Software Testing
 Software testing is a process to identify the correctness, completeness and quality of
developed software, it includes a set of activities conducted with the intent of
finding errors in software, so that it could be corrected before the product is
released to the end-users.
 In simple words software testing is an activity to check that the software system is
defect free.

Why Software Testing is Important?


Testing is important because software bugs could be expensive or even dangerous. Software
bugs can potentially cause monetary and human loss, history is full of such examples.
China Airlines Airbus A300 crash, Canada's Therac-25 radiation therapy machine
malfunction, Nissan cars have to recall over 1 million cars from the market due to software failure in
the airbag sensory detectors etc.

Types of Software Testing


 Functional Testing.
 Unit Testing
 Integration Testing
 Smoke
 UAT ( User Acceptance Testing)
 So on
 Non-Functional Testing or Performance Testing.
 Performance
 Endurance
 Load
 So on
 Maintenance Testing.
 Regression
 Maintenance

Fundamental Principles of Software Testing


7 Software Testing Principles:
 Exhaustive testing is impossible:
 Exhaustive testing is not possible. Instead, we need the optimal amount
of testing based on the risk assessment of the application.
 Defect Clustering:
 Defect Clustering in Software Testing means that the majority of the
defects are caused by a small number of modules, i.e. the distribution of
defects are not across the application but rather centralized in limited
sections of the application.
 Defect Clustering in Software Testing is based on the Pareto principle,
also known as the 80-20 rule, where it is stated that approximately 80%
of the problems are caused by 20% of the modules.

 Pesticide Paradox:
 Pesticide paradox in software testing is the process of repeating the
same test cases again and again eventually the same test cases will no
longer find new bugs.
 So to overcome the pesticide paradox it is necessary to review the test
cases regularly and add or update them to find more defects.

 Testing shows presence of defects:


 Testing talks about the presence of defects and don’t talk about the
absence of defects. i.e. Software Testing reduces the probability of
undiscovered defects remaining in the software but even if no defects
are found, it is not a proof of correctness.

 Absence of errors – fallacy:


 Finding and fixing defects does not help if the system build is unusable
and does not fulfil the user's needs & requirements.

 Early Testing:
 Testing should start as early as possible in the Software Development
Life Cycle. So that any defects in the requirements or design phase are
captured in early stages. It is much cheaper to fix a Defect in early stages
of testing.
 It is recommended that you start finding the bug the moment the
requirements are defined.

 Testing is context dependent:


 Testing is context dependent which basically means that the way you
test an e-commerce site will be different from the way you test a
commercial off the shelf application.
 All the developed software’s are not identical.
 You might use a different approach, methodologies, techniques and
types of testing depending upon the application type.
 For instance testing, any POS system at a retail store will be different
than testing an ATM machine.
SDLC
Software Development Life Cycle (SDLC) is a process used by the software industry to design,
develop and test high quality software’s. The SDLC aims to produce a high-quality Software that
meets or exceeds customer expectations, reaches completion within times and cost estimates.

 SDLC is the acronym of Software Development Life Cycle.


 It is also called as Software Development Process.
 SDLC is a framework defining tasks performed at each step in the software
development process.
 It consists of a detailed plan describing how to develop, maintain, replace and alter
or enhance specific software.
 Though SDLC uses the term ‘Development’, it does not involve just coding tasks
done by developers but also incorporates the tasks contributed by testers and
stakeholders.
 In SDLC, test cases are created.
 ISO/IEC 12207 is an international standard for software life-cycle processes. It aims
to be the standard that defines all the tasks required for developing and maintaining
software.

The following figure is a graphical representation of the various stages of a typical SDLC.
STEP:1

STEP:2

STEP:3
STEP:4

STEP:5

STEP:6
SDLC Models:
Various software development life cycle models defined and designed which are followed during the
software development process.

Following are the most important and popular SDLC models followed in the industry:
 Waterfall Model
 Iterative Model
 Spiral Model
 V-Model
 Big Bang Model

Other related methodologies are Agile Model, RAD Model and Prototyping Models.

Waterfall Design:
 Waterfall approach was first SDLC Model to be used widely in Software Engineering
to ensure success of the project and also is an example for sequential model.
 In "The Waterfall" approach, the whole process of software development is divided
into separate phases.
 In this Waterfall model, typically, the outcome of one phase acts as the input for the
next phase sequentially.
 Following illustration is a representation of the different phases of the Waterfall
Model.
S.No Phase Activities Performed Deliverables

1 Requirement 1. Capture all the requirements. RUD ( Requirements


Analysis 2. Do brainstorming and walkthrough to Understanding
understand the requirements. Document)
3. Do the requirements feasibility test to ensure
that the requirements are testable or not.

