Jakarta, 27 April 2016


No. : 01-002/MJS/IV/2016

Kepada :
PT. TETRA DESAINDO
Jl. Tanah Abang IV No. 1,
Kel.Petojo Selatan, Kec.Gambir, Jakarta
Telepon:(021) 3518910

u.p. : Bapak EKO YULIANTO E-mail : eko@tetra.co.id

Hal : Penawaran Harga Pengadaan & Pemasangan Movable Partition MOWA – MEETING ROOM LT.03,04 & 05 -
RD FLOOR PROYEK ASTRA HONDA MOTOR OFFICE - JAKARTA

Dengan hormat,
Bersama ini kami sampaikan penawaran harga pengadaan & pemasangan Movable Partition berdasarkan data gambar
via e-mail (26/04/2016) sebagai berikut :

A . SPESIFIKASI
NO. ITEM DESCRIPTION
A PANEL & TRACK
1 Merk MOWA
2 Tebal Panel 83 mm (Frame Alumunium)
3 Bingkai / Frame Panel Aluminium Natural Anodized
4 Inner Frame Hollow di zinchromate (bukan rangka kaso/kayu)
5 Surface Panel MDF Board 12 mm (Bukan Particlel Board )
6 Mechanism Contact Device Bottom & Top Mechanism Seal (panel standard)
7 Infill panel Rockwool 80 kg/m3 – 50 mm (bukan glass wool)
8 Track Track Lurus + Stacking OT.400#36
9 Runner Double Runner per Panel DR.400#36 (panel standard )
B HANGER L 35x35 + Rod 3/8”
C SOUND BARRIER Gypsum 9 mm, Rock Wool 60 Kg/m3 – 25 mm , Hollow 40x40

TRACK SOUND
MARK SIZE (mm) VOLUME NUMBER OF PANEL MODUL
STACKING BARRIER
MEETING ROOM 3RD FLOOR
P1 9.300 x 2.200 20.461 m2 8 Panels, included 1 LCP/telescopic panel 3.255 m1 6.510 m2
P2 8.307 x 2.200 18.275 m2 7 Panels, included 1 LCP/telescopic panel 3.400 m1 5.815 m2
P3 8.307 x 2.200 18.275 m2 7 Panels, included 1 LCP/telescopic panel 3.400 m1 5.815 m2
P4 8.307 x 2.200 18.275 m2 7 Panels, included 1 LCP/telescopic panel 3.400 m1 5.815 m2
P5A 4.962 x 2.200 10.916 m2 5 Panels, included 1 LCP/telescopic panel 2.277 m1 3.473 m2
P5B 2.107 x 2.200 4.635 m2 2 Panels, included 1 LCP/telescopic panel 2.000 m1 1.475 m2
P6 5.932 x 2.200 13.050 m2 5 Panels, included 1 LCP/telescopic panel 3.000 m1 4.152 m2
P7 6.182 x 2.200 13.600 m2 6 Panels, included 1 LCP/telescopic panel 3.111 m1 4.327 m2
P8 4.232 x 2.200 9.310 m2 4 Panels, included 1 LCP/telescopic panel 2.280 m1 2.962 m2
Subtotal 57.636 x 2.200 103.889 m2 51 Panels, included 9 LCP/telescopic panel 26.123 m1 40.345 m2
MEETING ROOM 4RD FLOOR
P9 7.200 2.400 17.280 m2 6 Panels, included 1 LCP/telescopic panel 2.770 m1 3.600 m2
P10 3.400 2.400 8.160 m2 3 Panels, included 1 LCP/telescopic panel 1.770 m1 1.700 m2
Subtotal 10.600 x 2.400 25.440 m2 9 Panels, included 2 LCP/telescopic panel 4.540 m1 5.300 m2
MEETING ROOM 5RD FLOOR
P11 6.592 2.400 15.821 m2 6 Panels, included 1 LCP/telescopic panel 2.770 m1 3.296 m2
Subtotal 6.592 2.400 15.821 m2 6 Panels, included 1 LCP/telescopic panel 2.770 m1 3.296 m2

