Coal Remark

NAME OF THE
MINE / PROJECTS HOE/Dep't
Crushing/Transport
Total PR/EC/FC/Land/Rehab Capacity Other
enhancement/Engg
Enhancement
BALLARPUR AREA (UG Mines)
Blasting
efficiency to be
improved.
Ballarpur RO 0.135 Ventilation circuit
and fan capacity
to be assessed for
higher production.
Proposal of sand
stowing to be
expedite for 2 yrs.
Sasti RO 0.140 One new LHD
against survey off
and one SDL from
AB

UG TOTAL 0.275

BALLARPUR AREA (OC Mines)

Explore the
Scheme for dip
possibility of
side property to be
Scheme for Ballarpur rehandling of OB
0.625 expedite in
OC within existing
consultation of
patch to increase
CMPDIL.
the life of mine.

Retender of HOE with


Gauri I & II Expn. Diversion of
1.020 updation of estimate/pay-
Scheme public Road
off to be expedites.

Expedite the
conversion of
power supply
from Rural to
Industrial load.
Explore the
One BE 1000 & 8 possibility of
0.600 OB Dump space dumpers tobe offering balance
Gauri Deep
Added coal quantity
against cost-plus
agreement to
prospective
consumers.
Explore the
possibility of
converting
employees having
requisite
qualification to
HEMM operators
by Constituting a
area level
committee.

Scheme for barrier coal


11 KV powerline
Pauni 0.750 between Gouri Expn &
diversion.
Pauni

New HOE
proposal
Pauni II Expansion EC Enhancement to 3.25 submission for Sakhri nalla
1.800
OCM MTPA enhanced capacity diversion
& commencement
before monsoon.

Transport cap to 66KV/11KV


Sasti Expn. 2.000 be augment to Power-line
match the gap Diversion

OC TOTAL 6.795

AREA TOTAL 7.070

CHANDRAPUR AREA (UG Mines)

Planning of
another district of
200 TPD with 2
SDL.
Durgapur Rayatwari Exploring the
0.165
RPR construction of
Water Dam
between DRC
3&4 and DRC
6&7

Mana 0.095

UG TOTAL 0.520

CHANDRAPUR AREA (OC Mines)


Erai river
EC enhancement for diversion for
1.365 MTPA Approval HOE proposal after working in Quarry
Bhatadih Expn. 1.365 of Expansion PR. approval of Expn II matter to be
Bhatadi Village PR discussed in joint
rehabilitation. meeting with
CMPDI.

Diversion of 220
FC & village KV power-line to
Durgapur Sec - V Rehabilitation to be be expedite.
2.500
Scheme expedite to maintain the Pipeline for
continuity of production. Monsoon
preperation.

Submission &
finalization of
Hindustan Lalpeth FC for 36.98 Ha Forest
0.400 HOE proposal for
Expn land tobe expedite.
execution by
October.

for 38 Ha Forest land Diversion of


tobe expedite. Motaghat Nalla
Padmapur 1.200 Rehabilitation of Kitadi tobe taken in a
village in a time bound time bound
manner. manner.

OC TOTAL 5.465

AREA TOTAL 5.985

MAJRI AREA (OC Mines)

Finalization of
Approval of RPR HOE contract.
New Majri UG to OC 2.000 EC Enhancement as per Additional
approved RPR equipments as per
gap-in capacity.

New Majri Sector IA & Shifting of


2.500
II A Extn. Workshop.

Arrangement for
Proposal of FEL
EC Enhancement to 3.44 excv. of additional
to be initiated by
Yekona I & II 2.000 MTPA (peak cap) . CTO quantity. (Fresh
Area for coal-
for 1 MTPA Cap HOE proposal in
stock handling
yekona I)

Telwasa 0.000 Reserve Exhaustion.


