REGION IV-A

Project ID 4A0313H00236
Project name Construction of Calibuyo Bridge and approaches PAVED (CONCRETE) TO PAVED
(CONCRETE) / Tanza,Cavite District Engineering Office, Region IV-A
Contractor Joint Venture - THREE W BUILDERS, INC. et. al.
Implementing Office Cavite District Engineering Office, Region IV-A
Source Of Funds: DPWH
Estimated Cost 25,674,000
Date Started 7/24/2017
Original completion 8/25/2017
Actual Completion 2/25/2018
status 100%

Project ID 4A0314H00059
Project name Naic Diversion Br. along Naic Div Rd WIDENING OF BRIDGE / Naic,Cavite 2nd District
Engineering Office, Region IV-A
Contractor D.V. SALUD CONSTRUCTION
Implementing Office Regional Office, Region IV-A
Source Of Funds: WPBR
Estimated Cost 3,8930,000
Date Started 6/2/2014
Original completion 9/15/2017
Actual Completion 1/15/2018
status 100%

Project ID 4A0315H00070
Project name Construction of Tarapiche Bridge along Maragondon-Gen. Aguinaldo Road, Brgy.
Lumipa, Bailen, Cavite CONSTRUCTION OF NEW BRIDGE / Maragondon,Cavite 2nd
District Engineering Office,Region IV-A
Contractor NORTHERN BUILDERS
Implementing Office Regional Office,Region IV-A
Source Of Funds: TDTD
Estimated Cost 150,000,000
Date Started 8/12/2015
Original completion 5/24/2017
Actual Completion 7/15/2018
status 100%

Project ID 4A0315H00076
Project name Noveleta Diversion Br.(B02896LZ) along Noveleta Div Rd WIDENING OF BRIDGE /
Districtwide-1st Congressional District,Cavite District Engineering Office, Region IV-A
Contractor HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG)
Implementing Office Cavite District Engineering Office, Region IV-A
Source Of Funds: CNPW
Estimated Cost 31,033,000
Date Started 11/2/2015
Original completion 12/29/2016
Actual Completion 9/29/2018
status 100%

Project ID 4A0315H00088
Project name Pagsawitan Br. (B02467LZ) along Calamba-Sta Cruz-Famy Jct Rd WIDENING OF
BRIDGE / Sta. Cruz,Laguna 1st District Engineering Office,Region IV-A
Contractor PERFORMANCE BUILDERS & DEVELOPERS CORPORATION
Implementing Office Regional Office, Region IV-A
Source Of Funds: CNPW
Estimated Cost 65,000,000
Date Started 5/11/2015
Original completion 10/4/2016
Actual Completion
status

Project ID 4A0415F00042
Project name Flood Control and River Improvement Project along Laguna Lake based on Metro Manila
Master Plan-Construction of Slope Protection for Sta. Maria-Mabitac River, Laguna
CONSTRUCTION / Sta. Maria,Laguna 1st District Engineering Office,Region IV-A
Contractor D.L CERVANTES CONSTRUCTION CORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: FMPR
Estimated Cost 133,719,000
Date Started 1/24/2017
Original completion 11/4/2017
Actual Completion 1/6/2018
status 100%

Project ID 4A0513H00091
Project name Widening of Bridges along Lucena Diversion Road, Lucena City, Lacawan Bridge
WIDENING OF BRIDGE / Lucena City,Quezon 2nd District Engineering Office,Region
IV-A
Contractor NEW KANLAON CONSTRUCTION, INC.
Implementing Office Regional Office,Region IV-A
Source Of Funds: TRAFFIC
Estimated Cost 39,828,000
Date Started 8/1/2013
Original completion 6/1/2018
Actual Completion 7/1/2018
status 100%

Project ID 4A0514H00318
Project name Concreting of Provincial Road, Polillo to Burdeos, Polillo-burdeos GRAVEL TO PAVED /
DistrictWide,Quezon 1st District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 75,000,000
Date Started 5/15/2016
Original completion 2/9/2017
Actual Completion 7/15/2018
status 100%

