You are on page 1of 6

MIAMI BEACH

OFFICE OF THE CITY MANAGER


212- 2019
LE
IyI' ER TO COMMISSION

TO: Mayor Dan Gelber and Members oft City Comr - sion

FROM: Jimmy L. Morales, City Manager f

DATE: April 11, 2019

SUBJECT: Implosion of 630 Alton Road site ( South Shore Hospital)

There have been some questions regarding the implosion permit for the South Shore
Hospital site. The purpose of the LTC is to provide the most complete up to date
information.

Assistant City Manager Eric Carpenter coordinated all the City departments Police, Fire,
Public Works, Building and Tourism & Culture to identify the least impactful date and time for
the implosion, coordinating around traffic, special events and safety concerns.

The Building Department has been in contact with the contractor BG Group LLC
Steven Greenberg) throughout the process. Blaster Controlled Demolitions Inc.,
Field operations manager Thom Doud) will be on site throughout the preparation

and blasting process.

The Public Works Department has reviewed the necessary road closures and MOT
as well as the facilities protection report and the vibration monitoring plans provided
by the engineers. Both the implosion demolition plans, and the necessary road
closure permits have been approved.

The Fire Department Fire Prevention Division has reviewed the storage magazines
and the distances to buildings and roadways.

Miami- Dade County Environmental Resource Management has reviewed the plans,
including the asbestos survey pursuant to 40 CFR 61 subpart M ( National Emission
Standards for Hazardous Air Pollutants) and F. S. 469. 001- 015, of the existing
building and has approved the permit for demolition by implosion.

The Police Department will secure all the necessary exclusion zones to ensure the
safety of residents in the surrounding buildings and area. The entire process should
take between one — two hours. The sequence of events is attached.

Both the contractor and the owners have been providing notices ( Attachment # 1) to the
4th
neighboring properties. A pre- implosion meeting was held last Thursday April at
6: 00 p. m. ( Attachment # 2). The contractor has also provided a detailed list of the areas and
properties and buildings to be protected ( Attachment # 3). Steven Greenberg has indicated
that the dust should dissipate within minutes of the implosion. The Marketing and
Communications Department will be disseminating this information using our social media
platforms and traffic text system.

Finally, the structural modification permit BC1910377 had its approved final inspection prior
to issuance of the demolition permit. The County Blast Permit ( issued by Miami- Dade
Department of Transportation and Public Works Construction Division) is required by the city
prior to allowing the explosives to be brought to the site and can be issued now that the
building permit is issued.

If there are any new developments, we will advise the Mayor and Commission. If you have
any questions, please contact ACM Eric Carpenter.

Thank you.

JLM/ SMT/ AS
rf
vourrio

MI -
lir 4
6

rte'.

44.. , 4.
S mrip.": 1-
y 4,..;,,. i{
fy

dr- 4 %.. _ .%
I
44,...
2.-''

b
I.
mom a

P-
M` A :
w ¢ f a', '
C C t
r
t IN
r. y

Y
ijP t4. 0
Y.
r Is`
tel."_ _ '^
e
7-,.

yam
k.
Ff
1 7 , ,•
i
y..
a

14,
i t Nib
s, I Mist' s cdRceptual rdnelErmgi
a

IMPLOSION LOCATION

April 16, 2019 10: 00AM 600 Alton Rd. Miami Beach

Sequence of Events
8: 00- 8: 30AM 9: 59AM

Setup of barricades commences to secure the Sound three ( 3), 1- second long horns or sirens
Exclusion Zone
indicating 15 seconds to blast
Police on site Note: If there are any security or other issues that prevent the
A Command Post will be established on Alton Road, implosion from proceeding, CDI' s countdown will go into a" hold"
at ten( 10) seconds and recommence at this point once such
to the north

issues have been resolved.

