PROJECT REPORT ON SEWAGE TREATMENT PLANT
A Project Report
On
Submitted for partial fulfillment of the requirements for the award of the
Of
BATCH
Shri.R.M.JIGAJINNI
Sl.Gr.Lect.
______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT
Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT
BONAFIDE CERTIFICATE
Certified that this project report “SEWAGE TREATMENT PLANT‘’ is the bonafide
work of ‘’LAKKAPPA SHIRAGUMPI’’ who carried out the project under my
supervision.
SIGNATURE SIGNATURE
Shri.S.S.HUBLI Shri.R.M.JIGAJINNI
Examiners 1 ………………………………..
Examiners 2 ………………………………..
______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT
Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT
This is to certify that the project report chosen entitled “ SEWAGE TREATMENT
PLANT‘’ Submitted to DEPARTMENT OF TECHNICAL EDUCATION in partial
fulfillment of the requirement for the award of the degree of DIPLOMA IN CIVIL
ENGINEERING, will be a original work carried out by Mr.Lakkappa Shiragumpi The
matter embodied in this SYNOPSIS is a genuine and project chosen by me will not
be copied by any other source requirement of any course of study. Enrolment No:
_____________ under the guidance of Mr./Ms._________
Enrolment No:
______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT
Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT
Objectives of project :
■ To provide required workability and slump retention of foundation under
all condition.
■ To provide anchorage to the foundation for preventing its movement in a
vertical direction due to alternate swelling and shrinkage of soil in
expansive soils caused by seasonal changes in moisture content .
■ To provide additional bearing area through the enlarged bulb in firm
strata, underlying the top weak or filled up ground.
■ To obtain adequate load carrying capacity for downward, upward and
lateral loads and moments.
■ To take the foundation below the scour level.
■ To anchor the building to good bearing ground.
Strategies : By making a model of the imitating project and explaining about it.
Methodology :
■ Cleaning : The surface should be cleaned properly.
The water should sprinkled on the surface.
______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT
Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT
■ Drilling : The holes are being drilled into no. of holes required for inserting
the bars.
The holes are drilled in such a way that the diameter of holes should be
5mm more than the diameter of bars
For example- 30mm diameter for 25mm diameter bars.
■ Mixing of chemicals :The chemical is being mixed according to design.
■ Filling of chemicals : The chemical is being than poured into the holes.
■ Vibrating : This is done to fill the air gaps or voids.
■ Placing of bars : The bars are than inserted into the holes.
■ Hardening : Then the surface is tamped and hardened.
Date :
______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT
Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT
______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT
Page