You are on page 1of 11

JOINT OPERATION BODY PERTAMINA MEDCOE

& P TOMORI SULAWESI


JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 1 of 11
SNO-P-CC-001

JOINT OPERATING BODY


PLN GAS RECEIVING & METERING STATION

PIPING WALL SIZING AND THICKNESS CALCULATION

DOC. NO: SNO-P-CC-001

A 14-01-2018 Issued for Review AR AS NJ


PREP’D CHKD APVD CHKD APVD
REV DATE DESCRIPTION JOB PERTAMINA -
PT. CEP – PT. YUAN
MEDCO
JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 2 of 11
SNO-P-CC-001

TABULATION OF REVISION SHEET


REVISION REVISION
SHEET REMARKS SHEET REMARKS
A A
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X

ATTACHMENT
1 X
2 X
3 X
4 X
5 X
JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 3 of 11
SNO-P-CC-001

RECORD OF REVISION
Rev. Implemented
Section Page CLIENT’s Comment Explanation
Code (Y/N)
JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 4 of 11
SNO-P-CC-001

TABLE OF CONTENTS

TABULATION OF REVISION SHEET ...............................................................................2


RECORD OF REVISION ....................................................................................................3
TABLE OF CONTENTS .....................................................................................................4
1 INTRODUCTION ...................................................................................................5
1.1 PROJECT OVERVIEW ............................................................................................................................ 5
1.2 SCOPE.................................................................................................................................................. 5
2 DEFINITION AND TERMS....................................................................................5
3 CODE, STANDARD & REFERENCE ...................................................................5
3.1 CODES & STANDARDS ......................................................................................................................... 6
3.2 CONTRACTOR PROJECT DOCUMENTS ............................................................................................. 6
4 LINEPIPE AND PIPING PROPERTIES ................................................................6
5 FORMULA ............................................................................................................6
6 WALL THICKNESS VERIFICATION ..................................................................10
7 ATTACHMENT ...................................................................................................10
JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 5 of 11
SNO-P-CC-001

1 INTRODUCTION

1.1 Project Overview

The Operating Body Pertamina – Medco E&P Tomori Sulawesi (JOB PMTS) is planning to
deliver sales gas to PLN Luwuk. The gas will be supplied from 30” sales gas pipeline, tapped
from KM 6+700, close to PEP Matindok tie in point. In order to achieve delivered gas minimum
specification, JOB PMTS will Instal receiving facility downstream of the pipeline tie in point.
Scope.

1.2 Scope
This document is intended to verify the calculation of wall-thickness requirement for the line
pipe to be used for the gas pipeline & piping from KM 6+700, close to PEP Matindok tie in
point. Wall thickness has been designed to meet minimum requirements Pressure containment
(Hoop Stress Check) in accordance with ASME B. 31.3.

2 DEFINITION AND TERMS

COMPANY COMPANY is defined as JOB PERTAMINA – MEDCO E&P


TOMORI SULAWESI

CONTRACTOR/PURCHASER CONTRACTOR/PURCHASER is defined PT. CATUR ELANG


PERKASA & PT. YUAN SEJATI.

SUPPLIER /VENDOR SUPPLIER/VENDOR is defined as the COMPANY selected to


supply the equipment and service detailed in this specification.
This is the entity having unit responsibility as defined in the
industry codes and standards.

OTHERS OTHERS are defined as companies which have been


contracted by JOB PERTAMINA - MEDCO E&P TOMORI
SULAWESI to supply equipment, services or material.

3 CODE, STANDARD & REFERENCE


This specification of pipeline design document based on the last edition code and standard as shown
below:
JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 6 of 11
SNO-P-CC-001

3.1 Codes & Standards


ASME B 31.8 : Gas Transmission and Distribution Piping Systems

ASME B31.3 : Process piping


API SPEC. 5L – 44th edition : Specification for Line Pipe

No.300.K/38/M.PE/1997 : Decree of the Minister of Mines and Energy Regarding Oil and
Gas Pipeline Occupational Safety

3.2 CONTRACTOR Project Documents


SNO-G-DB-001 : Basisi of Design
SNO-R-DB-001 : Process Design Basis

4 LINEPIPE AND PIPING PROPERTIES


The piping shall be designed in accordance with ASME B31.3 for onshore portion. The design
pressure and temperature of the piping shall be in accordance with the following :

Material Pipe A 106 Gr. B


NPS 1/2”-14”
Ex. Coating type Painting
SMYS 35000
SMTS 60000
Design pressure (Psi) 555
Design temperature (F) 150
Location class 3
Design factor 1
CA (mm) 4
Design life (years) 20

5 FORMULA
a. Piping systems are designed based on ASME B31.3. The following formula is used for the
calculation of steel pipe wall thickness:

t= P.D

2(S.E.W + P.Y)
JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 7 of 11
SNO-P-CC-001

Where ;

S= Stress value for material from table A-1

P= Internal design gage pressure

D= Outside diameter of pipe as listed in tables of standards or specifications.


JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 8 of 11
SNO-P-CC-001

E= Quality factor from table A-1A or A-1B


JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 9 of 11
SNO-P-CC-001

Y= Coeff. From table 304.1.1, valid for t< D/6 and for materials shown. The value of Y
maybe interpolated for intermediate temperatures. For t ≥ D/ 6.

W = Longitudinal weld Joint Quality from table 302.3.4


JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 10 of 11
SNO-P-CC-001

The nominal wall thickness (t nom) shall be:

t nom = t + CA
Where, CA : Corrosion Allowance 3 mm

6 WALL THICKNESS VERIFICATION


The summary of the pipe wall thickness calculations results are presented as follow ATTACHMENT:

7 ATTACHMENT
Piping Wall Thickness Calculation as per ASME B31.3
JOINT OPERATION BODY PERTAMINA MEDCOE
& P TOMORI SULAWESI
JOINT OPERATING BODY
PLN GAS RECEIVING &
Document No.
METERING STATION
Page 11 of 11
SNO-P-CC-001

Attachment
Piping Wall Thickness Calculation