Installation manual  Mounting of current transformers and voltage tap-off must be 9.

Initial setup prerequisites


according to the labelling on the same phase (current
transformer 1 to voltage tap-off 1,…..). In case of uncertainty Ensure correct installation by an authorized installer and an
use an appropriate measuring device and power off the undamaged device.
This manual is valid for Power-Meter (Version EUMEL 1.0, Firmware
circuit braker
>2.2.0).
 The correct orientation of the current transformers must be After successful installation according to point 6 Status 1 LED glows
ensured. Connect the black and white wires according to the green. Continue with initial setup.
1. Technical data label. Check the orientation of the current transformers
 Three phase meter EUMEL 1.0 3x230 V; 50 Hz according to their manual (in most cases: arrow on the
 Measurable current depends on current transformers, input current transformers points from power source towards 10. Initial setup
voltage 0- 333 mV AC electric loads)
 Not to be used for billing purposes (not MID compliant) 10.1. Setup with WiFi Accesspoint
 Bi-directional meter, measuring of consumption and feed-in Allowed cross-section of wires connected to the voltage tap-off are 1.5  Activate accesspoint by pressing the WiFi-button for 2
per phase and total sum mm² or 2.5mm². Connected external conductors of the measured seconds
 Measurement per phase of voltage must be externally protected with protected with an overcurrent  Status 2 LED starts blinking when Wifi-accesspoint is active
protection of max. 16 A. 
 Active power (resolution 1/10 W) Search for the WiFi with your smartphone/computer, the
 Reactive power (resolution 1/10 var) name (SSID) of the network is “vpm<serialnumber>”
If the Power Meter is connected to a solar inverter, ensure powering off 
 Apparent power (resolution 1/10 VA) Password for the accesspoint is: powermeter
the inverter in addition to the respective overcurrent protection.
 Active energy (resolution 1/10 Wh)  Open internet browser and enter following URL:
Measurement of Power Meter’s own consumption depends on
 Reactive energy (resolution 1/10 varh) placement of current transformers before or behind its power supply.
 Apparent energy (resolution 1/10 VAh) http://192.168.255.1/
 Phase angle (resolution 1/10°) Installation according to EN 60950-1 safety standard: Voltage
 Voltage (resolution 1/10 V) You will be forwarded to the configuration site. Proceed with 10.3  Correct active power values:
tap-off must be after an external circuit breaker. Ensure an
 Current (resolution 1 mA) easy accessibility of an external disconnector in final If power is consumed from the grid during measurement
 Frequency (resolution 1/100 Hz) installation. 10.2. Setup without Accesspoint positive active power values for all phases should be shown
 Communication types: WiFi, Ethernet and Powerline  Setup with wired Ethernet on the screen.
(dynamic IP) Power measurement stops in case of disconnecting external o Attach Ethernet cable to the meter and connect it to your  Phase angle voltage – voltage:
 Static IP-setting via Ethernet available conductors from grid/power source (e.g. by switching off circuit network Phase angles should differ about 120° from each other (e.g.
 To be mounted on top-hat rails (EN 60715) in electric brakers). Energy values will be stored in a permanent flash storage.  Setup with Powerline 119°, -120°, 0°)
distribution boxes By disconnecting external wire L3 device stops operating. o Connect your powerline-adapter with your network and  Phase angle voltage – current:
 Own consumption typical 2 W (3 W max.) on L3 activate pairing mode (see manual) Depending on attached loads typical measurement values
o Activate pairing mode on the meter by pressing the PLC- are between -90 and +90°.
button for 3 seconds  In case of doubt use appropriate measurement devices to
2. Delivery scope o Successful pairing is indicated by a constantly green check the installation.
 Power-Meter 2.0 (version EUMEL 1.0) glowing PLC-LED  For easier installation checks it is recommended to
 Installation manual temporary turn off existing photovoltaic systems (see
 Current transformers, external wireless antenna and power The meter will now obtain a dynamic IP-address (DHCP-client). The manufacturer information)
line adapters are not included user interface can be reached by entering the IP-address into a
browser. Please ensure your device is connected to the same network
10.7. Finalisation of initial setup
as the meter. To obtain the IP-address of the meter please consult the
3. Compatible current transformers After finishing all steps of the initial setup you will be forwarded to the
manual of your network components or your network administrator.
login screen.
 333 mV secondary voltage
 Primary amperage individually configurable 10.3. User interface If you cannot access the login screen please check your
router configuration. For further information please see
4. Environmental conditions After starting the initial setup please follow the steps shown. You will be section 13 (Troubleshooting).
asked for the initial password.
 Ambient temperature in operation: 0°C to +50°C
Initial password: 123  Click “Login” and enter your chosen personal password.
 Ambient temperature during storage: -20°C to +70°C
 Relative air humidity: 10-90% REH Confirm by clicking on “Login”.
Afterwards you can enter your individual password.  Current measurement data and connection status will be
 Non condensing humidity
shown on the next screen.
 Only for indoor use in closed rooms
10.4. Current transformers  In addition following menu items are available:
Please enter the amperage of the attached current transformers for the
5. Safety precautions Illustration 1: Example wiring for 3-phases primary circuit. Only integers are allowed. Please find the relevant data
printed on the current transformers, in the respective manual or contact Measured values and connection status
Usage other than intended may lead to severe injuries or 7. LED the manufacturer. Only use compatible current transformers (see
fatal accidents. section 3) Language selection and modification
Status 1 Green glowing: System available
LED Green flashing: during system boot
Installation is only allowed for qualified electricians. Improper Red flashing: error
installation may lead to fire or electric shocks. 10.5. Single-/Multiphase Change password
Status 2 Green flashing: LAN connection attemp
LED Green glowing: LAN connection active Please choose if your meter is attached to one (single) or multiple
Current transformers must be connected to the power meter Red flashing: WiFi Accesspoint active phases. Advanced settings
before measured conductor is placed under voltage. Red glowing: no network connection (LAN/WiFi/PLC)
PLC LED Green flashing: Pairing mode 10.6. Installation check Information about Power-Meter
Do not dispose the device with regular household waste. After choosing the right option for the attached current transformers
Green glowing: PLC connected
Please dispose it at your local collection point for electrical current measure values will be shown. Check correct installation
WiFi LED Green flashing: WiFI connection attemp
scrap. according to following points (for 3-phases connection): Logout
Green glowing: WiFi connected

