Professional Documents
Culture Documents
WIND LOADING
In accordance with ASCE7-10
Using the directional design method
Tedds calculation version 2.1.00
30.9 ft
23.7 ft
4 0.9 ft 30.9 ft
Plan Elevation
Building data
Type of roof; Gable
Length of building; b = 40.88 ft
Width of building; d = 30.88 ft
Height to eaves; H = 16.00 ft
Pitch of roof; 0 = 26.6 deg
Mean height; h = 19.86 ft
General wind load requirements
Basic wind speed; V = 115.0 mph
Risk category; I
Velocity pressure exponent coef (Table 26.6-1); Kd = 0.85
Exposure category (cl 26.7.3); B
Enclosure classification (cl.26.10); Enclosed buildings
Internal pressure coef +ve (Table 26.11-1); GCpi_p = 0.18
Internal pressure coef –ve (Table 26.11-1); GCpi_n = -0.18
Gust effect factor; Gf = 0.85
Topography
Topography factor not significant; Kzt = 1.0
Velocity pressure equation; q = 0.00256 Kz Kzt Kd V2 1psf/mph2;
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (-ve) 19.86 -0.32 17.80 -8.00 705.46 -5.65
B (-ve) 19.86 -0.60 17.80 -12.28 705.46 -8.67
Total vertical net force; Fw,v = -12.80 kips
Total horizontal net force; Fw,h = 1.35 kips
Walls load case 1 - Wind 0, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A1 11.00 0.80 16.40 7.95 449.63 3.57
A2 16.00 0.80 16.69 8.15 0.00 0.00
B 19.86 -0.50 17.80 -10.77 654.00 -7.04
C 19.86 -0.70 17.80 -13.80 613.13 -8.46
D 19.86 -0.70 17.80 -13.80 613.13 -8.46
Overall loading
Projected vertical plan area of wall; Avert_w_0 = b H = 654.00 ft2
Projected vertical area of roof; Avert_r_0 = b d/2 tan(0) = 315.43 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 12.99 kips
Leeward net force; Fl = Fw,wB = -7.0 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 = 3.6 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 13.0 kips
Roof load case 2 - Wind 0, GCpi -0.18, -0cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (+ve) 19.86 0.16 17.80 5.63 705.46 3.97
B (+ve) 19.86 -0.60 17.80 -5.87 705.46 -4.14
Total vertical net force; Fw,v = -0.15 kips
Total horizontal net force; Fw,h = 3.63 kips
Project Job Ref.
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A1 11.00 0.80 16.40 14.36 449.63 6.46
A2 16.00 0.80 16.69 14.55 0.00 0.00
B 19.86 -0.50 17.80 -4.36 654.00 -2.85
C 19.86 -0.70 17.80 -7.39 613.13 -4.53
D 19.86 -0.70 17.80 -7.39 613.13 -4.53
Overall loading
Projected vertical plan area of wall; Avert_w_0 = b H = 654.00 ft2
Projected vertical area of roof; Avert_r_0 = b d/2 tan(0) = 315.43 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 12.99 kips
Leeward net force; Fl = Fw,wB = -2.9 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 = 6.5 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 13.0 kips
Roof load case 3 - Wind 90, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (-ve) 19.86 -0.90 17.80 -16.82 342.74 -5.77
B (-ve) 19.86 -0.90 17.80 -16.82 342.74 -5.77
C (-ve) 19.86 -0.50 17.80 -10.77 685.47 -7.38
D (-ve) 19.86 -0.30 17.80 -7.74 39.97 -0.31
Total vertical net force; Fw,v = -17.19 kips
Total horizontal net force; Fw,h = 0.00 kips
Walls load case 3 - Wind 90, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A1 11.00 0.80 16.40 7.95 339.63 2.70
A2 11.00 0.80 16.40 7.95 0.00 0.00
A3 23.72 0.80 18.70 9.51 0.00 0.00
B 19.86 -0.44 17.80 -9.79 613.13 -6.00
C 19.86 -0.70 17.80 -13.80 654.00 -9.02
D 19.86 -0.70 17.80 -13.80 654.00 -9.02
Overall loading
Projected vertical plan area of wall; Avert_w_90 = d H + d2 tan(0) / 4 = 613.13 ft2
Projected vertical area of roof; Avert_r_90 = 0.00 ft2
Project Job Ref.
