You are on page 1of 20

Banyu Urip Project

HOT OIL FLUSHING PROCEDURE

FOR MECHANICAL PACKAGE

IDBC-TS-WPZZZ-XXXX

A 15 September 2014 Issued for Internal review RHS

Rev Rev Date Description Prepared Checked Endorsed Approved


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 2 of 13

REVISION MODIFICATION LOG

Revision Section Description

A All Issued for internal review

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 3 of 13

TABLE OF CONTENT

1. PURPOSE………………………………………………………………………..................

2. CODE AND STANDARD……………………………………………………………………

3. SCOPE…………………..……………………….…………………………………………..

4. EQUIPMENTS REQUIRED………………………………………………………………………..

5. ACCEPTANCE CRITERIA………………………………………………………………….

6. FLUSHING FLOWRATE

7. FLUSHING EXECUTION……………….…………………………………………………..

7.1 SAFETY REQUIREMENT………………………………………………………………

7.2 ORGANIZATION CHART………………………………………………………………

7.3 PRE-EXECUTION WORK……………………………………………………………...

7.4 EXECUTION WORK………………………..…………………………………………..

8. POST FLUSH

9. ATTACHMENTS………………………………………….…………………………………

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 4 of 13

1. PURPOSE

The main objective of the hot oil pipe flushing for mechanical package is to ensure site
fabrication piping and cooler for mechanical package is clean for the lube oil system.
High velocity of oil flow will remove scale and dirt’s from the internal piping and through
close loop circulation. The scale and dirt will be trapped at flushing strainer.

2. CODE AND STANDARD

The ISO 4406 Cleanliness code range numbers for 4, 6 and 14 micron levels are
16/14/12 or lower (particle counter calibration per ISO 11171).

3. SCOPE

The procedure covers the internal cleanliness of the pipeline and lube oil cooler by
flushing loop. The designated pipeline number and lube oil cooler to be flushed is as
below:
1. Gas Turbine Generator A/B/C/D/E/F with cooler
2. HP Fuel Compressor A/B with cooler
3. Gas Lift Compressors 1st Stage Packages A/B and 2nd Stage Packages A/B
with cooler
4. Atmospheric Vapor Recovery Compressors A/B with cooler
5. Vapor Recovery Compressors 1st Stage Packages A/B and 2nd Stage
Packages A/B with cooler

Flushing loop must be done by interconnection external piping first. After flushing result
is acceptable than continue flushing loop with interconnection piping with cooler
package.

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 5 of 13

1. Gas Turbine Generator A/B/C/D/E/F

Tag No Equipment/Line Number SCH Oil Type Material


3-OL-833-9922-A11A 10S SS A312 GR. TP316L
V833500 3-OL-833-9902-A11A 10S ISO VG32 SS A312 GR. TP316L
¾-OL-833-9901-A11A 40S (Turbine Oil) SS A312 GR. TP316L
HFF833511 SS
3-OL-833-9905-A11A 10S SS A312 GR. TP316L
V833530 3-OL-833-9906-A11A 10S ISO VG32 SS A312 GR. TP316L
¾-OL-833-9904-A11A 40S (Turbine Oil) SS A312 GR. TP316L
HFF833541 SS
3-OL-833-9909-A11A 10S SS A312 GR. TP316L
V833560 3-OL-833-9910-A11A 10S ISO VG32 SS A312 GR. TP316L
¾-OL-833-9908-A11A 40S (Turbine Oil) SS A312 GR. TP316L
HFF833571 SS
3-OL-833-9913-A11A 10S SS A312 GR. TP316L
V833600 3-OL-833-9914-A11A 10S ISO VG32 SS A312 GR. TP316L
¾-OL-833-9912-A11A 40S (Turbine Oil) SS A312 GR. TP316L
HFF833611 SS
3-OL-833-9916-A11A 10S SS A312 GR. TP316L
V833630 3-OL-833-9917-A11A 10S ISO VG32 SS A312 GR. TP316L
¾-OL-833-9915-A11A 40S (Turbine Oil) SS A312 GR. TP316L
HFF833641 SS
3-OL-833-9920-A11A 10S SS A312 GR. TP316L
V833660 3-OL-833-9921-A11A 10S ISO VG32 SS A312 GR. TP316L
¾-OL-833-9919-A11A 40S (Turbine Oil) SS A312 GR. TP316L
HFF833671 SS

