FEASIBILITY REPORT

Company Name :

Part Name: Start Date:

Period for development:

Stages:1) Form of communication/enquiry

a) Receipt of drawing b) Receipt of Sample c) Verbal Communication

2) Possibility: Yes/No

3) Document Required :
a) Master Copy Yes/No
b) Control Copy Yes/No (Mandatory)
c) Quality Plan Yes/No (Mandatory)

4 Approval of Quotaion: Yes/ No ( If Yes than move ahead with below step)
( If No than time to rethink for costing (i.e. Negotiation))

5a) Avaibility of Raw Material : Yes/ No ( If No period required ………..days)

5b) Availbility of tooling:


Available
i) Yes/No ( If No period required ………..days)
ii) Yes/No ( If No period required …………..days)
iii) Yes/No ( If No period required …………..days)
iv) Yes/No ( If No period required …………..days)
v) Yes/No ( If No period required …………..days)

5c) Machinery Condition : OK/Not OK (If No time required for maintance ……….. Days)

5d) Avaibility of manpower: Yes/No (If No period required to make adjustment ………days)

6 Time Required for raw material availability : …………… days

7 Time Required for Production : …NA…… days

8 Requirement of outsourcing: Yes/No ( If No period required…NA….days)

9 Any additional Requirement : Yes/No ( If No period required …………..days)

10 Packing requirementc.) Yes/ No ( If No period required …………..days)

11 Product is ready to deliver by (i.e. End date) :

Prepared by: Approved by: