ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
TOTAL #REF!
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
2
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
e EF - LG - 2, 3 & 4 unit 3 1,200,000 3,600,000
Service : Toilet, Mini Laundry & Gudang
Kapasitas Total : 200 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
f EF - LG - 5 unit 1 3,800,000 3,800,000
Service : WG, DG & RG
Kapasitas Total : 500 CFM
Daya input : 155 Watt 220/ 1 /50 HZ 1400 rpm
Tipe Fan : IN-LINE Fan
g IF - LG - 1 & 2 unit 2 700,000 1,400,000
Service : W. Kopi & Security
Kapasitas Total : 1.500 CFM
Daya input : 40 Watt 220/ 1 /50 HZ 1400 rpm
Tipe Fan : Natural Wall Fan
3
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
II LANTAI DASAR
2.1 PEKERJAAN AC
Pengadaan dan pemasangan Air Cooled SPLIT- ( R-22 )
lengkap dengan Kabel kontrol, thermostat , Accesories dan peralatan bantu
a IU/OU - D - 1, 2, 3, 4 & 7 unit 5 45,000,000 225,000,000 BY OWNER
Service : Lobby, Koridor & R. Makan
Kapasitas Total : 50,000 BTU/H 5 pk
Sensible : 34,000 BTU/H
V ol. Udara : 1.600 CFM / 200 Pa / 44 dB
Daya input : 436 IU + 4.790 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 3/8 " (9.5mm ) dan 3/4"(19,1 mm)
b IU/OU - D - 8 unit 1 65,000,000 65,000,000 BY OWNER
Service : R. Makan
Kapasitas Total : 75,000 BTU/H
Sensible : 53,000 BTU/H
V ol. Udara : 2.500 CFM / 200 Pa / 44 dB
Daya input : 700 IU + 7.518 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 1/2 " (12.7mm ) dan 1"(25,4 mm)
b IU/OU - D - 5, 6, 9, 10, 11 & 12 unit 6 10,000,000 60,000,000 BY OWNER
Service : Klinik, Musholla, FOM & Retail
Kapasitas Total : 12,000 BTU/H 1.5 pk
Sensible : 8.160 BTU/H
V ol. Udara : 300 CFM
Daya input : 26 IU + 1,289 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 1/2"(12,7 mm)
2.2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
a EF - D - 1 unit 1 2,800,000 2,800,000
Service : Toilet Umum
Kapasitas Total : 900 CFM
Daya input : 200 Watt 220/ 1 /50 HZ 1400 rpm
Tipe Fan : IN-LINE Fan
b EF - D - 2 & 5 unit 2 1,200,000 2,400,000
Service : Tempat Wudhu & Storage
Kapasitas Total : 200 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
c EF - D - 3 unit 1 5,000,000 5,000,000
Service : Dapur
Kapasitas Total : 530 CFM
Daya input : 350 Watt 220/ 1 /50 HZ 1,400 rpm
Tipe Fan : Cooker Hood Exhaust Fan
4
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
d EF - D - 4 unit 1 2,500,000 2,500,000
Service : Dapur
Kapasitas Total : 600 CFM
Daya input : 155 Watt 220/ 1 /50 HZ 1400 rpm
Tipe Fan : IN-LINE Fan
e EF - D - 6 unit 1 1,400,000 1,400,000
Service : ME
Kapasitas Total : 300 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
f FA - D - 1 unit 1 2,400,000 2,400,000
Service : Fresh Air Unit Indoor
Kapasitas Total : 480 CFM
Daya input : 85 Watt 220/ 1 /50 HZ 1400 rpm
Tipe Fan : IN-LINE Fan
2.3 Pekerjaan Instalasi Ducting
Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 52 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Pekerjaan Ducting area Lobby
- 500 x 300 PIR 1.1 m2 mtr 19 308,000 5,852,000
- 400 x 300 PIR 1 m2 mtr 11 280,000 3,080,000
- 300 x 300 PIR 0.9 m2 mtr 8 252,000 2,016,000
- 300 x 200 PIR 0.7 m2 mtr 24 196,000 4,704,000
- 200 x 200 PIR 0.6 m2 mtr 51 168,000 8,568,000
b Pekerjaan Ducting Toilet tanpa isolasi
- 350 x 350 BJLS 60 1.05 m2 mtr 2 210,000 420,000
- 250 x 250 BJLS 60 0.75 p mtr 3 150,000 450,000
- 200 x 200 BJLS 60 0.6 m2 mtr 4 120,000 480,000
- 200 x 150 BJLS 60 0.5 m2 mtr 2 100,000 200,000
- 150 x 150 BJLS 60 0.45 m2 mtr 12 90,000 1,080,000
c Pekerjaan Ducting fresh air ke unit tanpa isolasi
- 200 x 200 BJLS 60 0.6 m2 mtr 39 168,000 6,552,000
2.4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh 34 400,000 13,600,000
b Spigot dia 200 mm bh 34 280,000 9,520,000
d Return Linier 600 x 200 mm c/w bo bh 18 475,000 8,550,000
f Flexible Duct c/w isolasi dia. 150 mm mtr 34 120,000 4,080,000
g EAG 150 x 150mm c/w spliter damper. bh 8 280,000 2,240,000
h PAG 800 x 400 mm c/w spliter damper. bh 2 700,000 1,400,000
i Volume damper 200 x 200mm .FreshAir bh 5 350,000 1,750,000
j Drain pant indoor unit berikut hanger bh 5 1,800,000 9,000,000
k Louvre 200 x 200 mm c/w Hood bh 4 225,000 900,000
2.5 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280 lengkap dengan isolasi class
APDM tebal 20 s/d 25 mm
Dia 1/4 " (6.4mm ) m 70 33,000 2,310,000
Dia 3/8 " ( 9.5mm ) m 37 49,000 1,813,000
Dia 1/2 " (12.7mm) m 31 68,000 2,108,000
Dia 3/4 " (19.1mm) m 15 97,000 1,455,000
b Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM
tebal 13 mm
Dia 1" ( 25mm ) m 70 39,000 2,730,000
Dia 1 3/4 " ( 32mm ) m 4 41,000 164,000
2.6 Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor
ke indoor, Ladder pipa ac termasuk kabel kontrol, exhaust fan dan grounding-
5
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
a Pengadaan dan Pemasangan Kabel power listrik kemasing-masing unit indoor
lengkap dengan peralatan bantu
- NYY 3 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 62 18,500 1,147,000
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 85 15,000 1,275,000
6
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
3.5 Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor
ke indoor, Ladder pipa ac termasuk kabel kontrol, exhaust fan dan grounding-
a Pengadaan dan Pemasangan Kabel power listrik kemasing-masing unit indoor
lengkap dengan peralatan bantu
- NYY 4 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 62 18,500 1,147,000
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 85 15,000 1,275,000
IV LANTAI 1 ( SATU )
4.1 PEKERJAAN AC
Pengadaan dan pemasangan Air Cooled SPLIT- ( R-22 )
lengkap dengan Kabel kontrol, thermostat , Accesories dan peralatan bantu
a OU/IU - 1 - 1 & 2 unit 2 145,000,000 290,000,000 BY OWNER
Service : Pre Function
Kapasitas Total : 100,000 BTU/H 10 pk
Sensible : 68,000 BTU/H
Vol. Udara /rpm/Noise : 3.200 CFM /200 Pa / 43dB
Daya input : 872 IU+ 9,700 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 5/8 " (15.9mm ) dan 1 1/8"(28,5mm)
b OU/ IU - 1 - 3 unit 1 35,000,000 35,000,000 BY OWNER
Service : Koridor
Kapasitas Total : 30,000 BTU/H
Sensible : 20.400 BTU/H
Vol. Udara /rpm/Noise : 900 CFM / 200 Pa / 41 dB
Daya input : 160 IU + 2,824 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 3/8 " (9.5mm ) dan 5/8"(15,9 mm)
c OU/IU - 1 - 4, 5, 6, 7, 8 & 9 unit 6 10,000,000 60,000,000 BY OWNER
Service : R. Rapat
Kapasitas Total : 12,000 BTU/H 1.5 pk
Sensible : 8.160 BTU/H
Vol. Udara /rpm/Noise : 300 CFM
