Professional Documents
Culture Documents
MOVIMIENTO DE TIERRAS
01.03.11.03 EXCAVACION TERRENO SUELTO/ CONGLOMERADO m3 1 1.50 1.00 0.86 1.29 1.36 1.36 m3
m3 1 0.30 0.50 0.44 0.07
01.03.11.04 NIVELACION INTERIOR APISONADO MANUAL m2 1 1.50 1.00 --- 1.50 1.65 1.65 m2
m2 1 0.30 0.50 --- 0.15
01.03.11.05 m3
ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m 1 1.50 1.00 1.08 1.61 1.70 1.70 m3
m3 1 0.30 0.50 0.55 0.08
ENCOFRADO
01.03.11.08 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) 9.27 9.27 0.00
MUROS LATERALES m2
Exterior de los Muros 2 1.30 --- 0.90 2.34
2 --- 0.90 0.90 1.62
Interior de los Muros 2 1.00 --- 0.90 1.80
2 --- 0.60 0.90 1.08
LOSA INFERIOR m2
Encofrado Lateral 2 1.50 --- 0.15 0.45
2 --- 1.10 0.15 0.33
Solado 2 1.50 --- 0.05 0.15
2 --- 1.10 0.05 0.11
CASETA m2
Muro Frontal (exterior) 1 0.50 --- 0.55 0.28
Muro Frontal (exterior) 1 0.30 --- 0.55 0.17
Muro Lateral (Exterior) 2 0.40 --- 0.55 0.44
Muro Lateral (interior) 2 --- 0.30 0.55 0.33
Solado 2 0.40 --- 0.10 0.08
2 --- 0.50 0.10 0.10
HOJA DE METRADOS CAMARA ROMPE PRESIONES
01.03.11.09 ENCOFRADO Y DESENCOFRADO DE LOSA TAPA
LOSA TAPA m2 1.40 1.40 m2
Base de la losa 1 1.00 0.60 --- 0.60
1 4.40 --- 0.10 0.44
4 0.60 --- 0.15 0.36
REVOQUES Y ENLUCIDOS
TARRAJEO
01.03.11.11 TARRAJEO INTERIOR IMPERMEABILIZANTE m2 1 1.00 0.60 --- 0.60 3.48 3.48 m2
2 1.00 --- 0.90 1.80
2 --- 0.60 0.90 1.08
1 0.30 0.30 --- 0.09
2 0.30 --- 0.60 0.36
2 --- 0.30 --- 0.60
01.03.11.12 TARRAJEO EXTERIOR C/MORTERO 1:5 C/A m2 2 1.30 --- 0.90 2.34 3.96 3.96 m2
2 --- 0.90 0.90 1.62
1 1.30 0.90 --- 1.17
2 0.40 --- 0.55 0.44
2 --- 0.50 0.55 0.55
PINTURA
01.03.11.13 PINTURA EN EXTERIORES A LATEX m2 2 1.30 --- 0.90 2.34 5.13 5.13 m2
2 --- 0.90 0.90 1.62
1 1.30 0.90 --- 1.17
HOJA DE METRADOS CAMARA ROMPE PRESIONES
SUMINISTRO E INSTALACION ACCESORIOS
01.03.11.14 SUMINISTRO DE ACCESORIOS CAMARA DE REUNION Glb 1 --- --- --- 1.00 1.00 1.00 Glb
01.03.11.15 TAPA METALICA DE INSPECCION DE 0.60 X 0.60m Und 1 --- --- --- 1.00 1.00 1.00 Und
01.03.11.16 TAPA METALICA DE INSPECCION DE 0.40 X 0.40m Und 1 --- --- --- 1.00 1.00 1.00 Und
METRADO DE CAMARA ROMPE PRESIONES
0.10
0.10
0.30 0.60
0.10
0.15
0.10
0.10 0.30
0.05
0.10
0.05
0.05
0.55 0.90
0.44
0.66
0.10
0.16
0.15
0.05
3/8 1 6 1.45 --- 1.45 --- --- --- --- 4.872 8.70
3/8 1 8 1.05 --- 1.05 --- --- --- --- 4.704 8.40
9.576 17.100
1.10
3/8 2 3 1.59 --- 1.59 --- --- --- --- 5.326 9.51
0.06 0.06 3/8 2 5 1.59 --- 1.59 --- --- --- --- 8.876 15.85
3/8 2 6 0.85 --- 0.85 --- --- --- --- 5.712 10.20
3/8 2 6 1.25 --- 1.25 --- --- --- --- 8.400 15.00
Ø 3/8 @ 0.20
1.15
28.314 50.560
Ø 3/8 @ 0.30
Peso Total del Acero = 28.314 Kg
0.45 0.45
HOJA DE METRADOS DE ACERO - CAMARA ROMPE PRESION
N° de Peso Longitud
LADOS DE CAMARA RECUBRIMIENTO 0.025 m
3/8 1 8 0.85 --- 0.85 --- --- --- --- 3.808 6.80
3/8 -1 4 0.65 --- 0.65 --- --- --- --- -1.456 -2.60
3/8 1 6 0.85 --- 0.85 --- --- --- --- 2.856 5.10
3/8 -1 4 0.65 --- 0.65 --- --- --- --- -1.456 -2.60
3.752 6.700
Ø 2 x 3/8
0.60 x 0.60 Peso Total del Acero = 3.752 Kg
Ø 3/8 @ 0.20
Longitud Total del acero Ø 3/8 = 6.7 ml
1.30
Tuberia de salida
Tuberia de
entrada 1 ∅= 1 1/2
∅= 1
N° DE C.D.C
1 de 1
LEYENDA
N° DESCRIPCION ∅ Pulg CANT
1 CODO 90° PVC SAP 1 3
INGRESO
16