Area/OC TOTAL 6.500

WANI AREA (OC Mines)

Possibility to
explore selling of
additional coal
Kolgaon RPR 0.600
above the cost
plus quantity on e-
auction basis

2019-20; 3.57 MT
coal with Dept cap
built up by shifting
Available crushing
of Niljai HEMM &
Mungoli Village cap is 3.3 Mte.
8 MTPA will be by
Rehabilitation, EC for Composite proposal
Mungoli Nirguda Deep HOE in separate
4.375 4.375 MTPA with of crushing &
Extn. OC patch. Scientific
additional land Fresh transport for
study for Blasting
HOE proposal. additional 1 Mte to
within proximity of
be initiated.
village for full
utilization of
Dragline.

Submission of
HOE & award.
Coal top OB of 4
Provision of Dep't
Mtr and RH for
Capacity (Manpower &
Bellora/ Naigaon Deep 0.600 blanketing will be
Equipments); Land
by Dep't.
possession
equipments & rest
of OB to be
removed by HoE.

Available crushing Water


capacity of 4.4 MT management tobe
tobe utilized, to done in
Neeljai Deep 3.500
ensure no uncrushed colloboration with
coal transported to Ukni OC specially
the Ghugus siding. drain cutting

6.3 MT coal by
contractor with
addition of one
more Surface
Penganga 6.300 Extension of EC validity. Miner with re-
appropriation of
additional quantity
of coal
transportation from
face to stock within
awarded quantity.

Area Total 15.375

WANI NORTH AREA (UG Mines)

Completion of
Exploring feasibility of
Review of belt UG bunker by
PR for Chinchala-
maintenance system. June 2019.
Rajur (Incl. RO) 0.125 Pisgaon or driavage of
Expedite the Enhancing the
separate Incline near
installation of MMV. Coal availability
workarea.
of 600 TPD

UG TOTAL 0.125

WANI NORTH AREA (OC Mines)

Retention of
Dumper operators
transferred from
Majri Area.
Ghonsa RPR 0.600
Release of
Excavator
operators from
Ballarpur Area.

Revisit of plan to
explore the
possibility of
extra coal with
modification in
Junad Extn. 0.800
limit line near
fault.Resurvey
and recasting of
embankment
before monsoon.

Strengthening of
pumping capacity
Kolar pimpri Extn. 1.500
& completion of
garland drain.

Award of Fresh Indenting for


HOE by April equipments of
Physical possession of
Ukni Deep 1.750 2019. Matching of Substation and
Land.
digging and finalisation of
transport capacity. powerline route.
OC TOTAL 4.650

AREA TOTAL 4.775

DT OP 39.705

NAGPUR AREA (UG Mines)

Mine will be closed from 1st


Men & Machines will
April for implementation
be distrubuted to
of Approved Adasa UG HoE to proposal for AdasaP&M will be shifted to
Saoner I,II,III and
Adasa 0.000 OC PR. UG to OC to be SNR I, II, III and
1 lakh prod will be
Land acquisition for finalised at earliest. Man-rider to SNR III.
compensated from
Adasa UG to OC to be
these 3 mines.
expedite

Explore the possibilityScheme for 2 Nos UDM


of enhancing the to be initiated.
Patansaongi 0.125
production with Initiate Proposalfor
addition of SDL. New man-rider

Land for Depillaring/


discussion with
Saoner-I 0.275 CMPDI/P&P and Area for
viability of SNR UG to
OC conversion PR

Saoner-II 0.275

Saoner-III 0.160 Manpower Augmentation.

Explore the possibility of


using existing shaft
Expedite the driavage
for Man-riding,
of 180Mts long
alternatively if suited
drift for addition of
man-rider of
production district.
Silewara 0.140 Kumberkhani can be
Indent to be
shifted.
submitted for Tele-
Hydrulic bolter from
monitoring system
Chandrapur Area to
with justification.
be given to Silewara
& patansaongi.