Project ID 4A0514H00320
Project name Concreting of farm-to-market road, Brgy. Palagaran, Tiaong GRAVEL TO PAVED /
Tiaong,Quezon 2nd District Engineering Office, Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 3,000,000
Date Started 7/30/2017
Original completion 2/29/2016
Actual Completion 9/30/2018
Status 100%

Project ID 4A0514H00321
Project name Concreting of farm-to-market road, Brgy. San Francisco, Tiaong GRAVEL TO PAVED /
Tiaong,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 3,000,000
Date Started 2/15/2017
Original completion 4/29/2016
Actual Completion 2/26/2018
Status 100%

Project ID 4A0514H00323
Project name Concreting of barangay road, Brgy. Briones, San Antonio GRAVEL TO PAVED / San
Antonio,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 6/1/2017
Original completion 4/29/2016
Actual Completion 2/26/2018
Status 100%

Project ID 4A0514H00324
Project name Concreting of barangay road, Brgy. Sampaga, San Antonio GRAVEL TO PAVED / San
Antonio,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 6/1/2017
Original completion 4/29/2016
Actual Completion 1/19/2018
Status 100%

Project ID 4A0514H00326
Project name Concreting of farm-to-market road, Brgy. Polo, San Antonio GRAVEL TO PAVED / San
Antonio,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 8/15/2017
Original completion 2/29/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00327
Project name Concreting of farm-to-market road, Brgy. Magsaysay, San Antonio GRAVEL TO PAVED
/ San Antonio,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 8/15/2017
Original completion 2/29/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00331
Project name Concreting of Brgy. Road, Brgy. Malabanban Norte, Candelaria GRAVEL TO PAVED /
Candelaria,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 3,000,000
Date Started 8/15/2017
Original completion 2/29/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00332
Project name Concreting of farm-to-market road, Brgy. Talaan Pantoc, Sariaya GRAVEL TO PAVED /
Sariaya,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 2/15/2017
Original completion 4/29/2016
Actual Completion 2/26/2018
Status 100%

Project ID 4A0514H00338
Project name Concreting of Provincial Road, Silangan, Infanta GRAVEL TO PAVED / Infanta,Quezon
1st District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 5,000,000
Date Started 8/15/2017
Original completion 6/14/2016
Actual Completion 3/28/2018
Status 100%

Project ID 4A0514H00345
Project name Concreting of farm-to-market road, Brgy. Sta. Catalina Sur, Candelaria GRAVEL TO
PAVED / Candelaria,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 3,000,000
Date Started 2/15/2017
Original completion 4/29/2016
Actual Completion 2/26/2018
Status 100%

Project ID 4A0514H00347
Project name Concreting of farm-to-market road, Mansilay-Tunton-Maguibuay, Tagkawayan GRAVEL
TO PAVED / Tagkawayan,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 5,000,000
Date Started 8/15/2017
Original completion 3/15/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00348
Project name Concreting of farm-to-market road, Brgy. Silangan to Sabang, Quezon GRAVEL TO
PAVED / Quezon,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 3,000,000
Date Started 8/15/2017
Original completion 2/14/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00349
Project name Concreting of farm-to-market road, Brgy. Mainit Norte, Perez GRAVEL TO PAVED /
Perez,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 8/15/2017
Original completion 2/14/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00350
Project name Concreting of farm-to-market road, Brgy. Vergaña-San Lorenzo, Lopez GRAVEL TO
PAVED / Lopez,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 8/15/2017
Original completion 2/14/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00351
Project name Concreting of farm-to-market road, Brgy. Camohaguin Section, Gumaca GRAVEL TO
PAVED / Gumaca,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 5,000,000
Date Started 6/1/2017
Original completion 4/15/2016
Actual Completion 7/15/2018
Status 100%

Project ID 4A0514H00352
Project name Concreting of farm-to-market road, Cabibihan, Guinayangan GRAVEL TO PAVED /
Guinayangan,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 6/1/2017
Original completion 4/14/2016
Actual Completion 3/21/2018
Status 100%

