The internship opportunity I had with DTL Engineering for the last six months was a very good
experience where I was given the chance to learn and understand more about the industry. I
am also grateful for having the chance to meet so many wonderful people and professionals
who led me through this internship period.
I would like to use this opportunity to express my deepest gratitude and special thanks to the
Mr.Keith Ho the Senior Designer of DTL Engineering for giving me the opportunity to join the
organization and guiding me through this internship.
I express my deepest thanks to Mr.Loo P.T the Project Director and Mr.Boon Chan the
contract and procurement director for giving necessary advices and guidance that allowed
me to carry out my project without any problems. I have always been grateful for their care
and support during this internship.
I also would li
ke to take this opportunity to express a deep sense of gratitude to all my wonderful colleagues
and my family for their endless support that keep me going.
I perceive this opportunity and experience as a big milestone in my career development. In
order to attain my desired career objectives, I will continue to improve myself and work even
harder in the future.
Sincerely,
Giofanny Gunawan
1st January 2018
2|Page
PREFACE
3|Page
TABLE OF CONTENT
ACKNOWLEDGEMENT………………………………………………………………………………………………………….2
PREFACE………………………………………………………………………………………………………………………………3
TABLE OF CONTENT……………………………………………………………………………………………………………..4
INTRODUCTION……………………………………………………………………………………………………………........5
COMPANY’S PROFILE………………………………………………………………………………………………………6-26
INTRODUCTION OF COMPANY…………………………………………………………………………….7-12
COMPANY PROJECT LIST……………………………………………………………………………………13-21
ORGANIZATION CHART………………………………………………………………………………………….22
ADMINISTRATIVE SYSTEM…………………………………………………………………………………23-25
PROJECT MANAGEMENT SYSTEM……………………………………………………………………….…26
WORK EXPERIENCE………………………………………………………………………………………………………27-106
SUMMARY SHEET……………………………………………………………………………………………………28
PROJECT SHEETS / LOG BOOK……………………………………………………………………………29-38
DIARY…………………………………………………………………………………………………………………39-83
APPENDIXES…………………………………………………………………………………………………….84-105
LESSON LEARNED………………………………………………………………………………………………….106
CONCLUSION……………………………………………………………………………………………………………………107
RECOMMENDATION…………………………………………………………………………………………………………108
4|Page
INTRODUCTION
As part of the module practical training and report 341 in this semester, we are required to
undertake a minimum of 60 to 120 days work experience in Interior/Architecture organization
as part of the program. The work experience is to be recorded on the official Log Sheets that
is enclosed in this outline. Students are to use a separate Work Experience Log Book Project
Sheet for each project and record the categories of experience, levels of experience and
number of hours. Each sheet needs to be signed and dated by both the project supervisor and
the student.
We are encouraged to work in a variety of practices and related fields during their studies so
they can explore the options that are available to them and to develop their areas of interest.
Filling out the Log Book is not meant to be an onerous task and generally it is best if students
spend time regularly updating their records. One of the main purposes of the Project Sheets
is to help students evaluate the type of work experience they are receiving and assess
whether this experience suits their goals and aspirations.
The Summary Sheet should be completed and then submitted along with the Project Sheets
to the Work Experience Coordinator by the end of the first semester. When we have
completed our work experience we are expected to prepare a Report addressing a number of
practical experiences during placement including Log Book as mentioned above. A working
Diary is also an essential item for the student to record daily tasks undertaken within a
particular project on decision-making and comments made prior to stage of work. It is also as
a reminder to review whether the decision has been implemented or not and caused of any
actions made and why.
5|Page
COMPANY’S PROFILE
6|Page
OFFICE ADDRESS
No. 25-1, Jalan 1/137B, Resource Industrial Centre, Batu 5, Jalan Klang Lama,
58000 Kuala Lumpur.
PHONE FAX
+603-7981 1036 +603-7980 1037
EMAIL
dtleng@hotmail.com
7|Page
COMPANY INTRODUCTION
We adopt proactive and quality driven style of management while adhering to an ethical and
prudent approach.
Today DTL have the expertise and capabilities in: turnkey design & build interior renovation,
office furniture supply, M&E works, and LAN network cabling.
8|Page
9|Page
10 | P a g e
11 | P a g e
CLIENT LIST
AIA International Assurance Berhad | Astro Malaysia BASF Asia-Pacific Service Sdn Bhd
DHL Express (M) Sdn Bhd | DHL Asia Pacific Shared Services (M) Sdn Bhd DHL Global
Forwarding (M) Sdn Bhd | DIGI Telecommunications Sdn Bhd
Digistar Holding Bhd | Dunlop Slazenger (M) Sdn Bhd | Endress + Hauser (M) Sdn Bhd
Established Metal Industries Sdn BhdHaltech (M) Sdn Bhd | Hard Rock Café
Invest KL Corporatio | KL Monorail System Sdn Bhd Ling & Theng Book (Advocates &
Solicitors)
Malaysian Association of Travel & Tour Agents (MATTA) MMC Corporation Berhad | MNE
Engineering & Trading Sdn Bhd
Oversea Business Development (M) Sdn Bhd Segabina Sdn Bhd | Syswin Controls Sdn Bhd
Tekmark (M) Sdn Bhd | TNT Express (M) Sdn Bhd Transmile Management Sdn Bhd |
Transmile Aviation Sdn Bhd
UBE Industry Sdn Bhd | UGAC Engineer Sdn Bhd | Unitex Enterprise Sdn Bhd Wan
Mohamed & Khoo Sdn Bhd
12 | P a g e
13 | P a g e
14 | P a g e
15 | P a g e
16 | P a g e
G-Next AIA Building George Town, Penang
17 | P a g e
18 | P a g e
BASF Asia-Pacific Service Centre Sdn Bhd Level 26, Menara TM,
Kuala Lumpur
19 | P a g e
Invest KL 16th Floor, Menara SSM@Sentral, K.L.
