You are on page 1of 19

0000-f175-168d-1568-52c.

txt

DECADE ETO PENMAN-MONTEITH DATA


(File: C:\Users\My Portege\Documents\TID\sidoarjo.PEC)
Country: Indonesia
Altitude: 3 m. Station: Meteorologi Juanda
Latitude: 7.38 癝 Longitude: 112.70 癊
Min Temp Max Temp Humidity Wind Sun Rad ETo
Month/Dec 癈 癈 % m/s hours MJ/m?day mm/day

Jan 1
2 24.5 32.8 78 1.6 4.8 17.1 4.15
3 24.8 32.1 82 1.5 4.3 16.4 3.85
Month 23.7 32.1 84 1.7 5.0 17.6 4.00
24.3 32.3 81 1.6 4.7 17.0 4.00
Feb 1
2 24.0 31.8 84 1.3 6.0 19.2 4.21
3 24.2 32.1 84 1.4 6.3 19.7 4.33
Month 24.5 32.4 82 1.7 6.6 20.2 4.54
24.2 32.1 83 1.5 6.3 19.7 4.36
Mar 1
2 23.9 31.4 85 1.7 4.4 16.6 3.75
3 24.7 31.8 82 1.5 4.3 16.2 3.78
Month 25.2 32.6 80 1.2 6.8 19.8 4.42
24.6 31.9 82 1.5 5.2 17.6 3.98
Apr 1
2 25.4 32.1 82 1.2 6.7 19.2 4.23
3 25.0 32.1 83 1.3 5.9 17.6 3.90
Month 25.3 31.6 84 1.3 3.8 14.0 3.24
25.2 31.9 83 1.3 5.5 17.0 3.79
May 1
2 24.6 31.1 80 1.3 6.1 16.9 3.71
3 25.2 31.7 74 1.9 9.2 20.7 4.65
Month 24.8 31.5 78 1.7 9.2 20.2 4.34
24.9 31.4 77 1.6 8.2 19.2 4.23
Jun 1
2 25.8 32.1 76 1.6 8.0 18.2 4.13
3 22.9 31.3 73 1.5 9.2 19.6 4.18
Month 23.3 31.1 74 1.4 8.8 19.1 4.04
24.0 31.5 74 1.5 8.7 19.0 4.11
Jul 1
2 22.3 30.5 73 1.6 8.3 18.5 3.99
3 24.2 30.8 76 2.7 8.4 18.9 4.39
Month 23.5 31.0 76 2.0 8.4 19.4 4.29
23.3 30.8 75 2.1 8.4 18.9 4.22
Aug 1
2 23.2 30.4 74 2.1 8.1 19.5 4.37
3 23.6 30.8 75 2.3 9.2 21.6 4.78
Month 22.3 31.4 72 1.8 9.5 22.6 4.92
23.0 30.9 74 2.1 8.9 21.2 4.69
Sep 1
2 22.2 31.6 70 1.9 9.5 23.2 5.16
3 22.6 31.8 69 2.1 9.3 23.4 5.36
Month 23.1 32.0 69 2.0 9.1 23.5 5.40
22.6 31.8 69 2.0 9.3 23.4 5.31
第 1
0000-f175-168d-1568-52c.txt
Oct 1 23.9 32.4 69 2.3 9.1 23.8 5.65
2 24.0 33.2 68 2.1 9.3 24.2 5.78
3 24.4 33.5 66 2.1 8.9 23.7 5.81
Month 24.1 33.0 68 2.2 9.1 23.9 5.75
Nov 1 25.9 34.5 68 1.6 8.1 22.4 5.47
2 26.3 34.5 67 1.6 9.2 24.0 5.79
3 26.2 34.5 71 1.4 7.9 21.9 5.25
Month 26.1 34.5 69 1.5 8.4 22.8 5.50
Dec 1 25.7 34.1 77 1.4 6.6 19.9 4.71
2 25.2 32.8 79 1.6 3.4 14.9 3.75
3 25.4 33.2 78 1.5 6.0 18.9 4.46
Month 25.4 33.4 78 1.5 5.3 17.9 4.31
Average 24.3 32.1 76 1.7 7.3 19.8 4.52

