GENERAL NOTES
Lap Splice Hooks (45deg.) Hooks (90deg.)
Beams 65d 6d 12d
Slabs 65d 6d 12d
Columns 40d 6d 12d
Cover
Member Designation
m
Slabs ( General ) 0.02
Slabs ( Exposed to weather ) 0.02
Beams 0.04
Columns 0.04
R.C. Shear Walls 0.04
Retaining Walls / Raft ( Earth Side Face ) 0.07
Retaining Walls / Raft ( Internal Face ) 0.07
Footing 0.075
PARAMETERS
Material psi Mpa ACI 318-05
f'c 4000 27.6 Dev't & Splice Length
fy 60000 414 12mm & higher
fyh 40000 276 10mm & lower
tie ø 10 stirrup ø 10
fyt 40000 fyt 40000
Anchorage
Bar ø length Ldh Standard Hook (mm) Beam Comp. Tension Lap Splice (m
(mm) (mm) (mm) 90 o
180 o
135 90 Splice (mm)Lap Class
o- o
Beam
Top Bar
10 0.6 0.15 0.16 0.11 0.12 0.3 A 0.33
B 0.43
12 0.62 0.23 0.2 0.12 0.13 0.35 A 0.59
B 0.77
16 0.82 0.3 0.26 0.13 0.16 0.46 A 0.79
B 1.03
20 1.03 0.38 0.32 0.16 0.2 0.58 A 0.98
B 1.27
25 1.64 0.48 0.4 0.2 0.25 0.72 A 1.54
B 2
28 1.9 0.53 0.48 0.26 0.81 A 1.72
B 2.24
32 2.24 0.61 0.55 0.29 0.93 A 1.97
B 2.56
36 2.59 0.69 0.65 0.36 1.04 A 2.21
B 2.87
PARAMETERS
Material psi Mpa ACI 318-05
f'c 5000 34.5 Dev't & Splice Length
fy 60000 414 12mm & higher
fyh 40000 276 10mm & lower
tie ø 10 stirrup ø 10
fyt 40000 fyt 40000
Anchorage
Bar ø length Ldh Standard Hook (mm) Beam Comp. Tension Lap Splice (m
(mm) (mm) (mm) 90o 180o 135o - 90o Splice (mm)Lap Class Beam
Top Bar
10 0.6 0.15 0.16 0.11 0.12 0.3 A 0.3
B 0.39
12 0.6 0.2 0.2 0.12 0.13 0.35 A 0.53
B 0.69
16 0.74 0.27 0.26 0.13 0.16 0.46 A 0.7
B 0.91
20 0.92 0.34 0.32 0.16 0.2 0.58 A 0.88
B 1.14
25 1.15 0.43 0.4 0.2 0.25 0.72 A 1.37
B 1.78
28 1.3 0.48 0.48 0.26 0.81 A 1.54
B 2
32 1.7 0.54 0.55 0.29 0.93 A 1.76
B 2.29
36 2.15 0.61 0.65 0.36 1.04 A 1.98
B 2.57
PARAMETERS
Material psi Mpa ACI 318-05
f'c 7000 48.3 Dev't & Splice Length
fy 60000 414 12mm & higher
fyh 40000 276 10mm & lower
tie ø 10 stirrup ø 10
fyt 40000 fyt 40000
Anchorage
Bar ø length Ldh Standard Hook (mm) Beam Comp. Tension Lap Splice (m
(mm) (mm) (mm) 90 o
180 o
135 90 Splice (mm)Lap Class
o- o
Beam
Top Bar
10 0.6 0.15 0.16 0.11 0.12 0.3 A 0.3
B 0.39
12 0.6 0.17 0.2 0.12 0.13 0.35 A 0.45
B 0.59
16 0.62 0.23 0.26 0.13 0.16 0.46 A 0.59
B 0.77
20 0.78 0.29 0.32 0.16 0.2 0.58 A 0.74
B 0.96
25 1.24 0.36 0.4 0.2 0.25 0.72 A 1.16
B 1.51
28 1.44 0.4 0.48 0.26 0.81 A 1.3
B 1.69
32 1.7 0.46 0.55 0.29 0.93 A 1.49
B 1.94
36 1.96 0.52 0.65 0.36 1.04 A 1.67
B 2.17
Tension Lap Splice (mm)
Beam Column Unit Wt.
