You are on page 1of 1

01

01

+55.000
+54.000
HYDRAULIC PARTICULARS
+53.000
+52.000 SI. DESCRIPTION
No.
+51.000
1 DISCHARGE REQUIRED(Cum/Sec) 138.52
+50.000
2 DISCHARGE DESIGNED(Cum/Sec) 142.23
+49.000
3 BED WIDTH(m) 37.00
+48.000 4 F.S.D (M) 4.30
STARTING OF 2A PUMPHOUSE @ KM 0.700
+47.000 5 FREE BOARD (M) 0.75
+46.000 6 BED FALL 1 in 15000

+45.000 7 VALUE OF 'n' 0.025


GL 8 VELOCITY (M/Sec) 0.761
+44.000
9 SIDE SLOPES(I/O) 1.5:1
+43.000 10 T.W OF BANKING (L/R) 8.0M/5.0M
+42.000
+41.000

+40.000
+39.000 TBL

+38.000 FSL

+37.000
8M
+36.000 1
4.0M
1.5:
5.00M
1
4.0M
1.5:
1.5: 1 2:1 2:1 1.5: 1
G.L SPOIL BANK F.B=0.75 SPOIL BANK G.L
+35.000
F.S.D=4.3

:1
1.5

1.5
:1
+34.000
Natural Surface CBL B.W=37.00
REACH-I
+33.000
+32.000
+31.000
DATUM : 30.000
VILLAGE LIMITS

39.255 4.220 1.080


39.254 5.298 0.002
REACH NO.

39.257 _ 5.300
HEIGHT OF STATEMENT SHOWING THE CURVE PARTICULARS OF LEADING CHANNEL OF C H L I S

_
_
_
_
_
_

_
_
_
_
_
_
_

_
_
_
_
_
_

_
_
_
_
_
_

_
39.250 14.977
39.249 19.764
39.247 21.472
39.245 21.038
39.244 20.787
39.242 19.554
39.240 18.259
39.239 14.984

39.237 13.987
39.235 13.583
39.234 12.968
39.232 12.365
39.230 11.963
39.229 10.984

39.219 10.108

39.217 10.980
39.215 10.406
39.214 10.681
39.212 10.697
39.210 10.715
BANKING

39.252 9.569

39.227 9.083
39.225 9.169
39.224 9.416
39.222 9.536
39.220 9.825
Fore Deflection Tangent Curve Tangent Tangent
DEPTH OF APEX NO. Chainage Radius
Bearing Angle Length Length Point 1 Point 2
CUTTING
(m) (Deg) (Deg) (m) (m) (m) (m) (m)

T.B.L 0
1 101 90 14 29 87 115

38.257
38.255
38.254
38.252
38.250
38.249
38.247
38.245
38.244
38.242
38.240
38.239

38.237
38.235
38.234
38.232
38.230
38.229
38.227
38.225
38.224
38.222
38.220
38.219

38.217
38.215
38.214
38.212
38.210
2 496 90 52 94 444 538

F.S.L
LEGEND
TOP BANK LEVEL (T.B.L)

33.957
33.955
33.954
33.952
33.950
33.949
33.947
33.945
33.944
33.942
33.940
33.939

33.937
33.935
33.934
33.932
33.930
33.929
33.927
33.925
33.924
33.922
33.920
33.919

33.917
33.915
33.914
33.912
33.910
C.B.L FULL SUPPLY LEVEL (F.S.L)

CANAL BED LEVEL (C.B.L)


33.957
38.175
39.252
43.521
48.927
53.713
55.419
54.984
54.731
53.496
52.200
48.923

47.924
47.518
46.902
46.297
45.893
44.913
43.010
43.094
43.340
43.458
43.745
44.027

