DAILY REPORT INSTALLATION

Date : 14 September 2018 Devision : Eng. Services

Costumer : Merak Energi Indonesia Plant : PLTU Merak Energi

Project : Jasa Overhaul Circulating Water Pump #C


Load Status
Model No Description of work in the field Target of work
Plan Actual open close
1 Remove Electrical and Instrumentation 4% ### 4% ### Ö
2 Uncouple CWP pump to motor coupling 3% ### 3% ### Ö Achievement
target
3 Pre-alignment check 2% ### 2% ### Ö 120%
4 Motor lifting include motor stool 3% ### 3% ### Ö 1 00%
100%
5 Pump axial check 2% ### 2% ### Ö
6 Disassemble pump stool 3% ### 3% ### Ö 80%
7 Disassemble and lifting top coloum include head shaft 5% ### 5% ### Ö
60% plan 56%
8 lifting all remaining lower pump section from pit 5% ### 5% ### Ö actu
al
9 Disassembly all pump part 5% ### 5% ### Ö 40%

10 Cleaning and Inspection 7% ### 7% ### Ö


20%
11 Send rotor to workshop for balancing 5% ### 5% ### Ö 4%4% 3%3%
2%2% 3%3% 2%2% 3%3%
5%5% 5%5% 5%5%
7%7%
5%5% 5%5% 5%5% 5% 5%
2%
5% 5% 5% 5% 5% 5%
2% 2% 2%
0%
12 Balancing rotor 5% ### 5% ### Ö 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Remove
Uncouple
Electrical
CWPMotor
Pre-alignment
Disassemble
and
pump
lifting
Instrumentation
lifting
toPump
motor
Disassemble
include
and
all
check
axial
remaining
lifting
coupling
motor
check
Disassembly
pump
top
Send
stool
lower
coloum
Cleaning
stool
rotor
pump
all
include
to
and
pump
workshop
section
Re-Assemble
Balancing
Inspection
Send
Install
head
part
Install
back
from
for
shaft
top
rotor
lower
rotor
balancing
pit
lower
coloum
Pump
pump
Re-Install
topump
site
Install
axial
include
section
section
pump
motor
final
Install
head
to
check
stool
unit
pit
Final
Electrical
shaft
and
include
alignment
to
Test
centering
pit
and
motor
Connect
motor
Instrumentation
Pump
no
stool
coupling
load
running
Progress
test
Vertical Mix
Flow
13 Send back rotor to site 5% ### 5% ### Ö
14 Re-Assemble lower pump section 5% ### 2% ### Ö
15 Install lower pump section to pit 5% ### ###
16 Install top coloum include head shaft to pit 5% ### ###
17 Install pump stool 5% ### ###
18 Pump axial final check and centering 5% ### ###
19 Re-Install motor unit include motor stool 5% ### ###
20 Final alignment 5% ### ###
Plan
21 Install Electrical and Instrumentation 5% ### ###
22 Test motor no load 2% ### ### Actua
l
23 Connect coupling 2% ### ###
24 Pump running test 2% ### ###

Progress 100% 56%

Date Work Activity in the field Remarks


: 14 September 2018
: 14 September 2018