Bottom Bar Tied Spiral kg/m
0.3 0.3 0.3 0.616
0.39
0.35 0.35 0.35 0.888
0.46
0.47 0.47 0.47 1.579
0.61
0.58 0.58 0.58 2.466
0.75
0.91 0.91 0.91 3.854
1.18
1.02 1.02 1.02 4.833
1.33
1.17 1.17 1.17 6.313
1.52
1.31 1.31 1.31 7.991
1.7
SLAB
I. A. Campbell Associates, Inc. Page 8 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 9 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 10 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 11 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 12 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 13 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 14 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 15 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 16 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 17 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 18 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 19 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 20 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 21 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 22 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 23 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 24 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 25 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 26 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 27 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 28 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 29 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 30 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 31 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 32 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 33 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 34 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 35 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 36 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 37 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 38 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 39 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 40 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 41 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 42 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 43 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 44 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 45 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 46 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 47 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 48 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 49 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 50 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 51 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 52 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 53 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 54 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 55 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 56 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 57 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 58 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 59 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 60 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 61 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 62 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 63 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 64 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 65 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 66 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 67 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 68 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 69 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 70 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 71 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 72 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 73 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 74 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 75 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 76 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 77 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 78 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 79 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 80 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 81 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 82 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 83 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 84 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 85 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 86 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 87 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 88 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 89 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 90 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 91 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 92 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 93 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 94 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 95 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 96 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 97 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 98 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 99 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 100 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 101 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 102 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 103 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 104 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 105 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 106 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 107 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 108 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 109 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 110 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 111 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 