Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .

Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited


Shahabad (M) Haryana Distt. Kurkshetra (Haryana)
Six monthly progress reports for the period of six month from
January-2014 to June-2014

STATUS OF COMPLIANCE

CONDITIONS

S. No. (A) GENERAL CONDITION :- STATUS OF


COMPLIANCE.
01 No Additional Land shall be acquired for any Utilities Complied
related to the project.
02 The Stack Height of the stack shall be as per the EPA Stack height Complied and
Act,1986 in this regard with continuous online online monitoring system
monitoring system. under compliance.
03 Dry ash collection system shall be provided. The Complied. (Installation an
Project authorities shall adhere to provision stipulated Automatic collection system
in the fly ash notification of Sep.1999, and as amended of fly ash as per requirement
in August 2003 in regard to fly ash utilization. Fly ash of our plant.)
shall be disposed in the ash pond through HCSD mode
and bottom ash through medium slurry mode.

04 The Ash Pond shall be provided with liming on all Not Applicable in our plant.
sides.
05 Effective dust suppression measures shall be taken to Complied
control SPM level in the area and ensure that the ash
from the ash pond does not get airborne.
06 Dust extraction and suppression system and water Under Compliance.
spikiness shall be provided for controlling fugitive dust
during transportation and other vulnerable area of the
plant.
07 Water requirement shall not exceed about 300KLD and Complied.
shall be met from the existing bore well.
08 Treated effluent conforming to the prescribed standards Complied.
shall be recycled and reused within the plant area. No
effluent shall be discharge outside the plant boundary.
09 Rain water harvesting shall be practiced. A detailed Under Compliance.
scheme for rain water harvesting to recharge the
ground water aquifer shall be prepared in consultation
with CGWA/SGWA.
10 Leq of Noise level shall be limited to 75 dB A and Complied.
regular maintenance of equipment should be
undertaken. For people working in high noise area
personal protection devices should provided.

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).
Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

11 The PP will plant area trees all around the periphery of Complied.
the projects and noise along the road side. The total
green area in the project will be 33 % of the project
area.
12 First aid and sanitation arrangement shall be made for Complied
the drivers and other contact workers during
construction phase.
13 Regular monitoring of the ambient air quality shall be Under Compliance
carried out in and around the power plant and records
maintained. The location of monitoring stations and
frequency of monitoring shall be decided in
consultation with HSPCB.
14 The PP shall advertise in at least two newspapers Complied.
widely circulated in region around the project one of
which shall be in the vernacular language of the
locality concerned.
15 Half yearly report on the status of implementation of Complied.
the stipulated condition and environmental safeguards
shall be submitted to R.O. MOEF./HSPCB.
16 R.O.MOEF and HSPCB will monitor the Complied.
implementation of the stipulated condition. a completed
set of EIA and EMP with the additional information
submitted from the time to time shall be forwarded to
the RO for their use during the monitoring.
17 Separate funds shall be allocated for implementation of Partially Complied.
environmental protection measures along with item
wise break up. These cost shall be included as part of
the project cost. The funds earmarked for the
environmental protection measures shall not be
diverted for other purpose and year wise expenditure
shall be reported to the MOEF/SEAC.

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).
Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

(B) SPECIAL CONDITION :-


01to 03 The Special Conditions S.No. 01, 02 and 03 related to --------
Authorities.
04 The Above Stipulations shall be enforced along with Complied. (Grant the
the provision of the Water (Prevention & Control of Consent for AIR/Water /HW
pollution ) Act- 1974 , the Air (Prevention & Control from the Haryana State
of Pollution ) ,Act-1981 and the Environmental Pollution Control Board for
Protection Act-1986, the manufacturing , storage and the year 2014-2015.
import of Hazardous chemical Rules, 1989,Hazardous
waste ( Management & Handling ) Rules , 1989, the
Public Liability Insurance Act, 1991 and rules there
under Environmental Impact Assessment Notifications
no. 1533 (E) dated 14/06/2006 and any other applicable
legislation or restrictions / conditions imposed by any
statutory authority.
05 S. No. 05 related to SLEIAA. Not Applicable.
06 All other statutory clearance such as the approvals for Complied.
storage of diesel from chief controller of explosives,
Fire Department, civil aviation, Deptt. Of Forest
(Conservation) Act, 1980 and Wildlife (Protections)
Act-1972 etc., shall be obtained as applicable, by
project proponents from the competent authorities. All
other safety measure is under taken at site as required
under the laws.
07 & 08 The Special Conditions S. No. 07 and 08 related to the Complied
Authorities.