20 | P a g e
21 | P a g e
22 | P a g e
ADMINISTRATIVE SYSTEM
23 | P a g e
24 | P a g e
25 | P a g e
PROJECT MANGEMENT SYSTEM
26 | P a g e
WORK EXPERIENCE
27 | P a g e
28 | P a g e
29 | P a g e
30 | P a g e
31 | P a g e
32 | P a g e
33 | P a g e
34 | P a g e
35 | P a g e
36 | P a g e
37 | P a g e
38 | P a g e
DIARY
13 JULY 2017 – 29 DECEMBER 2017
39 | P a g e
13 July 2017, Thursday
DAY 1
PROJECT REFERENCE : A
JUNE OFFICE
First day at work, we arrive at 9 o’clock and met Mr.Chan who is one of our supervisor. He
showed us around the office and introduce us to a full staff colleague called Shanice and
admin called Ms.Teh. I’m doing this internship with one of my classmate Mei, she sat beside
me in the office.
After waiting till 10 o’clock our supervisor Mr.Keith came and brief us on what to do, My first
project is to design a Law firm office. The 2d autocad has been done by Mr.Keith and I just
need to do the 3d visualization, The first thing that I have to do is to do research regarding
office design because this is my first time doing office design.
After doing the research I start to build the office structure in sketchup and start with the
signage design and furniture modelling till 6 o’clock that day.
40 | P a g e
17 July 2017, Monday
DAY 3
PROJECT REFERENCE : A
JUNE OFFICE
In the morning I have received reply from Mr.Keith regarding the general workspace design,
there are few things that I need to amend.
Signage design need to make it more simple and change the font smaller
Color scheme need to be change
Change the cabinet to built-in one
Add details to make looks more realistic
Change the partition to see-through semi partition
Then I continue to amend the design and send my progression to Mr.Keith through whatapps
because he usually is busy with site visit and send our progression to him by the end of the
day.
41 | P a g e
19 July 2017, Wednesday
DAY 5
ARCHIDEX
Today we need to attend archidex which is an annual exhibition for architects and designer
to know the newest products and to up to date regarding the newest technology.
This year archidex is being held at KLCC convention centre, we arrive at there at around 11
o’clock and Mr.Keith ask us to join him for lunch. After finished our lunch around 12 o’clock
we went to register and get the tag.
First we start exploring the interior section and start collecting catalogue of the products that
we think we might use in the future, this is my first time to come to this kind of exhibition. I
myself really enjoy it because we can learn a lot of things and know a lot regarding a material.
This kind of exposure is really useful for my internship as one of the thing that I want to
improve is to know where we can find this types of materials or products.
We went back to office at around 4.30 p.m and start to arrange the catalogue that we collect
just now to the office material shelves.
42 | P a g e
21 July 2017, Friday
DAY 7
PROJECT REFERENCE : A
JUNE OFFICE
Today I started my day by doing the pantry design after all night research, while nervously
sent to Mr.Keith, He seems to like the new design and suggest me to change few things
Change the bar table height to 1050mm
Add mirror to the wall to make the space looks bigger
Because the space for the pantry is actually quite small
Need to change the hanging picture to abstract black and white
And for the toilet design
Need to change the tiles to 300x600
Need to add grouting to the tiles
Then I continue to edit the things that I need to amend.
43 | P a g e
25 July 2017, Tuesday
DAY 9
PROJECT REFERENCE : A
JUNE OFFICE
This morning I continue with doing the directors room and received reply from the clients and
I need to change
color scheme to be lighter in color
Use grey colour vinyl
Signage use line design
After done with the changes I continue to do design for the director rooms, one of my problem
during this project is we need to use our own laptop to do rendering and my laptop takes a
lot of time to do rendering and Mr.Keith said that the office is going to buy new laptop soon.
While waiting for the directors room rendering I go and organize the catalogue in the material
shelves.
During this time I also help one of my colleague Shanice to trace logo for her project since it’s
a bit rush, today I go back a little late to help her till 8 pm.
26 July 2017,Wednesday
DAY 10
PROJECT REFERENCE : A
JUNE OFFICE
Today I’m done with rendering the directors room and Mr.Keith already sent it to the clients
and now just need to wait for their reply, while waiting I continue to render the amended
general workspace area.