112 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 113 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 114 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 115 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 116 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 117 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 118 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 119 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 120 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 121 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 122 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 123 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 124 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 125 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 126 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 127 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 128 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 129 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 130 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 131 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 132 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 133 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 134 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 135 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 136 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 137 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 138 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 139 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 140 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011
SLAB
I. A. Campbell Associates, Inc. Page 141 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 142 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 143 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 144 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 145 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 146 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 147 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 148 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 149 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 150 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 151 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 152 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 153 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 154 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 155 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 156 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 157 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 158 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 159 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 160 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 161 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 162 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 163 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 164 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 165 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 166 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 167 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 168 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 169 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
74,646.89
I. A. Campbell Associates, Inc. Page 170 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 171 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 172 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 173 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 174 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 175 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 176 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 177 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 178 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 179 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 180 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 181 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 182 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 183 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 184 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 185 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 186 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 187 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 188 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 189 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 190 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 191 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 192 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 193 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 194 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.175 57 3.97 200.90 2,812.60
Top Cont. 12 0.1 198 2.825 496.59 6,952.26
Tie Bars 10 2 9.9 12.21 170.94
Top Discont. 10 0.275 12 1.3575 10.04 140.56
Bottom 10 0.275 12 10.4 76.94 1,077.16
Top Cont. 10 0.275 12 1.0675 7.90 110.60
Tie Bars 10 2 3.27 4.03 56.42
Top Discont. 12 0
Bottom 12 0.175 52 3.97 183.28 366.56
Top Cont. 12 0.1 180 2.6 415.49 830.98
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.275 12 1.3575 10.04 20.08
Bottom 10 0.275 12 9.5 70.28 140.56
I. A. Campbell Associates, Inc. Page 195 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.175 52 3.97 183.28 366.56
Top Cont. 12 0.1 180 2.6 415.49 830.98
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.275 12 1.3575 10.04 20.08
Bottom 10 0.275 12 9.5 70.28 140.56
Top Cont. 10 0.275 12 1.0675 7.90 15.80
Tie Bars 10 2 3.27 4.03 8.06
I. A. Campbell Associates, Inc. Page 196 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 197 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 44 3.1 121.10 1,574.30
Top Cont. 12 0.15 132 2.825 331.06 4,303.78
Tie Bars 10 2 9.9 12.21 158.73
Top Discont. 10 0.3 8 1.14 5.62 73.06
Bottom 10 0.3 8 10.4 51.29 666.77
Top Cont. 10 0.3 8 0.85 4.19 54.47
Tie Bars 10 2 2.4 2.96 38.48
Top Discont. 12 0
Bottom 12 0.225 40 3.1 110.09 110.09
Top Cont. 12 0.15 120 2.6 276.99 276.99
