You are on page 1of 1

Internal Waste Pipe. Soil & Vent Pipe / Stub Stack / W.C.

Connection Detail Alternative detail using Internal


Connection Detail External Rainwater Pipe. Rainwater pipe

DC1 Adaptor retro - fitted in pipe


finished flush with screed (waste
DC2 Connection Detail
pipes only)
Waste pipe adaptor
32 mm - code SA4
Waste or Rainwater
Pipe Soil Pipe
DC4
40 mm - code SA5
Adaptor codes -
50 mm - code SA6 Short length of pipe
32/40 mm - S/S460
RWP adaptor cut to suit
50 mm - S/S462
82 mm - code SA8
Soil pipe adaptor RWP Adaptor
110 mm - code SA9
code SA9 68 mm round - code S/4A06B
F.F.L. 65 mm square - code S/4A06C
76 mm max Universal - code SA11
Coupling code SC1/1 Coupling code SC1/1
F.F.L. F.F.L.
within 150 mm of structure within 150 mm of structure G.L.

G.L. G.L.

Short length of
pipe cut to suit

Short length of
pipe cut to suit

90° Bend
90° Bend Rest Bend code SDB2/1
code SDB2/1 code SDBR1

Max 600 mm long "Rocker" Max 600 mm long "Rocker"


Pipe Pipe

Sited in soft landscaped areas Mini Access Chamber / PPIC


With standard round cover Square Rodding Point
Installation Detail Rodding Point code SRPS1/1

Round Ductile Iron cover & frame


GEN1 Installation Detail
Bends of up to max 45°
code SPK8
secured with clips supplied
angle can be used on any AP1
inlet and the outlet

Topsoil
Main
Flow

Mini Access Chamber


code SDAC1/1

Concrete bed

Polypropylene Inspection
Chamber
code SPIC1/1 - 940 mm deep Short length of pipe
code SPIC1/2 - 595 mm deep cut to suit
Where chambers are positioned
max 1.0 Metre deep on 90° corners always use Main
the main channel by fitting a Flow
45° bend code SB1/2 on
inlet and outlet Bend to suit