TOTAL 74.828 145.150 m2 66 Panels, included 13 LCP/telescopic panel 33.433 m1 48.941 m2

M o va b l e A c o u s t i c P a r t i t i o n s M O W A 1|3
www.partisilipat.com www.movable-partition.com
B. HARGA .
Belum termasuk, PPN, PPh, Main Structure, Bongkar Pasang Pekerjaan Lama, Cove /Drop/Ceiling, Dinding Storage,
Powder Coating.

NO ITEM QTT'Y UNIT PRICE PRICE (Rp.) JUMLAH (Rp.)


I MEETING ROOM 3RD FLOOR
1 Pek. Pesiapan Sewa Scaffolding & Proteksi LS 10,000,000 10,000,000
2 MP. 83 MM Unfinish - MDF 12 mm (Modul 1000-1200) 103.889 m2 2,999,000 311,563,111
3 Add. Steel Plate Sheet 0,3 mm 2 sisi (Excluded) 207.778 m2 450,000 93,500,100
4 Pintu Pass Door + Flush Handle MIWA 9 pcs 13.500 m2 2,400,000 32,400,000
5 Pintu Storage + Flush Handle MIWA 2 pcs (Optional) - m2 - -
6 Track Lurus+Joint+Bracket+Plate+Escaping OT.400 #36 57.636 m1 2,650,000 152,735,400
7 Track Stacking+Intersection OT.400 #36 26.123 m1 2,650,000 69,225,950
8 Hanger + Rod Track Lurus + Bracing+Fastener DR.400 57.636 m1 200,000 11,527,200
9 Hanger+Rod Track Stacking+Bracing+Fastener DR.400 26.123 m1 300,000 7,836,900
10 Sound barrier di atas rel jalur partisi Asumsi 40.345 m2 700,000 28,241,500
11 Paddedwall Kain ATEJA Standart MOWA (Optional) 207.778 m3 750,000 155,833,500
SUBTOTAL 872,863,661
II MEETING ROOM 4RD FLOOR
1 Pek. Pesiapan Sewa Scaffolding & Proteksi LS 2,000,000 2,000,000
2 MP. 83 MM Unfinish - MDF 12 mm (Modul 1000-1200) 25.440 m2 2,999,000 76,294,560
3 Add. Steel Plate Sheet 0,3 mm 2 sisi (Excluded) 50.880 m2 450,000 22,896,000
4 Track Lurus+Joint+Bracket+Plate+Escaping OT.400 #36 10.600 m1 2,650,000 28,090,000
5 Track Stacking+Intersection OT.400 #36 4.541 m1 2,650,000 12,033,650
6 Hanger + Rod Track Lurus + Bracing+Fastener DR.400 10.600 m1 200,000 2,120,000
7 Hanger+Rod Track Stacking+Bracing+Fastener DR.400 4.541 m1 300,000 1,362,300
8 Sound barrier di atas rel jalur partisi Asumsi 5.300 m2 700,000 3,710,000
9 Paddedwall Kain ATEJA Standart MOWA (Optional) 50.880 m3 750,000 38,160,000
SUBTOTAL 186,666,510
III MEETING ROOM 5RD FLOOR
1 Pek. Pesiapan Sewa Scaffolding & Proteksi LS 1,000,000 1,000,000
2 MP. 83 MM Unfinish - MDF 12 mm (Modul 1000-1200) 15.821 m2 2,999,000 47,447,179
3 Add. Steel Plate Sheet 0,3 mm 2 sisi (Excluded) 31.642 m2 450,000 14,238,900
4 Track Lurus+Joint+Bracket+Plate+Escaping OT.400 #36 6.592 m1 2,650,000 17,468,800
5 Track Stacking+Intersection OT.400 #36 2.770 m1 2,650,000 7,340,500
6 Hanger + Rod Track Lurus + Bracing+Fastener DR.400 6.592 m1 200,000 1,318,400
7 Hanger+Rod Track Stacking+Bracing+Fastener DR.400 2.770 m1 300,000 831,000
8 Sound barrier di atas rel jalur partisi Asumsi 3.296 m2 700,000 2,307,200
9 Paddedwall Kain ATEJA Standart MOWA (Optional) 31.642 m3 750,000 23,731,500
SUBTOTAL 115,683,479