Project ID 4A0514H00353
Project name Concreting of farm-to-market road, Sta. Cruz-San Roque, Guinayangan GRAVEL TO
PAVED / Guinayangan,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 6/1/2017
Original completion 2/14/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00354
Project name Concreting of farm-to-market road, Brgy. Apad Quezon-Tiniguiban, Calauag GRAVEL
TO PAVED / Calauag,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 10,000,000
Date Started 8/15/2017
Original completion 5/14/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00355
Project name Concreting of farm-to-market road, Manggalayan-Lebak, Atimonan GRAVEL TO PAVED
/ Atimonan,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 3,000,000
Date Started 8/15/2017
Original completion 2/14/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00356
Project name Concreting of farm-to-market road, Brgy. Camagong-Villa Norte, Alabat GRAVEL TO
PAVED / Alabat,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 4,000,000
Date Started 8/15/2017
Original completion 3/15/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00361
Project name Concreting of farm-to-market road, Brgy. Silangang Mayao, Lucena City GRAVEL TO
PAVED / Lucena City,Quezon 2nd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 3,000,000
Date Started 7/30/2017
Original completion 4/29/2016
Actual Completion 2/26/2018
Status 100%

Project ID 4A0514H00364
Project name Concreting of farm-to-market road, San Vicente, Padre Burgos GRAVEL TO PAVED /
Padre Burgos,Quezon 3rd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 6/1/2017
Original completion 4/14/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00365
Project name Concreting of farm-to-market road, Bolo, Padre Burgos GRAVEL TO PAVED / Padre
Burgos,Quezon 3rd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 4,000,000
Date Started 8/15/2017
Original completion 4/15/2016
Actual Completion 1/19/2018
Status 100%

Project ID 4A0514H00368
Project name Concreting of farm-to-market road, Binagbag, Agdangan GRAVEL TO PAVED /
Agdangan,Quezon 3rd District Engineering Office, Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 12/15/2017
Original completion 4/14/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0514H00371
Project name Concreting of farm-to-market road, Batabat Norte/Magallanes, Buenavista GRAVEL TO
PAVED / Buenavista,Quezon 3rd District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 2,000,000
Date Started 6/1/2017
Original completion 5/14/2016
Actual Completion 2/26/2018
Status 100%

Project ID 4A0514H00373
Project name Concreting of farm-to-market road, Brgy. Payapa-Munting Parang Bukal, Tagkawayan
GRAVEL TO PAVED / Tagkawayan,Quezon 4th District Engineering Office,Region IV-A
Contractor LUCBAN BUILDERS AND CONSTRUCTION SUPPLY INCORPORATION
Implementing Office Regional Office,Region IV-A
Source Of Funds: CDAQ
Estimated Cost 5,000,000
Date Started 8/15/2017
Original completion 3/15/2016
Actual Completion 9/28/2018
Status 100%

Project ID 4A0314H00144
Project name Cavite-Batangas Road (S01799LZ), Salitran Jct. Dasmariñas City, Cavite, Phase I,
K0028+223 CONSTRUCTION OF NEW BRIDGE / Silang,Cavite 2nd District Engineering
Office,Region IV-A
Contractor KLDS TRADING & CONSTRUCTION
Implementing Office Cavite District Engineering Office,Region IV-A
Source Of Funds: MVUC
Estimated Cost 18,792,000
Date Started 5/15/2017
Original completion 12/31/2016
Actual Completion 2/1/2018
Status 100%

Project ID 4A0214H00268
Project name PM 3-12: Asphalt Overlay of Batangas-Tabangao-Lobo Road, Batangas-Lobo Section,
K0106+940 to K0112+300 and K0116+960 to K0119+520, Batangas, Region IV
ASPHALT OVERLAY (100 MM THICK) / DistrictWide,Batangas 2nd District Engineering
Office,Region IV-A
Contractor E.M. CUERPO, INC.
Implementing Office PMO-NRIM
Source Of Funds: FANR
Estimated Cost 79,586,000
Date Started 1/28/2016
Original completion 7/29/2016
Actual Completion 9/23/2016
Status 100%

Project ID 4A0214H00269
Project name PM3-13: Asphalt Overlay of Batangas-Tabangao-Lobo Road, Batangas City Road
Section, K0119+520 to K0132+000, Batangas, Region IV-A Loan 7552-PH ASPHALT
OVERLAY (100 MM THICK) / DistrictWide,Batangas 2nd District Engineering
Office,Region IV-A
Contractor MARCBILT CONSTRUCTION, INC.
Implementing Office PMO-NRIM
Source Of Funds: FANR
Estimated Cost 64,712,000
Date Started 2/15/2016
Original completion 11/10/2016
Actual Completion 12/13/2016
Status 100%