Note:- The details of Environmental Monitoring Reports as per below.

1) Ambient Air Monitoring Report s - Annexure-1


2) Ground Water Analysis Reports – Annexure-II
3) Noise Monitoring – Annexure-III
4) Soil Testing Reports – Annexure- IV

For The Shahabad Co-op Sugar Mills Limited

(Managing Director)

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).
Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Annexure-I

Detailed Ambient Air Quality Monitoring Results (24-hourly Monitoring)

S. Date Locat Locations. Concen PM-10 PM- SO2 NOx CO


3
No. DD/MM/Y ion tration. (g/m3 2.5 3
(g/m ) (g/m3
(mg/m
Y Code ) (g/m3 ) )
No. )
3
1. 25/06/2014 AAQ Shahabad (g/m )
I Co-Sugar
Mills Factory 74 47 17 24 1.1
Area
2. 25/06/2014 AAQ Shahabad (g/m3)
II Town 94 54 22 29 1.2

3. 25/06/2014 AAQ Ramnagar (g/m3)


III Village 68 46 17 19 1.0

4. 26/06/2014 AAQ Deeg (g/m3)


IV Village 64 49 16 22 1.0

5. 26/06/2014 AAQ Dhola Majra (g/m3)


V Village
66 44 17 21 1.0

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).
Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Annexure-II

Details of Ground Water Quality Monitoring Stations

S. No. Location Code Type Locations and Source.


1 GW1 Ground Water Borewell water Shahabad Co-Sugar
Mills Factory Area.
2 GW2 Ground Water Hand Pump Shahabad
3 GW3 Ground Water Borewell Ramnagar Village
4 GW4 Ground Water Borewell Deeg Village
5 GW5 Ground Water Borewell Dhola Majra Village

Groundwater Quality Monitoring Results.

S.No. Parameters Unit Results


GW1 GW2 GW3 GW4 GW5
1 pH - 7.64 7.84 7.70 8.16 7.98
o
2 Temperature C 26 25 26 26 25
3 Colour Hazen <5 <5 <5 <5 <5
4 Taste - Agreeable Agreeable Agreeable Agreeable Agreeable

5 Conductivity µs/cm 402 587 397 463 1481


6 Turbidity NTU 0.8 0.5 0.8 0.5 0.54
7 TSS mg/l 7 6 <5 <5 <5
8 TDS mg/l 430 480 226 480 830
9 Dissolved mg/l 7.4 7.0 7.8 7.2 6.8
Oxygen
10 Chemical mg/l <10 <10 <10 <10 <10
Oxygen
Demand
11 Biochemical mg/l <5 <5 <5 <5 <5
Oxygen
Demand
12 Oil and mg/l N.D. <2 <2 <2 <2
Grease
13 Total mg/l 108 200 70 266 243
Hardness as
CaCO3

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).
Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

S.No. Parameters Unit Results


GW1 GW2 GW3 GW4 GW5
14 Calcium as mg/l 49 40 34 62 47
Ca
15 Sodium as Na mg/l 17 19 12 19 24
16 Magnesium mg/l 12 25 20 22 29
as Mg
17 Alkalinity mg/l 220 208 174 264 308

