Universal Projector Bracket

(forward/ground projection 2 into 1)

Installation Instructions
Model No.: 91-AR series

Ⅰ Safety Instructions
1. Please require professional installers to assemble, and at least two personnel to assemble and shakedown test; follow
the instructions strictly.
2. Please do not modify or change the product without authorization. Do not install it where it is easy to shake or fall.

3. Check the strength of the wall before installation, if the strength is not enough, please strengthen; after installation, do
not hang the heavy weight (this product limit load is within 30kg) or make the product come under a violent impact; once
damaged, it's not allowed to continue to use, otherwise, at the risk of the consequences; Our Company is not responsible
for damage and loss caused by failure to install and operate properly.

Ⅱ Component List
Componen Upper
t Name Upper segment of Lower segment of outer Lower segment of inner
segment of inner tube tube tube
outer tube
Qty 1 1 1 1

Photo

Fastener Expansion M8×65 M8*16 M8×25


Name screw&gasket&nu M4,M5,M6 cross head screw
screw screw&gasket&nut t screw&gasket

Qty 4sets 2sets each 4sets 2sets each 4pcs

Ⅲ Installation step
Wall conditions-ordinary concrete wall thickness must be more than 100 mm, drilling depth 55 mm, and use expansion
screw fastening; if you have questions about the installation of wall materials, please contact the manufacturer expert
consultation.

Step1: Determine the installation position of the hanger, drill holes in the "+", the bit is Φ 6, as shown in figure 1

figure 1

Step2: Connect 1 with 2 and 3 with 4, and combine them together. After combination, the hanger will be fastened with the
wall with expansion screws, as shown in the figure below.

Component
NO. Name

Upper segment
1 of outer tube
1

Upper segment
2 of inner tube
2

Lower segment
3 of outer tube

3 Lower segment
4 of inner tube
4
M8×16
screw&gasket&
Fastener nut
s Used M8×65
screw&gasket&nu
t
Step3: Install the projection product, determine the position of the claw head according to the location of the projection
installation hole (if the hole spacing to be installed is small, remove the claw head to install directly), as shown in the
following figure
Ⅳ  Regulation method-----Please adjust as actual requirement

1. The bottom plate is equipped with a long hole, which can adjust the projection position front&back and left&right, and
the maximum adjustment distance is 50mm:

Adjust left and right projection position

Adjust front and back projection position

2. Adjust up and down projection position:

Up and down projection position adjustment

3. Projection angle fine-tuning:

Front-Back Sway Left-Rignt turn

4. Frontal/ Ground projection effect conversion:

ct
Effe
oin
ject
Pro
l
Gr
ou
nd
Pro
ject
oin
Eff Ground locking hole
ect
Fro
nta
l
Pro
ject
oin
Effe Forward locking hole
ct
into 1)

and shakedown test; follow

it is easy to shake or fall.

ngthen; after installation, do


under a violent impact; once
Company is not responsible

Connecting Plate

M4,M5,M6 cross head screw

each 4pcs
55 mm, and use expansion
the manufacturer expert

as shown in figure 1

nger will be fastened with the

qty

1
4sets

2sets

he location of the projection


irectly), as shown in the
ont&back and left&right, and

sition

ition

tment
Universal Projector Bracket
Installation Instruction
Model No.: 91-NS series

Ⅰ Safety Instructions
1.In order to ensure safe and correct use, read and understand all instructions, and strictly
follow the instructions to operate, keep it properly for future reference.
2.Please authorize the relevant professional installation company to install it or require
professional installers to assemble, and require at least two personnel to assemble and
shakedown test.
3.Before installation check whether the wall has enough strength to install projector and
hanger. If the strength is not enough, please reinforce it before installing it.
4.After installation, do not hang heavy objects on this hanger or cause the product to be hit
violently. If damaged, do not continue to use, otherwise the consequences are at your own
expense.
5.We are not responsible for any damage or loss caused by failure to install and operate properly.

Ⅱ Component List

No. Component Name Photo Qty

1 Inner and outer tube 1set

2 Connector 1set

3 Connecting claw 1set

4 Extended claw 1set

M4,M5,M6
5 each 4pcs
cross head screw
M6*10
6 cross head screw 8pcs

7 Φ6 Flat gasket 8pcs

8 M8×55 Bolt &Nut 1set


9 Expansion screw 4sets

Ⅲ Installation step

Ⅳ  Regulation method

Loosen screws slightly,


left and right, back and
forth swing angle

Loosen the screw The connecting


slightly and rotate claw head can be
from left to right rotated according
to the projector
connecting hole
site