Project ID 4A9913H00001
Project name National Road Improvement and Management Project, Phase II, Loan No. 7552-PH, LM-
2-2 South Luzon Package, Laguna 4th LD; Quezon 1st LD ASPHALT OVERLAY (50 MM
THICK) / DistrictWide,Regional Office,Region IV-A
Contractor CHINA INTERNATIONAL WATER & ELECTRIC CORPORATION
Implementing Office PMO-NRIM
Source Of Funds: RUAR
Estimated Cost 675,752,000
Date Started 9/3/2013
Original completion 9/2/2018
Actual Completion 9/2/2018
Status 100%
REGION III
Project ID 030115H00049
Project name Replacement of Permanent Bridges, Capitangan Br. 2 (B01567LZ) along
Jct Layac-Balanga-Mariveles Port Rd WIDENING OF BRIDGE /
DistrictWide,Bataan 1st District
Contractor A.S.V. CONSTRUCTION SUPPLY AND SERVICES
Implementing Office Bataan 1st District Engineering Office,Region III
Source Of Funds: CNPW
Estimated Cost 5,458,000
Date Started 12/21/2015
Original completion 5/18/2016
Actual Completion
Status

Project ID 030115H00051
Project name Calaylayan Br. (B01564LZ) along Jct Layac-Balanga-Mariveles Port Rd
WIDENING OF BRIDGE / DistrictWide,Bataan 1st District Engineering
Office,Region III
Contractor JEPA CONSTRUCTION & SUPPLIES
Implementing Office Bataan 1st District Engineering Office,Region III
Source Of Funds: CNPW
Estimated Cost 5,562,000
Date Started 12/21/2015
Original completion 5/18/2016
Actual Completion
Status

Project ID 030115H00052
Project name Abucay Br. (B01565LZ) along Jct Layac-Balanga-Mariveles Port Rd
WIDENING OF BRIDGE / DistrictWide,Bataan 1st District Engineering
Office,Region III
Contractor ORANI BUILDERS & SUPPLY
Implementing Office Bataan 1st District Engineering Office,Region III
Source Of Funds: CNPW
Estimated Cost 14,394,000
Date Started 12/21/2015
Original completion 5/18/2016
Actual Completion
Status

Project ID 030115H00058
Project name Bagac-Mariveles Rd - K0169+067 - K0169+200, K0169+400 -
K0174+260, K0176+340 GRAVEL TO PAVED / DistrictWide,Bataan
2nd District Engineering Office,Region III
Contractor MARCBILT CONSTRUCTION, INC.
Implementing Office Regional Office,Region III
Source Of Funds: RUSR
Estimated Cost 235,794,000
Date Started 11/12/2015
Original completion 5/12/2018
Actual Completion 5/12/2018
Status 100%

Project ID 030211H00014
Project name Construction of Balagtas and North Food, Exchange Interchange, San
Juan, Balagtas CONSTRUCTION OF NEW BRIDGE / Balagtas,Bulacan
1st District Engineering Office,Region III
Contractor L.R. TIQUI BUILDERS, INC.
Implementing Office Regional Office,Region III
Source Of Funds: DPWH
Estimated Cost 230,000,000
Date Started 4/3/2012
Original completion 12/28/2012
Actual Completion
Status

Project ID 030211H00437
Project name Construction of Balagtas North Food Exchange Interchange, Phase II,
San Juan, Balagtas CONSTRUCTION OF NEW BRIDGE /
Balagtas,Bulacan 1st District Engineering Office,Region III
Contractor L.R. TIQUI BUILDERS, INC.
Implementing Office Regional Office,Region III
Source Of Funds: SAVE
Estimated Cost 46,896,000
Date Started 1/29/2013
Original completion 12/30/2013
Actual Completion
Status

Project ID 030215F00130
Project name River Improvement in Bustos, Bulacan Along Angat River, San Pedro
REHABILITATION / Bustos,Bulacan 1st District Engineering
Office,Region III
Contractor L.R. TIQUI BUILDERS, INC.
Implementing Office Bulacan 1st District Engineering Office,Region III
Source Of Funds: VILP
Estimated Cost 47,530,000
Date Started 4/9/2017
Original completion 11/8/2017
Actual Completion
Status