12/02/19 7:17:15 AM
Cropwat 8.0 B 鑤 a
第 2 页
0000-eea8-168d-94a0-84a.txt

MONTHLY RAIN DATA


(File: C:\Users\My Portege\Documents\TID\hujan sidoarjo.CRM)
Station: Meteorologi Juanda

Eff. rain method: USDA Soil Conservation Service formula:


Peff = Pmon * (125 - 0.2 * Pmon) / 125 for Pmon <= 250 mm
Peff = 125 + 0.1 * Pmon for Pmon > 250 mm
Eff rain
Rain mm
mm

January
February 13.4 13.1
March 16.1 15.7
April 15.6 15.2
May 7.9 7.8
June 6.1 6.0
July 0.7 0.7
August 0.1 0.1
September 0.6 0.6
October 2.2 2.2
November 1.7 1.7
December 1.8 1.8
4.3 4.3
Total
70.5 69.2

12/02/19 6:27:09 AM
Cropwat 8.0 B 鑤 a
第 1 页
0000-ee51-168d-cda4-122.txt

RICE DATA
(File: C:\ProgramData\CROPWAT\data\crops\KURN-RICE.CRO)
Crop Name:
Rice Transplanting date: 05/03 Harvest: 02/07
Stage initial late
total nursery landprep growth stage

total puddling develop mid

30 20 5 20 30 40 30
Length (days)
150 0.70 0.30 0.50 --> 1.05 0.70
Kc dry

Kc wet
1.20 1.05 1.10 --> 1.20 1.05
Rooting depth (m)
0.10 --> 0.60 0.60
Puddling depth (m) --> 0.20 0.20
Nursery area (%) 0.40
Critical depletion 10
0.20 0.20

Yield response f.
1.09 1.00 1.09 1.09 1.09
Cropheight (m)
1.00

12/02/19 6:22:14 AM
Cropwat 8.0 B 鑤 a
第 1 页
0000-eeab-168d-e01d-b40.txt

SOIL DATA
(File: C:\ProgramData\CROPWAT\data\soils\BLACK CLAY SOIL.SOI)
Soil name: BLACK CLAY SOIL

General soil data:

Total available soil moisture (FC - WP)


Maximum rain infiltration rate 200.0 mm/meter
Maximum rooting depth 30 mm/day
Initial soil moisture depletion (as % TA 900 centimeters
Initial available soil moisture 50 %
100.0 mm/meter
Additional soil data for rice calculations:

Drainable porosity (SAT - FC) Critical


depletion for puddle cracking Water 10 %
availability at planting 0.60 mm/day
Maximum waterdepth 5 mm WD
120 mm

Cropwat 8.0 B 鑤 a
12/02/19 6:17:08 AM

第 1 页
0000-ef03-168d-ee26-761.txt

CROP WATER REQUIREMENTS Crop: Rice


Planting date: 05/03
ETo station: Meteorologi Juanda
Rain station: Meteorologi Juanda

Decade Stage Kc ETc ETc Eff rain Irr. Req.


Month coeff mm/day mm/dec mm/dec mm/dec

Feb
Feb 1 Nurs 1.20 0.50 4.0 4.0 0.0
Feb 2 Nurs/LPr 1.09 3.80 38.0 5.3 120.8
Mar 3 Nurs/LPr 1.06 4.83 38.6 5.2 123.4
Mar 1 Init 1.09 4.07 40.7 5.3 86.0
Mar 2 Init 1.10 4.16 41.6 5.4 36.2
Apr 3 Deve 1.10 4.87 53.6 4.4 49.2
Apr 1 Deve 1.11 4.69 46.9 3.3 43.6
Apr 2 Deve 1.12 4.35 43.5 2.4 41.2
May 3 Mid 1.12 3.63 36.3 2.2 34.0
May 1 Mid 1.12 4.16 41.6 2.3 39.3
May 2 Mid 1.12 5.21 52.1 2.2 49.9
Jun 3 Mid 1.12 4.86 53.4 1.5 51.9
Jun 1 Late 1.10 4.55 45.5 0.7 44.9
Jun 2 Late 1.06 4.42 44.2 0.0 44.1
Jul 3 Late 1.01 4.08 40.8 0.0 40.8
1 Late 0.98 3.92 7.8 0.0 7.8