2. HP Fuel Compressor A/B

Tag No Equipment/Line Number SCH Oil Type Material


4-OL-966-4123-B11A 10S SS A312 GR. TP316L
ISO VG68
4-OL-966-4124-B11A 10S SS A312 GR. TP316L
V966510 (Synthetic Oil,
4-OL-966-4125-B11A 10S SS A312 GR. TP316L
PAG) CPI: CP-
4-OL-966-4126-B11A 10S SS A312 GR. TP316L
1507-68
HFF966514
4-OL-966-4127-B11A 10S SS A312 GR. TP316L
ISO VG68
4-OL-966-4128-B11A 10S SS A312 GR. TP316L
V966610 (Synthetic Oil,
4-OL-966-4129-B11A 10S SS A312 GR. TP316L
PAG) CPI: CP-
4-OL-966-4130-B11A 10S SS A312 GR. TP316L
1507-68
HFF966614

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 6 of 13

3. Gas Lift Compressors 1st Stage Packages A/B and 2nd Stage Packages A/B

Tag No Equipment/Line Number Spec Oil Type Material


3-OL-654-5017-A11A 10S SS A312 GR. TP316L
3-OL-654-5018-A11A 10S ISO VG46 SS A312 GR. TP316L
V654510 (Turbine Oil)
¾-OL-654-5019-A11A 40S SS A312 GR. TP316L
HFF654513
3-OL-654-6017-A11A 10S SS A312 GR. TP316L
3-OL-654-6018-A11A 10S ISO VG46 SS A312 GR. TP316L
V654610 (Turbine Oil)
¾-OL-654-6019-A11A 40S SS A312 GR. TP316L
HFF654613
3-OL-654-5040-A11A 10S SS A312 GR. TP316L
3-OL-654-5041-A11A 10S ISO VG46 SS A312 GR. TP316L
V654560 (Turbine Oil)
¾-OL-654-5042-A11A 40S SS A312 GR. TP316L
HFF654563
3-OL-654-6040-A11A 10S SS A312 GR. TP316L
3-OL-654-6041-A11A 10S ISO VG46 SS A312 GR. TP316L
V654660 (Turbine Oil)
¾-OL-654-6042-A11A 40S SS A312 GR. TP316L
HFF654663

4. Atmospheric Vapor Recovery Compressors A/B

Tag No Equipment/Line Number Spec Oil Type Material


3-OL-656-5825-A11A 10S SS A312 GR. TP316L
V656510 ISO VG32
3-OL-656-5826-A11A 10S SS A312 GR. TP316L
(Turbine Oil)
HFF656516
3-OL-656-5823-A11A 10S SS A312 GR. TP316L
V656610 ISO VG32
3-OL-656-5824-A11A 10S SS A312 GR. TP316L
(Turbine Oil)
HFF656616

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 7 of 13

5. Vapor Recovery Compressors 1st Stage Packages A/B and 2nd Stage Packages A/B

Tag No Equipment/Line Number Spec Oil Type Material

V656540
3-OL-656-5895-A11A 10S SS A312 GR. TP316L
3-OL-656-5896-A11A 10S ISO VG32 SS A312 GR. TP316L
(Turbine Oil)
HFF656547

V656640
3-OL-656-5752-A11A 10S SS A312 GR. TP316L
3-OL-656-5753-A11A 10S ISO VG32 SS A312 GR. TP316L
(Turbine Oil)
HFF656647
3-OL-656-5917-A11A 10S SS A312 GR. TP316L
V656570 ISO VG32
3-OL-656-5918-A11A 10S SS A312 GR. TP316L
(Turbine Oil)
HFF656577
3-OL-656-5901-A11A 10S SS A312 GR. TP316L
V656670 ISO VG32
3-OL-656-5902-A11A 10S SS A312 GR. TP316L
(Turbine Oil)
HFF656677

The limitation of the flushing for each above pipe line refers to P&ID marked up
drawings in attachment 1.

4. EQUIPMENT REQUIRED

Flushing activity requires below material, not limited to. All metal piping material shall be
316SS and all internal shall be cleaned after manufacturing. And all of fastening device
(bolts/nuts and gasket) shall be provided together.

5. ACCEPTANCE CRITERIA

1. The ISO 4406 Cleanliness code range numbers for 4, 6 and 14 micron levels are
16/14/12 or lower (particle counter calibration per ISO 11171).
2. There are no visible particles on the 100 mesh screen or no more than 5 non-metallic
particles no larger than 0.010 inch (0.254mm) in the 25 micron bag(s).

