You are on page 1of 1

EXIST.

POLICLINIC

WAREHOUSE
PHASE 2

WAREHOUSE
PHASE 2

PARKING
SCHOOL AREA

RE-LOCATED
JL. YOS SOEDARSO ( JL. MINYAK )

EXIST. MOSQUE
X=3100.0000
Y=3000.0000
z=0.0000

CONSTRUCTION
LAYDOWN AREA

KARANGANYAR

JL. BONG
SPBU

AS
NEW BRIDGE & EXIST. EXIST.
CONSTRUCTION ACCESS GATE CHURCH SCHOOL EPC SITE OFFICES
CAR PARKING

PIPE TRENCH

D-20-08 R-9 R-6 R-3 D-20-05C D-20-05D D-20-07A D-20-07B D-20-07C


NEW HSSE
REFINERY SECURITY BUILDING

PARKING
"LOT A"
130

FENCE
GREEN VILLAGE R-8 R-5 R-2
WAREHOUSE 96
D-20-05A D-20-05B
COVERED AREA
PEN/TEK PEN
ACCESS RAMP & GATE 94 V-3
V-6
35

341-OP-003 P-5 R-10 R-7 R-4 R-1


V-5 V-4
OPEN STORAGE V-7 G-320-25A/B/C
D-20-06A D-20-06B NEW DIESEL TRANSFER PUMPS
SLUDGE POND
NEW OCR SUMP PIT
341-SS-114
D-320-12
FUTURE VACUUM RESIDUE TANKS (PHASE 2)
RELOCATED OUTFALL D-20-15B (EXIST. LOCATION OF TANKS O-15 TO 0-20)
P-32 D-20-13B FUTURE VACUUM RESIDUE PUMPS (PHASE 2)
D-20-15A
D-20-13A
R-11 CDU-IV PREFLASH SECTION
D-20-01A D-20-01B
P-31
NEW MAKE-UP HYDROGEN
FUTURE VACUUM RESIDUE TANKS (PHASE 2) D-320-02B
COMPRESSOR (K-3-02D/E)
(EXIST. LOCATION OF TANKS O-09 TO 0-14)
SS-76
POWER STATION - GTG (PHASE 2) D-20-04C D-20-04B
SHEET PILE RELOCATED FOAM TANK WEST OF PRE-FLASH
P-8 P-2
NEW OCR SUMP PIT
O-25 O-24 P-4 P-3 NEW LABORATORY BUILDING
341-SS-111 (PHASE 2) D-320-10
P-7 P-1 NEW CFR ENGINE ROOM
RELOCATED OUTFALL
D-320-02A 341-MCR-001 (MAIN CONTROL BUILDING)
0m
POWER STATION - GTG (PHASE 1) D-20-04A R6 NEW SS-1
120 NEW SATELITE FIRE HOUSE
R107m
UTILITY 0-22 D-320-11C
D-20-11 D-20-12 SHIFT DINING ROOM (TO BE RELOCATED BY REFINERY)
COOLING TOWER

148
(EXIST. INSPECTION SHOP)

m
0-23 0-21

7
POWER STATION- BOILER

10
PERTAMINA MAIN OFFICE

R
D-320-11D

R60m
POWER STATION- DEAERATOR NEW SITE OFFICE
API
SEPARATOR
CDU IV UP V
DIESEL BLENDING
D-320-11A D-20-18 D-20-03
O-8 O-6 O-4 50
A-331-07A

C-20-01A/B
A-331-07C

A-331-07D
A-331-07B

POWER STATION- STG


FUTURE GTG 1
MAINTENANCE ACCESS

MAINTENANCE ACCESS

MAINTENANCE ACCESS

ACCESS WAY

BOILER PACKAGES

NHT-I

40
EDG-01A/B/C D-320-11B CAT.REFORMER LPG RECY &
O-3 SOUR WATER STRIPPER SS #64 341-SS-107
CCR PLATFORMING-I SS #65 341-OP-08
341-UCR-001 D-20-17 341-OP-010
341-ISH-101 FG GTG
LER
341-ISH-107
R30
R30

19
JB JB JB JB JB
R30

JB JB JB JB JB

JB

JB JB
JB JB

JB JB
JB JB

JB JB
JB JB

JB JB
JB JB

JB JB
JB SHELTER

COVERED ACCESS (EXISTING)


R15
CONSOLE

SURFACE CONDENSER
LO

K-3-02E

STG PACKAGES
FRAME OIL

V24 AIR
CONSOLE

CENTRAL CONTROL 39 R15


COMMON 341-OP-009
LAYDOWN
CONSOLE

AREA

EXIST. PUMPS

PLANT 341-SS-112
CONSOLE

COMMON FACILITIES HOUSE ISH


LO

SURFACE CONDENSER

R15
37

62
800.0000
FACILITIES
K-3-02D
800.0000
800.0000
O-2
600.0000
800.0000
FRAME OIL
CONSOLE

PLANT 32
800.0000
800.0000
600.0000
341-OP-017
800.0000
800.0000
800.0000
HYDROGEN UNIT HYDROCROCKER UNIT COVERED WALKWAY
C-3-12E