Tie Bars 10 2 9 11.10 11.10
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 9.5 46.85 46.85
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96
Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 412.85
Top Cont. 12 0.25 72 2.6 166.20 831.00
I. A. Campbell Associates, Inc. Page 198 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 412.85
Top Cont. 12 0.25 72 2.6 166.20 831.00
Tie Bars 10 2 9 11.10 55.50
Top Discont. 10 0.3 8 1.14 5.62 28.10
Bottom 10 0.3 8 9.5 46.85 234.25
Top Cont. 10 0.3 8 0.85 4.19 20.95
Tie Bars 10 2 2.4 2.96 14.80
Top Discont. 12 0
Bottom 12 0.225 36 3.1 99.08 99.08
Top Cont. 12 0.15 108 2.35 225.32 225.32
Tie Bars 10 2 8 9.86 9.86
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 8.5 41.92 41.92
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96
I. A. Campbell Associates, Inc. Page 199 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 33 3.1 90.82 2,724.60
Top Cont. 12 0.25 80 2.825 200.64 6,019.20
Tie Bars 10 2 9.9 12.21 366.30
Top Discont. 10 0.3 8 1.14 5.62 168.60
I. A. Campbell Associates, Inc. Page 200 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 495.42
Top Cont. 12 0.25 72 2.6 166.20 997.20
Tie Bars 10 2 9 11.10 66.60
Top Discont. 10 0.3 8 1.14 5.62 33.72
Bottom 10 0.3 8 9.5 46.85 281.10
Top Cont. 10 0.3 8 0.85 4.19 25.14
Tie Bars 10 2 2.4 2.96 17.76
Top Discont. 12 0
Bottom 12 0.3 12 3.1 33.03 33.03
Top Cont. 12 0.25 28 1.225 30.45 30.45
Tie Bars 10 2 3.5 4.32 4.32
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 4 19.73 19.73
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96
Top Discont. 12 0
Bottom 12 0.3 12 3.1 33.03 33.03
I. A. Campbell Associates, Inc. Page 201 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 202 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 203 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 33 3.1 90.82 3,723.62
Top Cont. 12 0.25 80 2.825 200.64 8,226.24
Tie Bars 10 2 9.9 12.21 500.61
Top Discont. 10 0.3 8 1.14 5.62 230.42
Bottom 10 0.3 8 10.4 51.29 2,102.89
Top Cont. 10 0.3 8 0.85 4.19 171.79
Tie Bars 10 2 2.4 2.96 121.36
Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 247.71
I. A. Campbell Associates, Inc. Page 204 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 412.85
Top Cont. 12 0.25 72 2.6 166.20 831.00
Tie Bars 10 2 9 11.10 55.50
Top Discont. 10 0.3 8 1.14 5.62 28.10
Bottom 10 0.3 8 9.5 46.85 234.25
Top Cont. 10 0.3 8 0.85 4.19 20.95
Tie Bars 10 2 2.4 2.96 14.80
Top Discont. 12 0
Bottom 12 0.225 40 3.1 110.09 110.09
Top Cont. 12 0.15 120 2.6 276.99 276.99
Tie Bars 10 2 9 11.10 11.10
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 9.5 46.85 46.85
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96
I. A. Campbell Associates, Inc. Page 205 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 20 3.1 55.04 275.20
Top Cont. 12 0.25 48 1.825 77.77 388.85
Tie Bars 10 2 5.9 7.27 36.35
Top Discont. 10 0.3 8 1.14 5.62 28.10
Bottom 10 0.3 8 6.4 31.56 157.80
Top Cont. 10 0.3 8 0.85 4.19 20.95
Tie Bars 10 2 2.4 2.96 14.80
I. A. Campbell Associates, Inc. Page 206 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 207 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.25 40 3.6 127.84 1,022.72
Top Cont. 12 0.175 114 2.825 285.92 2,287.36
Tie Bars 10 2 9.9 12.21 97.68
Top Discont. 10 0.3 10 1.265 7.80 62.40
Bottom 10 0.3 10 10.4 64.12 512.96
Top Cont. 10 0.3 10 0.975 6.01 48.08
Tie Bars 10 2 2.9 3.58 28.64
Top Discont. 12 0
Bottom 12 0.25 36 3.6 115.06 230.12
Top Cont. 12 0.175 104 2.6 240.06 480.12
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.3 10 1.265 7.80 15.60
Bottom 10 0.3 10 9.5 58.57 117.14
I. A. Campbell Associates, Inc. Page 208 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.25 40 3.6 127.84 1,022.72
Top Cont. 12 0.175 114 2.825 285.92 2,287.36
Tie Bars 10 2 9.9 12.21 97.68
Top Discont. 10 0.3 10 1.265 7.80 62.40
Bottom 10 0.3 10 10.4 64.12 512.96
Top Cont. 10 0.3 10 0.975 6.01 48.08
Tie Bars 10 2 2.9 3.58 28.64
Top Discont. 12 0
Bottom 12 0.25 36 3.6 115.06 230.12
Top Cont. 12 0.175 104 2.6 240.06 480.12
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.3 10 1.265 7.80 15.60
Bottom 10 0.3 10 9.5 58.57 117.14
Top Cont. 10 0.3 10 0.975 6.01 12.02
Tie Bars 10 2 2.9 3.58 7.16
Top Discont. 12 0
Bottom 12 0.25 24 3.6 76.71 76.71
Top Cont. 12 0.175 68 1.825 110.18 110.18
I. A. Campbell Associates, Inc. Page 209 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 210 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 33 3.6 105.47 632.82
Top Cont. 12 0.275 72 2.825 180.58 1,083.48
Tie Bars 10 2 9.9 12.21 73.26
Top Discont. 10 0.3 10 1.265 7.80 46.80
Bottom 10 0.3 10 10.4 64.12 384.72
Top Cont. 10 0.3 10 0.975 6.01 36.06
Tie Bars 10 2 2.9 3.58 21.48
Top Discont. 12 0
Bottom 12 0.3 33 2.8 82.03 164.06
Top Cont. 12 0.3 66 2.825 165.53 331.06
Tie Bars 10 2 9.9 12.21 24.42
Top Discont. 10 0.3 7 1.065 4.60 9.20
Bottom 10 0.3 7 10.4 44.88 89.76
I. A. Campbell Associates, Inc. Page 211 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 212 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 213 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 24 3.97 84.59 84.59
Top Cont. 12 0.15 72 1.675 107.07 107.07
Tie Bars 10 2 5.3 6.53 6.53
Top Discont. 10 0.3 11 1.3575 9.21 9.21
Bottom 10 0.3 11 5.8 39.33 39.33
Top Cont. 10 0.3 11 1.0675 7.24 7.24
Tie Bars 10 2 3.27 4.03 4.03
118,070.44
Top Discont. 12 0
I. A. Campbell Associates, Inc. Page 214 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 31 4.06 111.74 111.74
Top Cont. 12 0.2 92 2.575 210.32 210.32
Tie Bars 10 2 9.1 11.22 11.22
Top Discont. 10 0.225 16 1.305 12.87 12.87
Bottom 10 0.225 16 9.5 93.71 93.71
Top Cont. 10 0.225 16 1.065 10.51 10.51
Tie Bars 10 2 3.46 4.27 4.27
Top Discont. 12 0
Bottom 12 0.3 17 4.06 61.28 61.28
Top Cont. 12 0.2 50 1.55 68.80 68.80
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.225 16 1.305 12.87 12.87
Bottom 10 0.225 16 5.4 53.27 53.27
Top Cont. 10 0.225 16 1.065 10.51 10.51
I. A. Campbell Associates, Inc. Page 215 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 4.06 122.55 1,470.60
Top Cont. 12 0.2 100 2.8 248.58 2,982.96
Tie Bars 10 2 10 12.33 147.96
Top Discont. 10 0.275 13 1.305 10.46 125.52
Bottom 10 0.275 13 10.4 83.35 1,000.20
