Professional Documents
Culture Documents
Revision number
Bleed : Installation
Bleeding in two pipe operation is automatic, but it could be accelerated by P : by-pass plug installed in return port
for two-pipe operation.
loosening the plug in a pressure gauge port.
M : without by-pass plug, return plugged
In one pipe operation, a pressure port must be opened to bleed the system. for one-pipe operation.
Vacuum
gauge port
By-pass By-pass
plug plug
removed inserted
SUNTEC INDUSTRIES FRANCE - 1, rue Lavoisier - CS 60 102 - F-21603 LONGVIC Cedex - Tel. 33 (0)3 80 70 60 70 - Fax 33 (0)3 80 70 61 11- www.suntec.fr
Capacity (L/h)
Pump capacity
TECHNICAL DATA
150
140
General 130
120
Mounting Flange or hub according to EN 225 110
AN 97
100
Connection threads Cylindrical according to ISO 228/1
r q 118°
n Suction r Vacuum
gauge port
s p Return and
21 A 21
Ø8
o internal
s Pressure
Ø10,5 74 Ø54 by-pass plug adjustment
A 15
Nozzle
35 p outlet
t t G1/4
t (only
Pressure port
for
A-A Inlet n and Return o q
Pressure "7000" series)
o 13,5 13,5 n 7
13
with direct sealing gauge port
63 21 25
for revision 6
92 Ø8
(sealing with washers can also be used)
We reserve the right to change specifications without prior notice. AN - 11 - Ed 13 - Sept. 2013