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_90 + pmin_r Avert_r_90 = 9.81 kips
Leeward net force; Fl = Fw,wB = -6.0 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 2.7 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 9.8 kips
Roof load case 4 - Wind 90, GCpi -0.18, +cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (+ve) 19.86 -0.18 17.80 0.48 342.74 0.16
B (+ve) 19.86 -0.18 17.80 0.48 342.74 0.16
C (+ve) 19.86 -0.18 17.80 0.48 685.47 0.33
D (+ve) 19.86 -0.18 17.80 0.48 39.97 0.02
Total vertical net force; Fw,v = 0.61 kips
Total horizontal net force; Fw,h = 0.00 kips
Walls load case 4 - Wind 90, GCpi -0.18, +cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A1 11.00 0.80 16.40 14.36 339.63 4.88
A2 11.00 0.80 16.40 14.36 0.00 0.00
A3 23.72 0.80 18.70 15.92 0.00 0.00
B 19.86 -0.44 17.80 -3.38 613.13 -2.07
C 19.86 -0.70 17.80 -7.39 654.00 -4.83
D 19.86 -0.70 17.80 -7.39 654.00 -4.83
Overall loading
Projected vertical plan area of wall; Avert_w_90 = d H + d2 tan(0) / 4 = 613.13 ft2
Projected vertical area of roof; Avert_r_90 = 0.00 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_90 + pmin_r Avert_r_90 = 9.81 kips
Leeward net force; Fl = Fw,wB = -2.1 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 4.9 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 9.8 kips
Roof load case 5 - Wind 0, GCpi -0.18, - cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (-ve) 19.86 -0.32 17.80 -1.59 705.46 -1.12
B (-ve) 19.86 -0.60 17.80 -5.87 705.46 -4.14
Total vertical net force; Fw,v = -4.71 kips
Total horizontal net force; Fw,h = 1.35 kips
Project Job Ref.
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A1 11.00 0.80 16.40 14.36 449.63 6.46
A2 16.00 0.80 16.69 14.55 0.00 0.00
B 19.86 -0.50 17.80 -4.36 654.00 -2.85
C 19.86 -0.70 17.80 -7.39 613.13 -4.53
D 19.86 -0.70 17.80 -7.39 613.13 -4.53
Overall loading
Projected vertical plan area of wall; Avert_w_0 = b H = 654.00 ft2
Projected vertical area of roof; Avert_r_0 = b d/2 tan(0) = 315.43 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 12.99 kips
Leeward net force; Fl = Fw,wB = -2.9 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 = 6.5 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 13.0 kips
Roof load case 6 - Wind 0, GCpi 0.18, + cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (+ve) 19.86 0.16 17.80 -0.77 705.46 -0.55
B (+ve) 19.86 -0.60 17.80 -12.28 705.46 -8.67
Total vertical net force; Fw,v = -8.24 kips
Total horizontal net force; Fw,h = 3.63 kips
Walls load case 6 - Wind 0, GCpi 0.18, + cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A1 11.00 0.80 16.40 7.95 449.63 3.57
A2 16.00 0.80 16.69 8.15 0.00 0.00
B 19.86 -0.50 17.80 -10.77 654.00 -7.04
C 19.86 -0.70 17.80 -13.80 613.13 -8.46
D 19.86 -0.70 17.80 -13.80 613.13 -8.46
Overall loading
Projected vertical plan area of wall; Avert_w_0 = b H = 654.00 ft2
Projected vertical area of roof; Avert_r_0 = b d/2 tan(0) = 315.43 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 12.99 kips
Leeward net force; Fl = Fw,wB = -7.0 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 = 3.6 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 14.2 kips
Project Job Ref.
40.9 ft
15.4 ft
B
30.9 ft
15.4 ft
Wind - 0o
A2
16 ft
A1
40.9 ft
Windward face
16 ft
16 ft
C B
30.9 ft 40.9 ft
Side face Leeward face
Project Job Ref.
40.9 ft
30.9 ft
Wind - 90o
A B C D
1.2 ft
Plan view - Gable roof
A32
16 ft
A1
30.9 ft
Windward face
16 ft
16 ft
C B
40.9 ft 30.9 ft
Side face Leeward face