Daya input : 26 IU + 1,840 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 1/2"(12,7 mm)
d IU/OU - 1 - 10, 11, 12 & 13 unit 4 65,000,000 260,000,000 BY OWNER
Service : R. Serbaguna
Kapasitas Total : 75,000 BTU/H
Sensible : 53,000 BTU/H
V ol. Udara : 2.500 CFM / 200 Pa / 44 dB
Daya input : 700 IU + 7.518 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 1/2 " (12.7mm ) dan 1"(25,4 mm)
4.2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
a EF - 1 - 1 unit 1 2,800,000 2,800,000
Service : Toilet Umum
Kapasitas Total : 900 CFM
Daya input : 200 Watt 220/ 1 /50 HZ 1400 rpm
Tipe Fan : IN-LINE Fan
7
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
b EF - 1 - 2 unit 1 1,400,000 1,400,000
Service : ME
Kapasitas Total : 300 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
c EF - 1 - 3 unit 1 5,000,000 5,000,000
Service : Pantry
Kapasitas Total : 530 CFM
Daya input : 350 Watt 220/ 1 /50 HZ 1,400 rpm
Tipe Fan : Cooker Hood Exhaust Fan
d EF - 1 - 4 unit 1 1,850,000 1,850,000
Service : Gudang
Kapasitas Total : 600 CFM
Daya input : 60 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
e EF - 1 - 5 & 6 unit 2 800,000 1,600,000
Service : R. Ganti Pria & Ganti Wanita
Kapasitas Total : 600 CFM
Daya input : 68 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Ceiling Fan
f EF - 1 - 7 unit 2 500,000 1,000,000
Service : Ruang Ganti
Kapasitas Total : 120 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Ceiling Fan
4.3 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 52 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a ( area Lobby & Kantor )
- 900 x 300 PIR 1.5 m2 mtr 5 420,000 2,100,000
- 800 x 300 PIR 1.4 m2 mtr 10 392,000 3,920,000
- 700 x 300 PIR 1.3 m2 mtr 5 364,000 1,820,000
- 500 x 300 PIR 1.1 m2 mtr 10 308,000 3,080,000
- 400 x 300 PIR 1 m2 mtr 15 280,000 4,200,000
- 300 x 300 PIR 0.9 m2 mtr 5 252,000 1,260,000
- 300 x 200 PIR 0.7 m2 mtr 10 196,000 1,960,000
- 200 x 200 PIR 0.6 m2 mtr 42 168,000 7,056,000
b Pekerjaan Ducting Toilet tanpa isolasi
- 350 x 350 BJLS 60 1.05 m2 mtr 2 294,000 588,000
- 250 x 250 BJLS 60 0.75 m2 mtr 3 210,000 630,000
- 200 x 200 BJLS 60 0.6 m2 mtr 4 168,000 672,000
- 200 x 150 BJLS 60 0.5 m2 mtr 2 140,000 280,000
- 150 x 150 BJLS 60 0.45 m2 mtr 12 126,000 1,512,000
c Pekerjaan Ducting fresh air ke unit tanpa isolasi
- 200 x 200 BJLS 60 0.6 m2 mtr 8 168,000 1,344,000
- 150 x 150 BJLS 60 0.45 m2 mtr 12 41,000 492,000
4.4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh 28 400,000 11,200,000
b Spigot dia 200 mm bh 28 280,000 7,840,000
c Return Linier 600 x 150 mm c/w bo bh 15 475,000 7,125,000
d Flexible Duct c/w isolasi dia. 150 mm mtr 28 475,000 13,300,000
e EAG 150 x 150mm c/w spliter damper. bh 8 400,000 3,200,000
f PAG 800 x 400 mm c/w spliter damper. bh 2 120,000 240,000
g Volume damper 150 x 150mm Fresh Air bh 1 280,000 280,000
h Volume damper 200 x 200mm .FreshAir bh 2 350,000 700,000
i Drain pant indoor unit berikut hanger bh 3 1,800,000 5,400,000
8
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
j Louvre 200 x 200 mm c/w Hood bh 2 225,000 450,000
4.5 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280 lengkap dengan isolasi class
APDM tebal 20 s/d 25 mm
Dia 1/4 " (6.4mm ) m 10 33,000 330,000
Dia 3/8 " ( 9.5mm ) m 15 49,000 735,000
Dia 1/2 " (12.7mm) m 23 68,000 1,564,000
Dia 5/8 " (15.9mm) m 70 77,000 5,390,000
Dia 3/4 " (19.1mm) m 18 97,000 1,746,000
Dia 1 " (25.4mm) m 10 135,000 1,350,000
Dia 1 1/8 "(28.58mm) m 58 138,000 8,004,000
b Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM
tebal 13 mm
Dia 1" ( 25mm ) m 50 39,000 1,950,000
Dia 1 3/4 " ( 32mm ) m 10 41,000 410,000
Dia 2" ( 50mm ) m 10 49,000 490,000
4.6 Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor
ke indoor, Ladder pipa ac termasuk kabel kontrol, exhaust fan dan grounding-
a Pengadaan dan Pemasangan Kabel power listrik kemasing-masing unit indoor
lengkap dengan peralatan bantu
- NYY 4 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 62 18,500 1,147,000
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 85 15,000 1,275,000
b Pengadaan dan Pemasangan Kabel kontrol dari Outdoor Unit ke Indoor Unit
lengkap dengan peralatan bantu
- NYY 2 x 1,5 mm2 dari OUV-AT-4 ke Masing-masing Indoor unit mtr 75 20,500 1,537,500
V LANTAI 2 ( DUA )
5.1 PEKERJAAN AC
Pengadaan dan pemasangan Air Cooled SPLIT- ( R-22 )
lengkap dengan Kabel kontrol, thermostat , Accesories dan peralatan bantu
a IU/OU - 2 - 1 & 2 unit 2 45,000,000 90,000,000 BY OWNER
Service : Lounge
Kapasitas Total : 50,000 BTU/H
Sensible : 34,000 BTU/H
V ol. Udara : 1.600 CFM / 200 Pa / 44 dB
Daya input : 436 IU + 4.790 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 3/8 " (9.5mm ) dan 3/4"(19,1 mm)
b IU/OU - 2 - 3, 4, 13 & 20 unit 4 6,000,000 24,000,000 BY OWNER
Service : R. Alat, R. VA, Musholla & CLS
Kapasitas Total : 9,000 BTU/H
Sensible : 6.120 BTU/H
Vol. Udara /rpm/Noise : 300 CFM
Daya input : 25 IU + 862 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 3/8"(9,5 mm)
c OU/IU - 2 - 5, 6, 7, 8, 9, 10, 11, 12, 14, 15, 16, 17, 18, 19, 21, 22, 23, 26, 27, 2 unit 21 10,000,000 210,000,000 BY OWNER
Service : R. Pustaka, R. Baca, R. Diskusi, R. Dosen, R. Rapat
R. Materi, R. File, R. Tata Usaha, Kapus & R. Tamu
Kapasitas Total : 12,000 BTU/H
Sensible : 8.160 BTU/H
Vol. Udara /rpm/Noise : 300 CFM
Daya input : 26 IU + 1,840 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 1/2"(12,7 mm)
9
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
d IU/OU - 2 - 24 & 25 unit 2 6,000,000 12,000,000 BY OWNER
Service : SEKR
Kapasitas Total : 7,800 BTU/H
Sensible : 5.300 BTU/H
Vol. Udara /rpm/Noise : 300 CFM
Daya input : 25 IU + 717 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 3/8"(9,5 mm)
5.2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
a EF - 2 - 1 unit 1 2,800,000 2,800,000
Service : Toilet Umum
Kapasitas Total : 900 CFM
Daya input : 200 Watt 220/ 1 /50 HZ 1400 rpm
Tipe Fan : IN-LINE Fan
b EF - 2 - 2 unit 1 1,400,000 1,400,000
Service : ME
Kapasitas Total : 300 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
c EF - 2 - 3 unit 1 1,800,000 1,800,000
Service : Gudang
Kapasitas Total : 400 CFM
Daya input : 40 Watt 220/ 1 /50 HZ 1.300 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
d FA - 2 - 1 unit 1 3,300,000 3,300,000
Service : Servise Indoor Unit R. Serbaguna
Kapasitas Total : 1.000 CFM
Daya input : 350 Watt 220/ 1 /50 HZ 1300 rpm
Tipe Fan : IN-LINE Fan
5.3 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 52 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Area Lobby