GENERAL HEATING SYSTEM FLOOR FINISHES


Well compacted bedding All work is to be carried out in strict accordance with the current Building Hot water and space heating to be via a new gas boiler system with minimum 87% Carpet/Laminate/Ceramic Tiles to Clients choice, skirting to be 150 x 19 Softwood
matrial used as backfill Regulations and to the satisfaction of the Local Authority Building Inspector, who efficiency and installed in the nKitchen. All additional radiators to be fitted with once splayed, primer, undercoat & 2 coats gloss, colour White.
is to be notified, by the Contractor, when work ids due to commence and when thermostatic valves and room thermostat installed. Upon satisfactory completion Wet Areas to be prepared and primed where necessary in strict accordance with
relevant work stages are ready for inspection. of all gas installations a gas comissioning certificate for the boilers will be Manufacturers' written instructions, including hot welding to Altro Flooring (or
The quality of materials and workmanship is to be to all relevant and current provided. equal approved) with manufacturers recommended adhesives and sealants.
Codes of Practice, and all products and materials are to be applied, fixed, installed Unless instructed otherwise.
etc in strict accordance with the manufacturers' written instructions. MECHANICAL ROOM VENTILATION WALL FINISHES
All drawings are to be read in conjunction and any discrepancies or anomalies are Approved extract fans to be installed within Shower Room enclosures, and to be Generally Quick Drying Eggshell to walls, colours to be agreed.
to be immediately brought to the attention of the CA. ducted to external air space via an approved ducting system and fitted with a Studwork to detail.
N.B. A minimum of 2 weeks prior to the date that the Contractor wishes to hand proprietory terminal grill. CEILING FINISHES
over the completed works, the CDM Coordinator must be provided with all Fans fitted to WC areas to be independently switched and capable of providing 3 Generally Vinyl Matt Emulsion colour White on Plasterboard & Skim.
information necessary to complete the Health & Safety File. Similarly, all operating air changes per hour and set to a 15 minute overrun when switched off. Bathroom All surfaces to be prepared, primed, and finished in strict accordance with
manuals must be provided a minimum of 2 weeks before the same date. A and En Suite areas to be independently switched and capable of providing an Manufacturer's instructions. Paints to be by DULUX or equal approved.
Certificate of Practical Completion will NOT be issued until the above has taken extract rate of not less than 15 litres per second. Where a WC is installed within a Decoration to window boards.
place and the information is to the entire satisfaction of the CA and the CDM Bathroom or En Suite the higher extract value shall apply. SANITARY WARE AND RAINWATER GOODS:
Coordinator. Where enclosures are not provided with an openable window to external air space Marley box (or equal approved) gutter system (colour to be agreed) with down
fans are to be operated with the room lightswitch. Not withstanding the above pipes. All Gutters, down pipes, support brackets, clips, adaptors, stopend fittings
DIMENSIONS descriptions all ventilation installations shall comply fully with Approved Document and seals all to be fixed in accordance with manufacturers instructions (Marley
Existing Site Dimensions to be checked and confirmed prior to commencement of F of the current building regulations. Plumbing and Drainage - Tel: 01622 852585), or equal approved, to be
Works. Dimensions shown on this drawing are between Masonry faces and connected to existing drainage. Each rainwater downpipe to discharge into
Structural Timber NOT finished faces. GENERAL VENTILATION existing surface water drainage system as indicated. Make all necessary
All habitable rooms shall have ventilation openings of at least 1/20th of the floor connections to existing drainage and make good all existing surfaces disturbed.
PITCHED ROOF CONSTRUCTION : area of the room with part of the opening at least 1.75m above floor level. All NOTE:
Marley roof tiles, BBA certified, type and colour as approved by planners, on windows to be fitted with controllable and secured trickle ventilator units having a ALL 'U' VALUES FOR WALLS, FLOORS, ROOFS AND WINDOWS TO ACHIEVE
