You are on page 1of 75

ITEM DESCIPCION P.

PRIVADO FACTOR
01 BARRIO SAN MARTIN 1360297.9
01.01 OBRAS PROVICIONALES 8710.42 0.847
01.02 OBRAS PRELIMINARES 31083.48 0.847
01.03 SEGURIDAD Y SALUD 11748.46 0.847
01.04 LINEA DE ADUCCION Y DISTRIBUCION (L=2883.68 M) 99618.79 0.802
01.05 VALVULA DE PURGA (02 UND) 1055.2 0.759
01.06 VALVULA DE CONTROL (08 UND) 3343.76 0.759
01.07 CAMARA ROMPE PRESION TIPO 7 (04 UND) 5274.58 0.759
01.08 CONEXIONES DOMICILIARIAS CON TEE (88 UND) 26399.35 0.759
01.09 INSTALACION DEL SISTEMA DE ALCANTARILLADO 793705.43
01.09.01 REDES COLECTORAS (L=2440.00 M) 242235.61 0.772
01.09.02 REDES EMISORAS (L=1541.40 M) 176928.92 0.772
01.09.03 CONSTRUCCION DE BUZONES (RED COLECTOR Y EMISOR) 290245.98 0.759
01.09.04 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO (88 UNID) 84294.92 0.759
01.10 INSTALACION SANITARIA INTRADOMICILIARIA 379358.43
01.10.01 CASETA DE LADRILLO 379358.43 0.759
02 COMUNIDAD DE ORCCOPUQUIO 858029.77
02.01 CAPTACION MANANTIAL (2 UND) 13280.45 0.759
02.02 RESERVORIO 02 (10.00 M3) 31454.52 0.759
02.03 CASETA DE VALVULAS 02 (RESERVORIO) 3634.01 0.759
02.04 HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II 5017.35 0.759
02.05 LINEA DE CONDUCCION (L=240 ML) 10418.06 0.802
02.06 CAMARA DE ENTRADA A SIFON 802.64 0.759
02.07 CAMARA DE SALIDA DE SIFON 757.36 0.759
02.08 TUBERIA SIFON INVERTIDO (L=160ml) 8210.74 0.759
02.09 LINEA DE ADUCCION Y DISTRIBUCION (L=4680.51 M) 146493.71 0.802
02.10 VALVULA DE PURGA (07 UND) 3451.23 0.759
02.11 VALVULA DE CONTROL (14 UND) 5748.81 0.759
02.12 CAMARA ROMPE PRESION TIPO 7 (05 UND) 10387.37 0.759
02.13 CONEXIONES DOMICILIARIAS CON TEE (83 UND) 23998.22 0.759
02.14 LAVADEROS CON UNA SOLA POZA 86678.85 0.759
02.15 INSTALACION DEL SISTEMA DE ALCANTARILLADO 104702.06
02.15.01 REDES COLECTORAS (L=540.00 M) 64055.18 0.772
02.15.02 CONSTRUCCION DE BUZONES (RED COLECTOR) 29154.02 0.772
02.15.03 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO (12 UNID) 11492.86 0.759
02.16 INSTALACION SANITARIA INTRADOMICILIARIA 275897.6 0.759
02.16.01 CASETA DE LADRILLO 275897.6
02.16 UNIDAD BASICA DE SANEAMIENTO (UBS) ARRASTRE HIDRAULICO (16 UNID) 127096.79 0.759
02.16.01 CASETA DE LADRILLO 69767.93
02.16.02 CAJA DE REGISTRO DE CONCRETO PREFABRICADO DE 0.30X0.60 H=0.60M 2048.77
02.16.03 TRAMPA DE NATAS Y SOLIDOS 2527.49
02.16.04 TANQUE BIODIGESTOR DE 600 LT 27742.89
02.16.05 CAJAS DE REGISTRO DE LODOS 0.60X0.60X0.70 4432.17
02.16.06 TUBERIA DE EVACUACION DE AGUAS GRICES Y NEGRAS 4864.98
02.16.07 POZO DE INFILTRACION 15712.56
03 COMUNIDAD DE MATARCCOCHA 342979.72
03.01 CAPTACIÓN MANANTIAL (01 UNIDAD) 6642.17 0.759
03.02 VALVULA DE PURGA (03 UND) 1451.66 0.759
03.03 RESERVORIO (10.00 M3) 15729.03 0.759
03.04 CASETA DE VALVULAS (RESERVORIO) 1816.53 0.759
03.05 HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II 2451.38 0.759
03.06 LINEA DE CONDUCCION (L=462.00 ML) 14206.65 0.802
03.07 LINEA DE ADUCCION Y DISTRIBUCION (L=1428.00 M) 44388.79 0.802
03.08 VALVULA DE CONTROL (05 UND) 2020.64 0.759
03.09 CAMARA ROMPE PRESION TIPO 7 (02 UND) 4131.71 0.759
03.10 CONEXIONES DOMICILIARIAS CON TEE (38 UND) 11398.66 0.759
03.11 LAVADEROS CON UNA SOLA POZA 45872.64 0.759
INSTALACION SANITARIA INTRADOMICILIARIA 129328.35 0.759
CASETA DE LADRILLO 129328.35
03.12 UNIDAD BASICA DE SANEAMIENTO (UBS) ARRASTRE HIDRAULICO (08 UNID) 63541.51 0.759
03.12.01 CASETA DE LADRILLO 34878.82
03.12.02 CAJA DE REGISTRO DE CONCRETO PREFABRICADO DE 0.30X0.60 H=0.60M 1024.12
03.12.03 TRAMPA DE NATAS Y SOLIDOS 1263.48
03.12.04 TANQUE BIODIGESTOR DE 600 LT 13869.97
03.12.05 CAJAS DE REGISTRO DE LODOS 0.60X0.60X0.70 2216.08
03.12.06 TUBERIA DE EVACUACION DE AGUAS GRICES Y NEGRAS 2432.57
03.12.07 POZO DE INFILTRACION 7856.47
04 EDUCACION SANITARIA 24212.54 0.909
04.01 IMPLEMENTACION DEL PROGRAMA DE EDUCACION SANITARIA 2397.5
04.02 PROGRAMA DE EDUCACION SANITARIA 15040.4
04.03 PROGRAMA DE OPERACION, MANTENIMIENTO 6774.64
05 PLAN DE MANEJO AMBIENTAL 25683.42 0.909
05.01 MEDIDAS DE MITIGACION 4893.66
05.02 EDUCACION EN MANTENIMIENTO Y CONSERVACION AMBIENTAL 13248.56
05.03 MEDIDAS DE CONTROL 1700
05.04 MEDIDAS DE PREVENCIÓN 5000
05.05 SEÑALIZACION 841.2
06 FORTALECIMIENTO DE LA JASS Y CAPACITACION 8750 0.909
06.01 FORTALECIMIENTO DE LA JASS Y CAPACITACION 8750
07 PLAN DE MONITOREO ARQUEOLOGICO 10000 0.909
07.01 PLAN DE MONITOREO ARQUEOLOGICO 10000

COSTO DIRECTO 2,629,953.35


GASTOS GENERALES (9.68%) 9.68% 254634.4055958 0.909
UTILIDAD (5%) 5.00% 131,497.67 0.909
SUB TOTAL 1 3,016,085.42
IGV (18%) 18.00% 542,895.38
SUBTOTAL 2 3,558,980.80
SUPERVISION (3.03%) 3.03% 79,815.64 0.909
SUBTOTAL 3 3,638,796.44
EXPEDIENTE TECNICO 42,000.00 0.909
PRESUPUESTO TOTAL 3,680,796.45
P.SOCIALES
1046734.58064 ALCANTARILLADO P.PRIVADO P.SOCIAL
7377.72574 COSTO DIRECTO 898407.49 688552.1434
26327.70756 GASTOS GENERALES (9.68%) 86984.606476 79,069.01
9950.94562 UTILIDAD (5%) 44,920.37 40,832.62
79894.26958 SUB TOTAL 1 ### 808,453.77
800.8968 IGV (18%) 185,456.24 145521.6787992
2537.91384 SUBTOTAL 2 ### 953,975.45
4003.40622 SUPERVISION (3.03%) 27,265.49 24,784.33
20037.10665 SUBTOTAL 3 ### 978,759.78

187005.89092 PRESUPUESTO TOTAL ### 978,759.78


136589.12624
220296.69882
63979.84428 UBS P.PRIVADO P.SOCIAL
COSTO DIRECTO 190638.3 144694.4697
287933.04837 GASTOS GENERALES (9.68%) 18457.76854 16,778.11
659203.52114 UTILIDAD (5%) 9,531.92 8,664.51
10079.86155 SUB TOTAL 1 218,627.98 170,137.09
23873.98068 IGV (18%) 39,353.04 30624.67656675
2758.21359 SUBTOTAL 2 257,981.02 200,761.77
3808.16865 SUPERVISION (3.03%) 5,785.62 5,259.13
8355.28412 SUBTOTAL 3 263,766.64 206,020.90
609.20376
574.83624 PRESUPUESTO TOTAL 263,766.65 206,020.90
6231.95166
117487.95542
2619.48357 AGUA POTABLE P.PRIVADO P.SOCIAL
4363.34679 COSTO DIRECTO 1,540,907.56 1197931.87772
7884.01383 GASTOS GENERALES (9.68%) 149192.03058 135,615.56
18214.64898 UTILIDAD (5%) 77,045.38 70,034.25
65789.24715 SUB TOTAL 1 ### 1,403,581.68
IGV (18%) 318,086.09 252644.7027816
49450.59896 SUBTOTAL 2 ### 1,656,226.38
22506.90344 SUPERVISION (3.03%) 46,764.53 42,508.95
8723.08074 SUBTOTAL 3 ### 1,698,735.34
209406.2784 EXPEDIENTE TECNICO 42,000.00 38,178.00
PRESUPUESTO TOTAL ### 1,736,913.34
96466.46361
3,680,796.47 2,921,694.02