6. Installation 8. Buttons
The meter may be connected to three or one phases. If used to 11. Advanced settings
measure active power (W) and active energy (Wh) metering of the WiFi 2s: activate/deactivate WiFi Accesspoint (status change
after 5 seconds indicated by Status 2 LED) Network Change of network settings possible
neutral wire is necessary.
Accesspoint automatically closes after 30 minutes Reset of all energy values or offset of total active
If used with 2 wires L3 and N must be used on the voltage PLC 2s: start PLC Pairing mode energy values in Watthours (Wh). By entering offset
7s: PLC remove pairing Energy
measurement side. The current transformer must be attached values the metered active energy values can be
to input „3“. 10s: reset PLC values corrected (e.g. to adjust values to the grid
operator‘s meter values enter the difference).
For accurate measurement following points must be observed: Positive as well as negavite offsets can be entered,

Manual V 2.0.0 1
energy values below 0 will be corrected 14.8. Obtain MAC-Address of the Power-Meter
automatically to 0. Depending on your connection choice (WiFi, Ethernet or Powerline) the
Firmware Power-Meter has different MAC-Addresses. The current MAC-Address
Update the firmware of the device and information is shown on the bottom of the “Measured values and connection status”
Update about current firmware version. screen.
All implementend data interfaces can be (de-)
Interfaces activated. By clicking the shown links you will be 14.9. Obtain the serial number of the Power-Meter
redirected to the corresponding interface URL. The serial number is shown on the screen of “Information about Power-
Single- Changes the reported values of the device (only Meter”. In addition it is printed on the back of the device and on the
one phase or all phases). ATTENTION: a change packaging (to be used without colons).
/Multiphase
leads to a reset of all metering values
Reboot 14.10. What are the credentials for accessing the local data
Device performs a reboot interfaces?
devices
The username for the HTML, JSON and XML data interface is “admin”.
The password is the same as for the user interface of the device.
12. Reaching the device within a network
The user interface of the devices can be accessed via the IP-address 15. Open Source licences
of the device. In addition the device can be reached by Respective licence terms can be found in the user interface – see
http://vpm<serialnumber>.local if needed services are supported within “About”. Contact the manufacturer in case of source code requests.
the network.

16. Standards
13. Power meter factory reset The Power Meter 2.0 complies to the necessary standards for CE
In case of forgotten passwords or other reasons to factory-reset your declaration and complies to RoHS (Reduction of Hazardous
power meter carry out following step: Substances) requirements.
Hold down PLC and WiFi button simultaneously for at least 10 EMC Immunity EN 61000-6-2:2005
seconds. EMC Emissions EN 61000-6-3:2007
Safety EN 60950-1 Kat. II 230V
Performing a reset will irrevocably delete measured data and Accuracy oriented towards EN 50470-3/class B*
settings from the device. * depending on used current transformers, cannot be guaranteed

After the reboot your power meter is successfully reset. Initial setup can 17. Contact and manufacturer
be started again (see point 10).
Verbund Solutions GmbH
Europaplatz 2
14. Troubleshooting 1150 Vienna
Austria
14.1. Measured values seem to be wrong +43(0)50313 52251
Check correct installation of the power meter and the attached current
transformers (orientation of current transformers, phase match) and
voltage tap-off connection with an appropriate measuring device. Also
ensure a correct choice of current transformers type (perform reset).

14.2. What amperage do my current transformers have


Please check data printed on the current transformers, the manual of
the current transformers or contact the vendor/manufacturer.

14.3. WiFi connection cannot be established


Ensure your WiFi network is working. Re-enter your WiFi credentials by
entering the “Advanced Settings” Menu --> “Network”. Always use an
external antenna (optionally available).

14.4. PLC connection cannot be established


Ensure your adapter supports HomePlug AV or HomePlug AV2
standard. Using PLC-adapters on multiple outlet strips is not
recommended by most vendors.

14.5. I forgot my password


Perform a reset (section 11) and restart initial setup.

14.6. Power meter cannot be reached by


http://vpm<serialnumber>.local.
Check correct spelling of URL (in particular „http://“ without „s“). Ensure
necessary services for name resolution in connection with AVAHI are
installed on your computer (e.g. Apple Bonjour©). Please check again
the entered serial number (without any colons). Alternatively try to
connect to the power meter by entering its IP-address. To obtain the
correct IP-address read manufacturer manual of your router or contact
your network administrator.

14.7. Status 1 LED shows an error (red glowing)


Perform a reset of your power meter and carry out initial setup again. If