Control measures
• Mark the area of excavation and arrange the resource as per the depth of
the excavation.
• Conduct underground survey (Using Scanner and / Trial pit) and identify
the underground facilities.
• Obtain work permit and excavation certificate. Implement all PTW control
measures and JSA.
• Don’t perform mechanical excavation within 2m radius of identified
underground facility. Perform mechanical excavation only if work permit
is permitted to do so.
• A close supervision shall be provided for all excavation activates.
• Any excavation more than 1.2 meter deep must be adequately supported
on the sides by proper slopping / benching / shoring or shielding for
personnel protection.
• Stability of adjacent structure need to be ensured and provide adequate
support for the same if required
• Excavated material should be kept at least 1.5 m away from the top edge
of excavation.
• Ensure safe means of access and entry / exit for excavations deeper
than 600 mm
• Protection for all excavations edges. (Sloping, Shoring etc..)
• Excavated area shall be barricaded by hard barricading and installed
sign boards.