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 8 of 13

6. FLUSHING FLOWRATE

The following flushing sequence is required to minimize the possibility of contamination of


components and assemblies. It is to be followed at the manufacturing facilities and in the
field. Adherence to this sequence as prescribed in Figure 1, will substantially minimize
the effort and the time necessary to successfully complete the flushing operations. Each
flow line, cooler, etc. shall be flushed at a flow rate and temperature so that a minimum
Reynolds number of 4000 is achieved through each section, or 150% of design flow,
whichever is applicable. The Reynolds number can be calculated by:

Nr = 3160.GPM
CS.D

Where: GPM = flushing fluid flow rate - gallons per minute


CS = flushing fluid viscosity - centistokes
D = pipe/tube inside diameter - inches

7. FLUSHING EXECUTION
7.1 SAFETY REQUIREMENT
a) Ensure Job Safety Analysis (JSA) has been prepared, reviewed and approved by
the authorize persons.
b) Conduct safety toolbox meeting within the working crew in accordance with
approved JSA.
c) Prepare necessary work permits as required
d) Ensure the use of the minimum Personal Protective Equipment (rain gear, rubber
boots, rubber gloves, safety glasses and visor) for all personnel involved.
e) Running water shall be made available at working area near the pump
f) Only personnel with adequate training shall execute hot oil flushing operations.
g) Personnel working within Pre/Commissioning Team must be fully aware of their
duties, responsibilities and potential hazards associated with the system to be
commissioned or tested.
h) Material data sheet for the oil type is to be displayed in the secured area
of the hot oil flushing unit. Personnel carrying out the work should be
familiar with the information contained in the document.
i) Walkie-talkies for use by the Pre/Commissioning Team to be made available.
Public announcement must be made when necessary.

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 9 of 13

j) Provide safety barriers on the affected working areas, especially surrounding


piping and lube oil cooler.
k) Appropriate lighting and fire-fighting equipment must be readily available at site.
l) Necessary warning signs are also be required to provide at designated locations.
m) A safety risk assessment will be conducted prior commencing the flushing work.
n) All Schedule waste has to manage to comply with Waste Management System

7.2 ORGANIZATION CHART


The organisation chart during flushing execution as shown in attachment-1:
a) Flushing leader is the responsible person for the successfully execution and
coordinate overall preparation as per the approved plan.
b) One supervisor with the crew will be assigned at flushing area. He will be
responsible for all require preparation and execution activities. He will be a signal
controller when the flushing is ready.
c) One safetyman will be assigned at pig launcher area while one more other at pig
receiver area. They will be responsible to secure the area boundary from
unauthorized and relevant persons as well as advise the crews for any unsafe
action and condition during the preparation and execution.

7.3 PRE-EXECUTION WORK


The flushing will be executed after the completion of pneumatic test and air blowing of
the pipe lines. A join inspection will be conducted between the Contractor and Client
representative to ensure the reediness of pre-execution work are in placed with the
agreed plan and safety requirement.

7.4 EXECUTION WORK


- Confirm lube oil cooler fan motor has been de-energized.
- Confirm lube oil cooler pipes are cleaned before installation.
- Confirm Air blowing of the external lube oil pipe line has been done.
- Confirm oil for flushing is same specification with oil machinery.

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 10 of 13

A. Flushing Interconnecting External Piping


STEP1: Preparation
a. Line-up flushing equipment, hoses and fittings as per attachment for every package.
Barricade the area of flushing activities.
b. Filling temporary lube oil flushing tank up to 60% of the tank using oil filling. During
filling lube oil flushing tank, filter shall be installed to prevent any contamination in
original lube oil.
c. For first flushing, install mesh 50 at the outlet spool piping.
d. Priming flushing pump with oil by open pump suction valve (V1) and bleed through
recycle valve (V2) back to tank.
e. Open recycle valve (V2) to about 20% and ‘bump start’ the pump with discharge valve
(V3) closed position.
f. Restart flushing pump if there is no leak and slowly open more recycle valve (V2).
STEP2: Flushing loop with 50 mesh filter
a. Line up V4, V5 & V6 and then slowly open V3 discharge valve and start filling L.O
flushing for loop.
Caution:
1) Monitor oil tank level closely, top-up oil into the tank if necessary.
2) Check all joints for any leak. If there is major leak, immediately stop flushing pump and repair leak.
b. When flow of oil return back to the flushing oil tank established, slowly closed
recirculation line V2 and continue flushing loop for 2 hours.
Caution:
1) Keep on monitor tank level and pump discharge pressure.
2) If pump discharge pressure increase more than 4 barg, stop flushing and prepare to clean or change
filter basket.
c. Check wire mesh filter every 1 hour. Stop flushing when no dirt collected at 50 mesh
filter.
STEP3: Flushing loop with 100 mesh filter
a. Stop flushing pump and change strainer filter to 100 mesh and line-up through loop.
b. Line up V4, V5 & V6 and then slowly open V3 discharge valve and start filling L.O
flushing for loop.
Caution:
1) Monitor oil tank level closely, top-up oil into the tank if necessary.
2) Check all joints for any leak. If there is major leak, immediately stop flushing pump and repair leak
c. When flow of oil return back to the flushing oil tank established, slowly closed
recirculation line V2 and continue flushing loop for 2 hours.
d. Inspect wire mesh filter every 1 hours and cleanness of the flushing oil/strainer. Stop
flushing when no dirt collected at 100 mesh filter.