262841.2114
5041.40703
1101.80994
11938.33377
1378.74627
1860.59742
11393.7333
35599.80958
1533.66576
3135.96789
8651.58294
34817.33376
98160.21765

48228.00609

22009.19886

23346.22878

7953.75

9090

2031178.49082
231,462.67
119,531.38
2,382,172.55
428791.0581475
2,810,963.60
72,552.42
2,883,516.02
38,178.00
2,921,694.02
FACTORES DE CORRECCION A NIVEL DE COMPONENTE
FACTOR DE
N° COMPONENTE
CORRECCION
1 Planta de Tratamiento de agua potabl 0.797
2 Línea de agua potable 0.802
3 Obras civiles estructuras 0.759
4 Equipamiento e Instalación hidraulica 0.838
5 Línea de Alcantarillado 0.772
6 Planta de Tratamiento de Desague 0.785
Fuente: Anexo SNIP Nº10.

FACTORES DE CORRECCION
FACTOR DE
N° PRECIO BASICO SECTOR
CORRECCION
1 Bienes No Transables 0.847 Saneamiento
2 Bienes Transables 0.867 Saneamiento
3 Mano de Obra Calificada 0.909 Saneamiento
4 Mano de Obra No Calificada 1/
1/ Factores de corrección de los precios de la mano de obra no calificada (Ver ítem 3.5 de este anexo SNIP Nº10.)
Fuente: Sector Saneamiento y DGPI

FACTORES DE CORRECCION MANO DE OBRA NO CALIFICADA


N° REGION F.C. MO URBANO F.C. MO RURAL

1 Lima Metropolitana 0.860 -


2 Resto Costa 0.680 0.570
3 Sierra 0.600 0.410
4 Selva 0.630 0.490
Fuente: Anexo SNIP Nº10.
SAN MARTIN CON PROYECTO
AGUA POTABLE

RUBRO PRINCIPAL UNIDADCANTIDAD

MANTENIMIENTO
LIMPIEZA DE CAPTACIÓN UND 1
MANTENIMIENTO DE LA LÍNEA DE CONDUCCIÓN ML 324
LIMPIEZA DE RESERVORIO UND 1
MANTENIMIENTO DE LA LÍNEA DE ADUCCIÓN Y DISTRIBUCION ML 2883.68
OPERACIÓN
POTABILIZACIÓN DEL AGUA MESES 12
SUELDO DEL TRABAJADOR (SUELDO/AÑO) PER 1
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL

ALCANTARILLADO

RUBRO PRINCIPAL UNIDADCANTIDAD

MANTENIMIENTO
MANTENIMIENTO DE COLECTORES ML 2442.5
MANTENIMIENTO DE LOS EMISORES ML 1541.4
MANTENIMIENTO Y LIMPIEZA DE LOS BUZONES UND 89
OPERACIÓN
SUELDO DEL PERSONAL (SUELDO/AÑO) AÑO 1
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL

MATARCCOCHA CON PROYECTO


AGUA POTABLE

RUBRO PRINCIPAL UNIDADCANTIDAD

MANTENIMIENTO
LIMPIEZA DE CAPTACIÓN UND 1
MANTENIMIENTO DE LA LÍNEA DE CONDUCCIÓN ML 462
LIMPIEZA DE RESERVORIO UND 1
MANTENIMIENTO DE LA LÍNEA DE ADUCCIÓN Y DISTRIBUCIÓNML 1428
OPERACIÓN
POTABILIZACIÓN DEL AGUA MESES 12
SUELDO DEL TRABAJADOR (SUELDO/AÑO) PER 1
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL
UBS

RUBRO PRINCIPAL UNIDADCANTIDAD

CASETAS UND 8
TANQUE SÉPTICO UND 8
POZO PERCOLADOR UND 8
INSUMOS QUIMICOS GLB 1
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL

ORCCOPUQUIO CON PROYECTO


AGUA POTABLE

RUBRO PRINCIPAL UNIDADCANTIDAD

MANTENIMIENTO
LIMPIEZA DE CAPTACIÓN UND 2
MANTENIMIENTO DE LA LÍNEA DE CONDUCCIÓN ML 240
LIMPIEZA DE RESERVORIO UND 2
MANTENIMIENTO DE LA LÍNEA DE ADUCCIÓN Y DISTRIBUCIÓNML 4680.51
OPERACIÓN
POTABILIZACIÓN DEL AGUA MESES 12
SUELDO DEL TRABAJADOR (SUELDO/AÑO) PER 1
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL
UBS

RUBRO PRINCIPAL UNIDADCANTIDAD

CASETAS UND 16
TANQUE SÉPTICO UND 16
POZO PERCOLADOR UND 16
INSUMOS QUIMICOS GLB 1
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL
ALCANTARILLADO

RUBRO PRINCIPAL UNIDADCANTIDAD

MANTENIMIENTO
MANTENIMIENTO DE COLECTORES ML 2450
MANTENIMIENTO Y LIMPIEZA DE LOS BUZONES UND 50
OPERACIÓN
SUELDO DEL PERSONAL (SUELDO/AÑO) AÑO 1
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL
PROYECTO

TOTAL TOTAL
P.U. PRECIO FACTOR PRECIO
MERCADO SOCIAL
2846.144 2325.99808
80 80 0.792 63.36
0.8 259.2 0.82 212.544
200 200 0.792 158.4
0.8 2306.944 0.82 1891.69408
2760 2466.72
30 360 0.792 285.12
2400 2400 0.909 2181.6
5606.144 4792.71808
556.6900992 475.916905344
S/. 6,162.83 S/. 5,268.63

TOTAL TOTAL
P.U. PRECIO F.C PRECIO
MERCADO SOCIAL
4475.51 3580.46
0.9 2198.25 0.802 1762.9965
0.9 1387.26 0.802 1112.58252
10 890 0.792 704.88
2400 2181.6
2400 2400 0.909 2181.6
6,875.51 5,762.06
682.738143 572.172460686
S/. 7,558.25 S/. 6,334.23
S/. 13,721.08 S/. 11,602.87
N PROYECTO

TOTAL TOTAL
P.U. PRECIO F.C PRECIO
MERCADO SOCIAL
1792 1461.6
80 80 0.792 63.36
0.8 369.6 0.82 303.072
200 200 0.792 158.4
0.8 1142.4 0.82 936.768
2760 2466.72
30 360 0.792 285.12
2400 2400 0.909 2181.6
4,552.00 3,928.32
452.0136 390.082176
S/. 5,004.01 S/. 4,318.40
TOTAL TOTAL
P.U. PRECIO F.C PRECIO
MERCADO SOCIAL
### 160 0.84 134.4
### 480 0.84 403.2
### 480 0.84 403.2
600 600 0.847 508.2
1120 940.8
111.216 93.42144
S/. 1,231.22 S/. 1,034.22
S/. 6,235.23 S/. 5,352.62
PROYECTO

TOTAL TOTAL
P.U. PRECIO F.C PRECIO
MERCADO SOCIAL
4496.408 3671.37456
80 160 0.792 126.72
0.8 192 0.82 157.44
200 400 0.792 316.8
0.8 3744.408 0.82 3070.41456
2760 2466.72
30 360 0.792 285.12
2400 2400 0.909 2181.6
7256.408 6138.09456
720.5613144 609.512789808
S/. 7,976.97 S/. 6,747.61

TOTAL TOTAL
P.U. PRECIO F.C PRECIO
MERCADO SOCIAL
20 320 0.84 268.8
60 960 0.84 806.4
60 960 0.84 806.4
600 600 0.847 508.2
2240 1881.6
S/. 222.43 S/. 186.84
S/. 2,462.43 S/. 2,068.44

TOTAL TOTAL
P.U. PRECIO F.C PRECIO
MERCADO SOCIAL
2705 2164.41
0.9 2205 0.802 1768.41
10 500 0.792 396
2400 2181.6
2400 2400 0.909 2181.6
5,105.00 4,346.01
506.9265 431.558793
S/. 5,611.93 S/. 4,777.57
S/. 16,051.33 S/. 13,593.62
SAN MARTIN SIN PROYECTO
AGUA POTABLE

CANTIDA
RUBRO PRINCIPAL UNIDAD P.U.
D

MANTENIMIENTO
LIMPIEZA DE LA CAPTACIÓN UND 1 80
MANTENIMIENTO DE LA LÍNEA DE CONDUCCIÓN ML 320 0.8
LIMPIEZA DE RESERVORIO UND 1 200
MANTENIMIENTO DE LA LÍNEA DE ADUCCIÓN Y DISTRIBUCIÓNML 2883.68 0.8
OPERACIÓN
POTABILIZACIÓN DEL AGUA MES 12 20
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL

ALCANTARILLADO

RUBRO PRINCIPAL UNIDADCANTIDAD P.U.

