You are on page 1of 5

Gutor PxW

Starting — Switching Over — Stopping


of Single Systems

Contents
1. OPERATIONAL BUTTONS FOR STARTING, SWITCHING OVER, STOPPING ........................................ 2
2. STARTING THE UPS SYSTEM .................................................................................................................... 2
3. SWITCHING OVER FROM NORMAL OPERATION TO BYPASS OPERATION ........................................ 3
4. SWITCHING OVER FROM BYPASS OPERATION TO NORMAL OPERATION ........................................ 3
5. SWITCHING OVER TO MANUAL BYPASS ................................................................................................. 4
6. SWITCHING OVER FROM MANUAL BYPASS TO NORMAL OPERATION ............................................... 5
7. STOPPING THE UPS SYSTEM.................................................................................................................... 5

Rev. Description of change Original document #: 7RA9118GB Issued Validated Approved Date
04 New Design mp MDR LUS 13-08-22
05 New Ideograms / New buttons and display pictures mp LUS BKI 14-02-13

Please note:
No part of this document may be reproduced or transmitted in any form or by any means — electronic or
mechanical, including photocopying and recording — for whatever reason, without the explicit written
permission of GUTOR Electronic LLC

7RA9118GB: Rev.05 Page 1 / 5


Starting — Switching Over — Stopping of Single Systems

! This chapter contains all the necessary information to operate the UPS system
after installation and commissioning. See also
Installation» and «Commissioning».
Instruction «Erection –
NOTICE

1. OPERATIONAL BUTTONS FOR STARTING, SWITCHING


OVER, STOPPING
.................. Button «SYSTEM ON» for switching on the UPS system

.................. Button «OFF» for switching off the UPS system (simultaneously the button

has to be pushed)

.................. Button «LAMP TEST»

.................. Operational parameters

..... Cursor keys for the selection between operational parameters

.................. Activation of ON

.................. Activation of OFF

2. STARTING THE UPS SYSTEM


When the system is programmed for «AUTOSTART» the system will start
automatically after 60secs., if the rectifier mains is switched on and within the
tolerance range.

1. Switch on the rectifier mains supply (close the rectifier input switch Q001). The display

shows: . After 10 seconds the display changes to:

2. Turn on the UPS system by pressing the button on the front panel. If the display

shows: wait a short time or press any button, e.g. C , then the

7RA9118GB: Rev.05 Page 2 / 5


Starting — Switching Over — Stopping of Single Systems

display shows: .

3. Connect the battery (close the battery switch Q004).


8

4. Check the battery voltage in the display by pressing the button .

5. Check in the display that the inverter output voltage is within the tolerance range by
9

pressing the button .

6. Switch on the bypass mains supply (close the bypass input switch Q090).

7. Wait 10 seconds and then press the button C until all red LED’s of «Alarm indications»

are extinguished.

Now the UPS system is switched on.

3. SWITCHING OVER FROM NORMAL OPERATION TO


BYPASS OPERATION
1. Switch over the UPS system to bypass operation by means of the foil keypad by pressing

and then the cursor key or until the display shows:


1

. Thereafter press and if the bypass mains is within the

tolerance range the green LED 9 «BYPASS MAINS O.K.» and the yellow LED 6

«SYNCHRONOUS» are illuminated and the display shows: .

The load is now supplied direct from the bypass mains.

If during bypass operation a fault in the bypass mains occurs, the system will automatically
switch over to normal operation if the rectifier mains is available, otherwise to battery
operation if the battery is available and within the tolerance range.

Depending on the programming a short loss of the output voltage can occur.

4. SWITCHING OVER FROM BYPASS OPERATION TO


NORMAL OPERATION
1. Switch over the UPS system to normal operation by means of the foil keypad by pressing

and then the cursor key or until the display shows:

7RA9118GB: Rev.05 Page 3 / 5


Starting — Switching Over — Stopping of Single Systems
0

. Thereafter press and the display shows:

The load is now supplied direct from the system.

5. SWITCHING OVER TO MANUAL BYPASS

Never actuate the manual bypass switch when the system is running in
normal operation !

1. Switch over the UPS system to bypass operation by means of the foil keypad by pressing

and then the cursor key or until the display shows:

. Thereafter press and if the bypass mains is within the

tolerance range the green LED 9 «BYPASS MAINS O.K.» and the yellow LED 6

«SYNCHRONOUS» are illuminated and the display shows: .

Step 2 and 2b) have to be performed for systems with 2-position manual
bypass switch.

Step 2a), 2b) and 2c) have to be performed for systems with 3-position
manual bypass switch.

2. Before switching the manual bypass switch Q050 to position «BYPASS», secure that the
static switch EN is turned on (the green LED 10 «LOAD VIA EN» must illuminate), then turn
the manual bypass switch Q050 to position «BYPASS» the green LED 11
«MANUAL BYPASS» illuminates.

2a) Before switching the manual bypass switch Q050 to position «TEST», secure that the static
switch EN is turned on (the green LED 10 «LOAD VIA EN» must illuminate), then turn the
manual bypass switch Q050 to position «TEST» the green LED 11 «MANUAL
BYPASS» illuminates.

2b) Turn off the UPS by pressing simultaneously the buttons and on the front

panel the UPS changes to standby operation. The display shows:

2c) Then turn the manual bypass switch Q050 to position «BYPASS». The green LED
11 «MANUAL BYPASS» illuminates.

The load is supplied direct from the bypass mains.

7RA9118GB: Rev.05 Page 4 / 5


Starting — Switching Over — Stopping of Single Systems

In the case of a bypass fault the consumers are no longer supplied !

6. SWITCHING OVER FROM MANUAL BYPASS TO NORMAL


OPERATION
Proceed as under section 4 «Recommissioning of the UPS» of the instructions
«Commissioning».

7. STOPPING THE UPS SYSTEM

Ensure that the users of all consumers connected to the UPS system are informed
before proceeding with the following steps and before turning off the system.

After the following steps, i.e. after approx. 5 minutes, when the DC capacitor bank
has discharged, the UPS system is volt-free with the exception of components,
which are connected between the terminals and the switch.
NO OUTPUT VOLTAGE !
Check by means of a voltage measuring device that all power sections are de-
energized. Remember, the rectifier mains and the bypass mains, as well
as the battery are still applied !
The connecting terminals are carrying hazardous voltage !

STOPPING THE SYSTEM FROM NORMAL OPERATION:


1. Switch off the bypass mains supply (open the bypass input switch Q090).

2. Press simultaneously the buttons and on the front panel for switching off the

system. The display shows: .

3. Disconnect the battery (open the battery switch Q004).

4. Turn off the rectifier mains supply (open the rectifier input switch Q001).

After approx. 30 seconds the display shows no indication.

Thereafter the UPS system is turned off all LED indications are
extinguished.

7RA9118GB: Rev.05 Page 5 / 5