Professional Documents
Culture Documents
MATERIALES
CONCRETO f'c= 210 kg/cm2
ACERO fy= 4200 kg/cm2 B
1.0. DISEÑO POR FLEXION
t
CUANTIA MINIMA h
𝐴𝑠𝑚𝑖�=0.7∗√( 〖� ^′ 〗 _𝑐 )/�𝑦∗𝑏∗�
Areas de acero
Diametro Diametro
Comerci Nominal
SECCION DE VIGA
al (cm)
b= 10 cm 6 mm 0.60
h= 20 cm d= 18.00 cm 8 mm 0.80
r= 2 cm t= 5 cm 3/8" 0.95
B= 40 cm 12 mm 1.20
Cuantias permisibles 1/2" 1.27
Asmin= 0.43 cm2 5/8" 1.59
3/4" 1.91
1" 2.54
ANALISIS ESTRUCTURAL:
Acero Longitudinal
Momento Ultimo (+)
Mu= 0.54 tn-m
a (asu) As a (cal) N° ø Area unit (cm2)
8.18 1.03 0.60 1.00 1/2" 1.29
0.60 0.81 0.47 1/2" 1.29
0.47 0.80 0.47 - 6 mm 0.28
- 6 mm 0.28
Asmin<As calc TOTAL
Verificacion 0.43 0.80 ok
Area de Acer 0.8043 cm2
Momento Ultimo (-)
Mu= 0.88 tn-m
a (asu) As a (cal) N° ø Area unit (cm2)
3.30 1.42 3.35 1.00 5/8" 1.99
3.35 1.43 3.36 - 1/2" 1.29
3.36 1.43 3.36 - 1/2" 1.29
- 6 mm 0.28
Asmin<As calc<As max TOTAL
Verificacion 0.43 1.43 0.00 ok
Area de Acer 1.4263 cm2
�_𝑐=∅∗0.53∗√(�^′
Corte resistente del 𝑐)∗b∗d=
concreto
Vc= 1.18 Tn
Solicitacion:
b=�𝑢/(∅∗
Calculo de0.53 ∗√(�^′ �)∗d)
ensanche
b= 15 cm
L= 50 cm
eas de acero
Area
Nominal
(cm2)
0.28
0.5
0.71
1.13
1.29
1.99
2.84
5.1
Area acero
1.29
-
-
-
1.29
Area acero
1.99
-
-
-
1.99
DISEÑO DE LOSA SOLIDA ARMADA EN UN SENTIDO
MATERIALES
CONCRETO f'c= 210 kg/cm2
ACERO fy= 4200 kg/cm2 B
1.0. DISEÑO POR FLEXION
t
CUANTIA MINIMA h
𝐴𝑠𝑚𝑖�=0.7∗√( 〖� ^′ 〗 _𝑐 )/�𝑦∗𝑏∗�
Areas de acero
Diametro Diametro
Comerci Nominal
SECCION DE LOSA
al (cm)
b= 100 cm 6 mm 0.60
e= 20 cm d= 18.00 cm 8 mm 0.80
r= 2 cm 3/8" 0.95
12 mm 1.20
Cuantias permisibles 1/2" 1.27
Asmin= 4.35 cm2 5/8" 1.59
3/4" 1.91
1.0. ACERO DE TEMPERATURA 1" 2.54
𝐴𝑠=𝜌∗𝑏∗�
Acero Longitudinal
Momento Ultimo
Mu= 3.2 tn-m
a (asu) As a (cal)
8.18 6.09 1.43
1.43 4.90 1.15
1.15 4.86 1.14
EspaciamienVarilla 3/8"
@= 0.71 = 15 cm
4.86
Asmin<As calc
Verificacion 4.35 4.86 ok
Area de Acer 4.86 cm2
Acero transversal
As min= 4.35 cm2
EspaciamienVarilla 3/8"
@= 0.71 = 15 cm
4.35
Vc= 11.75 Tn
Solicitacion:
Areas de acero
Diametro Diametro
Comerci Nominal
SECCION DE VIGA
al (cm)
b= 10 cm 6 mm 0.60
h= 20 cm d= 18.00 cm 8 mm 0.80
r= 2 cm t= 5 cm 3/8" 0.95
B= 40 cm 12 mm 1.20
Cuantias permisibles 1/2" 1.27
Asmin= 0.43 cm2 5/8" 1.59
3/4" 1.91
1" 2.54
ANALISIS ESTRUCTURAL:
Acero Longitudinal
Momento Ultimo (+)
Mu= 0.11 tn-m
a (asu) As a (cal) N° ø Area unit (cm2)
8.18 0.21 0.12 1.00 3/8" 0.71
0.12 0.16 0.10 1/2" 1.29
0.10 0.16 0.10 - 6 mm 0.28
- 6 mm 0.28
Asmin<As calc TOTAL
Verificacion 0.43 0.16 colocar Asmin
Area de Acer 0.4347 cm2
Momento Ultimo (-)
Mu= 0.14 tn-m
a (asu) As a (cal) N° ø Area unit (cm2)
3.30 0.23 0.53 1.00 3/8" 0.71
0.53 0.21 0.49 - 1/2" 1.29
0.49 0.21 0.49 - 1/2" 1.29
- 6 mm 0.28
Asmin<As calc<As max colocar TOTAL
Verificacion 0.43 0.21 0.00 Asmin
Area de Acer 0.4347 cm2
𝑀𝑢�=∅∗0.85∗�^′ 𝑐∗𝐵∗�∗(�−�/2)
Vc= 1.18 Tn
Solicitacion:
Calculo de ensanche
b=�𝑢/(∅∗0.53∗√(�^′ �)∗d)
b= 5 cm
L= 50 cm
eas de acero
Area
Nominal
(cm2)
0.28
0.5
0.71
1.13
1.29
1.99
2.84
5.1
Area acero
0.71
-
-
-
0.71
Area acero
0.71
-
-
-
0.71