Project ID 030215H00147
Project name Meycauayan-Camalig-Bahay Pari Rd - K0020+000 - K0020+178,
K0020+300 - K0020+596, K0021+-045 - K0021+045, K0022+920+ -
K0024+660, K0024+960 - K0025+298, K0028+000 - K0028+597
PAVED (CONCRETE) TO PAVED (CONCRETE) / Districtwide-2nd
Congressional District,Bulacan 1st District Engineering Office,Region III
Contractor 525 CONSTRUCTION
Implementing Office Regional Office,Region III
Source Of Funds: UPSR
Estimated Cost 48,242,000
Date Started 8/14/2015
Original completion 3/1/2018
Actual Completion 3/1/2018
Status 100%

Project ID 030215H00148
Project name Gen Alejo Santos Highway - K0067+423 - K0069+1347, K0069+1815 -
K0069+2471 PAVED (CONCRETE) TO PAVED (CONCRETE) /
Districtwide-1st Congressional District,Bulacan 1st District Engineering
Office,Region III
Contractor R.S. SEPIAN CONSTRUCTION & TRUCKING
Implementing Office Regional Office,Region III
Source Of Funds: UPSR
Estimated Cost 87,564,000
Date Started 3/13/2015
Original completion 2/28/2018
Actual Completion 2/28/2018
Status 100%

Project ID 030314H00098
Project name Construction of Dalton Pass (Eastern Route Alignment), Segment 1,
(K0189+345.76 - NK0195+775) and Replacement of Seguim Bridge,
Nueva Ecija GRAVEL TO PAVED / Districtwide-1st Congressional
District,Nueva Ecija 1st District Engineering Office,Region III
Contractor PACIFIC CONCRETE PRODUCTS, INC
Implementing Office Regional Office,Region III
Source Of Funds: CNBP
Estimated Cost 149,240,000
Date Started 1/22/2015
Original completion 2/20/2018
Actual Completion 2/20/2018
Status 100%

Project ID 030315H00110
Project name Daang Maharlika (LZ) - K0127+980-K0129+400.38, K0134+000-
K0135+133.20, K0135+156.20-K0135+984.60, K0138+525-
K0140+475.40, K0142+612-K0143+420 WIDENING - PAVED /
Districtwide-3rd Congressional District,Nueva Ecija 2nd District
Engineering Office,Region III
Contractor KYRO BUILDER INC. (FORMERLY: KYRO BUILDERS)
Implementing Office Regional Office,Region III
Source Of Funds: WANR
Estimated Cost 101,392,000
Date Started 1/20/2016
Original completion 3/9/2018
Actual Completion 3/9/2018
Status 100%

Project ID 030413H00012
Project name Aquino Byway-Manila North Road (via San Jose Malino-Anao Road and
Del Rosario-Calulut), San Fernando WIDENING - PAVED /
Districtwide-3rd Congressional District,Pampanga 1st District
Engineering Office,Region III
Contractor TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC
Implementing Office Regional Office,Region III
Source Of Funds: TOURISM
Estimated Cost 150,000,000
Date Started 2/6/2014
Original completion 3/30/2018
Actual Completion 3/30/2018
Status 100%

Project ID 030515H00091
Project name Construction of a new Clark-Bamban-Capas Access Road leading to
Clark City, Tarlac GRAVEL TO PAVED / DistrictWide,Tarlac 2nd
District Engineering Office,Region III
Contractor NORTHERN BUILDERS
Implementing Office Regional Office,Region III
Source Of Funds: TDTD
Estimated Cost 141,858,000
Date Started 10/14/2015
Original completion 3/29/2018
Actual Completion 3/29/2018
Status 100%

Project ID 030615H00040
Project name Olongapo-Bugallon Rd - K0133 + (-14) - K0133+183, K0133+243 -
K0133+474, K0133+484 - K0135+551, K0135+573 - K0135+738
WIDENING - PAVED / Olongapo City,Zambales 2nd District
Engineering Office,Region III
Contractor NEW KANLAON CONSTRUCTION, INC.
Implementing Office Regional Office,Region III
Source Of Funds: WANR
Estimated Cost 92,500,000
Date Started 7/16/2015
Original completion 7/14/2018
Actual Completion 7/14/2018
Status 100%

