Ret. No.GSI0C/tngg/Works/:000/ >} S'S 4. 2 Febuary 2019
‘TO WHOMSOEVER IT MAY CONCERN
This sto certify that M/s Larsen & Toubro Limited, Mount Poonamallee Road, Manapekkam,
Post ox No.279, Chennai ~ 600 089 is executing the Project "DESIGN AND CONSTRUCTION
OF BRIDGE ACROSS RIVER MANDOVI AT PANAJI INCLUDING APPROACHES ON NH 17
BETWEEN PUNDALIKNAGAR JUNCTION (PORVORIM) AND MERCES JUNCTION’. The work
‘was awarded vide Work Order No. GSIDC/Engg/Works/1000/2338 dated 17/07/2014.
lent
Goa State Infrastructure Development Corporation Ltd,
Stipulated date of commencement: 27 july 2018
Main Bridge ~Cable stayed bridge
85 4x 150.6 85m span
‘Stipulated date of completion 26" January 2017
Exersion grote upto aang
orginal on Vale ws 40300¢s
tavsed Apron Vue 5260865008 wats
rrgess Percentage 945 eran
Amant paid ante 1 85908
‘Scope of Works
7 Four lane structural portion = 1465 fav
omiegetdeott |]? Trot srcur pron 2:28 kn
cor + Chesed goto terres) 0420
+ Toaleofsan como 530¢
TETRIS TT sosomen erst anon er
oo Rar in par
cE
ith ote + Rihdesorion-2s9"< 2m
__|! fiat 8 nd 9a rape
foe wan
oo + uo 243759 Sepe me Em
‘Two lane wnduct
Corporation Limited (A Gowerernt of Go Unsetaing)
‘rn Floor EDE House, Dr AB, Rod, Panay Goan 409001, (832) 2450550 8] FDS) 200577
Gin No, UrstT20az001S2C00200 | wn acdc comasic?
Cornerstone of Goats Future
3 span continuous of 3754S 0e97.5m, 320+ 4100 520m
*#_2span continuous of2x 37.5m & Single span of375m
Four ane and Two lane -120m (single stip seal)
+ Cable stayed Bridge ~ 620 m (modula joint)
ourlane
1 Precast segmental strutted box girder.
1 Pre-stressed both longitudinally an tranversly
1 spherical bearings
r
Spacing of}
Bored cast-in pile of 1.2m
otal deck area of our lane vieduet 28119 sum.
Cablestaved Bridge
Precast segmental strutted box girder.
Prestressed both longitudinally and transversely.
Integral at intermediate pylons
Spherical bearings at end support
Bored cast-n-sit ple of 1m dia
Total deck area of cable stayed bridge is 1302059.
‘Twolane
Precast segmental /cast in-situ box girder
1 Pre-stressed longitudinally,
1 spherical bearings
4 Bored castin-situ pile of1.2m dia
Tota deck rea of two lane vaduct fs 19399 sqm.Two lane
‘Superstructur is of box girder which i longtudinally prestressed
and constructed by segmental/catinsitu construction. The
superstructure rests on a combination of fee/fixed and guided
spherical bearings, which inturm rests on single RCC per cap and
Pier. The foundation system consist of 1.2mdia bored casein
piles.
Total deck area of vo lane viaduct is 19399 sam,
"8.0m wide main cariage way on either sces
‘125m wide footpath with provision of pen dain
Structural system
Avgrade roads
‘This certifieate is solely being issued forthe prequalfiction purpose forthe tendering and cant be
sed for any purpose
kor
(nb chante
ener Mangere)
Goa State nfrastrecture Development Corporation Limited (A Goverment of Gos Ut)
‘floor EDE House, DAB. Rosd, Pana) ~ Goa. in 403001 (0832) 240888050 F(O8S2) 2400577
Gin No, Urstt2eAz001SGC002004 | wie ace com