MANTENIMIENTO
MANTENIMIENTO DE COLECTORES ML 2442.5 0.9
MANTENIMIENTO DE LOS EMISORES ML 1541.4 0.9
MANTENIMIENTO Y LIMPIEZA DE LOS BUZONES UND 89 10
OPERACIÓN
SUELDO DEL PERSONAL (SUELDO/AÑO) AÑO 1 2400
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL

MATARCCOCHA SIN PROYECTO


AGUA POTABLE

RUBRO PRINCIPAL UNIDADCANTIDAD P.U.

MANTENIMIENTO
LIMPIEZA DE CAPTACIÓN UND 1 80
MANTENIMIENTO DE LA LÍNEA DE CONDUCCIÓN ML 4000 0.8
LIMPIEZA DE RESERVORIO UND 1 200
MANTENIMIENTO DE LA LÍNEA DE ADUCCIÓN Y DISTRIBUCIÓNML 241 0.8
OPERACIÓN
POTABILIZACIÓN DEL AGUA MESES 12 30
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL
UBS

RUBRO PRINCIPAL UNIDADCANTIDAD P.U.

CASETAS UND 8 ###


TANQUE SÉPTICO UND 8 ###
POZO PERCOLADOR UND 8 ###
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL

ORCCOPUQUIO SIN PROYECTO


AGUA POTABLE

RUBRO PRINCIPAL UNIDADCANTIDAD P.U.

MANTENIMIENTO
LIMPIEZA DE CAPTACIÓN UND 1 80
MANTENIMIENTO DE LA LÍNEA DE CONDUCCIÓN ML 38 0.8
LIMPIEZA DE RESERVORIO UND 2 200
MANTENIMIENTO DE LA LÍNEA DE ADUCCIÓN Y DISTRIBUCIÓNML 1578 0.8
OPERACIÓN
POTABILIZACIÓN DEL AGUA MESES 12 30
SUELDO DEL TRABAJADOR (SUELDO/AÑO) PER 0 2400
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL
UBS

RUBRO PRINCIPAL UNIDADCANTIDAD P.U.

CASETAS UND 16 0
TANQUE SÉPTICO UND 16 0
POZO PERCOLADOR UND 16 0

COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL
ALCANTARILLADO

RUBRO PRINCIPAL UNIDADCANTIDAD P.U.

MANTENIMIENTO
MANTENIMIENTO DE COLECTORES ML 1910 0.9
MANTENIMIENTO Y LIMPIEZA DE LOS BUZONES UND 41 10
OPERACIÓN
SUELDO DEL PERSONAL (SUELDO/AÑO) AÑO 1 2400
COSTO DIRECTO
GASTOS GENERALES (9.93%)
TOTAL
TOTAL TOTAL
PRECIO F.C PRECIO
MERCADO SOCIAL
2842.944 2323.37408
80 0.792 63.36
256 0.82 209.92
200 0.792 158.4
2306.944 0.82 1891.69408
240 190.08
240 0.792 190.08
3082.944 2513.45408
306.136339 249.5859901
### S/. 2,763.04

TOTAL TOTAL
PRECIO F.C PRECIO
MERCADO SOCIAL
4475.51 3580.46
2198.25 0.802 1762.9965
1387.26 0.802 1112.58252
890 0.792 704.88
2400 2181.6
2400 0.909 2181.6
6,875.51 5,762.06
682.738143 572.17246069
S/. 7,558.25 S/. 6,334.23

TOTAL TOTAL
PRECIO F.C PRECIO
MERCADO SOCIAL
3672.8 3003.856
80 0.792 63.36
3200 0.82 2624 O Y M TOTAL SAN MARTIN O Y M TOTAL M
200 0.792 158.4 DESCRIPCION
AÑO AÑO
192.8 0.82 158.096 OPERACIÓN MANTENIMIENTO
360 285.12 1 5672.388 8048.6942422 1
360 0.792 285.12 2 5672.388 8048.6942422 2
4,032.80 3,288.98 3 5672.388 8048.6942422 3
400.45704 326.5953168 4 5672.388 8048.6942422 4
S/. 4,433.26 S/. 3,615.57 5 5672.388 8048.6942422 5
6 5672.388 8048.6942422 6
7 5672.388 8048.6942422 7
TOTAL TOTAL
PRECIO F.C PRECIO
MERCADO SOCIAL 8 5672.388 8048.6942422 8
0 1 0 9 5672.388 8048.6942422 9
0 1 0 10 5672.388 8048.6942422 10
0 1 0 11 5672.388 8048.6942422 11
0 0 12 5672.388 8048.6942422 12
0 0 13 5672.388 8048.6942422 13
S/. 0.00 S/. 0.00 14 5672.388 8048.6942422 14
15 5672.388 8048.6942422 15
16 5672.388 8048.6942422 16
O 17 5672.388 8048.6942422 17

TOTAL TOTAL
PRECIO F.C PRECIO
MERCADO SOCIAL 18 5672.388 8048.6942422 18
1772.8 1440.256 19 5672.388 8048.6942422 19
80 0.792 63.36 20 5672.388 8048.6942422 20
30.4 0.82 24.928
400 0.792 316.8 O Y M TOTAL ORCCOPUQUIO O Y M TOTAL
1262.4 0.82 1035.168 DESCRIPCION
AÑO AÑO
360 285.12 OPERACIÓN MANTENIMIENTO
360 0.792 285.12 1 5230.692 10378.9398144 1
0 0.909 0 2 5230.692 10378.9398144 2
2132.8 1725.376 3 5230.692 10378.9398144 3
211.78704 171.3298368 4 5230.692 10378.9398144 4
S/. 2,344.59 S/. 1,896.71 5 5230.692 10378.9398144 5
6 5230.692 10378.9398144 6
TOTAL TOTAL
PRECIO F.C PRECIO
MERCADO SOCIAL 7 5230.692 10378.9398144 7
0 0.84 0 8 5230.692 10378.9398144 8
0 0.84 0 9 5230.692 10378.9398144 9
0 0.84 0 10 5230.692 10378.9398144 10
11 5230.692 10378.9398144 11
0 0 12 5230.692 10378.9398144 12
S/. 0.00 S/. 0.00 13 5230.692 10378.9398144 13
S/. 0.00 S/. 0.00 14 5230.692 10378.9398144 14
15 5230.692 10378.9398144 15
TOTAL TOTAL
PRECIO F.C PRECIO
MERCADO SOCIAL 16 5230.692 10378.9398144 16
2129 1703.358 17 5230.692 10378.9398144 17
1719 0.802 1378.638 18 5230.692 10378.9398144 18
410 0.792 324.72 19 5230.692 10378.9398144 19
2400 2181.6 20 5230.692 10378.9398144 20
2400 0.909 2181.6
4,529.00 3,884.96
449.7297 385.7763294
S/. 4,978.73 S/. 4,270.73
O Y M TOTAL MATARCCOCHA O Y M TOTAL SAN MARTIN
DESCRIPCION DESCRIPCION
AÑO
OPERACIÓN MANTENIMIENTO OPERACIÓNMANTENIMIENTO
3034.068 3201.1616 1 5109.89818 6492.96829003
3034.068 3201.1616 2 5109.89818 6492.96829003
3034.068 3201.1616 3 5109.89818 6492.96829003
3034.068 3201.1616 4 5109.89818 6492.96829003
3034.068 3201.1616 5 5109.89818 6492.96829003
3034.068 3201.1616 6 5109.89818 6492.96829003
3034.068 3201.1616 7 5109.89818 6492.96829003

3034.068 3201.1616 8 5109.89818 6492.96829003


3034.068 3201.1616 9 5109.89818 6492.96829003
3034.068 3201.1616 10 5109.89818 6492.96829003
3034.068 3201.1616 11 5109.89818 6492.96829003
3034.068 3201.1616 12 5109.89818 6492.96829003
3034.068 3201.1616 13 5109.89818 6492.96829003
3034.068 3201.1616 14 5109.89818 6492.96829003
3034.068 3201.1616 15 5109.89818 6492.96829003
3034.068 3201.1616 16 5109.89818 6492.96829003
3034.068 3201.1616 17 5109.89818 6492.96829003

3034.068 3201.1616 18 5109.89818 6492.96829003


3034.068 3201.1616 19 5109.89818 6492.96829003
3034.068 3201.1616 20 5109.89818 6492.96829003

O Y M TOTAL 03 BARRIOS O Y M TOTAL ORCCOPUQUIO


DESCRIPCION DESCRIPCION
AÑO
OPERACIÓN MANTENIMIENTO OPERACIÓNMANTENIMIENTO
13,937.15 21,628.80 1 4712.00198 8483.720846808
13,937.15 21,628.80 2 4712.00198 8483.720846808
13,937.15 21,628.80 3 4712.00198 8483.720846808
13,937.15 21,628.80 4 4712.00198 8483.720846808
13,937.15 21,628.80 5 4712.00198 8483.720846808
13,937.15 21,628.80 6 4712.00198 8483.720846808

