1 PROPANE
Agreed: Agreed:
2 BUTANE
Agreed: Agreed:
3 Diameter of shore line 6 Height of Shore tanks above sea level 9 Any booster pumps ashore 12 Min Depth m
4 Distance from berth to shore tanks 7 Maximum Pressure at Manifold 10 Any manifold freeboard restriction 13 UKC allowed m
5 Any sampling requirement 8 Any additive to be added to cargo 11 Vapour recovery tanks or flare stack 14 ICCP On or Of
CC) REQUIRED LEAD TIME
Advance notice to stop: (mins), Time to reduce rate: ____________(mins), Time to stop transfer: _______________ (mins)
Quantity remaining in shore lines after being ordered to stop: ____________________(M 3 / MT)
Ship shore access: Ship's Gangway/ Ship's ofshore Gangway and launch boat/ Terminal Gangway/ Transfer Basket
HH) ANTICIPATE STOPPAGES/DELAYS (shore tank changes, Cargo analysis, Documentation, EDP, Shore line clearing etc.
CHIEF OFFICER: DATE & TIME OF SHIP - SHORE AGREEMENT (NAME, SIGN & STAMP) LOADING MASTER