You are on page 1of 2

Criterion C: Project Schedule

Date Action Details Comments and Date Criterion


follow up Completed

Nov. 2018 The teacher The class started I started Nov 8, 2018 A
introduced the researching possible brainstorming ideas of
internal assessment. clients, problems, and clients and solutions
solutions. that I might consider

Nov. 2018 Started a proposal Began thinking of Contacted the client Nov. 16, 2019 A
for the project questions for the and briefly explained
consultation the project and talked
about a possible
solution to the
problem

Dec. 2018 First interview with The problem was Started the search for Dec. 7, 2018 A
Luis furthered discuss. A website inspiration
solution to the that may suit the
problem, Luis decided client’s needs
on a website

Dec. 2018 Write up Criteria A The solution was Discussed the problem Dec. 10, 2018 A
finalized and the and the inadequacies
client approved it.

Dec. 2018 Write Criteria B Description of the Requirements of the Dec. 10, 2018 B
requirements needed solutions were
to solve the problem discussed, as well as
the justification. This

Jan. 2019 Introduction to The teacher I brainstormed ideas Jan. C and D


Criteria C and D introduced the tasks for the tasks

Feb. 2019 Write Criteria C Started to schedule I outlined what will Feb. 5, 2019 C
tasks and actions need to be done to
complete the project

Feb. 2019 Draft of Criterion D Started work on I made a draft of the Feb. 7, 2019 D
criteria D and finished design and sketched
it the website. I’ve
included annotations
as well

Feb. 2019 Consultation with Present ideas to the I showed my draft to Feb. 9,2019 D
the client client the client, he
approved of most of
it and made some
suggestions.

Feb.2019 Changes to Making revisions to I added the changes Feb. 15, 2019 D
Criteria D the design the client wanted,
such as updating the
contact information
that had been given
to me before for the
contact us page

March 2019 Started working I started making the I finished the overall March 3, 2019 E
on the Website basic outline of the design of the
website, such as website/model
pages and tabs

March 2019 Continued I started outlining I finished the home March 10, 2019 E
Website what the page, contact page,
development information on each and about page
page is going to say

March 2019 Continued I worked on the I finished the March 15, 2019 E
Website “ministries” and “ministries” and
development “services” pages “services” pages

March 2019 Continued I worked on the I finished the March 22, 2019 E
Website events page “events” page
development

March 2019 Met with client to I met with the client The client was March 25, 2019 E
show the website and showed him the satisfied with the
website which was website and gave me
mostly done some final pictures
to add

March 2019 Called the client I called the client to The client was March 26, 2019 F
to get feedback get feedback on the satisfied with the
product website and gave me
feedback

March 2019 Final Submission I finished the final March 28, 2019
details on the site

You might also like