- 500 x 300 PIR 1.1 m2 mtr 35 308,000 10,780,000
- 400 x 300 PIR 1 m2 mtr 20 280,000 5,600,000
- 300 x 300 PIR 0.9 m2 mtr 25 252,000 6,300,000
- 300 x 200 PIR 0.7 m2 mtr 25 196,000 4,900,000
- 200 x 200 PIR 0.6 m2 mtr 48 168,000 8,064,000
b Pekerjaan Ducting Toilet tanpa isolasi
- 350 x 350 BJLS 60 1.05 m2 mtr 2 294,000 588,000
- 250 x 250 BJLS 60 0.6 m2 mtr 3 168,000 504,000
- 200 x 200 BJLS 60 0.6 m2 mtr 4 168,000 672,000
- 200 x 150 BJLS 60 0.5 m2 mtr 2 140,000 280,000
- 150 x 150 BJLS 60 0.45 m2 mtr 12 126,000 1,512,000
10
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
c Pekerjaan Ducting fresh air ke unit tanpa isolasi
- 300 x 300 BJLS 60 0.9 m2 mtr 10 252,000 2,520,000
- 250 x 250 BJLS 60 0.75 m2 mtr 7 210,000 1,470,000
- 200 x 200 BJLS 60 0.6 m2 mtr 14 168,000 2,352,000
d Pekerjaan Ducting Return
- 300 x 300 PIR 0.9 m2 mtr 18 252,000 4,536,000
- 300 x 200 PIR 0.7 m2 mtr 17 196,000 3,332,000
- 200 x 200 PIR 0.6 m2 mtr 23 168,000 3,864,000
5.4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh 32 400,000 12,800,000
b Spigot dia 200 mm bh 32 280,000 8,960,000
d Return Linier 600 x 150 mm c/w bo bh 23 475,000 10,925,000
f Flexible Duct c/w isolasi dia. 150 mm mtr 32 120,000 3,840,000
g FAG 200X200 mm c/w wire mesh&anti serangga. bh 1 280,000 280,000
h EAG 150 x 150mm c/w spliter damper. bh 8 300,000 2,400,000
i PAG 800 x 400 mm c/w spliter damper. bh 2 700,000 1,400,000
j Volume damper 200 x 200mm .FreshAir bh 6 350,000 2,100,000
l Drain pant indoor unit berikut hanger bh 6 1,800,000 10,800,000
m Louvre 200 x 200 mm c/w Hood bh 2 225,000 450,000
5.5 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280 lengkap dengan isolasi class
APDM tebal 20 s/d 25 mm
Dia 1/4 " (6.4mm ) m 35 33,000 1,155,000
Dia 3/8 " ( 9.5mm ) m 8 49,000 392,000
Dia 1/2 " (12.7mm) m 25 68,000 1,700,000
Dia 3/4 " (19.1mm) m 20 97,000 1,940,000
b Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM
tebal 13 mm
Dia 1" ( 25mm ) m 55 39,000 2,145,000
Dia 1 3/4 " ( 32mm ) m 20 41,000 820,000
5.6 Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor
ke indoor, Ladder pipa ac termasuk kabel kontrol, exhaust fan dan grounding-
a Pengadaan dan Pemasangan Kabel power listrik kemasing-masing unit indoor
lengkap dengan peralatan bantu
- NYY 4 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 62 18,500 1,147,000
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 85 15,000 1,275,000
VI LANTAI 3 ( TIGA )
6.1 PEKERJAAN AC
Pengadaan dan pemasangan Air Cooled SPLIT- ( R-22 )
lengkap dengan Kabel kontrol, thermostat , Accesories dan peralatan bantu
a IU/OU - 3 - 1 & 2 unit 2 45,000,000 90,000,000 BY OWNER
Service : Lounge
Kapasitas Total : 50,000 BTU/H
Sensible : 34,000 BTU/H
V ol. Udara : 1.600 CFM / 200 Pa / 44 dB
Daya input : 436 IU + 4.790 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 3/8 " (9.5mm ) dan 3/4"(19,1 mm)
b IU/OU - 3 - 3 & 4 unit 2 6,000,000 12,000,000 BY OWNER
Service : R. Alat & R. Materi
Kapasitas Total : 9,000 BTU/H
11
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
Sensible : 6.120 BTU/H
Vol. Udara /rpm/Noise : 300 CFM
Daya input : 25 IU + 862 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 3/8"(9,5 mm)
c OU/IU - 3 - 5, 6, 7, 8, 9, 10, 11, 12, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25 unit 32 10,000,000 320,000,000 BY OWNER
28, 29, 30, 31, 32, 33, 34, 35, 36 & 37
Service : R. Kelas 1, CLS, R. Kelas 2, Ujian, Lab. BHS
Lab. Kom
Kapasitas Total : 12,000 BTU/H
Sensible : 8.160 BTU/H
Vol. Udara /rpm/Noise : 300 CFM
Daya input : 26 IU + 1,840 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 1/2"(12,7 mm)
6.2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
a EF - 3 - 1 unit 1 2,800,000 2,800,000
Service : Toilet Umum
Kapasitas Total : 900 CFM
Daya input : 200 Watt 220/ 1 /50 HZ 1400 rpm
Tipe Fan : IN-LINE Fan
b EF - 3 - 2 unit 1 1,400,000 1,400,000
Service : ME
Kapasitas Total : 300 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
6.3 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct 1,800,000 14,400,000
Polyisocyanurate, Non CFC, tebal 20 mm density 52 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Area Lobby
- 500 x 300 PIR 1.1 m2 mtr 30 308,000 9,240,000
- 400 x 300 PIR 1 m2 mtr 6 280,000 1,680,000
- 300 x 300 PIR 0.9 m2 mtr 8 252,000 2,016,000
- 300 x 200 PIR 0.7 m2 mtr 7 196,000 1,372,000
- 200 x 200 PIR 0.6 m2 mtr 23 168,000 3,864,000
b Pekerjaan Ducting Toilet tanpa isolasi
- 350 x 350 BJLS 60 1.05 m2 mtr 2 294,000 588,000
- 250 x 250 BJLS 60 0.75 m2 mtr 3 210,000 630,000
- 200 x 200 BJLS 60 0.6 m2 mtr 4 168,000 672,000
- 200 x 150 BJLS 60 0.5 m2 mtr 2 140,000 280,000
- 150 x 150 BJLS 60 0.45 m2 mtr 12 126,000 1,512,000
c Pekerjaan Ducting fresh air ke unit tanpa isolasi
- 200 x 200 BJLS 60 0.6 m2 mtr 8 168,000 1,344,000
6.4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh 15 400,000 6,000,000
b Spigot dia 200 mm bh 15 280,000 4,200,000
d Return Linier 600 x 150 mm c/w bo bh 10 475,000 4,750,000
f Flexible Duct c/w isolasi dia. 150 mm mtr 15 120,000 1,800,000
h EAG 150 x 150mm c/w spliter damper. bh 8 300,000 2,400,000
i PAG 800 x 400 mm c/w spliter damper. bh 2 700,000 1,400,000
j Volume damper 200 x 200mm .FreshAir bh 2 350,000 700,000
12
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
l Drain pant indoor unit berikut hanger bh 2 1,800,000 3,600,000
m Louvre 200 x 200 mm c/w Hood bh 2 225,000 450,000
6.5 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280 lengkap dengan isolasi class
APDM tebal 20 s/d 25 mm
Dia 1/4 " (6.4mm ) m 130 33,000 4,290,000
Dia 3/8 " ( 9.5mm ) m 20 49,000 980,000
Dia 1/2 " (12.7mm) m 122 68,000 8,296,000
Dia 3/4 " (19.1mm) m 16 97,000 1,552,000
b Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM
tebal 13 mm
Dia 1" ( 25mm ) m 130 39,000 5,070,000
Dia 1 3/4 " ( 32mm ) m 16 41,000 656,000
6.6 Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor
ke indoor, Ladder pipa ac termasuk kabel kontrol, exhaust fan dan grounding-
a Pengadaan dan Pemasangan Kabel power listrik kemasing-masing unit indoor
lengkap dengan peralatan bantu
- NYY 4 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 62 18,500 1,147,000
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 85 15,000 1,275,000
13
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
b EF - 4 - 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23,
24, 25, 26, 27, 28, 29, 30 & 31 unit 29 400,000 11,600,000
26, 27, 28, 29, 30 & 31
Service : Toilet Unit Kamar Type Standar & Type Eksekutif