Final confirmation that the security area is clear


9: 00- 9: 59AM

9 Exclusion Zone to be cleared. CDI or BG Group


10: OOAM
personnel in touch with the Command Post will be
An audible countdown (" 10, 9, 8..:') over CDI' s radios
placed in the lobbies of the adjacent residential

will be performed
properties to ensure that residents do not exit the

the Exclusion Zone the


600 Alton Road Building is imploded
structure and enter during
countdown.

9 Area security to be checked. Confirmation from local 10: 00- 10: 30AM

authorities that the Exclusion Zone is clear, save for CDI will inspect the demolition area and sound a five

traffic on Alton Road 5) second long signal to designate an" All Clear:'
Confirm that the Exclusion Zone is clear Control of the demolition site and adjacent streets

4 Traffic on Alton Road will be stopped and cleared at will be returned to BG Group for dust cleanup and
9: 45AM reopening of streets for traffic in cooperation with
Sound two ( 2), 5- second long horns or sirens the local authorities.

indicating 2- minutes to blast at 9: 58AM


See Disclaimers Page.
T.-"'''.
Telt
iiti.
7-

500 S.

Alton CC IX i ll
a

Q i
t 1
ifs-., - w •
4
etaar4

ji 7•

Ex •, • 1=-- -°-

I' I i" i,
a- am
I,
T

1
tPVII

1\' . OW.

1
SIE

lIIII

Implosion j 1
1

jt

r 1

31

4,
Exclusion Zqn , - 4..'

4' I
olio.
4 -47-1
r
5TH S s 4n
P;----- R a' -

Conditions Following the Implosion


The building will collapse within 12 to 16 seconds after COI will inspect the debris pile and issue the" All Clear;'
implosion charges begin to detonate in the initiation turning the site and adjacent streets back over to BG
system. The structure will fall to create a debris pile Group for follow- on operations.
which will primarily be within the footprint of the
structure and slightly to the north and west of that Immediately following the" All Clear," BG Group' s crews
footprint. BG Group will have equipment staged, with will begin dust cleanup operations and removal of
operators and demolition attachments, on site the any previously- placed adjacent property protection.

morning of the implosion to stabilize the debris pile, as The disposition of dust following the implosion will

may be needed, to ensure that the debris pile does not be a direct function of the prevailing wind speed and

impose risk to the public on the two ( 2) adjacent direction at the time of the implosion.
any

streets following the implosion.

This project is being developed by TCH 500 Alton, LLC, a Florida limited liability company(' Developer". All images and designs depicted herein are artist' s conceptual renderings, which are based upon preliminary development plans, and are subject to
change without notice in the manner provided in the offering documents. All such materials are not to scale and are shown solely for illustrative purposes. The Developer reserves the right to modify, revise or withdraw any or all of the same in its sole discretion
and without prior notice. All improvements, designs and construction are subject to first obtaining the appropriate federal, state and local permits and approvals for same. The Sequence of Events is only the Developer' s proposed timeline, and is subject to
approval of applicable governmental authorities. The Sequence of Events as stated herein should not be considered the actual sequence of events, and should not be relied upon for any reason. The project graphics, renderings and text provided herein are
infringement copyright
dissemination is strictly prohibited and constitutes
display
M.
Unauthorized other of such materials
copyrighted works owned by the Developer. All rights reserved. reproduction, or
YOUR ATTENTION PLEASE
Contractor), Controlled
South Beach Heights I, LLC ( Owner), The BG Group, LLC, ( General and

Demolition, Inc. (" CDI" - Implosion Subcontractor) would like you to be aware that on April 16, 2019, the
vacant South Shore Hospital will be demolished by implosion.

Implosion is a process where a small amount of explosives is used to disrupt selected supports in a building.
This allows gravity to pull the structure down in a controlled manner. CDI has used this implosion method

thousands of times around the world during the past 65 years to assist Property Owners and Contractors in
the removal of unwanted structures.

There are three ( 3) points we would like to make you aware of:

1. Dust is an unpreventable byproduct of all types of demolition. With a wrecking ball or high- reach
excavator, the building is slowly broken up releasing dust over a lengthy period of time. With implosion,
the same overall quantity of dust is released in a matter of seconds, and may linger in the general area
for 4 to 6 minutes before crews begin cleanup of same from streets and sidewalks. Depending
on wind speed and direction on the day of the implosion, the dust may or may not reach your properties.
As a precautionary measure, we recommend you see that all windows, doors and air intakes are closed,
and cover any other openings that might allow dust to enter your apartment, house or building.
We also recommend you turn off all exhaust fans before or at the time of the implosion as these
might draw air in to your building through cracks in walls and windows.

