01
+55.000
+54.000
HYDRAULIC PARTICULARS
+53.000
+52.000 SI. DESCRIPTION
No.
+51.000
1 DISCHARGE REQUIRED(Cum/Sec) 138.52
+50.000
2 DISCHARGE DESIGNED(Cum/Sec) 142.23
+49.000
3 BED WIDTH(m) 37.00
+48.000 4 F.S.D (M) 4.30
STARTING OF 2A PUMPHOUSE @ KM 0.700
+47.000 5 FREE BOARD (M) 0.75
+46.000 6 BED FALL 1 in 15000
+40.000
+39.000 TBL
+38.000 FSL
+37.000
8M
+36.000 1
4.0M
1.5:
5.00M
1
4.0M
1.5:
1.5: 1 2:1 2:1 1.5: 1
G.L SPOIL BANK F.B=0.75 SPOIL BANK G.L
+35.000
F.S.D=4.3
:1
1.5
1.5
:1
+34.000
Natural Surface CBL B.W=37.00
REACH-I
+33.000
+32.000
+31.000
DATUM : 30.000
VILLAGE LIMITS
39.257 _ 5.300
HEIGHT OF STATEMENT SHOWING THE CURVE PARTICULARS OF LEADING CHANNEL OF C H L I S
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
39.250 14.977
39.249 19.764
39.247 21.472
39.245 21.038
39.244 20.787
39.242 19.554
39.240 18.259
39.239 14.984
39.237 13.987
39.235 13.583
39.234 12.968
39.232 12.365
39.230 11.963
39.229 10.984
39.219 10.108
39.217 10.980
39.215 10.406
39.214 10.681
39.212 10.697
39.210 10.715
BANKING
39.252 9.569
39.227 9.083
39.225 9.169
39.224 9.416
39.222 9.536
39.220 9.825
Fore Deflection Tangent Curve Tangent Tangent
DEPTH OF APEX NO. Chainage Radius
Bearing Angle Length Length Point 1 Point 2
CUTTING
(m) (Deg) (Deg) (m) (m) (m) (m) (m)
T.B.L 0
1 101 90 14 29 87 115
38.257
38.255
38.254
38.252
38.250
38.249
38.247
38.245
38.244
38.242
38.240
38.239
38.237
38.235
38.234
38.232
38.230
38.229
38.227
38.225
38.224
38.222
38.220
38.219
38.217
38.215
38.214
38.212
38.210
2 496 90 52 94 444 538
F.S.L
LEGEND
TOP BANK LEVEL (T.B.L)
33.957
33.955
33.954
33.952
33.950
33.949
33.947
33.945
33.944
33.942
33.940
33.939
33.937
33.935
33.934
33.932
33.930
33.929
33.927
33.925
33.924
33.922
33.920
33.919
33.917
33.915
33.914
33.912
33.910
C.B.L FULL SUPPLY LEVEL (F.S.L)
47.924
47.518
46.902
46.297
45.893
44.913
43.010
43.094
43.340
43.458
43.745
44.027
44.897
44.321
44.595
44.609
44.625
NATURAL SURFACE
GL LEADING CHANNEL
TLIS LA BOUNDARY
0.000
0.025
0.050
0.075
0.100
0.125
0.150
0.175
0.200
0.225
0.250
0.275
0.300
0.325
0.350
0.375
0.400
0.425
0.450
0.475
0.500
0.525
0.550
0.575
0.600
0.625
0.650
0.675
0.700
CHAINAGE
ISRMC MAIN CANAL
(KM)
CHLIS LA BOUNDARY
TANKS
VILLAGE
246 WELL
257 22
KM 249 26
.900 245 247 124
: 11
CH 00
16.4
125
USE
248
PHO
25
CH:0.400KM
261
SE .725
UM
2A
AP
KM
OU 1 2
260 23
00
2
CH:0.300KM
33
M KM
TO
M
11.8 :
127
L
0K
CH
PH
PU @
NE
00
16.3
TO G
AN
CH:0.200KM
50
L SIN
244
CH
.
NE OS
:0
ING M
CH:0.100KM
AN CR
.948
M
CH
CH:0.000KM
40
D 0K
K
LEA
12.4
CH IR
00
60
KM 12
O
1.7
A
:1
KM
:0
F2
CH:12.700KM
AD UL
CH
CH
EO
LE EG
@
32
-20 @
CH:12.600K
263 0
.20
R
KM
-19
US
M
16 122 M
2.500K
HO
EX
2.900
APEX
00 31
AP
MP
.7
M
M
CH:1
:0
PU
CH:1
00K
FB:270 39'3"
CH:12.800KM
00K
CH
:13.0
123
2.4
0
.10
16
H:1
2
CH
.14
M
128
M
0K
13
0K
231 243
KM
.10
47.142+TANK "
.30
:13
47.161+TANK
239 3' 2
@
121
:12
CH
00
47.062+TANK
-2
5
CH
240
0.1
TP
4
M
MANTINAVANI TANK
:30
K
47.042+TANK
M
66
00
00
K
.1
FB
K
.2
12
20
00
.0
:13
16 241
.2
2.2
KM
129
CH
:13
IS 120
:1
Ralla Kunta
@
CH
CH
00
-1
RM 50 242
0.2
@ KM 12.1
TP
CROSSING
STREAM .
ED S.PMF Cumecs
D:10.680
00
PROPOS
C 9L M
.9
1 Sq.km,
INOR
00
15
238 CA : 0.45
2.1
M
:1
KOV
K
CH
VAD
00
00
A
0.3
:0.1
CH
00
0K
232 130
15
Vertical 1cm = 1m
M
0
PUVATI TANK
2.0
K
131
00
:1
CLIENT:
CH
:0.2
46.685+TANK
GOVT. OF ANDHRA PRADESH., WATER RESOURCE DEPT.
CH
118
46.685+TANK PROJECT:
KM
119
KM
46.818+TANK
CHINTALAPUDI LIFT IRRIGATION SCHEME,PACKAGE-1
00
Ralla Kunta
00
1.9
47.222+TANK
:0.3
46.818+TANK
:1
47.621+TANK TITLE:
CH
CH
47.222+TANK 237 LONGITUDINAL SECTION OF APPROACH CHANNEL FROM LEADING CHANNEL
KOBBARI CHERUVU
47.621+TANK AIN M TO 2A PUMPHOUSE From Km 0.000 To Km 0.700
223 RE Contractor: Prepared By:
117 SU
ES
233 PR M/s.MEIL-GAYATRI-ZVS-ITT CONSORTIUM SUMADHURA GEOMATICA PVT.LTD
110 -2 HYDERABAD #1-2-607/54/7,SBH COLONY,BEHIND:DBR MILLS
GE A HYDERABAD-80,Ph:27663112/13/13
ST DWG NO: SGPL/CHLIS/LC/LS/0.000KM-0.700KM