Kapasitas Total : 90 CFM
Daya input : 15 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Ceiling Fan
7.3 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 52 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Area Lobby
- 500 x 300 PIR 1.1 m2 mtr 18 308,000 5,544,000
- 400 x 300 PIR 1 m2 mtr 12 280,000 3,360,000
- 300 x 300 PIR 0.9 m2 mtr 12 252,000 3,024,000
- 300 x 200 PIR 0.7 m2 mtr 13 196,000 2,548,000
- 200 x 200 PIR 0.6 m2 mtr 18 168,000 3,024,000
b Pekerjaan Ducting Toilet tanpa isolasi
- 250 x 200 BJLS 60 0.6 m2 mtr 5 168,000 840,000
- 200 x 150 BJLS 60 0.5 m2 mtr 2 140,000 280,000
- 150 x 150 BJLS 60 0.45 m2 mtr 9 126,000 1,134,000
c Pekerjaan Ducting fresh air ke unit tanpa isolasi
- 200 x 200 BJLS 60 0.6 m2 mtr 8 168,000 1,344,000
7.4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh 12 400,000 4,800,000
b Spigot dia 200 mm bh 12 280,000 3,360,000
c Supply Linier 600 x 200 mm c/w bok bh 11 475,000 5,225,000
f Flexible Duct c/w isolasi dia. 150 mm mtr 12 120,000 1,440,000
i PAG 800 x 400 mm c/w spliter damper. bh 2 700,000 1,400,000
j Volume damper 200 x 200mm .FreshAir bh 2 350,000 700,000
l Drain pant indoor unit berikut hanger bh 2 1,800,000 3,600,000
m Louvre 200 x 200 mm c/w Hood bh 2 225,000 450,000
7.5 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280 lengkap dengan isolasi class
APDM tebal 20 s/d 25 mm
Dia 1/4 " (6.4mm ) m 116 33,000 3,828,000
Dia 3/8 " ( 9.5mm ) m 134 49,000 6,566,000
Dia 3/4 " (19.1mm) m 20 97,000 1,940,000
b Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM
tebal 13 mm
Dia 1" ( 25mm ) m 116 39,000 4,524,000
Dia 1 3/4 " ( 32mm ) m 20 41,000 820,000
7.6 Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor
ke indoor, Ladder pipa ac termasuk kabel kontrol, exhaust fan dan grounding-
a Pengadaan dan Pemasangan Kabel power listrik kemasing-masing unit indoor
lengkap dengan peralatan bantu
- NYY 4 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 62 18,500 1,147,000
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 85 15,000 1,275,000
14
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
VIII LANTAI 5 ( LIMA )
8.1 PEKERJAAN AC
Pengadaan dan pemasangan Air Cooled SPLIT- ( R-22 )
lengkap dengan Kabel kontrol, thermostat , Accesories dan peralatan bantu
a IU/OU - 5 - 1 & 2 unit 2 45,000,000 90,000,000 BY OWNER
Service : Lounge
Kapasitas Total : 50,000 BTU/H
Sensible : 34,000 BTU/H
V ol. Udara : 1.600 CFM / 200 Pa / 44 dB
Daya input : 436 IU + 4.790 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 3/8 " (9.5mm ) dan 3/4"(19,1 mm)
b IU/OU - 5 - 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22 unit 30 6,000,000 180,000,000 BY OWNER
25, 26, 27, 28, 29, 30, 31 & 32
Service : Unit Kamar Type Standar & Type Eksekutif
Kapasitas Total : 9,000 BTU/H
Sensible : 6.120 BTU/H
Vol. Udara /rpm/Noise : 300 CFM
Daya input : 25 IU + 862 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 3/8"(9,5 mm)
8.2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
a EF - 5 - 1 & 2 unit 2 1,400,000 2,800,000
Service : ME & Linen
Kapasitas Total : 300 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
b EF - 5 - 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23,
24, 25 ,26, 27, 28, 29, 30 & 31 unit 29 400,000 11,600,000
15
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
c Pekerjaan Ducting fresh air ke unit tanpa isolasi
- 200 x 200 BJLS 60 0.6 m2 mtr 8 168,000 1,344,000
8.4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh 12 400,000 4,800,000
b Spigot dia 200 mm bh 12 280,000 3,360,000
c Supply Linier 600 x 200 mm c/w bok bh 11 475,000 5,225,000
f Flexible Duct c/w isolasi dia. 150 mm mtr 12 120,000 1,440,000
i PAG 800 x 400 mm c/w spliter damper. bh 2 700,000 1,400,000
j Volume damper 200 x 200mm .FreshAir bh 2 350,000 700,000
m Drain pant indoor unit berikut hanger bh 2 1,800,000 3,600,000
n Louvre 200 x 200 mm c/w Hood bh 2 225,000 450,000
8.5 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280 lengkap dengan isolasi class
APDM tebal 20 s/d 25 mm
Dia 1/4 " (6.4mm ) m 116 33,000 3,828,000
Dia 3/8 " ( 9.5mm ) m 134 49,000 6,566,000
Dia 3/4 " (19.1mm) m 20 97,000 1,940,000
b Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM
tebal 13 mm
Dia 1" ( 25mm ) m 116 39,000 4,524,000
Dia 1 3/4 " ( 32mm ) m 20 41,000 820,000
8.6 Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor
ke indoor, Ladder pipa ac termasuk kabel kontrol, exhaust fan dan grounding-
a Pengadaan dan Pemasangan Kabel power listrik kemasing-masing unit indoor
lengkap dengan peralatan bantu
- NYY 4 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 62 18,500 1,147,000
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 85 15,000 1,275,000
IX LANTAI 6 ( ENAM )
9.1 PEKERJAAN AC
Pengadaan dan pemasangan Air Cooled SPLIT- ( R-22 )
lengkap dengan Kabel kontrol, thermostat , Accesories dan peralatan bantu
a IU/OU - 6 - 1 & 2 unit 2 45,000,000 90,000,000 BY OWNER
Service : Lounge
Kapasitas Total : 50,000 BTU/H
Sensible : 34,000 BTU/H
V ol. Udara : 1.600 CFM / 200 Pa / 44 dB
Daya input : 436 IU + 4.790 OU Watt 380/3/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 3/8 " (9.5mm ) dan 3/4"(19,1 mm)
b IU/OU - 6 - 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22 unit 30 6,000,000 180,000,000 BY OWNER
25, 26, 27, 28, 29, 30, 31 & 32
Service : Unit Kamar Type Standar & Type Eksekutif
Kapasitas Total : 9,000 BTU/H
Sensible : 6.120 BTU/H
Vol. Udara /rpm/Noise : 300 CFM
Daya input : 25 IU + 862 OU Watt 220/1/50 HZ
Tipe Indoor : Spilt Wall Mounted
Liquit & gas : dia 1/4 " (6.4mm ) dan 3/8"(9,5 mm)
9.2 PEKERJAAN MEKANIKAL FAN
Pengadaan dan pemasangan INTAKE & EXHAUST FAN
lengka dengan Kable kotrol, Speed Kotrol , Acesoris dan peralatan bantu
16
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
a EF - 6 - 1 & 2 unit 2 1,400,000 2,800,000
Service : ME & Linen
Kapasitas Total : 300 CFM
Daya input : 32 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Axial Wall Fan c/w Auto Shutter
EF - 6 - 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23,
b 24, 25 unit 29 400,000 11,600,000
26, 27, 28, 29, 30 & 31
Service : Toilet Unit Kamar Type Standar & Type Eksekutif
Kapasitas Total : 90 CFM
Daya input : 15 Watt 220/ 1 /50 HZ 950 rpm
Tipe Fan : Ceiling Fan
9.3 Pengadaan dan pemasangan ducting AC suplly dan return dengan PIR panel Duct
Polyisocyanurate, Non CFC, tebal 20 mm density 52 kg/m3, Thermal konductivity
0,0117w/m°C Temperatur bekerja - 60s/d 80 °C, Flame retardan lengkap dengan
acesoris,pengantung &material bantu.