13,937.15 21,628.80 7 4712.00198 8483.720846808


13,937.15 21,628.80 8 4712.00198 8483.720846808
13,937.15 21,628.80 9 4712.00198 8483.720846808
13,937.15 21,628.80 10 4712.00198 8483.720846808
13,937.15 21,628.80 11 4712.00198 8483.720846808
13,937.15 21,628.80 12 4712.00198 8483.720846808
13,937.15 21,628.80 13 4712.00198 8483.720846808
13,937.15 21,628.80 14 4712.00198 8483.720846808
13,937.15 21,628.80 15 4712.00198 8483.720846808

13,937.15 21,628.80 16 4712.00198 8483.720846808


13,937.15 21,628.80 17 4712.00198 8483.720846808
13,937.15 21,628.80 18 4712.00198 8483.720846808
13,937.15 21,628.80 19 4712.00198 8483.720846808
13,937.15 21,628.80 20 4712.00198 8483.720846808
O Y M TOTAL MATARCCOCHA O Y M TOTAL SAN MARTIN
DESCRIPCION DESCRIPCION
AÑO AÑO
OPERACIÓNMANTENIMIENTO OPERACIÓNMANTENIMIENTO
1 2711.6653 2640.95832 1 2902.152 8045.1764822
2 2711.6653 2640.95832 2 2902.152 8045.1764822
3 2711.6653 2640.95832 3 2902.152 8045.1764822
4 2711.6653 2640.95832 4 2902.152 8045.1764822
5 2711.6653 2640.95832 5 2902.152 8045.1764822
6 2711.6653 2640.95832 6 2902.152 8045.1764822
7 2711.6653 2640.95832 7 2902.152 8045.1764822

8 2711.6653 2640.95832 8 2902.152 8045.1764822


9 2711.6653 2640.95832 9 2902.152 8045.1764822
10 2711.6653 2640.95832 10 2902.152 8045.1764822
11 2711.6653 2640.95832 11 2902.152 8045.1764822
12 2711.6653 2640.95832 12 2902.152 8045.1764822
13 2711.6653 2640.95832 13 2902.152 8045.1764822
14 2711.6653 2640.95832 14 2902.152 8045.1764822
15 2711.6653 2640.95832 15 2902.152 8045.1764822
16 2711.6653 2640.95832 16 2902.152 8045.1764822
17 2711.6653 2640.95832 17 2902.152 8045.1764822

18 2711.6653 2640.95832 18 2902.152 8045.1764822


19 2711.6653 2640.95832 19 2902.152 8045.1764822
20 2711.6653 2640.95832 20 2902.152 8045.1764822

O Y M TOTAL 03 BARRIOS O Y M TOTAL ORCCOPUQUIO


DESCRIPCION DESCRIPCION
AÑO AÑO
OPERACIÓNMANTENIMIENTO OPERACIÓNMANTENIMIENTO
1 12,533.57 17,617.65 1 2797.812 4922.44554
2 12,533.57 17,617.65 2 2797.812 4922.44554
3 12,533.57 17,617.65 3 2797.812 4922.44554
4 12,533.57 17,617.65 4 2797.812 4922.44554
5 12,533.57 17,617.65 5 2797.812 4922.44554
6 12,533.57 17,617.65 6 2797.812 4922.44554

7 12,533.57 17,617.65 7 2797.812 4922.44554


8 12,533.57 17,617.65 8 2797.812 4922.44554
9 12,533.57 17,617.65 9 2797.812 4922.44554
10 12,533.57 17,617.65 10 2797.812 4922.44554
11 12,533.57 17,617.65 11 2797.812 4922.44554
12 12,533.57 17,617.65 12 2797.812 4922.44554
13 12,533.57 17,617.65 13 2797.812 4922.44554
14 12,533.57 17,617.65 14 2797.812 4922.44554
15 12,533.57 17,617.65 15 2797.812 4922.44554

16 12,533.57 17,617.65 16 2797.812 4922.44554


17 12,533.57 17,617.65 17 2797.812 4922.44554
18 12,533.57 17,617.65 18 2797.812 4922.44554
19 12,533.57 17,617.65 19 2797.812 4922.44554
20 12,533.57 17,617.65 20 2797.812 4922.44554
O Y M TOTAL MATARCCOCHA O Y M TOTAL SAN MARTIN
DESCRIPCION DESCRIPCION
AÑO AÑO
OPERACIÓNMANTENIMIENTO OPERACIÓNMANTENIMIENTO
1 395.748 4037.50904 1 2607.18782 6490.08372683
2 395.748 4037.50904 2 2607.18782 6490.08372683
3 395.748 4037.50904 3 2607.18782 6490.08372683
4 395.748 4037.50904 4 2607.18782 6490.08372683
5 395.748 4037.50904 5 2607.18782 6490.08372683
6 395.748 4037.50904 6 2607.18782 6490.08372683
7 395.748 4037.50904 7 2607.18782 6490.08372683

8 395.748 4037.50904 8 2607.18782 6490.08372683


9 395.748 4037.50904 9 2607.18782 6490.08372683
10 395.748 4037.50904 10 2607.18782 6490.08372683
11 395.748 4037.50904 11 2607.18782 6490.08372683
12 395.748 4037.50904 12 2607.18782 6490.08372683
13 395.748 4037.50904 13 2607.18782 6490.08372683
14 395.748 4037.50904 14 2607.18782 6490.08372683
15 395.748 4037.50904 15 2607.18782 6490.08372683
16 395.748 4037.50904 16 2607.18782 6490.08372683
17 395.748 4037.50904 17 2607.18782 6490.08372683

18 395.748 4037.50904 18 2607.18782 6490.08372683


19 395.748 4037.50904 19 2607.18782 6490.08372683
20 395.748 4037.50904 20 2607.18782 6490.08372683

O Y M TOTAL 03 BARRIOS O Y M TOTAL ORCCOPUQUIO


DESCRIPCION DESCRIPCION
AÑO AÑO
OPERACIÓNMANTENIMIENTO OPERACIÓNMANTENIMIENTO
1 6,095.71 17,005.13 1 2500.51406 3455.7748702
2 6,095.71 17,005.13 2 2500.51406 3455.7748702
3 6,095.71 17,005.13 3 2500.51406 3455.7748702
4 6,095.71 17,005.13 4 2500.51406 3455.7748702
5 6,095.71 17,005.13 5 2500.51406 3455.7748702
6 6,095.71 17,005.13 6 2500.51406 3455.7748702

7 6,095.71 17,005.13 7 2500.51406 3455.7748702


8 6,095.71 17,005.13 8 2500.51406 3455.7748702
9 6,095.71 17,005.13 9 2500.51406 3455.7748702
10 6,095.71 17,005.13 10 2500.51406 3455.7748702
11 6,095.71 17,005.13 11 2500.51406 3455.7748702
12 6,095.71 17,005.13 12 2500.51406 3455.7748702
13 6,095.71 17,005.13 13 2500.51406 3455.7748702
14 6,095.71 17,005.13 14 2500.51406 3455.7748702
15 6,095.71 17,005.13 15 2500.51406 3455.7748702

16 6,095.71 17,005.13 16 2500.51406 3455.7748702


17 6,095.71 17,005.13 17 2500.51406 3455.7748702
18 6,095.71 17,005.13 18 2500.51406 3455.7748702
19 6,095.71 17,005.13 19 2500.51406 3455.7748702
20 6,095.71 17,005.13 20 2500.51406 3455.7748702
O Y M TOTAL MATARCCOCHA
DESCRIPCION
AÑO
NIMIENTO OPERACIÓNMANTENIMIENTO
1 313.432416 4336.3603408
2 313.432416 4336.3603408
3 313.432416 4336.3603408
4 313.432416 4336.3603408
5 313.432416 4336.3603408
6 313.432416 4336.3603408
7 313.432416 4336.3603408

8 313.432416 4336.3603408
9 313.432416 4336.3603408
10 313.432416 4336.3603408
11 313.432416 4336.3603408
12 313.432416 4336.3603408
13 313.432416 4336.3603408
14 313.432416 4336.3603408
15 313.432416 4336.3603408
16 313.432416 4336.3603408
17 313.432416 4336.3603408

18 313.432416 4336.3603408
19 313.432416 4336.3603408
20 313.432416 4336.3603408

O Y M TOTAL 03 BARRIOS
DESCRIPCION
AÑO
NIMIENTO OPERACIÓNMANTENIMIENTO
1 5421.1343 14282.2189378
2 5421.1343 14282.2189378
3 5421.1343 14282.2189378
4 5421.1343 14282.2189378
5 5421.1343 14282.2189378
6 5421.1343 14282.2189378

7 5421.1343 14282.2189378
8 5421.1343 14282.2189378
9 5421.1343 14282.2189378
10 5421.1343 14282.2189378
11 5421.1343 14282.2189378
12 5421.1343 14282.2189378
13 5421.1343 14282.2189378
14 5421.1343 14282.2189378
15 5421.1343 14282.2189378