TOTAL I, II & III 1,175,213,650


DISCOUNT 25% 293,803,413
TOTAL After Discount 881,410,238
IV ONGKOS/UPAH
1 Ongkos Pemasangan 145.150 m2 375,000 54,431,250
2 Delivery/Mobilisasi / Peralatan Jakarta - Jakarta LS Included Included
3 Transportasi, Akomodasi SDM Jakarta - Jakarta LS Included Included
NETTO 54,431,250
GRAND TOTAL HARGA MOVABLE PARTISI + ONGKOS UPAH 935,841,488
VAT (PPN 10%) 93,584,149
GRAND TOTAL HARGA MOVABLE PARTISI + ONGKOS UPAH 1,029,425,636

M o va b l e A c o u s t i c P a r t i t i o n s M O W A 2|3
www.partisilipat.com www.movable-partition.com
C. KETENTUAN PEMBAYARAN

I. 35 % D P I setelah PO dikeluarkan
II. 35 % setelah Track terpasang (BAP)
III. 25 & setelah Panel terpasang (BAST)
IV. 5 % Retensi 3 (tiga) bulan setelah terpasang

D. PELAKSANAAN
- Pemasangan Track dan Panel: 8 – 9 minggu, setelah PO, DP dan Approval Shop Drawing
(kondisi sitesiappasang).

E. CATATAN
- Power Listrik, alat bantu, gudang disediakan pemberi kerja tanpa dibebankan pada PT Misella Jaya Suplindo.
- Tidak termasuk pekerjaan dinding box,dinding solid, eksisting,dll), interior (bongkar pasang ornament,
Finishing/ wall paper, cat, powder coat,list profil dll), sound barrier, MEP (mechanical, electrical, plumbing, dll).
- Dimensi Ruang Simpan Panel (Storage) harus mengakomodir panel finish, manuver panel dan manuver pintu
storage, diatas ceiling setiap ruang mengeliling harus dipasang sound barrier dan tidak ada celah MEP (di luar
pekerjaan PT Misella Jaya Suplindo).
- Manuver panel, pintu storage, stacking tidak boleh terganggu oleh komponen sipil (balok,kolom),interior
(ornament,list, cove) dan M/E/P (ducting, sprinkler, listrik, pipa, plumbing) dll.
- Kondisi lantai dan ceiling pada jalur partisi dan stacking harus level, sehingga panel partisi dapat beroperasi
dengan baik (di luar pekerjaan PT Misella Jaya Suplindo).
- Di atas track jalur partisi dan di atas ceiling sekeliling ruang,selain sound barrier pada jalur partisi , harus
dipasang sound Barrier sedemikian ruang harus rapat, sehingga panel partisi dapat beroperasi dengan baik.
- Garansi Seumur Hidup, terhadap Bearing Runner, Track & Sistem pengoperasian panel partisi, sesuai syarat
dan ketentuan berlaku, tidak termasuk force majeur dan pengoperasian yang tidak semestinya.
- Harga sewaktu-waktu dapat berubah tanpa pemberitahuan terlebih dahulu.

Demikian penawaran harga ini kami sampaikan, atas perhatiannya dan kerjasamanya kami sampaikan terimakasih.

Hormat kami,

SUSANTO GOZALI
Direktur Utama
0877.7017.1383

M o va b l e A c o u s t i c P a r t i t i o n s M O W A 3|3