a Area Lobby
- 500 x 300 PIR 1.1 m2 mtr 18 308,000 5,544,000
- 400 x 300 PIR 1 m2 mtr 12 280,000 3,360,000
- 300 x 300 PIR 0.9 m2 mtr 12 252,000 3,024,000
- 300 x 200 PIR 0.7 m2 mtr 13 196,000 2,548,000
- 200 x 200 PIR 0.6 m2 mtr 18 168,000 3,024,000
b Pekerjaan Ducting Toilet tanpa isolasi
- 250 x 200 BJLS 60 0.6 m2 mtr 5 168,000 840,000
- 200 x 150 BJLS 60 0.5 m2 mtr 2 140,000 280,000
- 150 x 150 BJLS 60 0.45 m2 mtr 9 126,000 1,134,000
c Pekerjaan Ducting fresh air ke unit tanpa isolasi
- 200 x 200 BJLS 60 0.6 m2 mtr 8 168,000 1,344,000
9.4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a Diffuser 300 x 300 c/w spliter damper bh 12 400,000 4,800,000
b Spigot dia 200 mm bh 12 280,000 3,360,000
c Supply Linier 600 x 200 mm c/w bok bh 11 475,000 5,225,000
f Flexible Duct c/w isolasi dia. 150 mm mtr 12 120,000 1,440,000
i PAG 800 x 400 mm c/w spliter damper. bh 2 700,000 1,400,000
j Volume damper 200 x 200mm .FreshAir bh 2 350,000 700,000
l Drain pant indoor unit berikut hanger bh 2 1,800,000 3,600,000
m Louvre 200 x 200 mm c/w Hood bh 2 225,000 450,000
9.5 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280 lengkap dengan isolasi class
APDM tebal 20 s/d 25 mm
Dia 1/4 " (6.4mm ) m 116 33,000 3,828,000
Dia 3/8 " ( 9.5mm ) m 134 49,000 6,566,000
Dia 3/4 " (19.1mm) m 20 97,000 1,940,000
b Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM
tebal 13 mm
Dia 1" ( 25mm ) m 116 39,000 4,524,000
Dia 1 3/4 " ( 32mm ) m 20 41,000 820,000
9.6 Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor
ke indoor, Ladder pipa ac termasuk kabel kontrol, exhaust fan dan grounding-
a Pengadaan dan Pemasangan Kabel power listrik kemasing-masing unit indoor
lengkap dengan peralatan bantu
- NYY 4 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 62 18,500 1,147,000
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 85 15,000 1,275,000
17
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA KET
Rp Rp
10.1 PEKERJAAN AC
Pengadaan dan pemasangan Air Cooled SPLIT- ( R-22 )
lengkap dengan Kabel kontrol, thermostat , Accesories dan peralatan bantu
a IU/OU - RML - 1 unit 1 6,560,000 6,560,000 BY OWNER
Service : Service R.Mesin Lift
Kapasitas Total : 18,000 BTU/H
Sensible : 12,250 BTU/H
V ol. Udara : 530 CFM
Daya input : 53 IU + 2.080 OU Watt 220/1/50 HZ
Tipe Indoor : Duct Ceiling Mounting High Static Pres
Liquit & gas : dia 1/4 " (6.4mm ) dan 5/8"(15,9 mm)
10.2 Pekerjaan Peralatan mekanikal FAN
a EF - ME - 1, 2 & 3 unit 3 17,003,000 51,009,000
Service : R. Mekanikal
Kapasitas Total : 2,000 CFM
Daya Input : 250 Watt 220/1/50 HZ
Tipe Fan : Axial Wall Fan c/w Auto Shutter
b PF - AT - 1 & 2 unit 2 17,003,000 34,006,000
Service : R. Mekanikal
Kapasitas Total : 12,000 CFM
Daya Input : 5500 Watt 380/3/50 HZ
Tipe Fan : Axial Tube Fan c/w Range Hood & Wire Mesh
10.3 Pekerjaan Ducting Fresh air tanpa isolasi di Lt. Atap c/w zincromate &
cat ducting dilengkapi wire mase anti serangga.
- 700x 700 BJLS 80 0.7 m2 mtr 6 196,000 1,176,000
10.4 Pengadaan dan pekerjaan Air Terminal c/w accessories
a PAG 800 x 400 mm c/w spliter damper. bh 2 700,000 1,400,000
10.5 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280 lengkap dengan isolasi class
APDM tebal 20 s/d 25 mm
Dia 1/4 " (6.4mm ) m 5 33,000 165,000
Dia 5/8 " (15.9mm) m 5 77,000 385,000
b Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM
tebal 13 mm
Dia 1" ( 25mm ) m 5 39,000 195,000
10.6 Kabel Feeder
a Pekerjaan Pengkabelan dari PP-VAC ke unit Outdoor, dari Outdoor ke indoor,
Ladder pipa ac termasuk kabel kontrol,
- NYY 4 x 4 mm2 power Pressurize Fan ke PP - VAC - Atap mtr 94 55,000 5,170,000
- NYY 4 x 2,5 mm2 dari PP-VAC ke Masing-masing Indoor unit mtr 5 18,500 92,500
- NYM 3x2.5 mm2 Cabel control ke Masing-masing Indoor unit mtr 12 15,000 180,000
18
NO. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA REFERENSI HARGA
(Rp.) (Rp.)
1 PERALATAN UTAMA
a Pompa Transfer ( PT 201-202 ) Set 2 270,833 541,667
Kapasitas : 50 liter / menit
Head : 49 meter
Daya : 1,2 kW
Putaran : 1500 rpm
Terdiri dari 2 unit pump lengkap dgn pengkabelan, Panel
kontrol dan accessories ( 1 Operasi, 1 Cadangan)
c Pompa Transfer (dari Tangki WWTP ke Tangki RWT) Set 2 187,000 374,000
Kapasitas : 25 liter / menit
Head : 20 meter
Daya : 0.35 KW
Putaran : 2900 rpm
Terdiri dari 2 unit pump lengkap dgn pengkabelan, Panel
kontrol dan accessories ( 1 Operasi, 1 Cadangan)
e Sand filter
Kapasitas : 9 m³/jam Unit 1 1,250,000 1,250,000
f Carbon filter
Kapasitas : 9 m³/jam Unit 1 1,250,000 1,250,000
g Grease Trap
Kapasitas : 100 Liter Unit 2 166,667 333,333
jumlah 4,498,000
19
NO. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA REFERENSI HARGA
(Rp.) (Rp.)
2 INSTALASI RUANG POMPA & GROUND TANK
Water Heater Electrik Kap. 50 Liter unit 1 253,166 253,166
Water Heater Electrik Kap. 30 Liter unit 28 206,666 5,786,648
20
NO. JENIS PEKERJAAN SATUAN VOLUME HARGA JUMLAH HARGA KETERANGAN
SATUAN (Rp.)
(Rp.)
SISTEM HYDRANT
Peralatan Utama
1 Electric Hydrant Pump lengkap dengan panel kontrol Unit 1 1,541,666 1,541,666
NFPA 20
Kapasitas : 750 GPM
Head : 95 meter
Daya : 156,42 KW
Putaran : 2900 rpm
Type : Horisontal Split Case
2 Diessel Hydrant Pump lengkap dengan panel kontrol Unit 1 1,541,666 1,541,666
NFPA 20
Kapasitas : 750 GPM
Head : 95 meter
Daya : 187,7 KW
Putaran : 2900 rpm
Type : Horisontal Split Case
3 Jockey Pump lengkap dengan panel kontrol Unit 1 583,333 583,333
NFPA 20
Kapasitas : 25 GPM
Head : 105 meter
Daya : 3,4 KW
Putaran : 2900 rpm
Type : Vertical End Suction
4 Tanki Solar kap 500 ltr lengkap dengan accessories Unit 1 300,000 300,000
jumlah 3,966,665
5 Instalasi Hydrant Lantai Low Ground
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
6 Instalasi Hidran Lantai Ground
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
7 Instalasi Hidran Lantai Mezzanine
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
8 Instalasi Hidran Lantai 1
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
9 Instalasi Hidran Lantai 2
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
10 Instalasi Hidran Lantai 3
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
11 Instalasi Hidran Lantai 4
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
12 Instalasi Hidran Lantai 5
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
13 Instalasi Hidran Lantai 6
Indoor Hydrant Box dan nozzel dan Accessories set 2 250,000 500,000
14 Instalasi Hidran Lantai 7
Indoor Hydrant Box dan nozzel dan Accessories set 1 250,000 250,000
jumlah 4,750,000
2 Instalasi Sprinkler Lantai Low Ground
Head Sprikler tipe pendant ttk 26 4,166 108,316
Head Sprikler tipe Upright ttk 58 4,166 241,628
3 Instalasi Sprinkler Lantai Dasar
21
NO. JENIS PEKERJAAN SATUAN VOLUME HARGA JUMLAH HARGA KETERANGAN
SATUAN (Rp.)
(Rp.)
Head Sprikler tipe pendant ttk 57 4,166 237,462
4 Instalasi Sprinkler Lantai Mezzzanine
Head Sprikler tipe pendant ttk 55 4,166 229,130
5 Instalasi Sprinkler Lantai 1
Head Sprikler tipe pendant ttk 48 4,166 199,968
6 Instalasi Sprinkler Lantai 2
Head Sprikler tipe pendant ttk 54 4,166 224,964
7 Instalasi Sprinkler Lantai 3
Head Sprikler tipe pendant ttk 54 4,166 224,964
8 Instalasi Sprinkler Lantai 4
Head Sprikler tipe pendant ttk 50 4,166 208,300
22
NO. JENIS PEKERJAAN SATUAN VOLUME HARGA JUMLAH HARGA KETERANGAN
SATUAN (Rp.)
(Rp.)