16 5421.1343 14282.2189378
17 5421.1343 14282.2189378
18 5421.1343 14282.2189378
19 5421.1343 14282.2189378
20 5421.1343 14282.2189378
AGUA POTABLE
Flujo de costos precios privados
Agua potable total 03 LOCALICADES
O&M SIN PROYECTO O&M CON PROYECTO
Total de Costos de
Año Total Costos Costos de Total Costos
Costos de Mantenimient
de Operación Mantenimiento de Operación
O&M o
1 1 960.00 8,288.54 9,248.54 8,280.00 9,134.55
2 2 960.00 8,288.54 9,248.54 8,280.00 9,134.55
3 3 960.00 8,288.54 9,248.54 8,280.00 9,134.55
4 4 960.00 8,288.54 9,248.54 8,280.00 9,134.55
5 5 960.00 8,288.54 9,248.54 8,280.00 9,134.55
6 6 960.00 8,288.54 9,248.54 8,280.00 9,134.55
7 7 960.00 8,288.54 9,248.54 8,280.00 9,134.55
8 8 960.00 8,288.54 9,248.54 8,280.00 9,134.55
9 9 960.00 8,288.54 9,248.54 8,280.00 9,134.55
10 10 960.00 8,288.54 9,248.54 8,280.00 9,134.55
11 11 960.00 8,288.54 9,248.54 8,280.00 9,134.55
12 12 960.00 8,288.54 9,248.54 8,280.00 9,134.55
13 13 960.00 8,288.54 9,248.54 8,280.00 9,134.55
14 14 960.00 8,288.54 9,248.54 8,280.00 9,134.55
15 15 960.00 8,288.54 9,248.54 8,280.00 9,134.55
16 16 960.00 8,288.54 9,248.54 8,280.00 9,134.55
17 17 960.00 8,288.54 9,248.54 8,280.00 9,134.55
18 18 960.00 8,288.54 9,248.54 8,280.00 9,134.55
19 19 960.00 8,288.54 9,248.54 8,280.00 9,134.55
20 20 960.00 8,288.54 9,248.54 8,280.00 9,134.55
FUENTE: ELABORACION PROPIA

Flujo de costos precios sociales


Agua potable total 03 LOCALICADES
O&M SIN PROYECTO O&M CON PROYECTO

AÑO Total de Costos de


Total Costos Costos de Total Costos
Costos de Mantenimient
de Operación Mantenimiento de Operación
O&M o
1 760.32 6,767.49 7,527.81 7,115.04 7,458.97
2 760.32 6,767.49 7,527.81 7,115.04 7,458.97
3 760.32 6,767.49 7,527.81 7,115.04 7,458.97
4 760.32 6,767.49 7,527.81 7,115.04 7,458.97
5 760.32 6,767.49 7,527.81 7,115.04 7,458.97
6 760.32 6,767.49 7,527.81 7,115.04 7,458.97
7 760.32 6,767.49 7,527.81 7,115.04 7,458.97
8 760.32 6,767.49 7,527.81 7,115.04 7,458.97
9 760.32 6,767.49 7,527.81 7,115.04 7,458.97
10 760.32 6,767.49 7,527.81 7,115.04 7,458.97
11 760.32 6,767.49 7,527.81 7,115.04 7,458.97
12 760.32 6,767.49 7,527.81 7,115.04 7,458.97
13 760.32 6,767.49 7,527.81 7,115.04 7,458.97
14 760.32 6,767.49 7,527.81 7,115.04 7,458.97
15 760.32 6,767.49 7,527.81 7,115.04 7,458.97
16 760.32 6,767.49 7,527.81 7,115.04 7,458.97
17 760.32 6,767.49 7,527.81 7,115.04 7,458.97
18 760.32 6,767.49 7,527.81 7,115.04 7,458.97
19 760.32 6,767.49 7,527.81 7,115.04 7,458.97
20 760.32 6,767.49 7,527.81 7,115.04 7,458.97
FUENTE: ELABORACION PROPIA

UBS
Flujo de costos precios privados
UNIDADES BASICAS DE SANEAMIENTO 03 LOCALIDADES
O&M SIN PROYECTO O&M CON PROYECTO
Total de Costos de
Año Total Costos Costos de Total Costos
Costos de Mantenimient
de Operación Mantenimiento de Operación
O&M o
1 0.00 0.00 0.00 1,200.00 3,360.00
2 0.00 0.00 0.00 1,200.00 3,360.00
3 0.00 0.00 0.00 1,200.00 3,360.00
4 0.00 0.00 0.00 1,200.00 3,360.00
5 0.00 0.00 0.00 1,200.00 3,360.00
6 0.00 0.00 0.00 1,200.00 3,360.00
7 0.00 0.00 0.00 1,200.00 3,360.00
8 0.00 0.00 0.00 1,200.00 3,360.00
9 0.00 0.00 0.00 1,200.00 3,360.00
10 0.00 0.00 0.00 1,200.00 3,360.00
11 0.00 0.00 0.00 1,200.00 3,360.00
12 0.00 0.00 0.00 1,200.00 3,360.00
13 0.00 0.00 0.00 1,200.00 3,360.00
14 0.00 0.00 0.00 1,200.00 3,360.00
15 0.00 0.00 0.00 1,200.00 3,360.00
16 0.00 0.00 0.00 1,200.00 3,360.00
17 0.00 0.00 0.00 1,200.00 3,360.00
18 0.00 0.00 0.00 1,200.00 3,360.00
19 0.00 0.00 0.00 1,200.00 3,360.00
20 0.00 0.00 0.00 1,200.00 3,360.00

Flujo de costos precios sociales


UNIDADES BASICAS DE SANEAMIENTO 03 LOCALIDADES
O&M SIN PROYECTO O&M CON PROYECTO
Total de Costos de
Año Total Costos Costos de Total Costos
Costos de Mantenimient
de Operación Mantenimiento de Operación
O&M o
1 0.00 0.00 0.00 1,016.40 2,822.40
2 0.00 0.00 0.00 1,016.40 2,822.40
3 0.00 0.00 0.00 1,016.40 2,822.40
3 0.00 0.00 0.00 1,016.40 2,822.40
5 0.00 0.00 0.00 1,016.40 2,822.40
4 0.00 0.00 0.00 1,016.40 2,822.40
7 0.00 0.00 0.00 1,016.40 2,822.40
5 0.00 0.00 0.00 1,016.40 2,822.40
9 0.00 0.00 0.00 1,016.40 2,822.40
6 0.00 0.00 0.00 1,016.40 2,822.40
11 0.00 0.00 0.00 1,016.40 2,822.40
7 0.00 0.00 0.00 1,016.40 2,822.40
13 0.00 0.00 0.00 1,016.40 2,822.40
8 0.00 0.00 0.00 1,016.40 2,822.40
15 0.00 0.00 0.00 1,016.40 2,822.40
9 0.00 0.00 0.00 1,016.40 2,822.40
17 0.00 0.00 0.00 1,016.40 2,822.40
10 0.00 0.00 0.00 1,016.40 2,822.40
19 0.00 0.00 0.00 1,016.40 2,822.40
20 0.00 0.00 0.00 1,016.40 2,822.40

ALCANTARILLADO
Flujo de costos precios privados
ALCANTARILLADO 03 LOCALIDADES
O&M SIN PROYECTO O&M CON PROYECTO
Total de Costos de
Año Total Costos Costos de Total Costos
Costos de Mantenimient
de Operación Mantenimiento de Operación
O&M o
1 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
2 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
3 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
4 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
5 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
6 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
7 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
8 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
9 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
10 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
11 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
12 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
13 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
14 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
15 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
16 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
17 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
18 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
19 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51
20 4,800.00 6,604.51 11,404.51 4,800.00 7,180.51

Flujo de costos precios sociales


ALCANTARILLADO 03 LOCALIDADES
O&M SIN PROYECTO O&M CON PROYECTO
Total de Costos de
Año Total Costos Costos de Total Costos
Costos de Mantenimient
de Operación Mantenimiento de Operación
O&M o
1 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
2 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
3 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
3 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
5 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
4 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
7 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
5 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
9 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
6 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
11 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
7 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
13 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
8 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
15 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
9 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
17 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
10 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
19 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
20 4,363.20 5,283.82 9,647.02 4,363.20 5,744.87
os privados
OCALICADES
ON PROYECTO COSTO DE O&M INCREMENTAL
Total de Costos de Total de
Total Costos
Costos de Mantenimient Costos de
de Operación
O&M o O&M
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01
17,414.55 7,320.00 846.01 8,166.01

ios sociales
OCALICADES
ON PROYECTO COSTO DE O&M INCREMENTAL
Total de Costos de Total de
Total Costos
Costos de Mantenimient Costos de
de Operación
O&M o O&M
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21
14,574.01 6,354.72 691.49 7,046.21

os privados
OCALIDADES
ON PROYECTO COSTO DE O&M INCREMENTAL
Costos de Total de
Total Costos Total Costos
Mantenimient Costos de
de O&M de Operación
o O&M
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00
4,560.00 1,200.00 3,360.00 4,560.00

ios sociales
OCALIDADES
ON PROYECTO COSTO DE O&M INCREMENTAL
Total de Costos de Total de
Total Costos
Costos de Mantenimient Costos de
de Operación
O&M o O&M
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80
3,838.80 1,016.40 2,822.40 3,838.80

os privados
OCALIDADES
ON PROYECTO COSTO DE O&M INCREMENTAL
Costos de Total de
Total Costos Total Costos
Mantenimient Costos de
de O&M de Operación
o O&M
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00
11,980.51 0.00 576.00 576.00

ios sociales
OCALIDADES
ON PROYECTO COSTO DE O&M INCREMENTAL
Total de Costos de Total de
Total Costos
Costos de Mantenimient Costos de
de Operación
O&M o O&M
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05
10,108.07 0.00 461.05 461.05

