You are on page 1of 1

A B A B A B

10.5000 10.5000 10.5000

3.5000 3.5000 3.5000 3.5000 3.5000 3.5000 3.5000 3.5000 3.5000

2B2(30X30) 2B2(30X30) 2B2(30X30) RB2(30X30) RB2(30X30) RB2(30X30)


1 1 1
C1/F1 C2/F2 C2/F2 C1/F1

7.8000 7.8000 2B1(30X50) 2S2 2B3(30X50) 2S1 2B3(30X50) 2S2 2B1(30X50) 7.8000 RB1(30X50) RB3(30X30) RB3(30X50) RB1(30X50)

2B4(25X25)

2B2(30X30) 2B2(30X30) 2B2(30X30) RB2(30X30) RB2(30X30) RB2(30X30)


2 2 2
C1/F1 C2/F2 C2/F2 C1/F1

FOUNDATION PLAN 2ND FLOOR FRAMING PLAN ROOF BEAM FRAMING PLAN
SCALE 1:150 SCALE 1:150 SCALE 1:150

FOOTING SCHEDULE SCHEDULE OF BEAMS


fc' 3,000 psi (20.7MPa)
Concrete Fc' = 3000 PSI fy 40,000 psi ( 276 Mpa)
Rebar Fy = 40,000 PSI SCHEDULE OF COLUMNS fvy 33,000 psi ( 227 MPa)
3.50 3.50
fc' 3,000 psi (20.7MPa)
Assumed Soil Allowable Bearing Capacity = 3,500 PSF fy 40,000 psi ( 276 Mpa) STIRRUPS SPACING (2 Legs)
fvy 33,000 psi ( 227 MPa)
WIDTH DEPTH SPAN
MEMBER LOCATION LEFT MID RIGHT REMARKS
(CM) (CM) (M) (10mmΦ TIES)
1.30m 1.30m MARK FOOTING - 2ND FLOOR 2ND FLOOR - 3RD FLOOR
MAIN BARS 8-16mmΦ 8-16mmΦ TOP 5-16 mmΦ 3-16 mmΦ 5-16 mmΦ 10 @ 50 ; 0 @ 100 ; 0 @ 200 ;
2B1 30 50 7.80 CONVENTIONAL
7 - 16mmØ BARS

7 - 16mmØ BARS

L/4 L/4
BOTTOM 3-16 mmΦ 6-16 mmΦ 3-16 mmΦ REST @ 150 ;
C1 C2 TOP 4-16 mmΦ 3-16 mmΦ 4-16 mmΦ 1 @ 50 ; 7 @ 150 ; 0 @ 200 ;
1.30m 1.30m
C1 2B2 30 30 3.50 CONVENTIONAL
BOTTOM 2-16 mmΦ 7-16 mmΦ 2-16 mmΦ REST @ 250 ;
7 -16mmØ BARS 7 -16mmØ BARS 7.80 L/2 7.80 L/2
300mm x 300 mm 300mm x 300 mm TOP 5-16 mmΦ 3-16 mmΦ 5-16 mmΦ 18 @ 50 ; 6 @ 150 ; 0 @ 200 ;
10 mmΦ TIES 1 @ 50mm, 6 @ 75mm, rest @ 150mm 1 @ 50mm, 6 @ 75mm, rest @ 150mm 2B3 30 50 7.80 CONVENTIONAL
BOTTOM 3-16 mmΦ 6-16 mmΦ 3-16 mmΦ REST @ 250 ;
FOOTING - F1 FOOTING - F2 MAIN BARS 8-16mmΦ 8-16mmΦ
THICKNESS = 0.25m. THICKNESS = 0.25m.
TOP 3-16 mmΦ 3-16 mmΦ 3-16 mmΦ 1 @ 50 ; 0 @ 100 0 @ 200 ;
2B4 25 25 3.50 CONVENTIONAL
BOTTOM 3-16 mmΦ 4-16 mmΦ 3-16 mmΦ REST @ 150 ;
C2 L/4 L/4

TOP 5-16 mmΦ 3-16 mmΦ 5-16 mmΦ 1 @ 50 ; 0 @ 100 ; 0 @ 200 ;


RB1 30 50 7.80 CONVENTIONAL
300mm x 300 mm 300mm x 300 mm L/4 L/4 L/4 L/4 BOTTOM 3-16 mmΦ 6-16 mmΦ 3-16 mmΦ REST @ 150 ;
10 mmΦ TIES 1 @ 50mm, 6 @ 75mm, rest @ 150mm 1 @ 50mm, 6 @ 75mm, rest @ 150mm
TOP 4-16 mmΦ 3-16 mmΦ 4-16 mmΦ 14 @ 50 ; 4 @ 150 ; 0 @ 200 ;
RB2 30 30 3.50 CONVENTIONAL
SLAB THICKNESS = 10 cm Concrete Fc' = 3,000 PSI SLAB THICKNESS = 10 cm Concrete Fc' = 3,000 PSI BOTTOM 3-16 mmΦ 5-16 mmΦ 3-16 mmΦ REST @ 250 ;
2S1 Rebar Fy = 33,000 psi 2S2 Rebar Fy = 33,000 psi
TOP 5-16 mmΦ 3-16 mmΦ 5-16 mmΦ 10 @ 50 ; 0 @ 100 ; 0 @ 200 ;
RB3 30 50 7.80 CONVENTIONAL
BOTTOM 3-16 mmΦ 6-16 mmΦ 3-16 mmΦ REST @ 150 ;