Top Cont. 10 0.275 13 1.065 8.54 102.48
Tie Bars 10 2 3.46 4.27 51.24
Top Discont. 12 0
Bottom 12 0.3 31 4.06 111.74 223.48
Top Cont. 12 0.2 92 2.575 210.32 420.64
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 13 1.305 10.46 20.92
Bottom 10 0.275 13 9.5 76.14 152.28
Top Cont. 10 0.275 13 1.065 8.54 17.08
Tie Bars 10 2 3.46 4.27 8.54
I. A. Campbell Associates, Inc. Page 216 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 4,781.28
Top Cont. 12 0.25 80 2.8 198.87 9,545.76
Tie Bars 10 2 10 12.33 591.84
Top Discont. 10 0.3 9 1.115 6.19 297.12
Bottom 10 0.3 9 10.4 57.70 2,769.60
Top Cont. 10 0.3 9 0.875 4.85 232.80
Tie Bars 10 2 2.7 3.33 159.84
Top Discont. 12 0
Bottom 12 0.3 31 3.3 90.82 726.56
Top Cont. 12 0.25 74 2.575 169.17 1,353.36
Tie Bars 10 2 9.1 11.22 89.76
Top Discont. 10 0.3 9 1.115 6.19 49.52
Bottom 10 0.3 9 9.5 52.71 421.68
Top Cont. 10 0.3 9 0.875 4.85 38.80
Tie Bars 10 2 2.7 3.33 26.64
I. A. Campbell Associates, Inc. Page 217 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 24 3.3 70.31 70.31
Top Cont. 12 0.25 56 2.05 101.92 101.92
Tie Bars 10 2 7 8.63 8.63
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 7.4 41.06 41.06
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33
Top Discont. 12 0
Bottom 12 0.3 17 3.3 49.81 49.81
Top Cont. 12 0.25 40 1.55 55.04 55.04
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 5.4 29.96 29.96
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33
I. A. Campbell Associates, Inc. Page 218 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 4,183.62
Top Cont. 12 0.25 80 2.8 198.87 8,352.54
Tie Bars 10 2 10 12.33 517.86
Top Discont. 10 0.3 9 1.115 6.19 259.98
Bottom 10 0.3 9 10.4 57.70 2,423.40
Top Cont. 10 0.3 9 0.875 4.85 203.70
Tie Bars 10 2 2.7 3.33 139.86
Top Discont. 12 0
Bottom 12 0.3 20 3.3 58.59 175.77
Top Cont. 12 0.25 48 1.8 76.71 230.13
Tie Bars 10 2 6 7.40 22.20
Top Discont. 10 0.3 9 1.115 6.19 18.57
Bottom 10 0.3 9 6.4 35.51 106.53
Top Cont. 10 0.3 9 0.875 4.85 14.55
Tie Bars 10 2 2.7 3.33 9.99
I. A. Campbell Associates, Inc. Page 219 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 17 3.3 49.81 49.81
Top Cont. 12 0.25 40 1.55 55.04 55.04
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 5.4 29.96 29.96
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33
I. A. Campbell Associates, Inc. Page 220 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 221 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 23 3.3 67.38 336.90
Top Cont. 12 0.25 54 1.975 94.68 473.40
Tie Bars 10 2 6.7 8.26 41.30
Top Discont. 10 0.3 9 1.115 6.19 30.95
Bottom 10 0.3 9 7.1 39.39 196.95
Top Cont. 10 0.3 9 0.875 4.85 24.25
Tie Bars 10 2 2.7 3.33 16.65
Top Discont. 12 0
Bottom 12 0.3 23 3.85 78.61 157.22
Top Cont. 12 0.225 60 1.975 105.20 210.40
Tie Bars 10 2 6.7 8.26 16.52
Top Discont. 10 0.275 12 1.2525 9.27 18.54
Bottom 10 0.275 12 7.1 52.53 105.06
Top Cont. 10 0.275 12 1.0125 7.49 14.98
Tie Bars 10 2 3.25 4.01 8.02
I. A. Campbell Associates, Inc. Page 222 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.85 116.21 2,091.78
Top Cont. 12 0.225 90 2.8 223.73 4,027.14
Tie Bars 10 2 10 12.33 221.94
Top Discont. 10 0.275 12 1.2525 9.27 166.86
Bottom 10 0.275 12 10.4 76.94 1,384.92
Top Cont. 10 0.275 12 1.0125 7.49 134.82
Tie Bars 10 2 3.25 4.01 72.18
Top Discont. 12 0
Bottom 12 0.3 31 3.85 105.96 423.84
Top Cont. 12 0.225 82 2.575 187.46 749.84
Tie Bars 10 2 9.1 11.22 44.88
Top Discont. 10 0.275 12 1.2525 9.27 37.08
Bottom 10 0.275 12 9.5 70.28 281.12
Top Cont. 10 0.275 12 1.0125 7.49 29.96
Tie Bars 10 2 3.25 4.01 16.04
I. A. Campbell Associates, Inc. Page 223 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 224 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 225 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 226 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.1 93.57 93.57
Top Cont. 12 0.3 68 2.8 169.04 169.04
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 10.4 57.70 57.70
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08
Top Discont. 12 0
Bottom 12 0.3 25 3.1 68.80 68.80
Top Cont. 12 0.3 50 2.175 96.55 96.55
Tie Bars 10 2 7.5 9.25 9.25
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 7.9 43.83 43.83
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08
I. A. Campbell Associates, Inc. Page 227 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 228 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
70,076.63
I. A. Campbell Associates, Inc. Page 229 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 230 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 4.06 122.55 1,225.50
Top Cont. 12 0.2 100 2.8 248.58 2,485.80
Tie Bars 10 2 10 12.33 123.30
Top Discont. 10 0.275 13 1.305 10.46 104.60
Bottom 10 0.275 13 10.4 83.35 833.50
Top Cont. 10 0.275 13 1.065 8.54 85.40
Tie Bars 10 2 3.46 4.27 42.70
Top Discont. 12 0
Bottom 12 0.3 34 4.06 122.55 367.65
Top Cont. 12 0.25 80 2.8 198.87 596.61
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.3 12 1.305 9.65 28.95
Bottom 10 0.3 12 10.4 76.94 230.82
Top Cont. 10 0.3 12 1.065 7.88 23.64
Tie Bars 10 2 3.46 4.27 12.81
I. A. Campbell Associates, Inc. Page 231 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 1,792.98
Top Cont. 12 0.25 80 2.8 198.87 3,579.66
Tie Bars 10 2 10 12.33 221.94
Top Discont. 10 0.3 9 1.115 6.19 111.42
Bottom 10 0.3 9 10.4 57.70 1,038.60
Top Cont. 10 0.3 9 0.875 4.85 87.30
Tie Bars 10 2 2.7 3.33 59.94
Top Discont. 12 0
Bottom 12 0.3 31 3.3 90.82 272.46
Top Cont. 12 0.25 74 2.575 169.17 507.51
Tie Bars 10 2 9.1 11.22 33.66
Top Discont. 10 0.3 9 1.115 6.19 18.57
Bottom 10 0.3 9 9.5 52.71 158.13
I. A. Campbell Associates, Inc. Page 232 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 2,988.30
Top Cont. 12 0.25 80 2.8 198.87 5,966.10
Tie Bars 10 2 10 12.33 369.90
Top Discont. 10 0.3 9 1.115 6.19 185.70
Bottom 10 0.3 9 10.4 57.70 1,731.00
Top Cont. 10 0.3 9 0.875 4.85 145.50
Tie Bars 10 2 2.7 3.33 99.90
Top Discont. 12 0
Bottom 12 0.3 31 3.3 90.82 454.10
Top Cont. 12 0.25 74 2.575 169.17 845.85
Tie Bars 10 2 9.1 11.22 56.10
Top Discont. 10 0.3 9 1.115 6.19 30.95
Bottom 10 0.3 9 9.5 52.71 263.55
Top Cont. 10 0.3 9 0.875 4.85 24.25
Tie Bars 10 2 2.7 3.33 16.65
Top Discont. 12 0