14,280.00 19,675.06
34200 26630
19,920.00 6,954.94
Situación de los No Conectados al Sistema
Personas que Tiempo de acarreo numero de Tiempo total
acarrea por viaje (minuto) viajes (lt/viajje) acrreo Horas
1 2 3= (1x2)/60
Madre Padre e Hijos Mayores 15 3 0.75
Hijo Menor 14 3 0.70
total 29 6

DATOS:
valor del tiempo de acarreo por familia al mes S/. 33
valor del tiempo de acarreo por familia al año S/ 396.0
Capacidad d envase para acarreo lt 5
cantidad de acarreo al dia lt 30
cantidad de acarreo al mes. m3 0.90
valor del tiempo de acarreo de cada m3 (s/m3) 36.67
Sistema
Valor de tiempvalor de tiempo de
por hora solesacarreo (S/dia)
4 5=3x4
1.00 0.75
0.50 0.35
1.10
ESTRUCTURA DE PRODUCCION DE AGUA A PRECIOS PRIVADOS
Datos
Fuente 0.30 lt/seg
Producci25.92 Metros cúbicos/día
GASTOS POR DIA PARA 3 LOCALIDADES
Item DESCRIPCIÓN UNID. CANT. P.U. PARCIAL
Personal
1 Peon día 1.0 30.00 30.00
2 Ingeniero Responsable día 0.15 100.00 15.00
Materiales
1 Hipoclorito kg 0.5 12.00 6.00
Equipos y herramientas
1 Herramientas manuales glb 0.3 15.50 4.65
2 Otros (Pago por consumoglb 0.3 25.50 7.65
TOTAL COSTO POR DIA
COSTO DE PRODUCCIÓN DE AGUA POR M3 (Costo/día / Cantidad agua/día)
OS PRIVADOS ESTRUCTURA DE PRODUCCION DE AGUA A
Datos
Fuente 0.30 lt/seg
Producción 25.92 Metros cúbicos/día
ES GASTOS POR DIA PARA 3 LOCA
TOTAL Item DESCRIPCIÓN UNID.
45.00 Personal
1 Peon día
2 Ingeniero Responsable día
6.00 Materiales
1 Hipoclorito kg
12.30 Equipos y herramientas
1 Herramientas manuales glb
2 Otros (Pago por consumo glb
63.30 TOTAL COSTO POR DIA
S/. 2.44 COSTO DE PRODUCCIÓN DE AGUA POR M3 (Costo/día
CION DE AGUA A PRECIOS SOCIALES

DIA PARA 3 LOCALIDADES


PARCIAL
CoeficientePARCIAL TOTAL
25.94
30.00 0.41 12.30
15.00 0.909 13.64
5.08
6.00 0.847 5.08
10.51
4.65 0.867 4.03
7.65 0.847 6.48
STO POR DIA 41.53
OR M3 (Costo/día / Cantidad agua/día)
S/. 1.60
I. Curva de la Demanda y Beneficios Económicos para nuevos Usuarios

1. Estimación de la curva de demanda de agua

nuevos usuarios
Variable cantidad Variable precio
cantidad (m3) Precio (S/./m )
3

Precio máximo al cual no se


demandaria agua potable
0.00 38.95 curva:
Consumo de los no conectados al Precio económico del agua para los
sistema (m3/mes/vivi.) no conectados al sistema (S/./m3)
0.90 36.67 Q=
Consumo con proyecto
Tarifa (S/, /m3)
(m3/mes/vivi.) 14.40 2.44
Consumo de saturación con tarifa
marginal cero (m3/mes/vivi.) 15.36 0.00

CURVA DE DEMANDA Y BENEFICIOS ECONOMICOS PARA NUEVOS USUARIOS

RECURSOS LIBERADOS (RL)


45.00
38.95 EXCEDENTE DEL CONSUMIDOR.
P (S/./m3)

40.00 (EC)
36.67

35.00

30.00

25.00

20.00
RECURSOS LIBERADOS (RL)
45.00
38.95 EXCEDENTE DEL CONSUMIDOR.

P (S/./m3)
40.00 36.67
(EC)

35.00

30.00

25.00

20.00

15.00

10.00

5.00 2.44
0.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Q (m3/usuario/mes)

2. Estimación de los beneficios de nuevos usuarios


a. Beneficios por recursos liberados (S/. / fam/mes) 33.00
b. Beneficios por incremento del consumo de agua (S/. / f 265.2
c. Beneficios brutos totales (S/. / fam/mes) 298.16
II. Curva de la Demanda y Beneficios Económicos para Usuarios Antiguos

1. Estimación de la curva de demanda de agua

usuarios antiguos
Variable cantidad cantidad Precio Variable precio
(m3) (S/./m3)
Precio máximo al cual no se
demandaria agua potable
curva: m 0 38.9 (S/./m3)
Precio económico del agua
Consumo de los conectados al
para los conectados según
sistema (m3/mes/vivi.)
15.36 -0.39 P 0.90 36.67 curva de demanda (S/./m3)
Consumo con proyecto
Tarifa (S/./m3)
(m3/mes/vivi.) 14.40 2.44
Consumo de saturación con tarifa
marginal cero (m3/mes/vivi.) 15.36 0

CURVA DE DEMANDA Y BENEFICIOS ECONOMICOS PARA USUARIOS ANTIGUOS

AREA DE
INCREMENTO DE
P (S/./m3)

45.0
38.95 CONSUMO
40.0 36.67
35.0
30.0
25.0
20.0
AREA DE
INCREMENTO DE

P (S/./m3)
45.0
38.95 CONSUMO
40.0 36.67
35.0
30.0
25.0
20.0
15.0
10.0
5.0 2.44

0.0 0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Q (m3/usuario/mes)

2. Estimación de los beneficios usuarios antiguos


2.1 Beneficios por incremento del consumo de agua 265.16
SOLO PARA AGUA POTABLE
Beneficios Brutos Proyectados del proyecto
POB.
Nº DE FAMILIAS CONECTADAS AL
BENEFICIA COBERTURA
AÑOS SERVICIO
DA CON DEL PIP
AGUA ANTIGUAS NUEVAS
0 796 73% 157 49
1 801 100% 206 1
2 805 100% 207 1
3 810 100% 208 1
4 815 100% 210 1
5 819 100% 211 1
6 824 100% 212 1
7 828 100% 213 1
8 833 100% 214 1
9 838 100% 216 1
10 842 100% 217 1
11 847 100% 218 1
12 852 100% 219 1
13 856 100% 220 1
14 861 100% 222 1
15 865 100% 223 1
16 870 100% 224 1
17 875 100% 225 1
18 879 100% 226 1
19 884 100% 228 1
20 889 100% 229 1
yectados del proyecto 1.50%
AS CONECTADAS AL BENEFICIOS BRUTOS CON
ERVICIO PROYECTO �= �_0+ 〖 (� 〗 _0∗ 𝑟 /
TOTAL ANTIGUAS NUEVAS TOTAL 100)𝑥 �
206 499,563 175,318 674,881
207 655,477 4,284 659,761
208 659,287 4,284 663,571
210 663,097 4,284 667,381
211 666,907 4,284 671,192
212 670,717 4,284 675,002
213 674,527 4,284 678,812
214 678,338 4,284 682,622
216 682,148 4,284 686,432
217 685,958 4,284 690,242
218 689,768 4,284 694,052
219 693,578 4,284 697,862
220 697,388 4,284 701,672
222 701,198 4,284 705,482
223 705,008 4,284 709,292
224 708,818 4,284 713,102
225 712,628 4,284 716,912
226 716,438 4,284 720,723
228 720,248 4,284 724,533
229 724,058 4,284 728,343
230 727,869 4,284 732,153
(� 〗 _0∗ 𝑟 /
Evaluación Económica del Sistema de Agua Potable ALTERNATI
Nº DE FAMILIAS CONECTADAS AL
POB. SERVICIO
BENEFICI COBERTURA
AÑOS
ADA CON DEL PIP ANTIGUAS NUEVAS
AGUA

1 801 100% 206 1


2 805 100% 207 1
3 810 100% 208 1
4 815 100% 210 1
5 819 100% 211 1
6 824 100% 212 1
7 828 100% 213 1
8 833 100% 214 1
9 838 100% 216 1
10 842 100% 217 1
11 847 100% 218 1
12 852 100% 219 1
13 856 100% 220 1
14 861 100% 222 1
15 865 100% 223 1
16 870 100% 224 1
17 875 100% 225 1
18 879 100% 226 1
19 884 100% 228 1
20 889 100% 229 1