9 Instalasi Sprinkler Lantai 5
Head Sprikler tipe pendant ttk 50 4,166 208,300
11 Instalasi Sprinkler Lantai 7
Head Sprikler tipe pendant ttk 6 4,166 24,996
jumlah 4,750,000
1 Lantai Lower Ground
FE kap. 6 kg bh 1 125,000 125,000
FE kap. 23 kg c/w troly ( CO2 ) ( R.Genset ) bh 1 1,000,000 1,000,000
2 Lantai Ground
FE kap. 6 kg bh 3 125,000 375,000
FE kap. 10 kg bh 3 208,333 624,999
3 Lantai Mezzanine
FE kap. 6 kg ( Dry Chemical Powder ) bh 2 125,000 250,000
4 Lantai 1
FE kap. 6 kg bh 5 125,000 625,000
FE kap. 10 kg bh 1 208,333 208,333
5 Lantai 2
FE kap. 5 kg bh 5 125,000 625,000
6 Lantai 3
FE kap. 5 kg bh 5 125,000 625,000
7 Lantai 4
FE kap. 5 kg bh 5 125,000 625,000
8 Lantai 5
FE kap. 5 kg bh 5 125,000 625,000
9 Lantai 6
FE kap. 5 kg bh 5 125,000 625,000
10 Lantai 7
FE kap. 5 kg bh 2 125,000 250,000
jumlah 43 6,583,332
Total 15,299,997
23
PERKIRAAN BIAYA PENGELOLAAN GEDUNG MEKANIKAL ELEKTRIKAL GEDUNG PUSDIKLAT BPJS KETENAGAKERJAAN
TAHUN : 2015
SATUAN HARGA
NO. JENIS PEKERJAAN SAT VOL JUMLAH HARGA (Rp) KETERANGAN
(Rp)
24
SATUAN HARGA
NO. JENIS PEKERJAAN SAT VOL JUMLAH HARGA (Rp) KETERANGAN
(Rp)
25
SATUAN HARGA
NO. JENIS PEKERJAAN SAT VOL JUMLAH HARGA (Rp) KETERANGAN
(Rp)
10 Lantai 3
RMLM TL 2x28 Watt (T5) bh 2 95,188 190,376
BALK TL 1x28 Watt (T5) bh 216 25,000 5,400,000
BARRET LAMP TLE 32 Watt + NICAD bh 4 91,667 366,668
DOWN LIGHT LED 5 Watt bh 86 19,271 1,657,306
DOWN LIGHT LED 3 Watt bh 11 17,500 192,500
TKI TL 2x28 Watt (T5) bh 1 60,000 60,000
EXIT Lamp TL 10 Watt + Batt. Nicad bh 5 93,750 468,750
Sakelar Tunggal bh 5 5,417 27,085
Saklar seri bh 22 5,417 119,174
Saklar tukar bh 4 5,417 21,668
Saklar Kelompok 4 gang bh 2 33,333 66,666
Stop kontak 200 Watt 10A 1p bh 23 2,778 63,894
Stop kontak 200 Watt 10A 1p (proyektor) bh 8 5,417 43,336
Stop kontak 200 Watt 10A 1p (Floor Mounted) bh 23 12,500 287,500
jumlah 8,964,923
11 Panel panel
- DP-3 unit 1 182,813 182,813
- PP - VAC - 3 unit 1 131,250 131,250
jumlah 314,063
12 Lantai 4
BALK TL 1x28 Watt (T5) bh 2 25,000 50,000
TKI TL 2x28 Watt (T5) bh 1 60,000 60,000
BARRET LAMP TLE 32 Watt + NICAD bh 4 91,667 366,668
DOWN LIGHT LED 5 Watt bh 88 7,639 672,232
DOWN LIGHT LED 3 Watt bh 29 17,500 507,500
LAMPU MEJA PLC 7 Watt bh 58 12,500 725,000
EXIT Lamp TL 10 Watt + Batt. Nicad bh 5 93,750 468,750
Sakelar Tunggal bh 32 5,417 173,344
Saklar seri bh 31 5,417 167,927
Saklar tukar bh 4 5,417 21,668
Saklar Kelompok 6 gang bh 1 54,833 54,833
Stop kontak 200 Watt 10A 1p bh 67 5,417 362,939
Stop kontak 400 Watt 16A 1p (Water Heater) bh 29 10,417 302,093
jumlah 3,932,954
13 Panel panel
- DP - 4 unit 1 231,250 231,250
- BOK MCB unit 29 11,285 327,265
jumlah 558,515
14 Lantai 5
BALK TL 1x28 Watt (T5) bh 2 25,000 50,000
TKI TL 2x28 Watt (T5) bh 1 60,000 60,000
BARRET LAMP TLE 32 Watt + NICAD bh 4 91,667 366,668
DOWN LIGHT LED 5 Watt bh 88 19,271 1,695,848
DOWN LIGHT LED 3 Watt bh 29 17,500 507,500
LAMPU MEJA PLC 7 Watt bh 58 12,500 725,000
EXIT Lamp TL 10 Watt + Batt. Nicad bh 5 93,750 468,750
Sakelar Tunggal bh 32 5,417 173,344
Saklar seri bh 31 5,417 167,927
Saklar tukar bh 4 5,417 21,668
Saklar Kelompok 6 gang bh 1 45,833 45,833
Stop kontak 200 Watt 10A 1p bh 67 5,417 362,939
Stop kontak 400 Watt 16A 1p (Water Heater) bh 29 10,417 302,093
Total 4,947,570
Panel panel
- DP - 5 unit 1 231,250 231,250
- BOK MCB unit 29 11,285 327,265
jumlah 558,515
15 Lantai 6
BALK TL 1x28 Watt (T5) bh 2 25,000 50,000
TKI TL 2x28 Watt (T5) bh 1 60,000 60,000
BARRET LAMP TLE 32 Watt + NICAD bh 4 91,667 366,668
DOWN LIGHT LED 5 Watt bh 88 19,271 1,695,848
DOWN LIGHT LED 3 Watt bh 29 17,500 507,500
LAMPU MEJA PLC 7 Watt bh 58 12,500 725,000
EXIT Lamp TL 10 Watt + Batt. Nicad bh 5 93,750 468,750
Sakelar Tunggal bh 32 5,417 173,344
26
SATUAN HARGA
NO. JENIS PEKERJAAN SAT VOL JUMLAH HARGA (Rp) KETERANGAN
(Rp)
- Lampu Jalan Metalhalide 1 x 250 Watt lengkap dengan tiang bh 14 86,806 1,215,284
- Wall Lamp PL 9 watt lengkap dengan peralatan bantu bh 10 4,948 49,480
Saklar seri bh 3 5,417 16,251
Saklar Tunggal bh 2 5,417 10,834
1,291,849
19 LP - OL unit 1 38,194 38,194
Grand Total 85,056,883
27
PERKIRAAN BIAYA PENGELOLAAN GEDUNG MEKANIKAL ELEKTRIKAL GEDUNG PUSDIKLAT BPJS KETENAGAKERJAAN
SATUAN
NO. JENIS PEKERJAAN SATUAN VOLUME HARGA JUMLAH HARGA (Rp) KETERANGAN
(Rp)
28
VOLUM SATUAN HARGA JUMLAH HARGA
NO. JENIS PEKERJAAN SATUAN KETERANGAN
E (Rp) (Rp)
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
1 unit 1 7,500,000 7,500,000
Master Control Panel Fire Alarm (MCPFA) kap 40 Zone lengkap dengan
LCD Display Back up Battery, Rectifier & surge Arrester serta
pengkabelan dari MDF-FA ke MCP-FA, MCP-FA ke Sentral Sound
System, Outomatic dial Dinas Pemadam Kebakaran, panel ac & Kontrol
Lift
2 JB-FA unit 7 54,167 379,169
3 Annunciator unit 1 1,041,667 1,041,667
4 Rackmount UPS 1000VA unit 1 574,167 574,167
jumlah 9,495,003
5 Lantai Lower Ground
- Photo electrik smoke Detector buah 6 37,500 225,000
- Rate of Rise Heat Detector buah 14 20,833 291,662
- Manual Push Button c / w outlet intercom buah 2 17,917 35,834
- Alarm Bell buah 2 14,583 29,166
- Indicator Lamp buah 2 8,333 16,666
jumlah 598,328
6 Lantai Dasar
- Photo electrik smoke Detector buah 20 37,500 750,000
- Rate of Rise Heat Detector buah 6 20,833 124,998
- Manual Push Button c / w outlet intercom buah 2 17,917 35,834
- Alarm Bell buah 2 14,583 29,166
- Indicator Lamp buah 2 8,333 16,666
jumlah 956,664
30
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
7 Lantai Mezzanine
- Rate of Rise Heat Detector buah 6 20,833 124,998
Lantai 1
- Photo electrik smoke Detector buah 15 37,500 562,500
- Rate of Rise Heat Detector buah 2 20,833 41,666
- Manual Push Button c / w outlet intercom buah 2 17,917 35,834
- Alarm Bell buah 2 14,583 29,166
- Indicator Lamp buah 2 8,333 16,666
jumlah 685,832
8 Lantai 2
- Photo electrik smoke Detector buah 30 37,500 1,125,000
- Rate of Rise Heat Detector buah 1 20,833 20,833
- Manual Push Button c / w outlet intercom buah 2 17,917 35,834
- Alarm Bell buah 2 14,583 29,166
- Indicator Lamp buah 2 8,333 16,666
jumlah 1,227,499
9 Lantai 3
- Photo electrik smoke Detector buah 22 37,500 825,000