During this time Mr.Chan told us to reorganized the material shelves as it is a bit messy,
because I am free while rendering,I go and organized it, there are a lot of old catalogue that
need to be throw away and be replace with the new one that we get from archidex before.
While organizing the catalogue I also learn a few new thing like the specification that I think
is very useful, I think my self still lacks understanding in term of specification and try to learn
when I have the time.
44 | P a g e
27 July 2017, Thursday
DAY 11
PROJECT REFERENCE : A
JUNE OFFICE
This morning I’m done with the rendering for the amended general workspace for the clients,
Mr.Keith has sent it to the client and ask me to trace plan for KTV project.
After tracing this plan I encounter a problem to save it to pdf to scale, because I usually print
it not to scale, so I decided to ask Mr.Keith to teach me how to plot it to scale. Luckily, he
gladly explain to me and my friends on how it works. Even tough I am still a little bit confuse
I think I understand it quite well now. And I went back at around 7 o’clock after done tracing
the plan.
45 | P a g e
30 July 2017, Sunday
DAY 14
PROJECT REFERENCE : B
KENNY’S RESIDENTIAL
Today I still continue to work on the space planning and sent my progression to Mr.Keith and
he asked me to start building the structure and he will amend the plan that I have done.
I also continue to do research regarding the gym equipment that might be needed, and how
the arrangement should be by considering the comfort of the occupants and safety.
During this time I also tried to improve my sketchup skill because the result from my previous
project didn’t really satisfy me. I decide to improve myself by self-learning.
46 | P a g e
2 August 2017, Wednesday
DAY 17
PROJECT REFERENCE : B
KENNY’S RESIDENTIAL
This morning I’m done with the modelling for the gym area and will continue with the muay
thai boxing area and ballet room. Mr.Keith ask me to produce and animation of the space and
no need to render first because rendering actually takes a lot of time.
but before that there are few things that I need to amend for the gym area
Change the flooring colour to darker tone
Add gym poster for motivation
Change backdrop design
Add cabinet for small pantry
After done editing I continue searching for how to make the animation, I only found out that
it’s actually quite easy to create the animation. I have decided to continue tomorrow because
it’s already 8 pm now and I need to go back to cyberjaya.
47 | P a g e
3 August 2017, Friday
DAY 19
PROJECT REFERENCE : A
JUNE OFFICE
After done with the animation and waiting for the client’s reply, Mr.Keith asked me to do the
elevation drawing for June office.
General workspace hanging cabinet
Meeting room Built in cabinet
Meeting room frosted sticker
Pantry cabinet
Bathroom cabinet
Directors room cabinet
Signange
In the afternoon I helped Mr.Loo in counting areas needed for his project just like last time
what Shanice had taught me. But compare to last project, this space is so much bigger that
makes it more confusing for me but I managed to do it faster this time.
48 | P a g e
9 August 2017, Wednesday
DAY 22
PROJECT REFERENCE : C
CHARLES RESIDENTIAL
Today I continue doing my research regarding the design and started to do the modelling for
the bedroom wardrobe, Mr.Keith did show me the reference from the client. I did the
modelling in no time and I’m surprised that my speed in modelling things have improved
compare to last time.
After I’m done with modelling, I render it for 30 minutes which is quite fast compare to my
previous project because the file is smaller. Today I learned that in sketchup there are model
info where we can purge unused to make the sketchup file smaller because its going to delete
the unused information to make the file lighter.
I sent to Mr.Keith my progression for the wardrobe and he told me to change the wood
texture and wardrobe colour to white colour.
49 | P a g e
11 August 2017, Friday
DAY 24
PROJECT REFERENCE : C
CHARLES RESIDENTIAL
This morning I started to do the modelling for the dry kitchen and Mr.Keith treated us to lunch
this afternoon. After lunch he brought us to a show room near our office and show us around,
The show room design is really nice even though it’s just a small unit.
From my point of view one of the way to learn is through observation, just from the
showroom observation I can learn a few things like how the carpet placement under the bed
actually matter, the small detail like curtain color and wall laminate material can give off
different vibe and atmosphere.
50 | P a g e
14 August 2017, Monday
DAY 26
PROJECT REFERENCE : C
CHARLES RESIDENTIAL
This afternoon Mr.Keith asked me to continue doing the elevation because the client is
already like the design, so basically I have to do the elevation for
Bedroom wardrobe
Tv cabinet
Wet kitchen cabinet
Dry kitchen cabinet
I need to finished the elevation by today, luckily In previous project I have done elevation
drawing before this time around I manage to do it faster.
16 August 2017,Wednesday
DAY 28
PROJECT REFERENCE : C
CHARLES RESIDENTIAL
Today Mr.Keith asked me to help him to find furniture for Charles residential and ask about
the price. After I’m done with the Charles Residential project he asked me to trace a floor plan
for a new project and give me time to do research for the next project.
51 | P a g e
17 August 2017, Thursday
DAY 29
PROJECT REFERENCE : D
MELATI EHSAN
Today I continue to do research for the design while Mr.Keith is doing the space planning for
the show room. During the afternoon one of the supplier from Kian furniture come to our
office and do presentation about their products.
After the presentation I continue doing my research for the show room, I feel more pressure
for this project because I can feel Mr.Keith really want to get this project and I don’t want to
disappoint him and tried to do my best.