treated S.W. battens (size to be advised by manufacturer dependent on truss total area of not less than 8000sq.m. per room. All rapid and background CURRENT BUILDING CONTROL STIPULATED REQUIREMENTS.
design and layout, assume 50 x 25 for tendering), with all necessary fixings ventilation shall fully conform to Approved Document F of the current building -Door opening furniture to contrast visually with the surface of the door, be
including Ridge & Hip caps, Eave Guard and detailing as Manufacturer written regulations. capable of operation with a closed fist and not be cold to the touch.
recommendations, on underlay to BS 5534 with lap and sag as Manufacturer's -The door frames to contrast visually with the adjacent wall surfaces.
recommended details on Contractor designed truss system to give 40° pitch. 100 ELECTRICAL WORK -Electrical sockets and switches will be sited between 450 & 1200mm above floor
x 65 treated S.W. wallplate 30 x 5 x 1000 long galvanised straps at max. 1800 mm All electrical workis required to meet the requirements of Part P (Electrical Safety) level, will indicate when switched on and will contrast with their surroundings.
centres. All trusses to have truss clips to wallplate. Expanded Metal Lath to of the current Building Regulations, and must be designed, installed and inspected -Insulated cavity closer's to be provided to window and door openings.
internal face of wallplates at junction with 12.5 mm Plasterboard & Skim ceiling by a person competent to do so. Prior to completion the council must be satisfied -All glass in critical locations to be in toughened glass to BS6206.
300 mm insulation in 2 layers at right angles, void to be maintained between that an appropriate electrical installation certificate has been issued for the work, -Door and Opening: Provide IG lintels as detailed or similar approved with
insulation and roof membrane using Manufacturers Continuous Rafter Roll and it has been signed by a person competent to do so. The Local authority will perforated base plate with effective conductivity not exceeding 30W /MK
Ventilator. need to inspect the electrical installation at first fix stage, and will require the (Manufacturers certified data), with back face rendered prior to plastering.
installatuion to be tested upon completion by others, and evidence of the test -Cavity tray weep holes at 1200mm cc linked with perimeter tanking.
FASCIAS & SOFFITS -Provide insulated vertical dpc's to all reveals with block cavity closures.
provided before a building regulations completion certificate can be issued.
Form sw wrot 125X19 fascia, and exterior quality soffit, allow supports, fixings -Excavate to reduce levels allowing all general ground level reduction as required
and noggins behind by specialist. Incorporate proprietary 25mm and 50mm (see from existing levels.
details) continuous ventilator into soffit with insect guard. All in strict accordance FIRE DETECTION -New Storm Water Drainage: Provide adaptor at connection of rainwater pipes to
with manufacturer's written instructions. Smoke alarms shall be positioned in the property in the positions indicated on the new 100mm diameter surface water drain. All new surface water drains to be
drawing. The complete installation shall be approved by the Local building Control 100mm diameter laid to fall 1:40 minimum bedded and surrounded in pea gravel
FLOOR CONSTRUCTION: as conforming to Approved Document B of the current Building Regulations. with all joints to remain flexible. Drainage pipes and fittings to be either vitrified
Floor finish on GypFloor Silent (see detail) or approval equal, all to Structural HEAT MECHANICAL clayware to BS65 or uPVC to BS4660. Reinforced concrete lintel to bridge walls
SMOKE DETECTOR
Engineers Design and Specifications. DETECTOR EXTRACTION UNIT where drain passes under. Drain to be capped with concrete where passing under
building and all joints to remain flexible.Surface water drain to discharge into
EXTERNAL WALL CONSTRUCTION (Facing Brickwork Facade): public system.
Generally 102.5 mm facing bricks (as approved by planners) with contrasting ALL FOUNDATIONS, BEAMS, LINTELS & STRUCTURAL TIMBER TO
colour to soldier coursing above openings (as per elevations), 100 mm cavity fully STRUCTURAL ENGINEERS DESIGN, SPECIFICATIONS AND CALCULATIONS.
filled with Earthwool DriTherm 37 Standard Cavity Insulation. To external - ALL MEASUREMENTS TO BE CHECKED ON SITE ALL ELECTRICAL INSTALLATIONS TO ELECTRICAL ENGINEERS