- Manual Push Button c / w outlet intercom buah 1 17,917 17,917
- Alarm Bell buah 1 14,583 14,583
- Indicator Lamp buah 1 8,333 8,333
865,833
31
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
10 Lantai 4
- Photo electrik smoke Detector buah 42 37,500 1,575,000
- Manual Push Button c / w outlet intercom buah 2 17,917 35,834
- Alarm Bell buah 2 14,583 29,166
- Indicator Lamp buah 2 8,333 16,666
jumlah 1,656,666
11 Lantai 5
- Photo electrik smoke Detector buah 42 37,500 1,575,000
- Manual Push Button c / w outlet intercom buah 2 17,917 35,834
- Alarm Bell buah 2 14,583 29,166
- Indicator Lamp buah 2 8,333 16,666
1,656,666
12 Lantai 6
- Photo electrik smoke Detector buah 42 37,500 1,575,000
- Manual Push Button c / w outlet intercom buah 2 17,917 35,834
- Alarm Bell buah 2 14,583 29,166
- Indicator Lamp buah 2 8,333 16,666
1,656,666
13 Lantai 7 / Ruang ME
- Photo electrik smoke Detector buah 3 37,500 112,500
- Rate of Rise Heat Detector buah 2 20,833 41,666
- Manual Push Button c / w outlet intercom buah 1 17,917 17,917
- Alarm Bell buah 1 14,583 14,583
- Indicator Lamp buah 1 8,333 8,333
194,999
19,119,154
32
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
D.8 PEKERJAAN TELEPON
I PERALATAN UTAMA
1 Operator Consule buah 1 5,000,000 5,000,000 BY OWNER
2 Main Distribution Frame (MDF-TP)
Kapasitas 200 '' lengkap dengan
arresster untuk setiap line telepon unit 1 7,500,000 7,500,000
3 Sentral Telepon (PABX) kap. 10 PTT/ 100
ext. dengan fasilitas sesuai spesifikasi di
lengkapi back up battery minimal 2 jam unit 1 150,000,000 150,000,000 BY OWNER
4 Instalasi dari Terminal BoxTelekom
ke MDFTP dengan OTC 20 x 2 x 0,6 mm2 lot 1 4,500,000 4,500,000
5 Billing Sistem, Accounting Aplications lot 1 15,000,000 15,000,000 BY OWNER
IV Lantai Mezzanine
1 Outlet telepon 4 way , 4 contac buah 1 95,000 95,000
2 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 1 225,000 225,000
V Lantai 1
1 Outlet telepon 4 way , 4 contac buah 5 95,000 475,000
2 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 5 225,000 1,125,000
3 JB - TP/M Kap.10 pair buah 1 450,000 450,000
4 ITC 10x2x0,6 mm2 dari MDF - TP ke JB - TP-M mtr 26 150,000 3,900,000
5 Cable Tray 400 mm2 mtr 78 332,000 25,896,000
33
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
VI Lantai 2
1 Outlet telepon 4 way , 4 contac buah 13 95,000 1,235,000
2 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 13 225,000 2,925,000
3 JB - TP/2 Kap.20 pair buah 1 650,000 650,000
4 ITC 20x2x0,6 mm2 dari MDF - TP ke JB - TP-3 mtr 34 150,000 5,100,000
5 Cable Tray 400 mm2 mtr 78 332,000 25,896,000
VII Lantai 3
1 Outlet telepon 4 way , 4 contac buah 11 95,000 1,045,000
2 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 11 225,000 2,475,000
3 JB - TP/3 Kap.20 pair buah 1 650,000 650,000
4 ITC 20x2x0,6 mm2 dari MDF - TP ke JB - TP-3 mtr 40 150,000 6,000,000
5 Cable Tray 400 mm2 mtr 78 332,000 25,896,000
VIII Lantai 4
1 Outlet telepon 4 way , 4 contac buah 29 95,000 2,755,000
2 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 29 225,000 6,525,000
3 JB - TP4 Kap.40 pair buah 4 750,000 3,000,000
4 ITC 40x2x0,6 mm2 dari MDF - TP ke JB - TP-4 mtr 46 250,000 11,500,000
5 Cable Tray 400 mm2 mtr 78 332,000 25,896,000
VIII Lantai 5
1 Outlet telepon 4 way , 4 contac buah 29 95,000 2,755,000
2 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 29 225,000 6,525,000
3 JB - TP4 Kap.40 pair buah 4 750,000 3,000,000
4 ITC 40x2x0,6 mm2 dari MDF - TP ke JB - TP-4 mtr 46 250,000 11,500,000
5 Cable Tray 400 mm2 mtr 78 332,000 25,896,000
VIII Lantai 6
1 Outlet telepon 4 way , 4 contac buah 29 95,000 2,755,000
2 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 29 225,000 6,525,000
3 JB - TP4 Kap.40 pair buah 4 750,000 3,000,000
4 ITC 40x2x0,6 mm2 dari MDF - TP ke JB - TP-4 mtr 46 250,000 11,500,000
5 Cable Tray 400 mm2 mtr 78 332,000 25,896,000
IX Lantai 7 / Ruang ME
1 Outlet telepon 4 way , 4 contac buah 1 95,000 95,000
2 Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4"
lengkap dengan peralatan bantu ttk 1 225,000 225,000
34
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
Total Harga Pekerjaan Telepon (D.8) 491,113,000
35
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(RP) (RP)
IX. PEKERJAAN TATA SUARA
36
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(RP) (RP)
9 Lantai 6
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 10 550,000 5,500,000
10 Lantai 7 / Ruang ME
- Ceiling Speaker 6 Watt dapat ditapping 3 Watt buah 2 550,000 1,100,000
37
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
X. PEKERJAAN DATA
I PERALATAN UTAMA
1 SERVER unit 1 28,000,000 28,000,000 BY OWNER
38
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
2 Instalasi Kabel Data
Instalasi data dengan mengunakan kabel UTP Cat
6 cable 4 pair dalam pipa konduit PVC 20 mm ttk 4 544,500 2,178,000
3 Sistem Administrasi
Rack 19" tipe 12 U bh 1 3,932,500 3,932,500
Access Switch Hub PoE 24 Port bh 1 23,943,700 23,943,700
Patchpanel 24P Cat6, AMP bh 1 2,035,000 2,035,000
Wiring management bh 1 275,000 275,000
Peralatan bantu termasuk patch cord, connector,
coupling jumper dll lot 1 550,000 550,000
Patch cable Cat6 bh 4 96,250 385,000
Access Point bh 2 1,796,300 3,592,600
IV Lantai 1
1 Unit Terminal
Outlet RJ 45 + Face Plate bh 4 114,950 459,800
V Lantai 2
1 Unit Terminal
Outlet RJ 45 + Face Plate bh 11 114,950 1,264,450
39
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
VI Lantai 3
1 Unit Terminal
Outlet RJ 45 + Face Plate bh 11 114,950 1,264,450
VII Lantai 4
1 Unit Terminal
Outlet RJ 45 + Face Plate bh 58 114,950 6,667,100
VIII Lantai 5
1 Unit Terminal
Outlet RJ 45 + Face Plate bh 58 114,950 6,667,100
40
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
IX Lantai 6
1 Unit Terminal
Outlet RJ 45 + Face Plate bh 58 114,950 6,667,100
Sub Total X -
41
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
XI. PEKERJAAN CCTV
I PERALATAN UTAMA
Pengadaan dan Pemasangan Peralatan Utama
1 Digital Video Recorder, Hardisk 1 Tera Bite, 16 Chanel, bh 2 64,000,000 128,000,000
removable HDD, remote viewing whit client and web browser/
Internet Exp. Long term data solusion, USB port
enable, remote control for DVR.