Bottom 12 0.3 16 3.3 46.88 46.88
I. A. Campbell Associates, Inc. Page 233 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 18 3.3 52.74 52.74
Top Cont. 12 0.25 44 1.625 63.48 63.48
Tie Bars 10 2 5.3 6.53 6.53
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 5.7 31.63 31.63
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33
I. A. Campbell Associates, Inc. Page 234 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 3,884.79
I. A. Campbell Associates, Inc. Page 235 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 31 3.3 90.82 272.46
Top Cont. 12 0.25 74 2.575 169.17 507.51
Tie Bars 10 2 9.1 11.22 33.66
Top Discont. 10 0.3 9 1.115 6.19 18.57
Bottom 10 0.3 9 9.5 52.71 158.13
Top Cont. 10 0.3 9 0.875 4.85 14.55
Tie Bars 10 2 2.7 3.33 9.99
Top Discont. 12 0
Bottom 12 0.3 20 3.3 58.59 175.77
Top Cont. 12 0.25 48 1.8 76.71 230.13
Tie Bars 10 2 6 7.40 22.20
Top Discont. 10 0.3 9 1.115 6.19 18.57
Bottom 10 0.3 9 6.4 35.51 106.53
Top Cont. 10 0.3 9 0.875 4.85 14.55
Tie Bars 10 2 2.7 3.33 9.99
I. A. Campbell Associates, Inc. Page 236 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 199.22
Top Cont. 12 0.225 90 2.8 223.73 447.46
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.275 10 1.115 6.87 13.74
Bottom 10 0.275 10 10.4 64.12 128.24
Top Cont. 10 0.275 10 0.875 5.39 10.78
Tie Bars 10 2 2.7 3.33 6.66
I. A. Campbell Associates, Inc. Page 237 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 23 3.3 67.38 336.90
Top Cont. 12 0.25 54 1.975 94.68 473.40
Tie Bars 10 2 6.7 8.26 41.30
Top Discont. 10 0.3 9 1.115 6.19 30.95
Bottom 10 0.3 9 7.1 39.39 196.95
Top Cont. 10 0.3 9 0.875 4.85 24.25
Tie Bars 10 2 2.7 3.33 16.65
I. A. Campbell Associates, Inc. Page 238 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 23 3.85 78.61 157.22
Top Cont. 12 0.25 54 1.975 94.68 189.36
Tie Bars 10 2 6.7 8.26 16.52
Top Discont. 10 0.275 12 1.2525 9.27 18.54
Bottom 10 0.275 12 7.1 52.53 105.06
Top Cont. 10 0.275 12 1.0125 7.49 14.98
Tie Bars 10 2 3.25 4.01 8.02
Top Discont. 12 0
Bottom 12 0.3 34 3.85 116.21 1,162.10
I. A. Campbell Associates, Inc. Page 239 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 31 3.85 105.96 211.92
Top Cont. 12 0.225 82 2.575 187.46 374.92
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 12 1.2525 9.27 18.54
Bottom 10 0.275 12 9.5 70.28 140.56
Top Cont. 10 0.275 12 1.0125 7.49 14.98
Tie Bars 10 2 3.25 4.01 8.02
Top Discont. 12 0
Bottom 12 0.3 23 3.7 75.55 75.55
Top Cont. 12 0.225 60 1.975 105.20 105.20
Tie Bars 10 2 6.7 8.26 8.26
Top Discont. 10 0.275 12 1.215 8.99 8.99
Bottom 10 0.275 12 7.1 52.53 52.53
Top Cont. 10 0.275 12 0.975 7.21 7.21
Tie Bars 10 2 3.1 3.82 3.82
I. A. Campbell Associates, Inc. Page 240 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 23 3.7 75.55 75.55
Top Cont. 12 0.25 54 1.975 94.68 94.68
Tie Bars 10 2 6.7 8.26 8.26
Top Discont. 10 0.275 12 1.215 8.99 8.99
Bottom 10 0.275 12 7.1 52.53 52.53
Top Cont. 10 0.275 12 0.975 7.21 7.21
Tie Bars 10 2 3.1 3.82 3.82
Top Discont. 12 0
Bottom 12 0.3 34 3.7 111.69 893.52
Top Cont. 12 0.225 90 2.8 223.73 1,789.84
I. A. Campbell Associates, Inc. Page 241 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 31 3.7 101.83 203.66
Top Cont. 12 0.225 82 2.575 187.46 374.92
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 12 1.215 8.99 17.98
Bottom 10 0.275 12 9.5 70.28 140.56
Top Cont. 10 0.275 12 0.975 7.21 14.42
Tie Bars 10 2 3.1 3.82 7.64
Top Discont. 12 0
Bottom 12 0.3 34 3.7 111.69 223.38
Top Cont. 12 0.25 80 2.8 198.87 397.74
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.275 12 1.215 8.99 17.98
Bottom 10 0.275 12 10.4 76.94 153.88
Top Cont. 10 0.275 12 0.975 7.21 14.42
Tie Bars 10 2 3.1 3.82 7.64
I. A. Campbell Associates, Inc. Page 242 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.25 98.10 588.60
Top Cont. 12 0.275 74 2.8 183.95 1,103.70
Tie Bars 10 2 10 12.33 73.98
Top Discont. 10 0.3 9 1.1025 6.12 36.72
Bottom 10 0.3 9 10.4 57.70 346.20
Top Cont. 10 0.3 9 0.8625 4.79 28.74
Tie Bars 10 2 2.65 3.27 19.62
I. A. Campbell Associates, Inc. Page 243 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 34 3.1 93.57 93.57
Top Cont. 12 0.3 68 2.8 169.04 169.04
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 10.4 57.70 57.70
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08
Top Discont. 12 0
Bottom 12 0.3 22 3.1 60.55 60.55
Top Cont. 12 0.3 44 1.95 76.17 76.17
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 7 38.84 38.84
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08
I. A. Campbell Associates, Inc. Page 244 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 8 3.1 22.02 22.02
Top Cont. 12 0.3 16 0.85 12.07 12.07
Tie Bars 10 2 2.2 2.71 2.71
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 2.6 14.43 14.43
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08
Top Discont. 12 0
Bottom 12 0.3 34 3.1 93.57 93.57
Top Cont. 12 0.225 90 2.8 223.73 223.73
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 10.4 57.70 57.70
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08
Top Discont. 12 0
Bottom 12 0.3 22 3.1 60.55 60.55
Top Cont. 12 0.225 60 1.95 103.87 103.87
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.065 5.91 5.91
I. A. Campbell Associates, Inc. Page 245 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.3 11 3.1 30.27 30.27
Top Cont. 12 0.225 30 1.125 29.96 29.96
Tie Bars 10 2 3.3 4.07 4.07
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 3.7 20.53 20.53
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08
68,025.69
I. A. Campbell Associates, Inc. Page 246 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 247 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.2 50 4.06 180.22 2,162.64
Top Cont. 12 0.125 160 2.85 404.84 4,858.08
Tie Bars 10 2 10 12.33 147.96
Top Discont. 10 0.275 13 1.38 11.06 132.72
Bottom 10 0.275 13 10.5 84.15 1,009.80
Top Cont. 10 0.275 13 1.09 8.74 104.88
Tie Bars 10 2 3.36 4.14 49.68
Top Discont. 12 0
Bottom 12 0.2 46 4.06 165.81 331.62
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 13 1.38 11.06 22.12
Bottom 10 0.275 13 9.6 76.94 153.88
Top Cont. 10 0.275 13 1.09 8.74 17.48
Tie Bars 10 2 3.36 4.14 8.28
I. A. Campbell Associates, Inc. Page 248 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 45 3.3 131.84 2,373.12
