Data to be updated or modified on NEEPCO website

Performance Highlights

 The present installed capacity of the Corporation is 1457 MW comprising 925 MW in


Hydro, 527 MW in Thermal and 5 MW in Renewable (Solar).

 NEEPCO Commissioned its first 5 MW MWp Grid Interactive Solar PV Power Plant at
Monarchak in Sepahijala District of Tripura on the 15th February, 2015.

 Presently NEEPCO is implementing Hydro Project Kameng (600 MW) in the N.E. Region
which is scheduled for commissioning within the financial year 2019-20.

 NEEPCO operates the largest Hydro Power Plant in N.E. Region.

 The only CPSU having Hydro, Thermal and Solar Power Stations in operation in the North
East Region.

 Exposure to construction & operation of Hydro projects in highly difficult and Geo-
Technically sensitive terrain of N.E. Region.

 NEEPCO is the only CPSU operating a Hydel Power Station in Nagaland

Actual Generation (MU)


6400.00

6200.00
6166.31
6000.00 6103.82
5800.00

5600.00

5400.00 5472.24
5200.00
5220.37
5000.00

4800.00

4600.00
2015-16 2016-17 2017-18 2018-19
Installed capacity vs Generation from inception
7000 1600

6000 1400

1200
5000
1000
4000
800
3000
600
2000
400
1000 200

0 0

Installed Capacity(MW) Actual Generation (MU)

MONTHLY GENERATION IN MU
Monthly Generation in MU

725.32 712.59 707.99


628.47 622.56
538.45

427.35 429.53
393.51
306.24 295.43 316.37

Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19