You are on page 1of 19

COMPANY PROFILE

CADE – IDEPE
CADE – AMEC
CHILE

1
CONFIGURATION OF
CADE AMEC
AMEC Forestry CADE IDEPE
(Former H. A. Simons
Canada ) CHILE

50 % 50 %

CADE AMEC
CHILE

LOCAL P&P
CLIENTS
2
Configuration of
CADE IDEPE Group
Ingeniería y R.T.A DESTEC
Desarrollo de Servicios de Ingenieros Ltda. Desarrollo y
Proyectos Ltda. Ingeniería Ltda. Tecnología Ltda.

ARA, MINMETAL, GEOCONSULT


CADE CONSULTORES (Austria)

INDEC S.A. GEOCADE


Consorcio de Consultores

AMEC FORESTRY SYSTRA


(Canadá) (Francia)

CADE-AMEC
SYSCAD

INGEMA CADE CADE CADE


Ingeniería INGENIEROS CONSULTORES CAPACITACION
3
Board
Directory (8)

Organization
Chart President

Development Marketing
Department Department

Executive
Vice
President

General Special Commercial


Manager Services
Manager
Manager

Proposal
Preparation
Financial Disciplines Inf. Technologies Operation
Manager Manager Manager Manager EPCM
Services Proposal
Records

Accounting Architecture Project N° 1 Costing


Advertising

Personnel Mechanical
Instrumentation Project N° 2 Procurement
Piping

Internal
Services Civil Sanitary Scheduling
HVAC Project N° 3

Fire Protection Inspection


Structural Project N° 4

Environmental
Other Special
Electrical Project N° 5 Services

Project N° n
4
Engineering Market
Areas
(average)
Energy; 5%

Mining; 20%

Celullose & paper;


40%

Transport; 10%

Industrial; 7%
Environmental; 3%
Infrastructure; 15%

5
Engineering Market
Areas
(Years 2003-2005)
5%
10%

10%

5%
60%
7%

3%

6
Projects by Clients
between 1959 - 2005

CLIENT AREA MAN-HOUR % QUANTITY


CODELCO CHILE COPPER 3.526.570 18,39% 380
EMPRESAS CMPC PULP & PAPER 3.262.142 17,01% 153
CELARAUCO S.A. PULP & PAPER 3.024.590 15,77% 160
METRO S.A. SUBWAY 2.664.240 13,89% 107
MIN. OBRAS PUBLICAS PUBLIC 738.497 3,85% 41
AGUAS ANDINAS (ex EMOS) WATER & SEWER 636.711 3,32% 123
DISPUTADA LAS CONDES COPPER 376.620 1,96% 24
CHILGENER ENERGY 356.037 1,86% 48
MINERA PELAMBRES COPPER 306.320 1,60% 11
ALLIANCE COPPER LTD COPPER 286.928 1,50% 3
ESVAL S.A. WATER & SEWER 208.451 1,09% 23
ENAMI COPPER 207.685 1,08% 18
ARMADA DE CHILE PUBLIC 185.442 0,97% 16
OTHER CLIENTS 3.397.262 17,71% 1.780
TOTALS 19.177.495 100,00% 2.887

7
Annual Sales Volume
US$ millions
35
31,2
30 27,9 28,6
24,4
25
20,3 19,2 19,9
20 15,6
15,0 14,7
12,6
15

10

0
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004
8
Personnel (2005)
by levels

400 380
350
300 260
250
200
150
100 60
50
0
Engineers and Designers and Management
9 Architecs Draftmen and Services
Professional Personnel
yearly average (20 years window)

900
900
800

700 673 700

597
600 540
512 493
500 431 430
418 407410
400 382
350
330 335327
280
300 245
255 237231
272
207219 208 207 201
187 175 181
200 140

100
0
74 76 78 80 82 84 86 88 90 92 94 96 98 00 02 04
10
Years
11
0
20
40
60
80
100
120
140
Project