52 | P a g e
20 August 2017, Sunday
DAY 32
PROJECT REFERENCE : D
MELATI EHSAN
Today I’m editing the material to make it more realistic, I also learned one important thing
when doing 3d in sketch up. To make a a realistic 3d we have to pay attention to
Model
Lighting set up
Material set up
Camera angle
Composition
53 | P a g e
23 August 2017, Wednesday
DAY 35
PROJECT REFERENCE : D
MELATI EHSAN
Today I continue to working on the modelling and editing the materials, I tried to make it
looks as realistic as possible and it takes a lot of time because I need to keep repeating to
change the material settings and render to see the result.
54 | P a g e
28 August 2017, Monday
DAY 38
PROJECT REFERENCE : D
MELATI EHSAN
This morning Mr.keith brief me on the things that I need to amend
Change the gold colour scheme to grey colour
Reception backdrop need simpler design
Reception table design need to change
Need to change design for Model Display table
Floor tiles just use Ceramic
Reception table don’t want the whole thing from marble
Cushion colour need to be change
I started to edit the modelling
55 | P a g e
31 August 2017, Thursday
DAY 41
PROJECT REFERENCE : D
MELATI EHSAN
Even though today is Malaysia independence day that is supposed to be national holiday, I
need to continue the modelling and do the rendering for Melati Ehsan because the meeting
is tomorrow.
Me and My friend Mei cannot come to the office every Tuesday because we need to attend
our class on Tuesday, sometimes it is tiring for us because we need to finish our rushed project
just like today while having assignment at the same time.
56 | P a g e
DAY 44
PROJECT REFERENCE : E
LIM CHEE CHUAN BUNGALOW
This morning I continue to do Melati Ehsan elevation for the reception counter and proceed
with new project after I’m done.
The new project is a bungalow because it’s quite big we design it by area, I need to design
Study room
Master bedroom
57 | P a g e
9 September 2017, Saturday
DAY 47
PROJECT REFERENCE : E
LIM CHEE CHUAN BUNGALOW
This morning I continue to do the modelling for the Study room and apply the material, the
design that I used I more to natural material like wood to give calm and comfortable
atmosphere, after I’m done with the modelling I continue with rendering.
10 September 2017, Sunday
DAY 48
PROJECT REFERENCE : E
LIM CHEE CHUAN BUNGALOW
Today I have edited the material for rendering and sent my progression to Mr.Keith and
waiting for his reply. While waiting for his reply i decide to help Mr.chan to look for the
furniture he is looking for online and called the supplier asking for price.
58 | P a g e
13 September 2017, Wednesday
DAY 51
PROJECT REFERENCE : E
LIM CHEE CHUAN BUNGALOW
Today I’m done with modelling for the master bedroom and applying the material, in the
afternoon there are one supplier from compact plus which supply table top material for
kitchen come to do presentation for their product.
Dry Kitchen
Wet kitchen
I didn’t find this project difficult because previously I have done kitchen design for Charles’s
residential project. Just like always, I started to do basic research and try to so some sketches
to find ideas. So I follow his advice and start sketching because I think it is also good for me
to exercise my sketching skill.
59 | P a g e
16 September 2017, Saturday
DAY 54
PROJECT REFERENCE : F
ARMANEE TERRACE
Today I did the modelling for both the dry kitchen and wet kitchen, but I didn’t really like the
design and stuck for a long time. So, decide to take a break and will continue do it tomorrow
which I think is the right decision because this project Is not too rush compare to my previous
project.
Mr.Keith told me before that when I’m stuck with the idea it’s better to do some sketching
to brain storm, but that method sometimes works and sometimes it didn’t.
60 | P a g e
20 September 2017, Wednesday
DAY 57
PROJECT REFERENCE : F
ARMANEE TERRACE
Today Mr.Keith asked me to start doing the elevation for the wet kitchen and dry kitchen, I
finished it quite fast this time because I have did it few times before and already memorize
the standard dimension so there is no need for me to do research anymore that save me a
lot of time.
61 | P a g e
23 September 2017, Saturday
DAY 60
PROJECT REFERENCE : G
INNOVIX
Today I need to trace the floor plan from innovix and i just need to trace one level because
all of the other floor has the same layout.
62 | P a g e
27 September 2017, Wednesday
DAY 64
PROJECT REFERENCE : G
INNOVIX
This morning I start to do the space planning, I do few types and start to analyse it by
considering the advantages and disadvantages. I also discuss with Mr.Loo in the afternoon
regarding the space planning and looking for his advice because he has experience in this
field.
63 | P a g e
30 September 2017, Saturday
DAY 67
PROJECT REFERENCE : G
INNOVIX
Today I also continue on working on the space planning and in the afternoon Mr.Chan asked
me to help him to edit one of his project with photoshop.
64 | P a g e
3 October 2017, Tuesday
DAY 70
PROJECT REFERENCE : G
INNOVIX
This evening I continue working for the space planning for level 7, This time I think what learn
from my previous semester in university is actually useful. This project require our
understanding on space and in our previous semester we actually learn different types of
strategies to differentiate a space.