18 Nitrate- N mg/l 0.14 0.17 0.12 0.22 0.26

19 Ammonical – mg/l ND ND ND ND ND
N
20 Phosphate as mg/l ND ND ND ND ND
PO4
21 Sulphate as mg/l 10 12 8 12 18
SO4
22 Chloride as mg/l 49 82 49 66 49
Cl
23 Fluoride as F mg/l 0.10 ND 0.20 0.21 0.24
24 Phenols mg/l ND ND ND ND ND
25 Arsenic as As mg/l < 0.001 < 0.001 < 0.001 < 0.001 < 0.001
26 Cadmium as mg/l ND ND ND ND ND
Cd
27 Copper as Cu mg/l < 0.02 < 0.02 < 0.02 < 0.02 < 0.02
28 Lead as Pb mg/l < 0.010 < 0.010 < 0.010 < 0.010 < 0.010
29 Iron as Fe mg/l 0.19 0.21 0.18 0.14 0.16
30 Total mg/l < 0.002 < 0.002 < 0.002 < 0.002 < 0.002
Chromium
31 Zinc as Zn mg/l < 0.05 < 0.05 0.04 <0.05 <0.05
32 Total MPN/ Absent Absent Absent Absent Absent
Coliform 100 ml
33 Faecal MPN/ Absent Absent Absent Absent Absent
Coliform 100 ml
Source: Water samples were collected by us on 25/06/2014.

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).
Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Annexure-III

Ambient Noise Levels.

Leq (dBA) Standard Limits (Leq dB


Location Locations Area (A))
Code.
Code
Day Night Daytime Night Time
ANQ1 Shahabad Ind. 62.8 48.6
Co-Sugar
Mills Factory Industrial – Industrial –
Area 75 70
ANQ2 Shahabad CR 64.2 53.6
Town Commercial
ANQ3 Ramnagar R 58.2 44.2 /Mixed – 65 Commercial/
Village Mixed – 55
Residential/
ANQ4 Deeg Village R 54.2 42.6 Rural – 55 Residential/R
ANQ5 Dhola Majra R 52.9 44.2 ural – 45
Village

Source: Noise Monitoring on 25/06/2014and 26/06/2014.

Area category: I-Industrial, C-Commercial, R-Residential, S-Silence zone


Day time: 6.00 a.m. to 10.00 p.m. Night time: 10.00 p.m. to 6.00 a.m.
Permissible ambient noise standards in dB(A):
 Industrial Area : Day time: 75, Night time: 70
 Commercial Area : Day time: 65, Night time: 55
 Residential Area : Day time: 55, Night time: 45
 Silence Zone : Day time: 50, Night time: 40

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).
Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Annexure-IV

Details of Soil Quality Monitoring Locations.

Approximate Direction
Sampling Distance from with respect
S.No. Station Code Land Use
Location the Power from the
Plant site.
Shahabad Co- - -
1. SQ-I Sugar Mills Agriculture
Factory Area
Agriculture land 2.0 WWN
2. SQ-II near Shahabad Agriculture
Town
Ramnagar 6.0 WN
3. SQ-III Village Agriculture

4. SQ-IV Deeg Village 3.0 EES Agriculture


Dhola Majra 7.0 SW
5. SQ-V Village Agriculture

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).
Six monthly progress report for the period of six months from January-2014 to June-2014 for 24 MW Co-Gen .Power
Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Physico-Chemical Characteristics of Soil in the Study Area.

S. Soil Monitoring Locations


Parameters Unit
No. SQ-I SQ-II SQ-III SQ-IV SQ-V
1 pH - 8.14 7.42 7.28 8.1 7.48

2 Conductivity µmhos/cm 180 228 230 188 179

3 Bulk Density gm/cm 1.14 1.12 1.2 1.3 1.2

4 Soil Porosity % 34 36 46 38 34

5 Permeability cm/sec 0.08 0.08 0.10 0.08 0.09


Water Holding
6 % 28 34 36 29 24
Capacity
7 Organic Carbon % 4.2 5.6 4.4 4.6 4.4
Cation Exchange meq/100
8 16.8 16.4 16.8 14.4 14.6
Capacity gm

9 Nitrogen µg/g 77.28 64.12 61.12 60.31 60.10

Phosphorous
10 µg/g 19.81 24.1 26.2 21.8 22.6
as P
11 Iron as Fe gm/kg 0.064 0.078 0.09 0.086 0.084
12 Lead as Pb gm/kg BDL BDL BDL BDL BDL

13 Sodium µg/g 44.6 68.4 62.6 60.4 62.8

14 Potassium µg/g 118.6 101.8 114.4 116.8 126.2


Texture
a. Sand % 28 26 32 36 29
15
b. Silt % 32 42 36 41 41
c. Clay % 30 39 34 38 32
Source: Soil samples were collected by us on 25/06/2014.

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).