure’, evaluate and revise accordingly, [1] Pyzdek, T. The Handbook for Quality Management: Management
differentiating performance levels, and performance criteria Styles, 2nd edition. McGraw-Hill Publishing Company Limited, 2004.
(excellent, good, need improvement, and unacceptable). Secondly, [2] Heizer, Jay. Render, Barry. Operation Management, 7th edition. New
placement of the right people that must focus on variable focus of Jersey: Pearson Prentice Hall, 2006.
placement of the right people is define appropriate skill and talent [3] Salvatoe, Dominic. Managerial Economic in Global Economics.
profile requirement, give attract the right people, provides checking Singapore: Cengage Learning, 2005.
references, evaluation based interview (behavioral based interview, [4] Sekaran, Uma. Research Methods for Business. New Jersey: John
Willey & Son Inc, 2007.
work interest based interview, work experience, and skill based
[5] Sequence and Interaction of QMS Processes, ISO9001 (2013).
interview), and select the best person. Developing a talent profile [6] ISO 9001:2015, Revision Overview, December 2013, ISO/TC 176/SC
will help us explain the job and our organization to applicants for 2/WG23 N063.
selecting the best people. The points to consider as we develop our [7] IAF Informative Document, Transition Planning Guidance for ISO
one-page talent profile, are: a). delegate this work to someone else; 9001:2015, Issue 1, IAF ID 9:2015, International Accreditation
b). Always start by asking ourselves whether this position is really Forum, Inc.
needed. Is there some way to combine tasks or positions in a more [8] Burt Holm, ISO 9001:2015 Draft International Standard Overview, A
effective way, and thereby free up financial resources for other Survey of Proposed Changes to ISO 9001:2008, Business Assurance,
Northern District Sales Manager.
uses?; c). Think about people who are or have been successful in
[9] Performance Measurement Framework for The Canadian
this particular role. If possible, talk to them about their work, what Transportation Agency. (2010).
they like about it and why. Find out what skills they use most. Ask [10] ISO 9001 for Small Business, What to do Advice from ISO/TC 176.
what they look for in their employer and coworkers; d). Consider [11] Quality Management Principles. ISO9000 Series are Based.
what type of person will fit into our current work environment; e). [12] Developing Appropriate Assessment Tasks, Curtin Teaching and
Think about our personal and team skill gaps. Here the steps to Learning, 2010. PP.22-46. Curtin University: Perth.
identify the expertise, experience, and other qualities we want in [13] Jonassen. David. H., Tessmer Martin, Hannum Wallace. Task
team, whether they are permanent employees or temporary Analysis Methods for Instructional Design. Lawrence Erlbaum
Associates, Publishers. Mathwah, New Jersey (1999).
resources, are: a). Confirm that the work well assign to the new
employee is critical to achieving the goals of our organization; b). (Published Conference Proceedings style)
Define primary roles and responsibilities; c). Define the critical
skills and characteristics required (basic skills, specific job related [14] Sudha. T. Total Quality Management in Higher Education
skills, technical skills, interpersonal and communications skills, Institutions. Amjad Ali Khan College of Business Administration,
personal characteristics and values); d). Identify preferred or Mount Pleasant, Road No. 3. Banjara Hills, Hyderabad- 34.
required previous experience and achievement level. Thirdly, International Journal of Social Science & Interdisciplinary Research.
appropriate performance measurement that must focus on variable IJSSIR, Vol. 2 (6), JUNE (2013).
[15] Ali. S., Green. P. Effective IT Governance Mechanisms in Public
focus of appropriate performance measurement is develop a basic
Sectors: An Australian Context. International Journal of Global
result chain, identify and select performance indicators, set Informational Management, Vol. 15, Issue 4, 41-63 (2007).
performance targets or benchmarks, draft a performance [16] Psychogios. G. Alexandros. Understanding Total Quality
measurement plan, capture and analyze the performance Management in Context: Qualitative Research on Managers
information, interpret the findings and take corrective action as Awareness of TQM Aspects in the Greek Service Industry. The
necessary, and the last is communicate the result. All measurement Qualitative Report. Vol. 12 Number 1 March 2007 40-66.
process above also must be considerate by a good program [17] G. Monks, Theory and Problems of Operations Management, Tata
management process, constructing a basic results chain, and matrix McGraw-Hill Publishing Company Limited, 2nd Edition, 2004.
[18] Reid, R.D. & Sanders, R. Operations Management: An Integrated
for a performance measurement plan. Fourth (the last), suggestion
Approach, 4th edition, International Student Version. USA: Wiley,
appropriate work that must focus on variable focus of suggestion 2010.
appropriate work is work provides all suggestion that indicate the [19] Top 25 Hottest Articles. 2007. Top 25 Hottest Articles published in
cleans work (all material finish as instruction), assessment and the Journal of Operations Management. [Online] Available at:
works without breaking or tearing work materials, tools, or www.top25.sciencedirect.com. Accessed: 8 July 2010.
supplies, exhibits appropriate safety behaviors, around materials,
equipment, and supplies, continues working during distractions,