2 System Design 1. As per the requirements, create the design HLD ( High Level
2. Capture the hardware / software Design document)
requirements.
3. Document the designs LLD (Low level
design document)

3 Implementation 1. As per the design create the programs / code Programs


2. Integrate the codes for the next phase. Unit test cases and
3. Unit testing of the code results

4 Testing 1. Integrate the unit tested code and test it to Test cases
make sure if it works as expected. 2. Perform Test reports
all the testing activities (Functional and non- Defect reports
functional) to make sure that the system meets Updated matrices.
the requirements.
3. In case of any anomaly, report it.
4. Track your progress on testing through tools
like traceability metrics, ALM
5. Report your testing activities.

5 Deployment 1. Make sure that the environment is up User Manual


2. Make sure that there are no severe 1 defects
open. Environment
3. Make sure that the test exit criteria are met. definition /
4. Deploy the application in the respective specification
environment.
5. Perform a sanity check in the environment
after the application is deployed to ensure the
application does not break.

6 Maintenance 1. Make sure that the application is up and User Manual


running in the respective environment.
2. In case user encounters and defect, make List of production
sure to note and fix the issues faced. tickets
3. In case any issue is fixed; the updated code
is deployed in the environment. List of new features
4.The application is always enhanced to implemented.
incorporate more features, update the
environment with the latest features
When to use SDLC Waterfall Model?
SDLC Waterfall model is used when,

 Requirements are very well documented, clear and fixed.


 Product definition is stable.
 Technology is understood and is not dynamic.
 There are no ambiguous requirements.
 Resources are well trained and available.
 The project is short.

Pros and Cons of waterfall model:


Advantages:
 Simple & easy to understand and use.
 Works well for smaller projects where requirements are very well understood.
 Easy to manage due to the rigidity of the model. Each phase has specific deliverables
and a review process.
 The entry and exit criteria are well defined, so it easy and systematic to proceed
with quality.
 Results are well documented at the end of every stage.

Dis-advantages:
 Cannot adopt the changes in requirements.
 It becomes very difficult to move back to the phase. For example, if the application
has now moved to the testing stage and there is a change in requirement, It
becomes difficult to go back and change it.
 Delivery of the final product is late as there is no prototype which is demonstrated
intermediately.
 For bigger and complex projects, this model is not good as a risk factor is higher.
 Not suitable for the projects where requirements are changed frequently.
 Since the testing is done at a later stage, it does not allow identifying the challenges
and risks in the earlier phase so the risk mitigation strategy is difficult to prepare.

Conclusion:

In the waterfall model, it is very important to take the sign off of the
deliverables of each phase. As of today most of the projects are moving with
Agile and Prototype models, Waterfall model still holds good for smaller
projects. If requirements are straightforward and testable, Waterfall model
will yield the best results.
Iterative Model Design:

SPIRAL Model Design:

 Spiral model works in an iterative nature. It is a combination of both Prototype


development process and Linear development process (waterfall model).
 This model place more emphasis on risk analysis.
 Mostly this model adopts to the large and complicated projects where risk is high.
Every Iteration starts with a planning and ends with the product evaluation by client.

Example: Microsoft released Windows 8 and improved it based on user feedback and released the
next version (Windows 8.1).
Spiral Model undergoes 4 phases.

 Planning Phase – Requirement Gathering, Cost Estimation, Resource Allocation.


 Risk Analysis Phase – Strengths and weaknesses of the project.
 Design Phase – Coding, Internal Testing and deployment.
 Evaluation Phase – Client Evaluation (Client side Testing) to get the feedback.

Advantages:
It allows requirement changes.
Suitable for large and complicated projects.
It allows better risk analysis.
Cost effective due to good risk management.
Disadvantages:
 Not suitable for small projects.
 Success of the project depends on risk analysis phase.
 Have to hire more experienced resource especially for risk analysis.

V Model Design:

To understand the V model, let’s first understand what is verification and validation in software.

Verification: Verification is a static analysis technique. In this technique testing is done


without executing the code. Examples include – Reviews, Inspection and walkthrough.
Validation: Validation is a dynamic analysis technique where testing is done by executing the
code. Examples include functional and non-functional testing techniques.

 The V-model is an SDLC model where execution of processes happens in a sequential


manner in a V-shape.
 It is also known as Verification and Validation model.
 The V-Model is an extension of the waterfall model and is based on the association
of a testing phase for each corresponding development stage. This means that for
every single phase in the development cycle, there is a directly associated testing
phase.
 This is a highly-disciplined model and the next phase starts only after completion of
the previous phase.