845

Análisis Costo Efectividad Unidad Basica de Saneamiento (UBS)

POBLACION INVERSION
POB. POBLACION
AÑOS SERVIDA A PRECIOS
TOTAL SERVIDA
ADICIONAL SOCIALES
0 497 ###
1 500 500 0
2 503 503 3
3 506 506 3
4 509 509 3
5 511 511 3
6 514 514 3
7 517 517 3
8 520 520 3
9 523 523 3
10 526 526 3
11 529 529 3
12 532 532 3
13 535 535 3
14 537 537 3
15 540 540 3
16 543 543 3
17 546 546 3
18 549 549 3
19 552 552 3
20 555 555 3

Análisis Costo Efectividad ALCANTAILLADO

POBLACION INVERSION
POB. POBLACION
AÑOS SERVIDA A PRECIOS
TOTAL SERVIDA
ADICIONAL SOCIALES
0 652 0 0 ###
1 656 500 0
2 660 503 3
3 663 506 3
4 667 509 3
5 671 511 3
6 675 514 3
7 679 517 3
8 682 520 3
9 686 523 3
10 690 526 3
11 694 529 3
12 697 532 3
13 701 535 3
14 705 537 3
15 709 540 3
16 713 543 3
17 716 546 3
18 720 549 3
19 724 552 3
20 728 555 3
ma de Agua Potable ALTERNATIVA UNICA
S CONECTADAS AL
BENEFICIOS BRUTOS CON PROYECTO
RVICIO
INVERSION A
PRECIOS
TOTAL ANTIGUAS NUEVAS TOTAL SOCIALES

1,736,913.34
207 655,477 4,284 659,761
208 659,287 4,284 663,571
210 663,097 4,284 667,381
211 666,907 4,284 671,192
212 670,717 4,284 675,002
213 674,527 4,284 678,812
214 678,338 4,284 682,622
216 682,148 4,284 686,432
217 685,958 4,284 690,242
218 689,768 4,284 694,052
219 693,578 4,284 697,862
220 697,388 4,284 701,672
222 701,198 4,284 705,482
223 705,008 4,284 709,292
224 708,818 4,284 713,102
225 712,628 4,284 716,912
226 716,438 4,284 720,723
228 720,248 4,284 724,533
229 724,058 4,284 728,343
230 727,869 4,284 732,153

ca de Saneamiento (UBS)

COSTOS DE
O&M A P. TOTAL
SOCIALES
- 206,020.90
3,838.80 3,838.80
3,838.80 3,838.80 ###
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80
3,838.80 3,838.80 457.14
3,838.80 3,838.80
3,838.80 3,838.80
TSD 9.00%
VAC 241,064
POB. PROMEDI 527
ICE 457.14

ALCANTAILLADO

COSTOS DE
O&M A P. TOTAL
SOCIALES
- 978,759.78
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05
461.05 461.05 2,391.37
461.05 461.05
461.05 461.05
TSD 9.00%
VAC 982,969
POB. PROMEDI 527
ICE 1,864.04
VALOR
PRODUCCION COSTOS O&M FLUJO NETO FACTOR DE ACTUAL DEL
DE AGUA INCREMENTAL PRECIOS DESCUENT FLUJO NETO
( m3/año) ES ( S/./AÑO) SOCIALES O 9% A PRECIOS
SOCIALES.
-1,736,913.34 1.000 -1,736,913
11,816 7,046 652,715 0.917 598,821
11,896 7,046 656,525 0.842 552,584
11,976 7,046 660,335 0.772 509,900
12,056 7,046 664,145 0.708 470,497
12,135 7,046 667,955 0.650 434,125
12,215 7,046 671,766 0.596 400,552
12,295 7,046 675,576 0.547 369,563
12,375 7,046 679,386 0.502 340,961
12,455 7,046 683,196 0.460 314,562
12,535 7,046 687,006 0.422 290,199
12,615 7,046 690,816 0.388 267,714
12,695 7,046 694,626 0.356 246,964
12,774 7,046 698,436 0.326 227,815
12,854 7,046 702,246 0.299 210,145
12,934 7,046 706,056 0.275 193,839
13,014 7,046 709,866 0.252 178,794
13,094 7,046 713,676 0.231 164,911
13,174 7,046 717,486 0.212 152,103
13,254 7,046 721,297 0.194 140,285
13,334 7,046 725,107 0.178 129,381
TSD 9.00%
VAN 4,456,802
TIR 38.09%
En terminos socilaes el proyecto es rentable.
agua potable..
Nº DE FAMILIAS CONECTADAS AL
POB. SERVICIO
AÑOS COBERTURA
TOTAL
ANTIGUAS NUEVAS

1 801 100% 206 1


2 805 100% 207 1
3 810 100% 208 1
4 815 100% 210 1
5 819 100% 211 1
6 824 100% 212 1
7 828 100% 213 1
8 833 100% 214 1
9 838 100% 216 1
10 842 100% 217 1
11 847 100% 218 1
12 852 100% 219 1
13 856 100% 220 1
14 861 100% 222 1
15 865 100% 223 1
16 870 100% 224 1
17 875 100% 225 1
18 879 100% 226 1
19 884 100% 228 1
20 889 100% 229 1

SENSIBILIDAD ANTE UN INCREMENTO DEL MONTO DE INVERSIÓN DE S


% DE ALTERNATIVA UNICA
VARIACIO
VARIACION SENSIBILIDAD
N DE
DE VAN TIR
INVERSIO
INVERSION
N
-20% 1,389,531 4,804,184 48%
-15% 1,476,376 4,717,339 45%
-10% 1,563,222 4,630,493 42%
-5% 1,650,068 4,543,647 40%
0% 1,736,913 4,456,802 38.1%
5% 1,823,759 4,369,956 36%
10% 1,910,605 4,283,110 35%
15% 1,997,450 4,196,265 33%
20% 2,084,296 4,109,419 32%
34% 2,333,666 3,860,049 28% -30% -20% -10%
-30% -20% -10%

1997450.3
ALTERNATI VA I
AS CONECTADAS AL BENEFICIOS BRUTOS CON
ERVICIO PROYECTO INVERSION A
TOTAL ANTIGUAS NUEVAS TOTAL PRECIOS
SOCIALES
1,736,913.34
207 655,477.09 4,284.25 659,761.34
208 659,287.17 4,284.25 663,571.42
210 663,097.24 4,284.25 667,381.49
211 666,907.32 4,284.25 671,191.57
212 670,717.40 4,284.25 675,001.65
213 674,527.47 4,284.25 678,811.72
214 678,337.55 4,284.25 682,621.80
216 682,147.62 4,284.25 686,431.87
217 685,957.70 4,284.25 690,241.95
218 689,767.78 4,284.25 694,052.03
219 693,577.85 4,284.25 697,862.10
220 697,387.93 4,284.25 701,672.18
222 701,198.00 4,284.25 705,482.25
223 705,008.08 4,284.25 709,292.33
224 708,818.16 4,284.25 713,102.41
225 712,628.23 4,284.25 716,912.48
226 716,438.31 4,284.25 720,722.56
228 720,248.38 4,284.25 724,532.64
229 724,058.46 4,284.25 728,342.71
230 727,868.54 4,284.25 732,152.79

DE INVERSIÓN DE SISTEMA AGUA POTABLE.

SENSIBILIDAD DE TIR ANTE CAMBIOS DE INVERSION


50%
45%
40%
35%
30%
25%
20%
15%
10%
5%
0%
-30% -20% -10% 0% 10% 20% 30% 40% -30% -20% -1
10%
5%
0%
-30% -20% -10% 0% 10% 20% 30% 40% -30% -20% -1
PRODUCC VALOR
ION DE COSTOS O&M FLUJO NETO FACTOR DE ACTUAL DEL
AGUA INCREMENTAL PRECIOS DESCUENTO FLUJO NETO A
ES ( S/./AÑO) SOCIALES 9% PRECIOS
( m3/año) SOCIALES.
### 1.000 -1,736,913
11,816 7,046 652,715 0.917 598,821
11,896 7,046 656,525 0.842 552,584
11,976 7,046 660,335 0.772 509,900
12,056 7,046 664,145 0.708 470,497
12,135 7,046 667,955 0.650 434,125
12,215 7,046 671,766 0.596 400,552
12,295 7,046 675,576 0.547 369,563
12,375 7,046 679,386 0.502 340,961
12,455 7,046 683,196 0.460 314,562
12,535 7,046 687,006 0.422 290,199
12,615 7,046 690,816 0.388 267,714
12,695 7,046 694,626 0.356 246,964
12,774 7,046 698,436 0.326 227,815
12,854 7,046 702,246 0.299 210,145
12,934 7,046 706,056 0.275 193,839
13,014 7,046 709,866 0.252 178,794
13,094 7,046 713,676 0.231 164,911
13,174 7,046 717,486 0.212 152,103
13,254 7,046 721,297 0.194 140,285
13,334 7,046 725,107 0.178 129,381
TSD 9.00%
VAN 4,456,802
TIR 38.09%
En terminos socilaes el proyecto es rentable.

