PROJECT REPORT ON SEWAGE TREATMENT PLANT

SEWAGE TREATMENT PLANT


A PROJECT REPORT

Submitted by

LAKKAPPA SHIRAGUMPI - 16CI028


In partial fulfillment for the award of the diploma
Of

DIPLOMA IN CIVIL ENGINEERING PROGRAMME


IN

DEPARTMENT OF CIVIL ENGINEERING

B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT

DEPARTMENT OF TECHNICAL EDUCATION


BENG
ALURU-560001
Year Of Submission: April 2019

______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT

Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT

A Project Report
On

SEWAGE TREATMENT PLANT

Submitted for partial fulfillment of the requirements for the award of the
Of

DIPLOMA IN CIVIL ENGINEERING


IN
DIPLOMA IN CIVIL ENGINEERING PROGRAMME
BY

BATCH

1.Ms.DANESHWARI SATTIGERI - 16CI014


2.Ms.DEEPA WALIKAR - 16CI015
3.Mr.DHAREPPA HIPPARAGI - 16CI016
4.Mr.GANESH AIDAMANI - 16CI017
5.Mr.HANAMANT ARENAD - 16CI018
6.Mr.HANAMANTRAO KULAKARNI - 16CI019
7.Mr.HARISH TALAWAR - 16CI020
8.Mr.ISHWAR MENASAGI - 16CI021
9.Ms.JAYASHREE JOGIN - 16CI022
10.Ms.JYOTI HAMPIHOLI - 16CI023
11.Ms.KAVERI SALIMATH - 16CI024
12.Ms.KAVYA GAYAKAWAD - 16CI025
13.Mr.KIRAN NAIK - 16CI026
14.Mr.KIRANKUMAR WASTER - 16CI027
15.Mr.LAKKAPPA SHIRAGUMPI - 16CI028

Under the guidance of

Shri.R.M.JIGAJINNI
Sl.Gr.Lect.

Department of Civil Engineering


B.V.V.S POLYTECHNIC (AUTONOMOUS)
BAGALKO

______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT

Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT

DEPARTMENT OF TECHNICAL EDUCATION


BENGALURU-560001

BONAFIDE CERTIFICATE

Certified that this project report “SEWAGE TREATMENT PLANT‘’ is the bonafide
work of ‘’LAKKAPPA SHIRAGUMPI’’ who carried out the project under my
supervision.

SIGNATURE SIGNATURE

Shri.S.S.HUBLI Shri.R.M.JIGAJINNI

HEAD OF DEPARTMENT PROJECT CORDINATOR

Department Of Civil Engineering Department Of CiviI Engineering


B.V.V.S Polytechnic, Bagalkot B.V.V.S Polytechnic, Bagalkot

Examiners 1 ………………………………..

Examiners 2 ………………………………..

______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT

Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT

PROMISING CERTIFICATE OF ORIGINALITY

This is to certify that the project report chosen entitled “ SEWAGE TREATMENT
PLANT‘’ Submitted to DEPARTMENT OF TECHNICAL EDUCATION in partial
fulfillment of the requirement for the award of the degree of DIPLOMA IN CIVIL
ENGINEERING, will be a original work carried out by Mr.Lakkappa Shiragumpi The
matter embodied in this SYNOPSIS is a genuine and project chosen by me will not
be copied by any other source requirement of any course of study. Enrolment No:
_____________ under the guidance of Mr./Ms._________

Name of the student:

Signature of the Student

Enrolment No:

______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT

Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT

Name of organization : B.V.V.S POLYTECHNIC AUTONOMOUS


BAGALKOT
Program: CIVIL ENGINEERING
Project title : NEW TECHNIQUE IN FOUNDATION
Project starting date : Project end date :
Sponsor :------- Self
Project description :
Background of project :
Need and justification of project :
■ Initiation of new technology.
■ Labours requirement is less.
■ Avoids the dust and blasting.
■ All types of modern chemicals are available easily.
■ Environment friendly.
■ Can resist any type of load carrying capacity.
■ Comparatively, less cost to other foundations.

Objectives of project :
■ To provide required workability and slump retention of foundation under
all condition.
■ To provide anchorage to the foundation for preventing its movement in a
vertical direction due to alternate swelling and shrinkage of soil in
expansive soils caused by seasonal changes in moisture content .
■ To provide additional bearing area through the enlarged bulb in firm
strata, underlying the top weak or filled up ground.
■ To obtain adequate load carrying capacity for downward, upward and
lateral loads and moments.
■ To take the foundation below the scour level.
■ To anchor the building to good bearing ground.

Strategies : By making a model of the imitating project and explaining about it.
Methodology :
■ Cleaning : The surface should be cleaned properly.
The water should sprinkled on the surface.

______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT

Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT

■ Drilling : The holes are being drilled into no. of holes required for inserting
the bars.
The holes are drilled in such a way that the diameter of holes should be
5mm more than the diameter of bars
For example- 30mm diameter for 25mm diameter bars.
■ Mixing of chemicals :The chemical is being mixed according to design.
■ Filling of chemicals : The chemical is being than poured into the holes.
■ Vibrating : This is done to fill the air gaps or voids.
■ Placing of bars : The bars are than inserted into the holes.
■ Hardening : Then the surface is tamped and hardened.

Expected result of project :


Project beneficiaries :
Risk management :

Approved Not Approved

1. Name and designation of program in charge


2. Name designation of other members involved

Signature of program in charge

Date :

______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT

Page
PROJECT REPORT ON SEWAGE TREATMENT PLANT

______________________________________________
B.V.V.S POLYTECHNIC (AUTONOMOUS) BAGALKOT

Page

You might also like