You are on page 1of 7

Consolidated Statement

Subject:
Name of Project Konark Virtue
Type of institution
Name of Project Proponent
Name of Consultant
Type of project
New project/ expansion in existing
project/modernization/diversification
in existing project
If expansion / diversification, whether
environmental clearance has been
obtained for existing project
Location of the project
Taluka
Village
District
Area of the project
Whether in Corporation / Municipal /
other area
IOD/IOA/Concession document or any
other form or document as applicable
(Clarifying its conformity with local
planning rules & provision)
IOD/ IOA/ Concession/ Plan Approval
Number
Approved Built up area
Note on the initiated work (If applicable)
LOI/NOC/IOD from MHADA/Other
approvals (If applicable)
Total Plot Area (sq.m.)
Deductions (sq.m)
Net Plot area (sq.m)
Proposed Built-up Area (FSI & Non-
FSI)

Total ground coverage (m2)


Ground-coverage Percentage (%)
(Note: Percentage of plot not open to
sky)
Estimated cost of the project (in Rs.)

Number of buildings & its configuration


Serial
number Building Name Number of floors Height of the
& number building
(Mtrs)
1 Tower 1 P + 14 (112 Flats)
2 Tower 2 P + 18 (144 Flats)
3 Tower 3 P + 12 (96 Flats)
4 Tower 4 P + 9 (72 Flats)
5 Club House 1 G+1
6 Club House 2 G+1
7 Club House 3 G+1
Number of tenants and shops 424 Tenements
Number of expected residents/users 2120
Tenant density per hectare
Height of the building(s)
Right of way (Width of the road
from the nearest fire station to the
proposed building(s)
Turning radius for easy access of fire
tender movement from all around the
building excluding the width for the
plantation
Existing structure
(s) if any
Details of the demolition with
disposal(If applicable)

Production Details
Sr. Product Existing(MT/M) Proposed(MT/M) Total(MT/
No. M)
1 Not Not applicable Not applicable Not
applicable applicable
Total Water Requirement
Source of water Pune Municipal
Corporation (PMC)
Total

Fresh water(CMD): 190.80


Recycled water-Flushing(CMD): 95.40
Recycled water-Gardening 13.00
(CMD):
Swimming pool makeup(Cum): 5.00
Total Water 299.20
Dry season:
Requirement(CMD):
Firefighting-Underground water 200.00
tank(CMD):
Firefighting- Overhead water 20.00
tank(CMD):
Excess treated water 120.56

Source of water Pune Municipal


Corporation (PMC)
Total
Wet season: Fresh water(CMD): 190.80
Recycled water-Flushing(CMD): 95.40
Recycled water-Gardening 0.00
(CMD):
Swimming pool makeup ( Cum): 0.00
Total Water 286.20
Requirement(CMD):
Firefighting-Underground water 200.00
tank(CMD):
Firefighting-Overhead water 20.00
tank(CMD):
Excess treated water 133.56
Details of Swimming
pool (If any)
Details of Total water consumed
Particu
lars Consumption(CMD) Loss(CMD) Effluent(CMD)
Wat
er Exi Proposed Total Existi Proposed Total Existing Proposed Tot
Req st ng al
uire in
men g
t
190.80 190.8 28.62 28.62 257.58 257.
Dome 58
stic

Rain Water Level of the Ground water table:


Harvesting (RWH) Size and no of RWH tank(s) and
Quantity:
Location of the RWH tank(s):
Quantity of recharge pits:
Size of recharge pits:
Budgetary allocation (Capital
cost):
Budgetary allocation (O&M
cost):
Details of UGT tanks if any: ---

Storm water drainage Natural water drainage pattern:


Quantity of storm water: 8.58 m3Per min
Size of SWD: 450 mm DIA

Sewage and Waste water Residential:


Sewage generation in KLD: 258
STP technology: MBBR
Capacity of STP(CMD): 260
Location & area of the STP: 156 Sqm
Budgetary allocation (Capital cost): Rs.53.00 Lacs
Budgetary allocation (O&M cost): Rs.9.00 Lacs

Solid Waste Management


Waste generation in Waste generation:
the Pre-Construction Disposal of the construction waste
and Construction debris:
phase:

