You are on page 1of 1

PROJECT NAME: A0xxx.016.000.

0000 Quality Inspection Plan (QIP)


preliminary
Quality Assurance Work Shop Local Manufacturing
Client: Client Name for : One Set of 6000 t/d IKN Pendulum Clinker Cooler at Plant, Country Department : 016
B22 B24 C3 A1-
INSPECTION AND TEST ITEM Code B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B26 B27 B28
B23 B25 C4 A3
*1

t
atmen

t
ce Tes

perties
tion

p
hop

orksho
ace Tre

n
tion VT

ge

spectio
Inspec

partial

Work S

esistan

ch. pro

ity /
h Volta

ument

T
larity

g RT
ment

Test M
lling

rer
ace Co ection

mp

est at W

Reach n of Conform
le
st
al
n / Surf
Inspec

ng UT
/ Cubic
sembly

Leak te

rking In
r

nufactu
arance

n & Po
Electric

ctuato

nt Doc
ndition

and Pu

arth R

Testin
/ Labe

is / me

t Docu
st / Hig
Gear D t Check:

Electric t Check:

Relatio st
ection

analys te
heck:

st PT

ity
Te
Insp

Particle
ifica

Conform
ti
est

ance T

st
spectio
g Seam
al

nic Tes
rive / A

it
/ Appe

rary As

g & Ma
on & E

t
Motor

reatme

als Ma
ty Insp

nent C

tatic- /

ess tes

on Tes

raphic
l Circu

ing Te
arking

ant Te
Plates

al Cert
ension

nical /

tric Te
sional

onal T

Motor
EQUIPMENT NAME

nen

nen

tio
VT

tic
(PART OR COMPONENTS

Perform

Declara
Paint In

Compo

Compo

Hydros

Ultraso

Radiog
Insulati

Approv
Quality

Tempo

Item M

Balanc
Weldin

Magne
Mecha

Contro

Heat T

Packin
Quanti

Compo

Penetr
Dimen

Phase

Vibrati
Dielec

Materi
& Surf

& Dim

chem.
Visual

Functi

Hardn
Name

Pump
TO BE INSPECTED AND TESTED)

16.2 Supporting Structure


Side Rails AG 011 M I A M I A M I A MA MA MIA M MA A

16.3 Air Ducts and Seals


Air Ducts AG 002 M I A M I A M I A M I A MA MA MIA MA MA
Flaps AG 002 M I A M I A M I A MA MA MIA MA MA
Side Sealing AG 001 M I A M I A M I A MA MA MIA MA MA
Pressure Ducts AG 002 M I A M I A M I A M I A MA MA MIA MA MA
Side Sealing AG 001 M I A M I A M I A MA MA MIA MA MA

16.4 Grate Drives


Supports AG 014 M I A M I A M I A MA MA MIA MA MA A

16.7 Cooler Housing


Lower Cooler Housing AG 018 M I A M I A M I A M I A MA MA MIA MA MA A
Upper Cooler Housing AG 018 M I A M I A M I A M I A MA MA MIA MA MA A
Cooler Roof AG 018 M I A M I A M I A MA MA MIA MA MA A
Base Frame AG 050 M I A M I A M I A M I A MA MA MIA MA MA A
Bridge Roller Crusher AG 013 M I A M I A M I A M I A MA MA MIA MA MA A

16.9 Clinker Discharge


TDE Piping & Flange Seaings AG 016 M I A M I A M I A MA MA MIA MA MA
Discharge Chute AG 017 M I A M I A M I A M I A MA MA MIA MIA MA MA
Rev. Date: Initial: REMARKS: MARKINGS:
Quality Documents Transmittal
A * 1 : Funktion of flaps to be tested M) Inspected & tested by Manufacturer / Engineer / Owner

B S) Inspected by sub- supplier Recipient Type No. Format


C I) Inspected by IKN according to contractual obligations Purchaser / Owner / Engineer Records as A 1 PDF
D A) Inspection documents and certificates to be issued and submitted according to
contractual obligations and as specified in technical documents and standards.
E

A04xx_Quality_Assurance\A04xx_QA_Documents\A04xx_016_0000_QIP_EN.xlsx Page 1 of 1

You might also like