44.897
44.321
44.595
44.609
44.625
NATURAL SURFACE
GL LEADING CHANNEL

TLIS MAIN CANAL


25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 LINK CANAL

TLIS LA BOUNDARY
0.000
0.025
0.050
0.075
0.100
0.125
0.150
0.175
0.200
0.225
0.250
0.275

0.300
0.325
0.350
0.375
0.400
0.425
0.450
0.475
0.500
0.525
0.550
0.575

0.600
0.625
0.650
0.675
0.700
CHAINAGE
ISRMC MAIN CANAL
(KM)
CHLIS LA BOUNDARY

LONGITUDINAL SECTION FROM KM 0.000 To KM 0.700 MATCH LINE

Horizontal Scale ---> 1 Cm = 25 M CT / BT ROAD


Vertical Scale ---> 1 Cm = 1 M
STREAMS

TANKS

VILLAGE

246 WELL
257 22
KM 249 26
.900 245 247 124
: 11
CH 00
16.4
125

USE
248

PHO
25

CH:0.400KM
261

SE .725
UM

2A
AP
KM

OU 1 2
260 23
00
2

CH:0.300KM
33

M KM
TO

M
11.8 :
127
L

0K
CH

PH
PU @
NE
00
16.3

TO G
AN

CH:0.200KM

50
L SIN
244
CH

.
NE OS

:0
ING M

CH:0.100KM
AN CR

.948
M

CH
CH:0.000KM
40

D 0K
K

LEA
12.4

CH IR
00

60

KM 12
O
1.7

262 Raddi Kunta


.
IN AT

A
:1

KM

:0

F2
CH:12.700KM

AD UL
CH

CH

EO
LE EG
@

32

-20 @
CH:12.600K

263 0
.20
R

KM
-19

US
M

16 122 M
2.500K

HO
EX

2.900

APEX
00 31
AP

MP
.7

M
M

CH:1
:0

PU
CH:1

00K
FB:270 39'3"
CH:12.800KM
00K

CH

:13.0
123
2.4

0
.10
16
H:1

2
CH

.14
M
128
M

0K

13
0K

231 243

KM
.10
47.142+TANK "
.30

:13
47.161+TANK
239 3' 2

@
121
:12

CH

00
47.062+TANK

-2
5
CH

240

0.1
TP
4

M
MANTINAVANI TANK
:30

K
47.042+TANK

M
66

00
00

K
.1

FB
K

.2
12

20
00

.0

:13
16 241

.2
2.2
KM

129

CH

:13
IS 120
:1

Ralla Kunta
@

CH

CH

00
-1

RM 50 242

0.2
@ KM 12.1
TP

CROSSING
STREAM .
ED S.PMF Cumecs
D:10.680
00

PROPOS
C 9L M
.9

1 Sq.km,
INOR
00
15

238 CA : 0.45
2.1

M
:1

KOV

K
CH

VAD

00
00
A

0.3
:0.1
CH
00

Scale: Horizontal 1cm = 25m


.8

0K

232 130
15

Vertical 1cm = 1m

M
0

PUVATI TANK
2.0

K
131

00
:1

CLIENT:
CH

:0.2
46.685+TANK
GOVT. OF ANDHRA PRADESH., WATER RESOURCE DEPT.

CH
118
46.685+TANK PROJECT:
KM

119

KM
46.818+TANK
CHINTALAPUDI LIFT IRRIGATION SCHEME,PACKAGE-1
00

Ralla Kunta

00
1.9

47.222+TANK

:0.3
46.818+TANK
:1

47.621+TANK TITLE:
CH

CH
47.222+TANK 237 LONGITUDINAL SECTION OF APPROACH CHANNEL FROM LEADING CHANNEL
KOBBARI CHERUVU
47.621+TANK AIN M TO 2A PUMPHOUSE From Km 0.000 To Km 0.700
223 RE Contractor: Prepared By:
117 SU
ES
233 PR M/s.MEIL-GAYATRI-ZVS-ITT CONSORTIUM SUMADHURA GEOMATICA PVT.LTD
110 -2 HYDERABAD #1-2-607/54/7,SBH COLONY,BEHIND:DBR MILLS
GE A HYDERABAD-80,Ph:27663112/13/13
ST DWG NO: SGPL/CHLIS/LC/LS/0.000KM-0.700KM

Checked By Submitted By Recommended By Approved By

You might also like