Scrum Master:

Check List Item Acceptance Criteria Done(T/F)


Product Owner has access to the folder, and can access the
A folder created and shared with scrum master and
folder, and some one else with permissions can access it, if PO is
product owner
not available
A file is available in the folder with the name project creditionals,
having all the creditionals that will be required this includes the
Added a creditional files in the folder which has all the .pem file to server and other security certificates too (Security
creditionals provided by client, or purchased by CB for the certificates should be placed in the folder named security
project, certicates, while creditional file can refer to the path). It is the
e.g. Godaddy, AWS, etc. responsibility of PO to make sure that no desire creditional is
missing, and he can ask the team to review the list in finalizing
the acceptance
A project overview named document is available and is capable
Project Overview Document enough to explain to the new user about the scope, major
business rules etc. of the project
A document with the name resoureces should be available
having link to the overkills, overview, basecamp etc. or atleast
Project Resources
informing what resources are there, and how to obtain them if
cannot be provided
A document with the name any other information should must
be there, but may be empty if it does not have any thing to add.
Any Other information
Adding the list of the Developer/QA contributing to the project
will be good to have

* The purpose of all this effort is that work transfer to a new


person gets as smooth as possible