UG TOTAL 0.975
NAGPUR AREA (OC Mines)

Review of HoE
Composite proposal for
contractor's
Bhanegaon 0.750 balance land acquisition
performance to
tobe initiated by Area.
achieve the target

Gondegaon 3.500

Expedite the balance land One BE 1000 Machine


acquisition of Kamptee to be added to
UG to OC for hinderance Kamptee.
Kamptee Deep 1.800 free working in 2019-20. HoE proposal of 2
EC issue for amalgamated Lakh Te may be
mine to be taken up at initiated for gap in
earliest. capacity.

Inder UG to OC

EC Enhancement to 1.12
MTPA. Disputed Land Nalla diversion to be
Singori 1.000
acquisition under expedited.
subjudice to be expedite.

Adasa UG to OC 0.200

OC TOTAL 7.250

AREA TOTAL 8.225

Other issues:- Work order of Waghoda UG to be terminated in consultation with GM (Civil).


Crushing capacity to be reviewed as per projected coal production target and action shall be
taken accordingly.

UMRER AREA (UG Mines)

Replacement against 2
survey off LHD.
Submission of
Morpar 0.230 proposal for 3 nos
LHD for
procurement in
2019-20
UG TOTAL 0.230

UMRER AREA (OC Mines)

Gokul 1.875

Arrangement for
EC enhancement for 3.5
HOE/deptt cap for
Makardhokra I 3.500 MTPA. Approval of
1 .5 MTPA to be
RPR for 3 MTPA.
explored.

Existing HOE
award is for 3 MT
only, Contractor to
persuade for coal
Dinesh OC 4.200 FC to be expedite.
production of 4.2
MTPA with
corresponding OB
removal

Enhancement of
Dep't cap
(Transport &
Umrer Expansion (Amb Digging both).
3.500
River Phase - IV) HoE proposal for
re-handling of OB
to be initiated as
per gap in capacity.

OC TOTAL 13.075

AREA TOTAL 13.305

PENCH AREA (UG Mines)

Vishnupuri II 0.120

Replacement of 3
Mahadeopuri 0.115 SDL against
survey off

Tele-monitoring
system.
Mathani 0.125 Steel cogs to be
procured at Area
level
Obtaining depillaring
Naharia 0.310 permission with
heighting

UG TOTAL 0.670

PENCH AREA (OC Mines)

New Sethia 0.400

Start of HoE work


or Termination of
existing HOE
contract.
Urdhan 0.600 Retendering &
Award of Fresh
HOE Contract in
case of
termination.

OC TOTAL 1.000

AREA TOTAL 1.670

KANHAN AREA (UG Mines)

Jharna 0.060

Resources of
Jharana UG shall
Maori Scheme RCE 0.220 be utilized after
Oct 2019 to
achieve the target.

Tandsi Expan. (Incl. Drifting against F-


0.220
Tandsi RPR) 22 fault for III top

UG TOTAL 0.500

KANHAN AREA (OC Mines)

Finalization of
Mohan OC/ Patches 0.452
HOE
Ghorawari 0.000

Finalization of
Bharat OC Ph II 0.108
HOE

OC TOTAL 0.560

AREA TOTAL 1.060

PATHAKERA AREA (UG Mines)

Shortage of
manpower shall
be make up by
Chattarpur I 0.460
expediting
employment
against Dhankasa

Chatarpur II 0.100

Sarni (including D2
0.130
Dyke)

Sarni Scheme (For


working property 0.000
beyond D2 Dyke)

Satpura 0.000

Shobhapur 0.120

Tawa Phase-I 0.480

Tawa - II 0.000

Drifting for
Tawa -II Expansion 0.480
Bagdona Seam.

Gandhigram 0.000

Shaktigarh 0.000
UG TOTAL 1.770

PATHAKERA AREA (OC Mines)

AREA TOTAL 1.770

DT(PP) 26.030

UG TOTAL 5.065

OC TOTAL 60.670

WCL TOTAL 65.735

Total DT (OP) 39.705

Total DT(PP) 26.030

WCL TOTAL 65.735