65 | P a g e
9 October 2017, Monday
DAY 73
PROJECT REFERENCE : G
INNOVIX
This morning I started to edit the things that I need toamend for the space planning and can
start doing the 3d already
The space that I need to design are
Reception
Waiting area
Pantry
Workstation
Meeting room
Seminar room
After I amend tomorrow we will have last discussion for the space planning with Mr.Loo
tomorrow.
66 | P a g e
11 October 2017, Thursday
DAY 74
PROJECT REFERENCE : G
INNOVIX
This morning I continue to do the modelling for the reception and managed to finished it and
continue to do the waiting area modelling. I feel less pressure in this project because we have
the freedom in term of design but I’m also not confidence because I still lack the experience.
67 | P a g e
18 October 2017, Wednesday
DAY 78
PROJECT REFERENCE : G
INNOVIX
This morning I’m done with all the rendering and Mr.Loo suggest that we will have meeting
in the afternoon to discuss about the design. This time our colleagues will also join the
meeting to give feedback to our design and to see whether there are things that need to be
improve.
I find this kind of discussion to be very useful because we can improve our knowledge and
also the design. One of the most important things in discussion is that we need to learn to
listen to others advice and so that we can improve ourselves.
Mr.Loo asked me and Shanice to present our design and explain about it. At first I’m actually
quite taken aback because I’m not used to present without preparation in front of people
even though I had did many presentation before. Luckily, I managed to do well and they give
me some positive feedback and also suggestion to improve the design.
68 | P a g e
23 October 2017, Monday
DAY 81
PROJECT REFERENCE : G
INNOVIX
This morning Mr.Loo briefed us regarding what we need to do
Ceiling plan
M&E plan
A/c plan
I spent my days doing research for it and help Mr.chan to do some editing for his project from
photoshop.
69 | P a g e
27 October 2017, Friday
DAY 84
PROJECT REFERENCE : H
D’ISLAND
This morning Mr.Keith briefed me on new residential projects, I need to design these four
areas and other area will be done by Yee Lun
Living room
Dry kitchen
Altar
Daughter’s room
I spent my days doing some research and start doing the modelling for living room.
70 | P a g e
DAY 87
PROJECT REFERENCE : H
D’ISLAND
This morning while doing the rendering for the living room, I proceed doing the modelling for
the dry kitchen not to waste time. This afternoon Mr.Loo and Mr.Keith brought us to eat lunch
at the nearby mall but this time around our admin can join us, after that we go back to office
to continue our work.
71 | P a g e
6 November 2017, Monday
DAY 91
PROJECT REFERENCE : H
D’ISLAND
This morning I started to do the modelling for daughter’s room after done with the altar. For
the daughther’s room the client have bought the bed and desk furniture and I spent a lot of
time doing the modelling for the bed because I want to make it as close as possible.
After done doing modelling for the bed, I continue doing the modelling for the desk. I didn’t
spent long time doing the modelling for the desk because it’s just a modern and simple design.
Last but not least I have to do the modelling for the cabinet.
Starting from this week Tuesday I might not be able to do office works unless it is very rush
because I need to divide my time to finish my assignment for final submission that are coming
in few more weeks
72 | P a g e
10 November 2017, Friday
DAY 92
PROJECT REFERENCE : H
D’ISLAND
This afternoon after Mr.Keith meeting with the client, he said the client want to do some
changes on the living room back panel and the altar
Need to change the back panel for the tv cabinet
Change altar panel to champagne colour glass
Need to add side cabinet to the altar
73 | P a g e
16 November 2017, Thursday
DAY 95
PROJECT REFERENCE : I
AXIATA
Today I started to do research for the new project and arrange the mood board. Mr.Loo said
they prefer google like design which is like a modern office nowadays.
17 November 2017, Friday
DAY 96
PROJECT REFERENCE : I
AXIATA
Today we received the plan of the site from email and Mr.Keith suggest us to start from
bubble diagram because the space it quite big. Me and mei discuss about the concept that
we are going to use and the space planning. This afternoon we follow our admin to Mid Valley
to buy Christmas decoration because Christmas is coming soon. We bought Christmas tree
and few decorations to decorate our office.
74 | P a g e
23 November 2017, Thursday
DAY 99
PROJECT REFERENCE : I
AXIATA
This afternoon we have meeting with Mr.Loo to discuss about the plan and there are some
parts that I need to change for improvements.
24 November 2017, Friday
DAY 100
PROJECT REFERENCE : I
AXIATA
Today we started to build the structure and the modelling, we spent a lot of time doing the
modelling because the seating arrangement is in hotdesk style we suggest different types of
seating arrangements. Hotdesk itself means the practice in an office of allocating desks to
workers when they are required or on a rotating system, rather than giving each worker their
own desk.
PROJECT REFERENCE : I
AXIATA
This morning me and Mei do some discussion and we will split the job to get things to be done
faster there are some area that need to be design
Reception counter
Technical innovation centre
Hotdesk
Ceo room
Pantry
Me and Mei have worked on other projects a few time so we know each other well and know
what each other are doing.
