Reco # Date TAG #

2014-001 3/28/2014 Tank T-702 ;


2014-002 3/26/2014 Off Plot Piping
2014-003 4/30/2014 T-8131B
2014-004 5/2/2014 Flare line
2014-005 5/2/2014 E-201A & E-761A (T&I4)
2014-006 5/13/2014 P-8023 discharge
2014-007 5/13/2014 T-8031 Raw Water Tank
2014-008 5/15/2014 T-8131B
2014-009 5/16/2014 M-8121
2014-010 5/22/2014 T-714 Visbreaker Feed Tank
2014-011 5/22/2014 V-8141 LPG Bullet
2014-012 5/22/2014 V-8151 Naphtha bullet
2014-013 6/12/2014 Flare header
2014-014 6/18/2014 3"-HR-207-3E1B-3 1/2 - H
2014-015 6/20/2014 Tank T-741A
2014-016 6/23/2014 Tank T-704A
2014-017 6/27/2014 Piping U200/700
2014-018 7/14/2014 Tank T-741B
2014-019 7/29/2014 Tank T-714
2014-020 8/30/2014 Tank 714 Shell
2014-021 10/27/2014 Dearator V-8061
2014-022 10/30/2014 Tank Farm Sump
Description Status
Paint failure on roof & bottom internal Complete
Off Plot Piping ; Pipe support repair pending
Tank Bottom blasting , inspection & painting Complete
Erect scaffold for UT measurement Complete
Procurement of new tube bundles Complete
Replace P-8023 discharge line due to UT measurement result check
Replace spool piece of RW tank discharge line Complete
Revised Reco about tank bottom after internal inspection (VT & UT) Complete
Flare Water Seal Drum ; Internal Painting Reco Complete
External visual inspection Complete
External visual inspection Complete
External visual inspection Complete
Isolation U100 line from flare header Complete
Visbreaker Unit 200 - Transfer Line procedure Complete
Bottom repairs, roof underside painting (cancelled) Complete
Roof P&V Valve/ Flame arrestor Complete
CUI Inspection of piping Complete
Roof painting & general reco Complete
Shell bottom course insulation removal Complete
Shell bottom course 300 mm renewal CUI Complete
Dearator Water Sample Cooler check
Tank Farm Sump pit pending item 2
Date