CONTROL DE GASTOS TERCER PISO

CANT. DESCRIPCION INGRESO P.UNIT. EGRESO SALDO


Pago a cuenta 30,000.00
Descuento 4 % -Yover 1,200.00 28,800.00
Pago pendientes gestión 46.03 28,753.97
Pago a cuenta MEF 238.50 28,515.47
UCV (Mensualidades) 1,100.00 27,415.47
UCV (Derechos carpeta) 1,600.00 25,815.47
PLAZA VEA (deudas) 2,000.00 23,815.47
Jeca (dentista) 300.00 23,515.47
Pago total prestamo BN (Tarjeta) 950.00 22,565.47
MATERIALES DE OBRA 22,565.47
12 Kilos alambre Nº 8 3.650 43.80 22,521.67
30 Kilos alambre Nº 16 3.650 109.50 22,412.17
8 Kilos clavos 2 1/2" madera 3.693 29.54 22,382.63
3 triplay de 4" 23.455 70.37 22,312.26
170 bolsas de cemento pacasmayo 23.660 4,022.20 18,290.06
28 Varillas de Fierro 5/8 41.012 1,148.34 17,141.73
105 Varillas de Fierro 1/2 26.512 2,783.76 14,357.97
60 Varillas de Fierro 1/4 5.963 357.78 14,000.19
47 Varillas 8 milimitros 10.682 502.05 13,498.13
8 kilos clavos 2" madera 3.693 29.54 13,468.59
12 Cubos de arena gruesa procesada 45.000 540.00 12,928.59
6 cubos de piedra chancada 1/2 47.000 282.00 12,646.59
4 Millares de ladrillo pandereta 420.000 1,680.00 10,966.59
1.5 Millares de ladrillo pandereta 420.000 630.00 10,336.59
Tubos pvc 179.290 179.29 10,157.30
Tubos pvc 8.860 8.86 10,148.44
Pegamento PVC 39.300 39.30 10,109.14
8 Varillas 8 milimitros 10.590 84.72 10,024.42
100 CLAVOS DE ACERO 0.140 14.00 10,010.42
TUBERIA 16.000 16.00 9,994.42
8 KILOS ALAMBRE 8 3.800 30.40 9,964.02
REDUCCION 4.120 4.12 9,959.90
REDUCCION 4.960 4.96 9,954.94
2 triplay de 4" 23.450 46.90 9,908.04
MATERIALES DE OBRA 1,178.070 1,178.07 8,729.97
NOTA DE CREDITO 10.000 10.00 8,719.97
0.00 8,719.97
0.00 8,719.97
0.00 8,719.97
0.00 8,719.97
PRESTAMO 7,200.00 15,919.97
15,919.97
15,919.97
15,919.97
15,919.97
SERVICIO DE MANO DE OBRA 15,919.97
Primer adelanto 920.000 920.00 14,999.97
segundo adelanto 3,000.000 3,000.00 11,999.97
TERCER ADELANTO 2,000.000 2,000.00 9,999.97
ADICIONAL 350.000 350.00 9,649.97
9,649.97
9,649.97