C-3-13E
C-3-11E

X
341-SS-107
X
C-3-12D

C-3-13D
C-3-11D

X
X
X

X
X

95 HELICOPTER

1M

X
E-3-19D

E-3-18D

E-3-19E

E-3-18E

O-1
42

NEW ACCESS

X
EMERGENCY
0.6 8.5

X
SITE

X
GENERATOR

21
X

DESULFURIZATION UNIT
15

X
X

X
11.0

X
341-SS-109
5.0

X
341-SS-101
6.0

X
X
N-6 N-5 V-10 15 75 15 75 341-ISH-109 (ABOVE)
6.0

LIMIT HYDROGEN
EQUIPT. HYDROGEN
6.0

N-1
8.0

TRAIN "B"

V-11 N-4 N-3 N-2


HVU-III
CDU-V

HYDROCRACKER UNIT

HYDROCRACKER UNIT
12.0

REMINERALIZATION RFCC PROCESS COOLING TOWER


257
6.0

TRAIN "A"

248
RFCC LPG TREATING UNIT
12.0

EXIST.
PROPYLENE RECOVERY UNIT 341-OP-012
6.0

NORTH ACID GAS FLARE HC FLARE 341-SS-106/108


TRAIN "A"

TRAIN "B"
6.0

K.O. DRUM DHTU-2


RESIDUE

DHTU-1 341-ISH-106/108 (ABOVE)


6.0

INTERMEDIATE K.O. DRUM VDU II 341-ISH-110


6.0

178

178
6.0

142
6.0

BFW & DEMIN RFCC EXISTING SS-4


6.0

WATER STORAGE
6.0

NHT UNIT NEW SHIFT DINING ROOM (RU-V) TO BE DEMOLISHED


FUEL GAS
6.0
6.0

95

SYSTEM

341-SS-110
11.0

RELOCATED SMOOTH 125 30 210 30 80


8.0

FLUID LOADING HMU PHASE-1 30


12.0

72 341-OP-015
SS 63

112
9.0

341-OP-005 30
12.0

SS 61,62 7.5 LPG & PROPYLENE


12

12

12
12.0

NOTE 7 (TYP.) GASOLINE BLENDING (R90 & R92)


STORAGE SPHERES
6.0
6.0

341-SS-103
6.0

341-ISH-103 (ABOVE) 54
12.0

SS

15
A-335-02

EXIST.
A-335-01
6.0

SS#07

CPI
6.0

SWR0 PACKAGE U-12 U-11


COMPRESSOR

12 70 8
DHT COMMON
6.0

HYDROGEN

30 70 30 70 30 80 30 80 30 135 14
6.0

10 175 15
TREATMENT PLANT

U-14
6.0

341-OP-013
A-335-05

U-10
6.0

SATURATE GAS CONCENTRATION,


6.0

ISOMERIZATION UNIT
80

HMU UNIT
6.0

EFFLUENT

124
SHEET PILING CCR
5.0

U-13 A-335-03
PHASE 2 NHT UNIT
160

W-7 W-5 NITROGEN


PLATFORMING
12.0

REGENERATION UNIT & SOUR


341-OP-007
130
6.0

341-OP-004 UNIT
W-6 W-4
12.0

EXIST. CONTROL ROOM


ARU UNIT
SAT LPG TREATER, AMINE
170

170

130
WATER STRIPPING UNITS
6.0

PHASE 2

07
ALKYLATION UNIT
6.0
6.0

R1
FUEL OIL SYSTEM
6.0

T-01B
NO.73

T-01A
6.0

SS#
6.0

A
-05
A-337-15
8.5

341-SS-102 15 125 14 20
240

DEMIN
10.5

D-3 JALA
PLANT
341-ISH-102 (ABOVE) IT CENTRAL

30

5D
NY
6.0

11 25

B
8
6.0

R30 OS

0-0
-05
A-28 SUD
6.0

5.2030 6.0 6.0 6.0

IA/PA/N2 PLANT

10

-32
20
NO.70

R3
SS#

ACCESS TRACK
0
12.0

100 ARS

D-3

CD
A-26
R6
10
6.0

4
NO.69

O
0
6.0

SS#

-05
BOILER -0
6.0

NORTH ACID GAS FLARE VENT SRU - PHASE 1 20 A-24


5.0

FW

20

6A
3.2520

15
D-3

D-3
MOSQUE

10 47
30 TRAIN-A RELOCATED
JOCKEY NEW

-0
A-22
40
SCREEN
EXIST.