In V model, the development and QA activities are done simultaneously. There is no discrete phase
called Testing, rather testing starts right from the requirement phase. The verification and validation
activities go hand in hand. To understand the V model, let’s look at the figure below:
 In a typical development process, the left hand side shows the development
activities and right hand side shows the testing activities.
 I should not be wrong if I say that in the development phase both verification and
validation are performed along with the actual development activities. Now let’s
understand the figure:

Left Hand side:


As said earlier, left hand side activities are the development activities. Normally we feel,
what testing can we do in development phase, but this is the beauty of this model which
demonstrates that testing can be done in all phase of development activities as well.

Requirement analysis: In this phase the requirements are collected, analysed and studied. Here
how the system is implemented, is not important but, what the system is supposed to do, is
important. Brain storming sessions/walkthrough, interviews are done to have the objectives clear.

Verification activities: Requirements reviews.


Validation activities: Creation of UAT (User acceptance test) test cases
Artifacts produced: Requirements understanding document, UAT test cases.

System requirements / High level design: In this phase a high level design of the software is build.
The team studies and investigates on how the requirements could be implemented. The technical
feasibility of the requirements is also studied. The team also comes up with the modules that would
be created/ dependencies, Hardware / software needs

Verification activities: Design reviews


Validation activities: Creation of System test plan and cases, Creation of traceability
metrics
Artifacts produced: System test cases, Feasibility reports, System test plan,
Hardware software requirements, and modules to be created etc.
Architectural design: In this phase, based on the high level design, software architecture is created.
The modules, their relationships and dependencies, architectural diagrams, database tables,
technology details are all finalized in this phase.

Verification activities: Design reviews


Validation activities: Integration test plan and test cases.
Artifacts produced: Design documents, Integration test plan and test cases,
Database table designs etc.

Module design/ Low level Design: In this phase each and every module or the software components
are designed individually. Methods, classes, interfaces, data types etc are all finalized in this phase.

Verification activities: Design reviews.


Validation activities: Creation and review of unit test cases.
Artifacts produced: Unit test cases.

Implementation / Code: In this phase, actual coding is done.

Verification activities: Code review, test cases review.


Validation activities: Creation of functional test cases.
Artifacts produced: test cases, review checklist.

Right Hand Side:

Right hand side demonstrates the testing activities or the Validation Phase. We will start from
bottom.

Unit Testing: In this phase all the unit test case, created in the Low level design phase are executed.

*Unit testing is a white box testing technique, where a piece of code is written which invokes a
method (or any other piece of code) to test whether the code snippet is giving the expected
output or not. This testing is basically performed by the development team. In case of any
anomaly, defects are logged and tracked.

Artifacts produced: Unit test execution results

Integration Testing: In this phase the integration test cases are executed which were created in the
Architectural design phase. In case of any anomalies, defects are logged and tracked.

*Integration Testing: Integration testing is a technique where the unit tested modules are
integrated and tested whether the integrated modules are rendering the expected results. In
simpler words, it validates whether the components of the application work together as expected.

Artifacts produced: Integration test results.


Systems testing: In this phase all the system test cases, functional test cases and non-functional test
cases are executed. In other words, the actual and full fledge testing of the application takes place
here. Defects are logged and tracked for its closure. Progress reporting is also a major part in this
phase. The traceability metrics are updated to check the coverage and risk mitigated.

Artifacts produced: Test results, Test logs, defect report, test summary report and updated
traceability matrices.

User acceptance Testing: Acceptance testing is basically related to the business requirements
testing. Here testing is done to validate that the business requirements are met in the user
environment. Compatibility testing and sometimes non-functional testing (Load, stress and volume)
testing are also done in this phase.

Artifacts produced: UAT results, Updated Business coverage matrices.

When to use V Model? / V model is applicable when:

 Requirement is well defined and not ambiguous


 Acceptance criteria are well defined.
 Project is short to medium in size.
 Technology and tools used are not dynamic.

Pros and Cons of using V model:


STLC
 Software Testing Life Cycle (STLC) is defined as a sequence of activities conducted to
perform Software Testing.
 It consists of series of activities carried out methodologically to help certify your software
product.

Diagram - Different stages in Software Test Life Cycle

Each of these stages have a definite Entry and Exit criteria. Activities & Deliverables associated with
it.

Entry Criteria: Entry Criteria gives the prerequisite items that must be completed before testing can
begin.
Exit Criteria: Exit Criteria defines the items that must be completed before testing can be concluded

You have Entry and Exit Criteria for all levels in the Software Testing Life Cycle (STLC).
STAGE:1
STAGE-2

STAGE-3

STAGE-4
STAGE-5

STAGE-6

SDLC VS STLC

********************************************************************************