2 Video Manager 16 Channel Switcher c/w Port bh 1 7,500,000 7,500,000
Keyboard Controller + hook up & Keyboard expander
3 LCD Flat Screen monitor 32" bh 3 7,500,000 22,500,000
4 Rackmount UPS 1000VA unit 1 6,890,000 6,890,000
II PERALATAN CCTV
Pengadaan dan Pemasangan Peralatan CCTV lengkap
dengan peralatan bantu
1 Lantai Lower Ground
Camera Color Fixed w / 3 mm Lens ( Wide ) bh 2 1,400,000 2,800,000
Dome Camera Color w / 3 mm Lens ( Wide ) bh 1 1,700,000 1,700,000
2 Lantai Dasar
Camera Color Fixed w / 3 mm Lens ( Wide ) bh 2 1,400,000 2,800,000
Dome Camera Color w / 3 mm Lens ( Wide ) bh 4 1,700,000 6,800,000
Color Camera CCTV c/w PAN TILT & ZOOM Day Night Outdoor type bh 1 31,000,000 31,000,000
3 Lantai Mezzanine
Dome Camera Color w / 3 mm Lens ( Wide ) bh 1 1,700,000 1,700,000
4 Lantai 1
Dome Camera Color w / 3 mm Lens ( Wide ) bh 3 1,700,000 5,100,000
5 Lantai 2
Dome Camera Color w / 3 mm Lens ( Wide ) bh 3 1,700,000 5,100,000
6 Lantai 3
Dome Camera Color w / 3 mm Lens ( Wide ) bh 3 1,700,000 5,100,000
7 Lantai 4
Dome Camera Color w / 3 mm Lens ( Wide ) bh 3 1,700,000 5,100,000
8 Lantai 5
Dome Camera Color w / 3 mm Lens ( Wide ) bh 3 1,700,000 5,100,000
9 Lantai 6
Dome Camera Color w / 3 mm Lens ( Wide ) bh 3 1,700,000 5,100,000
10 Lantai 7 / Ruang ME
Camera Color Fixed w / 3 mm Lens ( Wide ) bh 1 1,400,000 1,400,000
42
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
III INSTALASI
Instalasi Camera dengan Coaxial Cable RG 11, dan
NYM 2 x 1.5 mm2 dalam pipa Conduit dia. 3/4" lot 30 750,000 22,500,000
IV MATERIAL BANTU
( Bracket, Kabel Control, Back Up Battery 1kva
selama 2 jam, Rectifier, Arrester dll) lot 1 7,500,000 7,500,000
43
KETERANGAN
44
KETERANGAN
TERMASUK
45
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
XII. PEKERJAAN MATV
I PERALATAN UTAMA
Pengadaan dan Pemasangan Peralatan Utama
1 Antena Parabola + pondasi unit 1 7,142,858 7,142,858
2 Antena UHF unit 1 1,051,922 1,051,922
3 Antena VHF unit 1 668,915 668,915
4 Master Head Amplifier unit 1 778,800 778,800
5 Programable Headend unit 1 12,528,000 12,528,000
6 Active Combiner 16 Channel unit 1 7,500,000 7,500,000
7 Decoder unit 2 1,428,572 2,857,144
8 TV Modulator unit 2 3,396,000 6,792,000
9 Pasive Combiner unit 1 10,286 10,286
10 Booster Amplifier unit 1 6,037,272 6,037,272
11 Power Supply ( AC - 220 V ) c/w Control Unit unit 1 3,807,600 3,807,600
12 Base Plate unit 2 840,343 1,680,686
13 Rack Mounting Lokal set 1 11,764,715 11,764,715
IV Lantai Mezzanine
Pengadaan dan Pemasangan Peralatan MATV
1 Main Splitter ( Top Off 4 way ) bh 1 173,143 173,143
2 Splitter 4 way bh 1 130,286 130,286
46
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
3 Power Amplifier kap 60 Watt bh 1 1,500,000 1,500,000
4 Outlet TV bh 1 114,286 114,286
5 Patchcord RG-11 ( 1 meter ) bh 1 125,000 125,000
Instalasi
6 Instalasi MATV , Kabel Coaxial RG-11 dlm HIP Conduit 20 mm ttk 1 431,429 431,429
V Lantai 1
Pengadaan dan Pemasangan Peralatan MATV
1 Main Splitter ( Top Off 4 way ) bh 1 173,143 173,143
2 Splitter 4 way bh 1 130,286 130,286
3 Outlet TV bh 3 114,286 342,858
4 Patchcord RG-11 ( 1 meter ) bh 3 125,000 375,000
Instalasi
5 Instalasi MATV , Kabel Coaxial RG-11 dlm HIP Conduit 20 mm ttk 3 431,429 1,294,287
VI Lantai 2
Pengadaan dan Pemasangan Peralatan MATV
1 Main Splitter ( Top Off 4 way ) bh 1 173,143 173,143
2 Splitter 4 way bh 1 130,286 130,286
3 Power Amplifier kap 60 Watt bh 1 1,500,000 1,500,000
4 Outlet TV bh 3 114,286 342,858
5 Patchcord RG-11 ( 1 meter ) bh 3 125,000 375,000
Instalasi
6 Instalasi MATV , Kabel Coaxial RG-11 dlm HIP Conduit 20 mm ttk 3 431,429 1,294,287
VII Lantai 3
Pengadaan dan Pemasangan Peralatan MATV
1 Main Splitter ( Top Off 4 way ) bh 1 173,143 173,143
2 Splitter 4 way bh 1 130,286 130,286
3 Outlet TV bh 1 114,286 114,286
4 Patchcord RG-11 ( 1 meter ) bh 1 125,000 125,000
Instalasi
5 Instalasi MATV , Kabel Coaxial RG-11 dlm HIP Conduit 20 mm ttk 1 431,429 431,429
VIII Lantai 4
Pengadaan dan Pemasangan Peralatan MATV
1 Main Splitter ( Top Off 4 way ) bh 1 173,143 173,143
2 Splitter 4 way bh 8 130,286 1,042,288
3 Power Amplifier kap 60 Watt bh 1 1,500,000 1,500,000
4 Outlet TV bh 29 114,286 3,314,294
5 Patchcord RG-11 ( 1 meter ) bh 29 125,000 3,625,000
Instalasi
6 Instalasi MATV , Kabel Coaxial RG-11 dlm HIP Conduit 20 mm ttk 29 431,429 12,511,441
47
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
IX Lantai 5
Pengadaan dan Pemasangan Peralatan MATV
1 Main Splitter ( Top Off 4 way ) bh 1 173,143 173,143
2 Splitter 4 way bh 8 130,286 1,042,288
3 Outlet TV bh 29 114,286 3,314,294
4 Patchcord RG-11 ( 1 meter ) bh 29 125,000 3,625,000
Instalasi
5 Instalasi MATV , Kabel Coaxial RG-11 dlm HIP Conduit 20 mm ttk 29 431,429 12,511,441
X Lantai 6
Pengadaan dan Pemasangan Peralatan MATV
1 Main Splitter ( Top Off 4 way ) bh 1 173,143 173,143
2 Splitter 4 way bh 8 130,286 1,042,288
3 Outlet TV bh 29 114,286 3,314,294
4 Patchcord RG-11 ( 1 meter ) bh 29 125,000 3,625,000
Instalasi
5 Instalasi MATV , Kabel Coaxial RG-11 dlm HIP Conduit 20 mm ttk 29 431,429 12,511,441
48
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
HARGA TOTAL
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(Rp.) (RP.)
49
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(RP.) (RP.)
50
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA KETERANGAN
(RP.) (RP.)
b Konstruksi Mobile roof beam tiap jarak 2.000 mm lot 1 67,500,000 67,500,000
Mobile roof beam Arm lot 1 325,000,000 325,000,000
Double track Rail IWF lot 1 279,552,000 279,552,000
Gear Trully Kondo 1 ton lot 1 2,600,000 2,600,000
51
RENCANA ANGGARAN BIAYA
ENGINEER'S ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG PUSDIKLAT PT. JAMSOSTEK (PERSERO)
LOKASI : JL. DADALI, TANAH SAREAL - BOGOR
TAHUN : 2013
52
No JENIS PEKERJAAN SATUAN VOLUME HARGA
SATUAN JUMLAH HARGA
(Rp) (Rp)
4 Pekerjaan elektrikal
a Kabel NYFGBY 4x6 mm2 dari panel kontrol ke PP - DW m 100 47,000 4,700,000
b Kabel NYYHY 3x1,5 mm2 dari panel kontrol ke WLC di Ground tank m 100 20,000 2,000,000
c WLC di Ground tank lot 1 450,000 450,000
Sub Total ( 5 ) -