Cropwat 8.0 B 鑤 a 628.7 44.3 813.2

12/02/19 6:32:05 AM
第 1 页
0000-ed97-168d-5df8-0c4.txt Planting date:

RICE IRRIGATION SCHEDULE Harvest date:


(File: C:\ProgramData\CROPWAT\data\sessions\jadwal.SCH)
ETo station: Meteorologi Juan Crop: Rice
12/02
Rain station: Meteorologi Jua Soil: BLACK CLAY SOIL
11/06

Yield red.:
0.0 %
Rice scheduling options 0.5 m
Irrigate at 20 % depletion of Field Capacity
Pre puddling: Refill soil moisture content to 100 % saturation
Soaking depth on day 1
Timing
Application Irrigate at 0 mm waterdepth
Refill waterdepth to 50 mm
Puddling
Timing
Application Irrigate at 5 mm waterdepth
Refill waterdepth to 100 mm
Growth stages
Timing
Application

Field efficiency
70 %

TIMING AND APPLICATION ADJUSTED BY USER

Table format: Irrigation schedule

Date
Day Stage Rain Ks Eta Puddl Percol.Depl.SMNet Gif Loss
Depl.SA
mm mm fract. % state mm mm mm mm

23 Jan 16 27 33
40.0 Mar Apr -19
7 Feb - -2.7 47
40.0 3.1 -4
10 Feb 30 62
11.3 Mar -1
17 Feb 0.3 75
4.1 14 6
3 Mar Apr
4.9 9.4 20
PrePu 0.0 0.0 1.00 100 OK
2.5 0.0 39 88.1 0.0
1.00
Puddl 0.9 0.0 1.00 100 OK
100 0.0 9 90.0 0.0
3
Puddl OK 0.0 1.00 100 OK
93 7.7 0 58.5 0.0
Init Pre 2.7 1.1 1.00 100 OK
3.1 0 99.1 0.0
p 1.00
Init 第 1 页
100 3.1 0 96.8 0.0
2.6
Dev OK
1.0 3.1 0 98.7 0.0
Dev 0 2.7
100 1.00 3.1 0 101.7 0.0
Mid Pre 100 2.9 0 100.3 0.0
Mid p OK
3.1 0 99.5 0.0
88 Mid 0000-ed97-168d-5df8-0c4.txt
10 May
-11.9 101 End 0.0 1.00 100 OK 3.1 0 102.7 0.0 0.8
23 May 1.00 100 OK 3.1 0 98.5 0.0 0.0 1.00
-12.5 114 End
5 Jun 100 OK 3.1 0 95.8 0.0 0.0 1.00 0
-14.7 End End
11 Jun OK 0.0 0

1613.9 mm Total rainfall


Totals:
1129.7 mm Effective rainfall
Total gross irrigation
51.1 mm 0.0 mm Total rain loss
Total net irrigation
51.1 mm 458.1 mm
Total irrigation losses
0.0 mm
Total percolation losses 527.5 mm Moist deficit at harvest

527.5 mm Actual irrigation requirement


Actual water use by crop
0.0 mm
Potential water use by crop
476.3 mm

Efficiency irrigation schedule 100.0


100.0 % % Efficiency rain
Deficiency irrigation schedule 0.0
%

Yield reductions:
Stagelabel
A B C D Season
0.0 0.0 0.0 0.0 0.0
Reductions in ETc
% 1.00 1.09 1.32 0.50 1.10
Yield response factor

Yield reduction 12/


% 0.0 0.0 0.0 0.0
02/
Cumulative yield reduction
% 0.0 0.0 0.0 0.0 19
1:3
6:3
6
Cropwat 8.0 B 鑤 a
AM
0.0

第 2 页

You might also like