SUMP

20
WORKSHO
"VENT4 "VENT 4

GASOLINE
3
70

FILTER A/B

PUMPS
R 60
CONTROL
PANELTRANSFORMER
RECTIFIER

EXISTING P
ACID

313

D-3
29
TANK
ELECTROLYZER A/B

W-8
FCV

PUMP
ACID

3
SHOCK HYPO.
DOSING PUMP A/B

V-17B
CONT. HYPO.
DOSING PUMP A/B

TANK

.1

-0
U-19
HYPOCHLORITE
AIR BLOWER A/B

NEW SWRO
TANK

A-27

9m

20
100 U-20

B
SULFUR

D-3
BY RU-V REFINERY A-33

-06
W-9 U-21 A-25

67
RECOVERY - PHASE 2

20
HEAVY HAUL ROAD SRU - PHASE 1 15 A-23 A-30

D-3
TRAIN-B
17 47
W10
A21
24
5
R4

BALIKPAPAN 1
CONSTRUCTION JETTY

HYDROCARBON BM 1 A-29 A-31 NEW TEMPORARY ROAD


T-202 A-7
FLARE V-219-01 RPAL
341-OP-014 TPS (EXIST.) & GATE 2A (BY EPC)
WASTE WATER TREATMENT TPS (NEW)
NAT. GAS METERING T-201
CW OUTFALL

15

UNIT (WWTP) 341-SS-105 FOAM A-20


FACILITIES SHEET PILE 341-ISH-105 (ABOVE) TANK
EXISTING

A-19 T-203
NEW BPP-II FLARE SHEET PILE SULFUR HANDLING A-32
A-18
65

CW PUMP HOUSE & STORAGE


CAUSTIC PREPARATION K.O. DRUM FOR RDMP
UNIT
m
LOA = 10

A-17
NEW HCC FLARE U-23
182 RELOCATED
EXIST.

EXISTING RECEIVER K.O. DRUM 341-SS-115


RELOCATED OUTFALL 341-ISH-115 (ABOVE) BUNKER FUEL TANK 341-SS-113
V-1 E-3 GASOLINE TANK
TANJUNG BATU SPENT CAUSTIC TREATMENT NEW RFCC FLARE E-5
K.O. DRUM RELOCATED EXISTING FW A-16 A-6 341-OP-016
CONTROL ROOM EXISTING OUTFALL SHEET PILE E-2 E-7
BERTH.8 EXISTING DITCH SUPPLY TANK
WAREHOUSE

E-4
WAREHOUSE

TANJUNG BATU METERING 341-SS-104 341-SS-116 V-2 A-15 A-5


EXISTING

FOR JOCKEY PUMPS


EXISTING

(GASOLINE & DIESEL) 341-ISH-104 (ABOVE) 341-ISH-116 (ABOVE) A-4 E-6


INTERMEDIATE FLARE E-1
EXISTING POWER STATION 341-OP-006 EXISTING CW & FW KO DRUM FOR HH ROAD CROSSING METERING (NEW)
PUMP HOUSE LPG, COMPACT PROVER
PROPYLENE, GASOLINE & PROPYLENE
CONSTRUCTION JETTY
5 A-3 T-904
R17
SPACE A-2 D-320-07A
RESEVED FOR BERTH.5A
A-1
5 AMINE HANDLING T-903
R 17 D-320-07B
SS-71
NEW
NEW 16" SUBSEA PIPELINE BERTH. 7 SULFUR JETTY SUB T-902 D-320-07C
(GASOLINE TO TANJUNG BATU) NEW 24" SUBSEA PIPELINE STN OIL MOVEMENT
(NAT. GAS FROM FSRU) ROOM
SOUTH ACID GAS
FLARE K.O. DRUM BERTH.6A BERTH.5C
NEW 16" SUBSEA PIPELINE NEW 20" SUBSEA PIPELINE EXISTING NEW
(DIESEL TO TANJUNG BATU) (CRUDE FROM LAWE-LAWE) INCINERATOR BERTH.5B
SEA WATER INTAKE SEA WATER INTAKE
SOUTH ACID GAS
FLARE STACK
BERTH.5 T-901
NEW RDMP RFCC FLARE
NEW RDMP HCC FLARE (RFCC) G-320-24A/B/C
(NEW BPP-II & HCC) NEW GASOLINE TRANSFER PUMPS
BERTH.4

T-900

BERTH.3
0
75

BERTH.2
R

NEW LPG /PROPYLENE


LOADING ARM
R750

NEW JET FUEL LOADING ARM

BERTH.1

BERTH.0

You might also like