Top Cont. 12 0.15 134 2.85 339.05 6,102.90
Tie Bars 10 2 10 12.33 221.94
Top Discont. 10 0.3 9 1.19 6.60 118.80
Bottom 10 0.3 9 10.5 58.26 1,048.68
Top Cont. 10 0.3 9 0.9 4.99 89.82
Tie Bars 10 2 2.6 3.21 57.78
Top Discont. 12 0
Bottom 12 0.225 41 3.3 120.12 360.36
Top Cont. 12 0.15 122 2.625 284.32 852.96
Tie Bars 10 2 9.1 11.22 33.66
Top Discont. 10 0.3 9 1.19 6.60 19.80
I. A. Campbell Associates, Inc. Page 249 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 34 3.3 99.61 99.61
Top Cont. 12 0.15 100 2.225 197.54 197.54
Tie Bars 10 2 7.5 9.25 9.25
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 8 44.39 44.39
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21
Top Discont. 12 0
Bottom 12 0.225 23 3.3 67.38 67.38
Top Cont. 12 0.15 68 1.6 96.59 96.59
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 5.5 30.52 30.52
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21
Top Discont. 12 0
I. A. Campbell Associates, Inc. Page 250 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 41 3.3 120.12 960.96
Top Cont. 12 0.15 122 2.625 284.32 2,274.56
Tie Bars 10 2 9.1 11.22 89.76
Top Discont. 10 0.3 9 1.19 6.60 52.80
Bottom 10 0.3 9 9.6 53.27 426.16
Top Cont. 10 0.3 9 0.9 4.99 39.92
Tie Bars 10 2 2.6 3.21 25.68
Top Discont. 12 0
Bottom 12 0.225 41 3.3 120.12 1,321.32
Top Cont. 12 0.15 122 2.625 284.32 3,127.52
Tie Bars 10 2 9.1 11.22 123.42
Top Discont. 10 0.3 9 1.19 6.60 72.60
Bottom 10 0.3 9 9.6 53.27 585.97
Top Cont. 10 0.3 9 0.9 4.99 54.89
I. A. Campbell Associates, Inc. Page 251 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 27 3.3 79.10 237.30
Top Cont. 12 0.15 80 1.85 131.39 394.17
Tie Bars 10 2 6 7.40 22.20
Top Discont. 10 0.3 9 1.19 6.60 19.80
Bottom 10 0.3 9 6.5 36.07 108.21
Top Cont. 10 0.3 9 0.9 4.99 14.97
Tie Bars 10 2 2.6 3.21 9.63
Top Discont. 12 0
Bottom 12 0.225 21 3.3 61.52 61.52
Top Cont. 12 0.15 62 1.4875 81.88 81.88
Tie Bars 10 2 4.55 5.61 5.61
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 5.05 28.02 28.02
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21
I. A. Campbell Associates, Inc. Page 252 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 253 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
I. A. Campbell Associates, Inc. Page 254 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom - S 12 0.2 11 1.6 15.63 31.26
Bottom - L 12 0.2 22 3.9 76.17 152.34
Top Cont. 12 0.125
Tie Bars 10 2 6.6 8.14 16.28
Top Discont. 10 0.275 12 1.34 9.91 19.82
Bottom - S 10 0.275 4 3.3 8.14 16.28
Bottom - L 10 0.275 8 7.1 35.02 70.04
Top Cont. 10 0.275 12 1.05 7.77 15.54
Top Discont. 12 0
Bottom - S 12 0.2 11 1.5 14.65 14.65
Bottom - L 12 0.2 22 3.7 72.27 72.27
Top Cont. 12 0.125
Tie Bars 10 2 6.6 8.14 8.14
I. A. Campbell Associates, Inc. Page 255 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 256 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.2 50 3.9 173.12 1,731.20
Top Cont. 12 0.125 160 2.85 404.84 4,048.40
Tie Bars 10 2 10 12.33 123.30
Top Discont. 10 0.275 12 1.34 9.91 99.10
Bottom 10 0.275 12 10.5 77.68 776.80
Top Cont. 10 0.275 12 1.05 7.77 77.70
Tie Bars 10 2 3.2 3.95 39.50
Top Discont. 12 0
Bottom 12 0.2 46 3.9 159.27 318.54
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 12 1.34 9.91 19.82
Bottom 10 0.275 12 9.6 71.02 142.04
Top Cont. 10 0.275 12 1.05 7.77 15.54
Tie Bars 10 2 3.2 3.95 7.90
Top Discont. 12 0
Bottom 12 0.2 50 3.9 173.12 865.60
Top Cont. 12 0.125 160 2.85 404.84 2,024.20
Tie Bars 10 2 10 12.33 61.65
I. A. Campbell Associates, Inc. Page 257 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.2 46 3.7 151.10 302.20
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 11 1.29 8.75 17.50
Bottom 10 0.275 11 9.6 65.10 130.20
Top Cont. 10 0.275 11 1 6.78 13.56
Tie Bars 10 2 3 3.70 7.40
I. A. Campbell Associates, Inc. Page 258 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 45 3.7 147.82 443.46
Top Cont. 12 0.15 134 2.85 339.05 1,017.15
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.3 10 1.29 7.95 23.85
Bottom 10 0.3 10 10.5 64.73 194.19
Top Cont. 10 0.3 10 1 6.17 18.51
Tie Bars 10 2 3 3.70 11.10
Top Discont. 12 0
Bottom 12 0.225 45 3.3 131.84 395.52
Top Cont. 12 0.15 134 2.85 339.05 1,017.15
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.3 9 1.19 6.60 19.80
Bottom 10 0.3 9 10.5 58.26 174.78
I. A. Campbell Associates, Inc. Page 259 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 45 3.3 131.84 791.04
Top Cont. 12 0.15 134 2.85 339.05 2,034.30
Tie Bars 10 2 10 12.33 73.98
Top Discont. 10 0.3 9 1.19 6.60 39.60
Bottom 10 0.3 9 10.5 58.26 349.56
Top Cont. 10 0.3 9 0.9 4.99 29.94
Tie Bars 10 2 2.6 3.21 19.26
Top Discont. 12 0
Bottom 12 0.275 37 3.3 108.40 108.40
Top Cont. 12 0.175 114 2.85 288.45 288.45
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 10.5 58.26 58.26
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21
Top Discont. 12 0
Bottom 12 0.275 24 3.3 70.31 70.31
I. A. Campbell Associates, Inc. Page 260 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.275 19 3.3 55.67 55.67
Top Cont. 12 0.175 58 1.6 82.39 82.39
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 5.5 30.52 30.52
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21
Top Discont. 12 0
Bottom 12 0.275 37 3.3 108.40 108.40
Top Cont. 12 0.175 114 2.85 288.45 288.45
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 10.5 58.26 58.26
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21
I. A. Campbell Associates, Inc. Page 261 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.275 24 3.3 70.31 70.31
Top Cont. 12 0.175 76 2 134.95 134.95
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 7.1 39.39 39.39
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21
Top Discont. 12 0
Bottom 12 0.275 19 3.3 55.67 55.67
Top Cont. 12 0.175 58 1.6 82.39 82.39
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 5.5 30.52 30.52
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21
105,334.83
I. A. Campbell Associates, Inc. Page 262 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.175 57 4.06 205.45 1,027.25
Top Cont. 12 0.125 160 2.85 404.84 2,024.20
Tie Bars 10 2 10 12.33 61.65
Top Discont. 10 0.225 15 1.38 12.76 63.80
Bottom 10 0.225 15 10.5 97.10 485.50