75 | P a g e
29 November 2017, Wednesday
DAY 100
PROJECT REFERENCE : I
AXIATA
Today we continue to do the modelling and start to think of the concept name. we have came
up with the concept Naturistic which is the combination of nature and futuristic
30 November 2017, Thursday
DAY 101
PROJECT REFERENCE : I
AXIATA
This morning we continue to do the modelling, we faced some difficulties when doing the Ceo
room because Mr.Loo did mention that the Ceo don’t want the table to be just like other
ordinary table.
So we come up with a very futuristic curvy design but we have difficulties in doing the model
because it is actually quite difficult to do curvy model on sketchup and we need to use 3dmax.
Since its been a long time I used 3d max I have forgotten some of the command and need to
refresh my memory.
76 | P a g e
4 December 2017, Monday
DAY 103
PROJECT REFERENCE : I
AXIATA
Today we started to worked on the technical innovation centre modelling and need to speed
up our progression because next Wednesday is the submission day.
This afternoon I have to help Mr.Chan to do elevation for Kithcen cabinet, we can feel
everyone are rushing to finished the project before Chinese new year and Mr.Keith said
December always have been the busiest month of the year.
PROJECT REFERENCE : I
AXIATA
This morning we continue to do the modelling for the technical innovation centre while
started to do the rendering for the ceo room. I realized that both my skill and speed have
improve so much compare to before I do my internship.
PROJECT REFERENCE : I
AXIATA
Today we have finished the modelling for technical innovation centre and proceed doing the
reception area. It will just be a small reception area because the client actually didn’t request
for one and we didn’t want people from outside can see inside the office directly so we
decided to suggest one reception area that can also be waiting area for guest.
77 | P a g e
7 December 2017, Thursday
DAY 106
PROJECT REFERENCE : I
AXIATA
Today I have completed doing the reception area and will proceed with the workstation, there
are few design that we need to built for the modelling and some takes up a lot of time because
of the curvy design.
Today Mr.Loo brought us to eat near sri petaling area, I find him very nice because he doesn’t
mind to share his personal experience and always gave us a lot of advice. He said being
friendly is one of the most important thing if we want to succeed in this field.
PROJECT REFERENCE : I
AXIATA
Today, just like yesterday we continue doing the modelling for the workstation and start to
prepare the material board. This time the submission for the tender we need to submit our
proposal through email online and only need to do the presentation if we are shotlisted.
PROJECT REFERENCE : I
AXIATA
We are almost done with all the rendering and have to proceed doing
Ceiling plan
M&E plan
A/c plan
78 | P a g e
12 December 2017, Tuesday
DAY 109
PROJECT REFERENCE : I
AXIATA
I have to finish the plan today and this time around I managed to do it faster and more
detailed because I already have experience from innovix projects.
We have done everthing today and just need to compile it for tomorrow submission before
12 o’clock.
PROJECT REFERENCE : J
BSAF
Today after submission for Axiata project, Mr.chan briefed me for a new project. This is I
need to design a pantry for office. He told me to do some research first because he also
know that we are still tired from doing Axiata project and need some rest.
PROJECT REFERENCE : J
BSAF
Today I need to go site visit project and do some measurement. This is the first time meet the
client alone without my supervisor, the client turn out to be very nice and showed me around
the office. She also send me some reference photo that they like for me which I think I very
helpful in understanding what kind of design the client want and expect.
79 | P a g e
15 December 2017, Friday
DAY 112
PROJECT REFERENCE : J
BSAF
Today I started to do the plan and modelling for the pantry and I’m have difficulties in building
the kitchen cabinet because of the curvy partition. I spent a lot of time building the cabinet
model.
After I’m done with the cabinet I proceed building the model for the table bench and table
chair as requested by the client they want to use a bench type.
I tried to look for the bench table and chair because we need to find the affordable one
because for these project we have a tight budget.
80 | P a g e
20 December 2017, Wednesday
DAY 113
PROJECT REFERENCE : J
BSAF
Today I have compile everything and sent it to Mr.chan to update the client, he said he will
send it to the client this afternoon alongside with the bill of quantities.
81 | P a g e
24 December 2017, Sunday
DAY 117
PROJECT REFERENCE : J
BSAF
I started to amend the kitchen cabinet first because it’s going to take more time compare to
others and change some of the graphic wallpaper to paint to bring the cost down
Today I continue to finish the modelling so that I just have to render it at the office next
Tuesday.
82 | P a g e
28 December 2017, Thursday
DAY 120
PROJECT REFERENCE : J
BSAF
Today I continue to do the construction drawing and help to order the furniture. I find the
construction drawing for the bench challenging because it’s a customize bench and I ask
Mr.Keith to teach me.