60
Management

Process

20
Information

16
Technology

Procurement and

10
Services

Environment

10
Civil

16
Architecture
28
by disciplines
Personnel

Structures
137

Mechanical/Piping
176

Hydraulics
30
Distribution of Professional

Electricity
75

Instrumentation
51

and Control

Administrative
77
12
PERSONNEL

-
100.00
200.00
300.00
400.00
500.00
600.00
700.00
Less than 1
years

Between 1
and 5 years

Between 10
and 15 years

Between 15
and 20 years
average 7.5 years, (2004)
Personnel Seniority

Between 20
and 25 years

Mas de 25
individual

año
Acummulative
BACKLOG CURVE
January 2005

800 HH/año

700
Req. Proy. Vendidos
856.638

600

500
H-Mes

Proy.
400 Vendidos+Probables
1.134.151

300

200

Proy. Vend. + Prob.+


Posib. 1.318.057
100

0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC

13
CADE IDEPE
SERVICES & FACILITIES

14
1. Services
ü Engineering: ü Costing:
vCapital Cost Estimate
v Basic Engineering v Cost Control during Engineering Stage
v Detail Engineering (Fabrication Eng.) v Cost Control during Construction Stage
v Field Engineering v Cost Control
v Project Definitions

üProcurement:
ü Scheduling:
v Purchasing Schedule Control
v Project Master Schedule v Quotation & Negotiation
v Engineering Schedule v Purchasing
v Purchasing Schedule v Expediting
v Construction Schedule

ü Industrial Modeling:
v Promodel

ü Environmental
v Visual Modflow (Water Contamination)
15 v Cormix (Plume Analysis)
2. Calculation & Engineering Tools
ü Process:
v METSIM (Metallurgical Simulation)
v Extend 5 (Flow Diagrams, Mass Balance)

üStructural:
v RISA 3D (Structural Analysis and Design)
v SAP 2000 (Finite Element Structural Analysis and Design)
v SAFE (Finite Element Slab Calculations)
v FLAC (Soil Mechanics)
v MAT-3D (Finite Element Foundation Design Software)
v LPIPE (Pilots Calculate)

üMechanical:
v Phoenics (Thermal Simulations)
v I-DEAS (Mechanical Modeling)
v Caesar II, Autopipe (Piping Stress)
v Heavent (Industrial Ventilation)
v Engineers Aide (Heat Exchange. Fans, Pumps,Blowers,
compresors)
16
ü PIPING:
v Surge 2000 (Water Hammer Analysis)
v Hydroflo II (Water Network)
v H – Calc 1.1 (Hydrologic Calculator)
v XP-SWMM (Storm Water and Wastewater Design and Analysis Software)
v Winpump (Water and Pulp pump)

üElectrical & Instrumentation:


v ETAP (Electrical Transient Analyzer Program)
v DataManager (Loops, Cable Scheduler, Instrument Index, Data Sheet,
Hookups)
v AGI32, GEL, CALA, GOLD (Lighting Calcs)
v Wiring (Elements and Motor index)

ü Fire Protection:
v HP4M: Fire Sprinklers Grid System Design
v HP6M: Fire Sprinklers Tree/Loop System Design

ü HVAC:
v E20 –II Carrier, Modules HVAC, Duct Design, Piping Design,
Psychometrics
v HVACSolution (HVAC Schematic Design System)

17
3. Design & Drafting Tools
ProjectWise: Documents and Drawings Project Manager.
CAD : MicroStation and Autocad Design in 2D and 3D
Architectural
GEOPAK: Survey, Road, Site Preparation
REBAR: Concrete Rebar Drawings
I&W : Instrumentation and Wiring design

VANTAGE PLANT DESIGN (PDMS)


3D Design (Structural,Mechanical, Piping, Electrical)
Drawings, Isometrics, Spooling, Reports
PLANTSPACE Process & Instrumental Diagrams
(P&ID in Database)

VANTAGE RESORCE MANAGEMENT (VPRM)


Material & Piping Catalogue
Bill of Materials & Requisitions

GLOBAL Electronic interconnection with other offices in USA and Europe

18
4. Management Tools

Microsoft Project: Scheduling, Engineering and Construction


Primavera Project Planner: Scheduling, Engineering and Construction
Prolog Manager: Budget and Cost Control, Procurement &
Engineering Drawing Control
Presto: Budget & Cost Control

5. Facilities at Main Office


ü Headquarter Offices with 4.000 m2
ü Cafeteria for 500 people
ü Internal Parking lot for 50 cars
ü Computer Network with more than 600 PC’s (Engineers & Draftsmen)
ü Drawing plotting equipment (180 drawing/hour)
ü Printer and photocopy reproduction (1500 pages/hour)
ü Necessary Equipments and Vehicles

19

You might also like