Top Cont. 10 0.225 15 1.09 10.08 50.40
Tie Bars 10 2 3.36 4.14 20.70
Top Discont. 12 0
Bottom 12 0.175 19 2.75 46.39 92.78
Top Cont. 12 0.125 54 1.19 57.05 114.10
Tie Bars 10 2 3.36 4.14 8.28
Top Discont. 10 0.225 9 1.0525 5.84 11.68
Bottom 10 0.225 9 3.86 21.42 42.84
Top Cont. 10 0.225 9 0.7625 4.23 8.46
Tie Bars 10 2 2.05 2.53 5.06
I. A. Campbell Associates, Inc. Page 263 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 264 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.225 45 3.3 131.84 2,636.80
Top Cont. 12 0.15 134 2.85 339.05 6,781.00
Tie Bars 10 2 10 12.33 246.60
Top Discont. 10 0.3 9 1.19 6.60 132.00
Bottom 10 0.3 9 10.5 58.26 1,165.20
Top Cont. 10 0.3 9 0.9 4.99 99.80
Tie Bars 10 2 2.6 3.21 64.20
I. A. Campbell Associates, Inc. Page 265 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.175 27 3.3 79.10 158.20
Top Cont. 12 0.125 74 1.5 98.55 197.10
Tie Bars 10 2 4.6 5.67 11.34
Top Discont. 10 0.225 12 1.19 8.80 17.60
Bottom 10 0.225 12 5.1 37.73 75.46
Top Cont. 10 0.225 12 0.9 6.66 13.32
Tie Bars 10 2 2.6 3.21 6.42
Top Discont. 12 0
Bottom 12 0.175 38 3.3 111.33 333.99
Top Cont. 12 0.125 106 2 188.21 564.63
Tie Bars 10 2 6.6 8.14 24.42
Top Discont. 10 0.225 12 1.19 8.80 26.40
Bottom 10 0.225 12 7.1 52.53 157.59
Top Cont. 10 0.225 12 0.9 6.66 19.98
Tie Bars 10 2 2.6 3.21 9.63
I. A. Campbell Associates, Inc. Page 266 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.2 33 3 87.89 175.78
Top Cont. 12 0.125 106 2 188.21 376.42
Tie Bars 10 2 6.6 8.14 16.28
Top Discont. 10 0.275 9 1.115 6.19 12.38
Bottom 10 0.275 9 7.1 39.39 78.78
Top Cont. 10 0.275 9 0.825 4.58 9.16
Tie Bars 10 2 2.3 2.84 5.68
I. A. Campbell Associates, Inc. Page 267 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.2 33 3.75 109.87 219.74
Top Cont. 12 0.125 106 2 188.21 376.42
Tie Bars 10 2 6.6 8.14 16.28
Top Discont. 10 0.275 11 1.3025 8.83 17.66
I. A. Campbell Associates, Inc. Page 268 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.2 33 3.6 105.47 105.47
Top Cont. 12 0.125 106 2 188.21 188.21
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.275 11 1.265 8.58 8.58
Bottom 10 0.275 11 7.1 48.15 48.15
Top Cont. 10 0.275 11 0.975 6.61 6.61
Tie Bars 10 2 2.9 3.58 3.58
Top Discont. 12 0
Bottom 12 0.2 50 3.75 166.46 665.84
I. A. Campbell Associates, Inc. Page 269 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.2 46 3.75 153.15 306.30
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 11 1.3025 8.83 17.66
Bottom 10 0.275 11 9.6 65.10 130.20
Top Cont. 10 0.275 11 1.0125 6.87 13.74
Tie Bars 10 2 3.05 3.76 7.52
Top Discont. 12 0
Bottom 12 0.2 50 3.6 159.80 1,278.40
Top Cont. 12 0.125 160 2.85 404.84 3,238.72
Tie Bars 10 2 10 12.33 98.64
Top Discont. 10 0.275 11 1.265 8.58 68.64
Bottom 10 0.275 11 10.5 71.21 569.68
Top Cont. 10 0.275 11 0.975 6.61 52.88
Tie Bars 10 2 2.9 3.58 28.64
I. A. Campbell Associates, Inc. Page 270 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.2 46 3.6 147.02 294.04
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 11 1.265 8.58 17.16
Bottom 10 0.275 11 9.6 65.10 130.20
Top Cont. 10 0.275 11 0.975 6.61 13.22
Tie Bars 10 2 2.9 3.58 7.16
I. A. Campbell Associates, Inc. Page 271 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.175 52 3.3 152.35 609.40
Top Cont. 12 0.125 146 2.625 340.25 1,361.00
Tie Bars 10 2 9.1 11.22 44.88
Top Discont. 10 0.225 12 1.19 8.80 35.20
Bottom 10 0.225 12 9.6 71.02 284.08
Top Cont. 10 0.225 12 0.9 6.66 26.64
Tie Bars 10 2 2.6 3.21 12.84
Top Discont. 12 0
Bottom 12 0.175 35 3.3 102.54 205.08
Top Cont. 12 0.125 98 1.865 162.26 324.52
I. A. Campbell Associates, Inc. Page 272 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
Top Discont. 12 0
Bottom 12 0.175 26 3.3 76.17 76.17
Top Cont. 12 0.125 74 1.4875 97.72 97.72
Tie Bars 10 2 4.55 5.61 5.61
Top Discont. 10 0.225 12 1.19 8.80 8.80
Bottom 10 0.225 12 5.05 37.36 37.36
Top Cont. 10 0.225 12 0.9 6.66 6.66
Tie Bars 10 2 2.6 3.21 3.21
Top Discont. 12 0
Bottom 12 0.175 52 3.3 152.35 304.70
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.225 12 1.19 8.80 17.60
Bottom 10 0.225 12 9.6 71.02 142.04
Top Cont. 10 0.225 12 0.9 6.66 13.32
Tie Bars 10 2 2.6 3.21 6.42
I. A. Campbell Associates, Inc. Page 273 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 274 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
49,012.13
485,166.61
Gr. 40 : 90,401.73
I. A. Campbell Associates, Inc. Page 275 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars
I. A. Campbell Associates, Inc. Page 276 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Concrete
Date : October 28, 2010
SLAB CONCRETE
Floor Level Area
Basement 2
150mm thk 6,650.21
Basement 1
175mm thk 16.97 41.02 30.77 37.54 51.62 51.62
150mm thk 25.70 574.31 75.08
125mm thk 94.72 401.22 689.00 3,306.41 372.28 508.53
Ground Floor
175mm thk 16.97 41.02 30.77 37.54 51.62 51.62
150mm thk 25.70 574.31 75.08 73.14
125mm thk 20.52 520.36 689.00 3,306.41 372.28 508.53
Second Floor
175mm thk - 41.02 30.77 37.54 51.62 -
150mm thk 25.70 492.34 75.08 90.93 52.81 72.08
125mm thk 94.72 401.22 689.00 3,207.21 319.47 508.53
Third Floor
175mm thk - 41.02 30.77 37.54 51.62 -
150mm thk 25.70 492.34 75.08 8.96 52.81 72.08
125mm thk 94.72 401.22 689.00 3,289.18 319.47 508.53
Fourth Floor
175mm thk - - - - - -
150mm thk 98.46 - - - - -
125mm thk 94.72 401.22 689.00 3,289.18 319.47 1,396.45
Roof Deck
175mm thk 163.66 - - - - -
150mm thk 125.58 636.00 69.84 66.84 292.56 66.84
125mm thk 113.83 271.78 361.46 73.03 204.94 375.04
Grand Total
I. A. Campbell Associates, Inc. Page 277 of 279 Slab Concrete - Dwg Dtd October 27, 2010
Total Area Volume
6,650.21 997.53
229.54 40.17
675.09 101.26
5,372.16 671.52
812.95
229.54 40.17
748.23 112.23
5,417.10 677.14
829.54
160.95 28.17
808.94 121.34
5,220.15 652.52
802.03
160.95 28.17
726.97 109.05
5,302.12 662.76
799.98
- -
98.46 14.77
6,190.04 773.76
788.52
163.66 28.64
1,257.67 188.65
1,400.09 175.01
392.30
5,422.86
I. A. Campbell Associates, Inc. Page 278 of 279 Slab Concrete - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Girder and Beams
Date :
Qty Length Lap Total Length Unit Weight Total Weight (kgs)
10mmø
6.00 32.04 5.00 34.29 0.616 126.74
Total 15,057.33
Gr. 40 : 15,057.33