83 | P a g e
APPENDIXES
84 | P a g e
PROJECT A
JUNE OFFICE
85 | P a g e
PROJECT REPORT
PROJECT STAGE : SPACE PLANNING
DURATION : 13 JULY 2017 – 27 JULY 2017 (14 DAYS)
TASK
SKETCHUP AUTOCAD
- WORKSPACE - AMEND PLAN
- MEETING ROOM - DO ELEVATIONS DRAWING
- PANTRY
- DIRECTOR’S ROOM
LESSON LEARNT
THE IMPORTANT OF ERGONOMETRIC
UNDERSTANDING MORE ABOUT DIMENSION
NEED TO UP TO DATE TO THE TREND
LEARN TO DO MORE DETAILED DRAWING
IMPROVED SKETCHUP SKILL
UNDERSTAND MORE REGARDING OFFICE DESIGN
86 | P a g e
PROJECT B
KENNY RESIDENTIAL
Gym perspective 1
87 | P a g e
Ballet Room Exterior Ballet room Interior
Gym perspective 2
PROJECT REPORT
PROJECT STAGE : -
DURATION : 28 JULY 2017 – 4 AUGUST 2017 (7 DAYS)
TASK
SKETCHUP AUTOCAD
- GYM AREA - SITE MEASUREMENT
- MUAY THAI BOXING - SPACE PLANNING
- BALLET ROOM
LESSON LEARNT
THE IMPORTANCE OF EXPERIENCE
IMPROVED SKETCHUP SKILL
UNDERSTAND MORE REGARDING FITNESS EQUIPMENT
LEARN TO DO SITE MEASUREMENT
LEARN TO DO SPACE PLANNING
GET TO KNOW MORE MATERIALS
88 | P a g e
PROJECT C
CHARLES RESIDENTIAL
Wardrobe 1 Wardrobe 2
89 | P a g e
Dry Kitchen Perspective 1
PROJECT REPORT
PROJECT STAGE : SPACE PLANNING
DURATION : 7 AUGUST 2017 – 16 AUGUST 2017 (10 DAYS)
TASK
SKETCHUP AUTOCAD
- DRY KITCHEN - ELEVATION DRAWING
- WET KITCHEN - TRACE FLOOR PLAN
- TV CABINET
- WARDROBE
LESSON LEARNT
SKETCHUP SKILL IMPROVED
DETAILED DRAWING
GET TO KNOW MORE ABOUT MATERIALS
UNDERSTANDING MORE ABOUT DIMENSION
NEED TO UP TO DATE TO THE TREND
FASTER IN TERM OF SPEED
90 | P a g e
PROJECT D
MELATI EHSAN
Entrance view
91 | P a g e
PROJECT REPORT
PROJECT STAGE : SPACE PLANNING
DURATION : 17 AUGUST 2017 – 4 SEPTEMBER 2017 (15 DAYS)
TASK
SKETCHUP AUTOCAD
- ENTRANCE - ELEVATION DRAWING
- WAITING AREA - TRACE FLOOR PLAN
- DISPLAY
- RECEPTION COUNTER
LESSON LEARNT
GAIN MORE EXPERIENCE
SKETCHUP SKILL IMPROVED
DETAILED DRAWING
GET TO KNOW MORE ABOUT MATERIALS
UNDERSTANDING MORE ABOUT DIMENSION
92 | P a g e
PROJECT E
MELATI EHSAN
Bedroom perspective 1
93 | P a g e
PROJECT REPORT
PROJECT STAGE : SPACE PLANNING
DURATION : 6 SEPTEMBER 2017 – 14 SEPTEMBER 2017 (9 DAYS)
TASK
SKETCHUP AUTOCAD
- BEDROOM - ELEVATION DRAWING
- STUDY AREA
LESSON LEARNT
LEARN MORE ABOUT DESIGN
DETAILED DRAWING
GET TO KNOW MORE ABOUT MATERIALS
UNDERSTANDING MORE ABOUT DIMENSION
LEARN MORE ABOUT ERGONOMETRIC
MANAGE TO FINISH IT FASTER THAN PREVIOUS PROJECT
94 | P a g e
PROJECT F
MELATI EHSAN
95 | P a g e
Dry kitchen perspective 2 Dry kitchen perspective 3
Dry kitchen perspective 1
PROJECT REPORT
PROJECT STAGE : SPACE PLANNING
DURATION : 15 SEPTEMBER 2017 – 20 SEPTEMBER 2017 (6 DAYS)
TASK
SKETCHUP AUTOCAD
- WET KITCHEN - ELEVATIONS DRAWING
- DRY KITCHEN
LESSON LEARNT
DETAILED DRAWING
GET TO KNOW MORE ABOUT MATERIALS
UNDERSTANDING MORE ABOUT DIMENSION
LEARN MORE ABOUT ERGONOMETRIC
MANAGE TO FINISH IT FASTER THAN PREVIOUS PROJECT
LEARN MORE ABOUT DESIGN
96 | P a g e
PROJECT G
INNOVIX
Reception Counter
97 | P a g e
Seminar room perspective 1 Seminar room perspective 2
Pantry
PROJECT REPORT
PROJECT STAGE : -
DURATION : 21 SEPTEMBER 2017 – 26 OCTOBER 2017 (26 DAYS)
TASK
SKETCHUP AUTOCAD
- RECEPTION COUNTER - SITE MEASUREMENT
- WAITING AREA - SPACE PLANNING
- PANTRY
- SEMINAR ROOM
LESSON LEARNT
THE IMPORTANCE OF EXPERIENCE
IMPROVED SKETCHUP SKILL
UNDERSTANDING MORE ON TECHNICAL SPECIFICATION
LEARN TO DO SITE MEASUREMENT
LEARN TO DO SPACE PLANNING
GET TO KNOW MORE MATERIALS
98 | P a g e
PROJECT H
D’ISLAND
99 | P a g e
Daughter’s room perspective 2 Daughter’s room perspective 3
Daughter’s room perspective 1
PROJECT REPORT
PROJECT STAGE : SPACE PLANNING
DURATION : 27 OCTOBER 2017 – 13 NOVEMBER 2017 (10 DAYS)
TASK
SKETCHUP AUTOCAD
- LIVING ROOM - ELEVATION DRAWING
- DAUGHTER’S ROOM
- DRY KITCHEN
LESSON LEARNT
DETAILED DRAWING
SKETCHUP SKILL IMPROVED
GET TO KNOW MORE ABOUT MATERIALS
UNDERSTANDING MORE ABOUT DIMENSION
LEARN MORE ABOUT ERGONOMETRIC
MANAGE TO FINISH IT FASTER THAN PREVIOUS PROJECT
LEARN MORE ABOUT DESIGN
100 | P a g e
PROJECT I
AXIATA
Workstation perspective 1
PROJECT REPORT
PROJECT STAGE : -
DURATION : 15 NOVEMBER 2017 – 12 DECEMBER 2017 (16 DAYS)
TASK
SKETCHUP AUTOCAD