Waste generation in the Dry waste:


operation Phase: Wet waste: 636
Hazardous waste: NA

Biomedical waste (If NA


applicable):
STP Sludge (Dry sludge): 3 Kg/day approx.
Others if any:
Mode of Disposal of Dry waste:
waste: Wet waste:
Hazardous waste:
Biomedical waste(If applicable):
STP Sludge (Dry sludge):
Others if any:
Area requirement: Location(s):
Area for the storage of waste &
other material:
Area for machinery:
Budgetary allocation Capital cost:
(Capital cost and O&M O&M cost:
cost):
Effluent Characteristics
Inlet Effluent

Outlet Effluent
Characteristics

Characteristics
Serial Number

Parameters

standards
discharge

(MPCB)
Effluent
Unit

NA NA NA NA NA NA

Amount of effluent NA
generation (CMD):
Capacity of the ETP: NA
Amount of treated NA
effluent recycled:
Amount of water NA
send to the CETP:
Membership of NA
CETP(if require):
Note on ETP NA
technology to be
used
Disposal of the ETP NA
sludge
Hazardous Waste Details
Sr. Description Cat UOM Existing Proposed Total Method of
No. Disposal

Stacks emission Details


Sr. No. Section & Fuel Used Stack Height Internal Temp. of
units with No. from diameter(m Exhaust
Quantity ground ) Gases
level(m
)

Details of Fuel to be used


Serial Type of Fuel Existing Proposed Total
Number

Source of Fuel
Mode of Transportation of fuel to
site

Green Belt Development Total RG area:


No of trees to be cut
:
Number of trees to be
planted:
List of proposed native
trees:
Timeline for completion
of plantation:

Number and list of trees species to be planted in the ground


Serial Number Characteristics
Name of the Common Name Quantity & ecological
plant importance
1
2
3
4
5

6
7
8
9
10
11
12
Total quantity of plants on ground
Number and list of shrubs and bushes species to be planted in the podium RG:
Serial
Number Name C/C Distance Area m2
1 Thevetianerifolia
2 Stachytarpheta
sp.
3 Plumbagozeylani
ca
4 Acoruscalamus
5 Korphad
6 Tulas
7 Kanher
8 Jaswanda

Power requirement: Source of power supply: MSEDCL


During Construction Phase: 11 KW
(Demand Load)
DG set as Power back-up 25 KVA
during construction phase
During Operation phase 1701 KW
(Connected load):
During Operation phase 1009 KVA
(Demand load):
Transformer:
DG set as Power back-up during 380 KVA
operation phase:
Fuel used:
Details of high tension line NO
passing through the plot if any:
Energy saving by non-conventional method:
Detail calculations &% of saving:
Serial Number Energy Conservation Measures Saving%
1 Solar hot water 20%
2 LED lighting
3 Solar PV system

Details of pollution control Systems


Source Existing pollution control Proposed to be installed
system
STP
OWC
DG Set

Budgetary allocation (Capital Capital cost:


cost and O&M cost): O&M cost:

Environmental Management plan Budgetary Allocation


Construction phase(with Break-up):
Serial Number
Attributes Parameter Total Cost per annum (
Rs. In Lacs)
1 Water
2 Air
3 Noise
Soil
Socio

Serial Number Capital cost Operational and


Component Description Rs.InLacs Maintenance
cost (Rs.
inLacs/yr)

Storage of chemicals (inflammable /explosive /hazardous /toxic


substances)
Description Status Location Storage Capacity Maximum Quantity of
in MT Storage at any point of
time in MT

Any Other Information

Parking details: Nos.of the junction to the main road & design
of confluence:
Number and area of basement:
Number and area of podia:
Total Parking area:
Area per car:
Area per car:
Number of 2-Wheelers as approved by
competent authority:
Number of 4-Wheelersasapproved by
competent authority:
Public Transport:
Width of all Internal roads(m):
CRZ/RRZ clearance obtain, if any:
Distance from Protected Areas/Critically Polluted areas/Eco-sensitive
areas/inter-State boundaries
Category as per schedule of EIA Notification sheet
Court case spending if any
Other Relevant Information
Have you previously submitted Application online on MOEF Website
Date of online submission

You might also like