SENSIBILIDAD DEL VAN


6,000,000

5,000,000

4,000,000

3,000,000

2,000,000

1,000,000

-
-30% -20% -10% 0% 10% 20% 30% 40%
1,000,000

-
-30% -20% -10% 0% 10% 20% 30% 40%
1 2 3 4 5
-1,389,531 -1,476,376 -1,563,222 -1,650,068 -1,736,913
652,715 652,715 652,715 652,715 652,715
656,525 656,525 656,525 656,525 656,525
660,335 660,335 660,335 660,335 660,335
664,145 664,145 664,145 664,145 664,145
667,955 667,955 667,955 667,955 667,955
671,766 671,766 671,766 671,766 671,766
675,576 675,576 675,576 675,576 675,576
679,386 679,386 679,386 679,386 679,386
683,196 683,196 683,196 683,196 683,196
687,006 687,006 687,006 687,006 687,006
690,816 690,816 690,816 690,816 690,816
694,626 694,626 694,626 694,626 694,626
698,436 698,436 698,436 698,436 698,436
702,246 702,246 702,246 702,246 702,246
706,056 706,056 706,056 706,056 706,056
709,866 709,866 709,866 709,866 709,866
713,676 713,676 713,676 713,676 713,676
717,486 717,486 717,486 717,486 717,486
721,297 721,297 721,297 721,297 721,297
725,107 725,107 725,107 725,107 725,107

4,456,802
6 7 8 9 10
-1,823,759 -1,910,605 -1,997,450 -2,084,296 -2,333,666
652,715 652,715 652,715 652,715 652,715
656,525 656,525 656,525 656,525 656,525
660,335 660,335 660,335 660,335 660,335
664,145 664,145 664,145 664,145 664,145
667,955 667,955 667,955 667,955 667,955
671,766 671,766 671,766 671,766 671,766
675,576 675,576 675,576 675,576 675,576
679,386 679,386 679,386 679,386 679,386
683,196 683,196 683,196 683,196 683,196
687,006 687,006 687,006 687,006 687,006
690,816 690,816 690,816 690,816 690,816
694,626 694,626 694,626 694,626 694,626
698,436 698,436 698,436 698,436 698,436
702,246 702,246 702,246 702,246 702,246
706,056 706,056 706,056 706,056 706,056
709,866 709,866 709,866 709,866 709,866
713,676 713,676 713,676 713,676 713,676
717,486 717,486 717,486 717,486 717,486
721,297 721,297 721,297 721,297 721,297
725,107 725,107 725,107 725,107 725,107
ESCRIPCION ALTERNATIVA Nº 1
Valor Actual Neto Social
S/. 4,456,801.57
Evaluación Social de (VANS) al 9% (soles)
Agua Potable
Tasa Interna de Retorno
38.09%
Social (TIR)
S/. 241,063.56
Valor Actual de Costos
Evaluación Social de
Población Beneficiaria
Unidad Basica de
año 0 497
Saneamiento
S/. 457.14
Índice Costo Efectividad
¿ALTERNATIVA SELECCIONADA? SI
ALTERNATIVA Nº 2

S/. 241,063.56

497
S/. 1,864.04
NO
Alternativa 1 Alternativa 2
A Precio de Mercado #REF! #REF!
Monto de la
Inversión Total
(Nuevos Soles) A Precio Social #REF! #REF!

Valor Actual Neto (Nuevos


S/. 4,456,802
Costo Beneficio Soles)
(A Precio
Social) TASA INTERNA de retorno
38.09%
(%)

Ratio C/E S/. 457.14 S/. 1,864.04

Costo/ Unidad de medida del ratio


Efectividad C/E (Ejms Beneficiario, BENEFICIARIO BENEFICIARIO.
alumno atendido, etc.)
Medida de
Control
Impacto Ambiental Grado
Ambiental
(MCA)

Acumular en bolsas o en contenedores


tapados los residuos sólidos, para su
posterior eliminación a los camiones
recolectores de basura.

Contarconunambienteexclusivo(techado)
dentrodelcampamento,paraalmacenamie
ntodeenvasesconcombustibles/lubricante
s.Losenvasesdebenserapropiadosparael
almacenamientodecombustiblesyaceites,
contapahermética.

Se colocará debajo de los equipos


(durante su permanencia en la obra)
parihuelas con una cama de arena fina
para absorber y contener las posibles
fugas de fluidos del equipo.
1. Área de almacenamiento(lubricantes,
combustibles) 2

Elabastecimientodecombustibleyaceitese
rápormediodeunabombamanualymangue
rahastaeltanquedecombustibleodepósito
de aceite del equipo.

1
Contaminación del suelo
Residuos sólidos (latas de pintura, bolsas,
envases y/o depósitos vacíos)

Derrame de lubricantes

Se colocará debajo de los equipos


(durante su permanencia en la obra)
parihuelas con una cama de arena fina
para absorber y contener las posibles
fugas de fluidos.

Considerar el abastecimiento de
combustible y aceite únicamente en el
2. Área de almacenamiento de herramientas, Campamento Provisional para la Obra
equipos acondicionado para tal fin.

El abastecimiento de combustible y
aceite será por medio de una bomba
manual y manguera hasta tanque de
combustible o aceite del equipo.

1
Contaminación del suelo

Derrame de lubricantes
Derrame de combustible

Acumular en bolsas (segregar) o en


contenedores tapados los residuos
sólidos, para su posterior eliminación a
los camiones recolectores de basura.
3. Zona de almacenamiento de elementos de
seguridad

Se colocará debajo de los equipos


(durante su permanencia en la obra)
parihuelas con una cama de arena fina 1
para absorber y contener las posibles
fugas de fluidos del equipo.

Contaminación del suelo


Residuos sólidos (cintas de seguridad, madera,
metales, etc.)

El contratista debe tener en buenas


condiciones sus unidades vehiculares
1
para evitar fugas de combustible y/o
lubricantes.

El contratista debe llevar acabo un


mantenimiento oportuno de los vehículos
4. Zona de parqueo y equipos a fin de evitar mala
combustión.

Evitar estar operativas durante muchas


horas, y los equipos y unidades
vehiculares deben tener mantenimiento
oportuno y adecuado.
1
Contaminación del suelo
Derrame de lubricantes

Derrame de combustible

Contaminación del aire


Gases (emanados por los vehículos de carga y
transporte SO2, CO, CO2, etc.)
Contaminación sonora
Ruido (causado por los motores, compresoras,
etc.)

5. Área de vestuarios Acumular en bolsas (segregar) o en


contenedores tapados los residuos
sólidos, para su posterior eliminación a
los camiones recolectores de basura.

1
Contaminación del suelo
Residuos sólidos (papeles, plásticos, cartones,
etc.)

6. Área de SSHH Acumular en bolsas (segregar) o en


contenedores tapados los residuos
sólidos, para su posterior eliminación a
los camiones recolectores de basura.

1
Contaminación del suelo
Residuos sólidos (papeles, plásticos, cartones,
etc.)

7. Área de higiene básica del personal


(tanque y/o
recipienteconvenientementetapado)
Acumular en bolsas (segregar) o en
contenedores tapados los residuos
sólidos, para su posterior eliminación a
los camiones recolectores de basura.

1
Contaminación del suelo
Residuos sólidos (sachets o cojines de champú,
etc.)

Acumular en bolsas (segregar) o en


contenedores tapados los residuos
sólidos, para su posterior eliminación a
los camiones recolectores de basura.

8. Área de oficinas
1

Contaminación del suelo


Residuos sólidos (papeles, útiles de oficina en
general)

Acumular en bolsas (segregar)


o en contenedores tapados los
residuos sólidos, para su
posterior eliminación a los
camiones recolectores de
basura.

9. Área de
maestranza
Se colocará debajo de los
equipos (durante su
permanencia en la obra)
parihuelas con una cama de
arena fina para absorber y
contener las posibles fugas de
9. Área de fluidos del equipo.
maestranza

El contratista debe llevar acabo


un mantenimiento oportuno de
los vehículos y equipos a fin de
evitar mala combustión.

Evitar el uso de estos equipos


durante muchas horas al día.

1
Contaminació
n del suelo
Residuos
sólidos
(material
sobrante)

Derrame
de
lubricantes
Derrame
de
combustibl
e

Contaminació
n del aire
Gases(producid
os por los
equipos
utilizados)

Contaminació
n sonora
Ruido(producid
os por los
equipos
utilizados)

Acumular en bolsas (segregar)


o en contenedores tapados los
residuos sólidos, para su
posterior eliminación a los
camiones recolectores de
basura.

10. Área de
comedor
Acumular en bolsas (segregar)
o en contenedores tapados los
residuos sólidos, para su
posterior eliminación a los
camiones recolectores de
basura.

1
Contaminació
n del suelo

Residuos
orgánicos

Residuos
sólidos
ado Duración

2 Mediano

1 Mediano

1 Mediano
1 Mediano

1 Mediano
1 Mediano

1 Mediano

1 Mediano
1 Mediano

1 Mediano

1 Mediano
1 Mediano

1 Mediano

Mediano
Mediano

Mediano
Mediano

Mediano

You might also like