- WORKSTATION - SITE MEASUREMENT
- CEO’S ROOM - SPACE PLANNING
- RECEPTION COUNTER
- TECHNICAL INNNOVATION CENTRE
LESSON LEARNT
IMPROVED SKETCHUP SKILL
UNDERSTANDING MORE ON TECHNICAL SPECIFICATION
LEARN TO DO SITE MEASUREMENT
LEARN TO DO SPACE PLANNING
GET TO KNOW MORE MATERIALS
102 | P a g e
PROJECT J
BSAF
Pantry perspective 1
103 | P a g e
Pantry perspective 4 Pantry perspective 5
Pantry perspective 6
PROJECT REPORT
PROJECT STAGE : -
DURATION : 13 DECEMBER 2017 – 29 DECEMBER 2017 (1212 DAYS)
TASK
SKETCHUP AUTOCAD
- PANTRY - SITE MEASUREMENT
- SPACE PLANNING
- ELEVATION DRAWING
LESSON LEARNT
IMPROVED SKETCHUP SKILL
UNDERSTANDING MORE ON TECHNICAL SPECIFICATION
LEARN TO DO IT FASTER
LEARN TO DO SITE MEASUREMENT
LEARN TO DO SPACE PLANNING
GET TO KNOW MORE MATERIALS
104 | P a g e
Celebrating Mr.Keith birthday
The internship during the last six month is one of the big achievement that I have done, I
experience and learn a lot of things that I haven’t learnt in my previous semester. Before this
I have a lot of questions regarding how the industry works and during my internship I have
somehow figure out the answers to all my questions.
One of the most memorable lesson that I have learned during this internship is that we need
to always up to date to the latest trend and technology because when I’m doing my first
project for june office I did the cabinet design with handles , My supervisor Mr.Keith said it is
not wrong but nowadays the design is without the handle. At first I thought it is okay for intern
not to know this kind of things, but then one of the now intern that came in 3 months after
we do our internship know about this.I realize how ignorance I’m and start to reflect on
myself.
One of the most important thing in working is communication, during this internship I realize
how meaning full is the word “good job”. Even though our office is just a small office with 4
people, we have 3 supervisor that have different project each, so usually we are always busy
and need to work overtime to meet the deadline. We always show our supervisor our
progression and some morale support is actually really helpful for me during hard times and
can make me feels being appreciated for my hardwork.
During this internship I also learn to express myself more, I’m not the quite type but I have
difficulties in expressing what is in my thought and when someone ask me to judge their
design i always afraid to express my honest thought because I afraid it will hurt their feeling
If it doesn’t looks good. But then I understand that I prefer someone will be honest with my
design eventhough the review is not good because that way we can still improve it.
The things that I improve the most during my intership is my 2d and 3d skill, I can really feel
the difference by comparing my previous project with the last one. Throughout my internship
period I have seen what elements of my career I would like to pursue in the future.
106 | P a g e
RECOMMEDATION
After six month of doing industial practice, I had earned and gained valuable experience at
DTL Engineering. I would like to share some suggestion and recommendation
107 | P a g e
CONCLUSION
The internship during the last six months at DTL Engineering was a great chance for
me to learn and gain experience in the professional field, I consider myself lucky as I get the
chance to worked and meet wonderful people there. Throughout my intership there I have
learn a lot regarding how the industry works and have improved myself a lot.
This internship help me to understand what my strength and weakness are, I believe
by understanding my strength and weakness can help me to improve in the future. , I took
every advices in positive ways as it will be useful guidance for me to improve myself and avoid
making the same mistake again. Apart from that, I had also developed my technical drawing
skills through various drawings I had done within my internship there.
I believe everything that I had learned during this internship will help me in the
future, It also gave me some insight and motivation to pursue my career in the future.