brickwork mortar Class 3 with light bucket handle pointing 100 mm thermal block PRIOR TO COMMENCEMENT OF WORKS. SPECIFICATIONS.
inner leaf, Celcon Standard or equal and approved, mortar Class 3 Wall ties to be - ALL SERVICES (ABOVE AND UNDERGROUND TO ALL MECHANICAL INSTALLATIONS TO MECHANICAL ENGINEERS
Stainless Steel to BS EN 845-1 at maximum spacings of 450 mm vertically and BE CHECKED AND LOCATED PRIOR TO SPECIFICATIONS.
900 mm horizontally and 225 mm vertically either side of door and window COMMENCEMENT OF WORKS, AND LIAISE WITH
openings. Wall tie Type 2 to BS 5628 Part 1. DPCs to be black polythene to BS SERVICE PROVIDERS WHERE REMOVAL/ INTERNAL PLUMBING & DRAINAGE
6515. 100 mm Thermabate or equal and approved cavity closers at Jambs, Cills ALTERATIONS/UPGRADES ARE REQUIRED. All uPVC single stack SVP's, waste pipes and appliance traps shall conform to BS
and head of walls. Inner leaf to be finished generally with 12.5 mm 2 coat plaster. - ALL DRAINAGE TO BE CHECKED PRIOR TO 5572, 1978 and BS 3943, 1979 and shall be fitted in complete accordance to tha
Tiled splashbacks in Wet Areas noted elsewhere. COMMENCEMENT OF WORKS. manufacturers instructions. 110mm diameter SVP's to have an external air
- ALL STRUCTURAL DESIGNS, SPECIFICATION AND terminal set at a minimum 900mm above any window opening or be fitted to a
FLOOR CONSTRUCTION: CALCULATIONS TO BE BY STRUCTURAL ENGINEER. complimentary venting roof tile similarly located. An access rodding point to be
New ground bearing floor 75mm cement screed with light mesh reinforcing on - ALL PUBLIC FOUL WATER AND STORM WATER fitted
separating membrane on 100mm Kingspan insulation board on 1200 gauge ALTERATIONS/MODIFICATIONS TO BE UNDERTAKEN at the base of all SVP's. Polypropelene and uPVC waste pipes and appliance
polythene dpm on Beam and Block Floor all to engineers design and IN LIAISON WITH THE LOCAL WATER AUTHORITY. traps shall conform to BS 4514, 1983 and BS 5254, 1976.
specifications. Foundations to Engineers design and specifications. - ALL STUDWORK AND FLOORS TO BE MIN. 30MIN. Basin waste pipes generally to be minimum 32mm diameter, Bath, shower and
FIRE RATED. sink waste pipes to be generally 40mm. Waste pipe diameters to be increased
GLAZING - ALL RAMS TO HSE REQUIREMENTS TO BE when lengths of pipes exceed the recommended distances as shown in Approved
Glazing generally to be class C double glazing to be min. 16mm air gap and to PROVIDED PRIOR TO ANY CONTRACTOR/ Document H of the current building regulations. All appliances shall be fitted with
have a soft Low E coating Pilkington K to achieve max. U values for windows to SUB-CONTRACTOR UNDERTAKING ANY WORKS. deep
be min. 1.6W/sq.m.K. and for doors 1.8W/sq.m.K. Safety glass conforming to - ALL WORKS TO CONFORM AND MEET CURRENT seal anti syphon traps. Cleaning eyes are to be fitted whenever
BS6206 shall be installed in all critical situations below 800mm above floor level in NHBC AND BUILDING REGULATIONS. rodding from the appliance is impractical. All access points to SVP's
windows and below 1500mm above floor level in doors and side lights. At least - UNDERTAKE REFURBISHMENT AND DEMOLITION are to be located above the spill over level of the lowest connected appliance.
one window in all habitable rooms shall have an unobstructed openable area of (ASBESTOS) SURVEY PRIOR TO COMMENCEMENT
FLOOR CONSTRUCTION (Suspended Floor):
not less than 0.33sq.m. and at least one dimension at least 450mm high or OF WORKS
New floor finish on GypFloor Silent (see detail-or equal approved) all to engineers
450mm wide, and to be able to be openned to at least 90 degrees in the case of - UNDERTAKE RADON CHECKS PRIOR TO
design and specifications.
casement windows. COMMENCEMENT OF WORKS.

Description
REVISION - A DETAILS
designer technologist 3d specialist specifier Project
PROPOSED DWELLING
1 Abbey Drive 1 Abbey Drive,
Luton, LU2 0LG.
Luton, LU20LG Client SEG TRADERS LTD,
Designed & 71 NEWNHAM AVENUE, BEDFORD,
Drawn by BEDFORDSHIRE, MK41 9QG.
KUMBIRAI MBOFANA tiled roof
pitched

35 Gratton Road,
roof
Issue Status Drawn Date Scale
Queens Park K.Mbofana 03.05.18 as shown @ A1
CONSTRUCTION
1050
2300

2100

Bedford, MK40 4EF W04 W05


1050

facebrick

United Kingdom Property Ref Project No Job No Checked Date Dwg No Rev.
1200

. 2018.05.03 J£ S.Gohar 03.05.18 ADL-04


-
2400

2100

D01
W01
900

facebrick

MOB: 07877 476202 dpc dpc


G.L.

kumbie_72@yahoo.com

You might also like