14
[20] http://businesscasestudies.co.uk/first-direct/using-customer-service- All Authors Biographies
to-position-a-business/what-is-customer-service.html#ixzz3j4bkAghJ First Author
(accessed August 2015) Bahrul Fauzi Rosyidi, Born in Banyuwangi, East
[21] http://www.quickmba.com/strategy/competitive-advantage/ (accessed Java, Indonesia at February, 27 1988.
August 2015) He is a lecturer of Applied Financial Management
[22] http://www.pnas.org/content/75/12/6026.full.pdf (accessed August Department, Vocational School of Universitas
2015) Gadjah Mada, and researcher assistant at CEPPS
[23] http://tutor2u.net/business/strategy/competitive_advantage.htm (Centre of Economic and Public Policy Study)
(accessed August 2015) Universitas Gadjah Mada Yogyakarta Indonesia.
[24] http://www.projectperfect.com.au/info_project_quality_planning.php He is also a productive writer of
(accessed August 2015) business/economic and motivational books.
[25] http://sorrel.humboldt.edu/~economic/econ104/marginal/(accessed
August 2015) Researchs, a.l:
[26] http://www.engineerlive.com/Process- a). Medium Term Development Plan for Ngawi Regency, East Java,
Engineer/Plant_Management/Advanced_solutions_key_to_creating_c Indonesia (2015); b). Regional Financial Road-mapping for Daerah
Author’s formal
ompetitive_advantage/21641/ (accessed August 2015) Istimewa Yogyakarta, Indonesia (2015); c). Vehicle Tax Potential Road-
photo
[27] http://www.biz-development.com/SupplyChain/6.2.Sustainable- mapping for Daerah Istimewa Yogyakarta, Indonesia (2015); d).
Competitive-Advantage.htm (accessed August 2015) Locally-generated revenue Road-mapping for Daerah Istimewa
[28] http://www.columbia.edu/~dj114/djbio.htm (accessed August 2015) Yogyakarta, Indonesia (2015); e). Medium Term Development Plan for
[29] http://docs.google.com/viewer?a=v&q=cache:x5frSur2aK0J:www.out Indragiri Hilir Regency, Riau, Indonesia (2013); f). Analysis of ICOR
.ac.tz/current/announcements/COURSE%2520OUTLINES/year%252 (Incremental Capital Output Ratio) Model for Economic Planning for
0one/managecon.pdf+managerial+economic+various+optimization+t Ngawi Regency, Indonesia (2014); g). Analysis of ILOR (Incremental
echniques+and+new+management+tools&hl=id&gl=id&pid=bl&srci Labour Output Ratio) Model for Economic Planning for Ngawi
d=ADGEESgR7Uw5Cpi0IjK3e3fM- Regency, Indonesia (2014); h). Business Plan of Cassava, Kutai
eAuQ8LHCDjeYpvNAQWVy18SdU9QCKXLTmIo2f02V6QLEupK Kartanagera Regency Case Study, East Kalimantan, Indonesia (2013);
EHXdGh1N_CEeou2rMuEeuhbwiKDwj47Uq2LaTYiwuv_kGGaIcH i). Structuring and Empowerment of Small Business Community in
lVX1l5eJsrbPQoRCb- Tenggarong City, Kutai Kartanegara, East Kalimantan, Indonesia
&sig=AHIEtbQDVutq7QWTUBYYez9dWfvJnFF1Cg (accessed (2013); j). Feasibility Analysis of Ampera Market, Merauke, Irian Jaya,
August 2015) Indonesia (2012); k). Workload Analysis Study and Research for Ngada
[30] http://www.taskmanagementsoft.com/solutions/articles/problems-and- Government, Flores, Nusa Tenggara Barat, Indonesia (2011); and l).
advantages-total-quality-management.php (accessed August 2015) Work Valuation and Evaluation of BP Migas, Recommendation for
Ministry of Energy and Mineral Resources (ESDM), Whitehouse, and
President of Republic Indonesia (2010).

Second Author
Mohammad Halimi,
Research, a.l:
a). Analysis of Attitude, Subjective Norm,
Behavioral Control and Consumer Interests
Buying at KFC Yogyakarta (2015); b).
Problem Identification and Solution for SME
in Yogyakarta (2014); c). Business Plan
Training and Implementation for Youth
Groups Mororejo and Sumber Rejo Village as
Candidate Future Indonesian Young
Entrepreneurship (2013); d). Public Perception of SWA Magazine
(2013); and e). Optimization of Ceramics Production Enterprises in
Bantul (2012).
Author’s formal
photo
Third Author
Sufitri
Research a.l:
a). Business Plan Salak Pondoh to Maximize
Profit for Farmers and Manufacturer in Sleman,
Yogyakarta, Indonesia (2014); b). Efficiency
Products Salak Pondoh (Export Quality) for
Author’s formal
Sleman Regency, Yogyakarta (2014); c).
photo Bankruptcy Prediction PT Bank Century Tbk
(2013); d). Feasibility Analysis for UPT Maguwo
Harjo, Sleman Regency, Yogyakarta (2013); e).
Potential Development of UPT Kuliner Condong Catur, Sleman
Regency, Yogyakarta (2012).

15

You might also like