2. Early Tuesday ( April 16th) morning, the City of Miami Beach Police Department will set up an
Exclusion Zone around the buildings. This is to prevent people from getting too close. We need your
cooperation with the Police and contractors to ensure this is a safe job. Everything they say to you or
ask of you is to minimize inconvenience or to promote safety.

3. There will be heavy dust in the block immediately surrounding the demolition site. Dust may also drift
outside and downwind of the Exclusion Zone, depending on weather conditions. If you find dust

uncomfortable or irritating, or if you have any respiratory conditions that would be aggravated by dust,
please stay indoors during the demolition.

4. More than 100 years of vibration/ noise monitoring data assembled by the US Bureau of Mines
established guidelines for safe vibration and noise levels around blasting sites.
For several days prior to the implosion, a pre- demolition photographic survey will be made to document
the pre- existing condition of adjacent structures and properties in accordance with State Law. Noise and
vibration monitoring instruments will be set up around the demolition site to monitor actual levels of
same generated by the implosion/ fall of the South Shore Hospital structure.
A follow- up post- implosion survey will be made the morning of the implosion to determine whether or
not any changes have taken place in the structures previously inspected, as a result of the implosion.
The vibration and pre/ post- survey reports go to the State of Florida to protect the interests of all
parties involved.

Should you have any questions, please direct them to:


The BG Group, LLC
Ivy Fradin
561- 998- 7997
knirnlhorlcmnlitinn rnm
THE BC GROUP! LIB
April 10, 2019

Ana M. Salgueiro, P. E.,

Director, Building Official


Building Department
1700 Convention Center Drive, Miami Beach, FL 33139

Re: 600 Alton Protection

Dear Ana:

I walked the surrounding neighborhood Tuesday and noted the following items to be addressed:
CID Muzzafiato Building. There are 6 doors to be protected that we, The BG Group ( BG), will seal

with 3" blue painters tape*.

i The Bentley, 520 Alton. The front glass doors on the north side will be closed and taped. *
The Bentley, 540 Alton. A BG employee will remain in the lobby to remove tape after blast.
o South side. The front glass doors will be closed and taped. *
o North side. There are 3 doors to be taped and 1 vented door that will be sealed with
poly sheeting and tape.*
The Floridian. BG will tape and have an employee remain in lobby to unseal the following.*
o South side. 2 doors and 3 vents to be protected.
o East side. 1 door and 5 vents.
Oo Main entrance. 1 door
IME o Northeast side. Vented doors will be completely sealed.
Receiving area. 2 doors and a window AC unit to be wrapped.
o

Community Health Center. We will wrap roof AC units if permitted.


Baptist Health. BG will tape and unseal 1 door on the west side.*
O CubeSmart. Spoke with owner Ken Edelman. He will not open until after the blast. BG will
tape and unseal the following.*
o West side. 2 doors
o South side. 2 doors
o Roof. Wrap AC units
St. Francis Church. AC units and fan/ duct will be wrapped and unsealed by BG.* Spoke with

office manager who will speak with maintenance about turning AC off and if any additional
protection is desired. The doors are all wood and very secure.
Publix. Met with manager and asst. manager. Doors will be locked—9: 30 and customers will
be allowed to leave via the emergency doors on the east side. We will have a BG employee in
the store during the blast to unseal and remove the tape after the dust clears.*
o North side. 4 '/ 2 doors and one ATM to be protected
o West side. 1 door. 2 100 yd. trailers will be parked under the Alton Rd. overpass.

Sincerely:

Steve Ctreev k erg


BG will seal on or about 8 am on April 16 and then have someone unseal and remove the tape asap
post blast as soon as the dust clears.

15560 Lyons Road• Delray Beach, FL• 33446. 561- 998- 1991• sieve@bgdemolition. com• CsC1511135