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 11 of 13

Figure 1. Typical PID for flushing equipment


B. Flushing Interconnecting External Piping with Cooler
STEP1: Preparation
a. After the external pipe flushing result acceptable, connect external pipe with cooler
package.
b. For flushing, still using 100 mesh filter basket into the outlet spool.
c. Priming flushing pump with oil by open pump suction valve (V1) and bleed through
recirculation valve V2 back to tank.
d. Open recirculation valve V2 minimum recycle line to about 20% and ‘bump start’ the
pump.
Restart flushing pump if there is no leak and slowly open more recycle valve (V2).
1) Monitor oil tank level closely, top-up oil into the tank if necessary.
2) Check all joints for any leak. If there is major leak, immediately stop flushing pump and repair leak
e. Line up V4, V5 & V6 and then slowly open V3 discharge valve and start filling L.O
flushing for loop.
Caution:
1) Monitor oil tank level closely, top-up oil into the tank if necessary.
2) Check all joints for any leak. If there is major leak, immediately stop flushing pump and repair leak
f. When flow of oil return back to the flushing oil tank established, slowly closed
recirculation line V2 and continue flushing loop for 2 hours.
g. Inspect wire mesh filter every 1 hours for cleanness of the flushing oil. Stop flushing
when no dirt collected at 100 mesh filter.

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 12 of 13

8. POST FLUSH
After completion of the hot oil flushing, secure temporary equipment for flushing and pipe
ends are to be sealed or reinstall to the system to prevent contamination from entering
the piping system.

9. ATTACHMENTS

Attachment 1. Inspection Report


Attachment 2. Gas Turbine Loop Flushing
Attachment 3. HP Fuel Compressor Loop Flushing
Attachment 4. Gas Lift Compressors Loop Flushing
Attachment 5. Atmospheric Vapor Recovery Compressors Loop Flushing
Attachment 6. Vapor Recovery Compressors Loop Flushing

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


HOT OIL FLUSHING PROCEDURE IDBC-TS-WPZZZ-XXXX
5 September 2014
BANYU URIP FOR MECHANICAL PACKAGE
Rev A
PROJECT
MPI: NOT CLASSIFIED Page 13 of 13

INSPECTION REPORT
HOT OIL FLUSHING

CUSTOMER : CERTIFICATE NO :
OWNER : DATE :
PROJECT : JOB NO :
SYSTEM : SUPERVISOR :
TEST PACK NO : PAGE : 1 OF 1

OIL FLUSHING DATA REMARKS


1 OIL TYPE
2 START : DATE/TIME /
3 STOP: DATE/TIME /
4 DURATION (hours & minutes)
O
5 TEMPERATURE/VISCOSITY C/ Cst
6 FLOWRATE Litre / Min

SAMPLES TAKEN CLEANLINESS LEVEL REMARKS


DATE TIME ISO 4406
1
2
3
4

Line Number / Equipment Number / Description (if applicable)

REMARKS:

THE ABOVE WORK HAS BEEN CARRIED OUT AND COMPLETED TO THE SATISFACTION OF
THE FOLLOWING REPRESENTATIVES.
ACCEPTANCE
CESCO’S TRIPATRA-SAMSUNG MCL VENDOR

NAME / SIGNATURE/DATE NAME / SIGNATURE/DATE NAME / SIGNATURE/DATE NAME / SIGNATURE/DATE

IDBC-TS-KPZZZ-…….Rev A HOT OIL FLUSHING PROCEDURE FOR MECHANICAL PACKAGE


NOTES :

: HOF PUMP
JUMPER LOOPING
: FILTER

: VALVE
: INLET
: OUTLET
: HOSE
NOTES :

: HOF PUMP

: FILTER

: VALVE
: INLET
: OUTLET

: HOSE

JUMPER LOOPING JUMPER LOOPING


NOTES :

: HOF PUMP

: FILTER

: VALVE
: INLET
: OUTLET
JUMPER LOOPING
: HOSE
JUMPER LOOPING
NOTES :

: HOF PUMP

: MANIFOLD
JUMPER LOOPING

: VALVE

: INLET

: OUTLET
JUMPER LOOPING
: HOSE
NOTES:

: HOF PUMP

: FILTER

: HOSE

: INLET

: OUTLET
JUMPER LOOPING
: VALVE
NOTES :

: HOF PUMP

: FILTER

: HOSE

: INLET
JUMPER LOOPING

: OUTLET

: VALVE
NOTES:

: HOF PUMP

: FILTER

: VALVE
JUMPER LOOPING
: INLET

: OUTLET

: HOSE

You might also like