Project ID 030615H00042
Project name Olongapo-Bugallon Rd-K0168+450-K0169+000,K0169+538-
K0169+921,K0170+355-K0172+025,K0174+533-
K0175+484,K0180+000-K0181+000,K0194+000-K0194+670 PAVED
(CONCRETE) TO PAVED (CONCRETE) / DistrictWide,Zambales 2nd
District Engineering Office,Region III
Contractor ST. GERRARD CONSTRUCTION
Implementing Office Regional Office,Region III
Source Of Funds: UPAR
Estimated Cost 133,386,000
Date Started 7/23/2015
Original completion 3/16/2018
Actual Completion 3/16/2018
Status 100%

Project ID 030615H00079
Project name Construction of Sindol Bridge
RETROFITTING/REHABILITATION/STRENGTHENING / San
Felipe,Zambales 1st District Engineering Office,Region III
Contractor ROMA CONSTRUCTION & DEVELOPMENT CORPORATION
Implementing Office Regional Office,Region III
Source Of Funds: FANB
Estimated Cost 33,300,000
Date Started 11/15/2016
Original completion 5/6/2018
Actual Completion 6/12/2018
Status 100%

Project ID 030715H00063
Project name Simbaham 'B' Br. along Baler-Casiguran Rd CONSTRUCTION OF
NEW BRIDGE / DistrictWide,Aurora District Engineering Office,Region
III
Contractor LEADWAY CONSTRUCTION & DEVELOPMENT CORPORATION
Implementing Office Regional Office,Region III
Source Of Funds: CNNP
Estimated Cost 76,889,000
Date Started 4/13/2015
Original completion 1/28/2018
Actual Completion 1/28/2018
Status 100%

Project ID 030114H00037
Project name NBCRP(Design&Build Bridges)-BCRP I-Design&Build Bridges for
Luzon - Samal Bridge
RETROFITTING/REHABILITATION/STRENGTHENING /
DistrictWide,Bataan 1st District Engineering Office,Region III
Contractor TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC
Implementing Office PMO-FABP
Source Of Funds: BCR1
Estimated Cost 18,660,000
Date Started 10/1/2015
Original completion 2/26/2019
Actual Completion
Status

Project ID 030214H00229
Project name Construction of Bridge 10 along CP IV, Plaridel Bypass Road, Sta
049+625.00 to Sta 057+365.73, under Arterial Bypass Road (ARBP),
Phase II, JICA PH-P2 CONSTRUCTION OF NEW BRIDGE /
Plaridel,Bulacan 1st District Engineering Office,Region III
Contractor C.M. PANCHO CONSTRUCTION, INCORPORATED
Implementing Office PMO-PJHL
Source Of Funds: DPWH
Estimated Cost 22,882,000
Date Started 1/1/2017
Original completion 9/25/2017
Actual Completion 1/1/2018
Status 100%
Project ID 030414F00025
Project name Flood Control Projects based on Flood Master Plan for Metro Manila and
Surrounding Areas - Restoration of Pasig Potrero - Original Channel
CONSTRUCTION / Districtwide-3rd Congressional District,Pampanga
1st District Engineering Office,Region III
Contractor Joint Venture - E.M.L. CONSTRUCTION & TRADING et. al.
Implementing Office PMO-MFCD-I, Cluster I
Source Of Funds: FMSD
Estimated Cost 180,798,000
Date Started 8/19/2015
Original completion 3/29/2018
Actual Completion
Status

Project ID 030415F00030
Project name Construction of Slope Protection and Desilting along Sapo River and
Maisac-Sto. Tomas Creek, Pampanga DREDGING/DESILTING / Sto.
Tomas,Pampanga 1st District Engineering Office,Region III
Contractor EDDMARI CONSTRUCTION & TRADING
Implementing Office PMO-MFCD-I, Cluster I
Source Of Funds: DDCD
Estimated Cost 152,037,000
Date Started 3/22/2016
Original completion 4/4/2018
Actual Completion
Status

Project ID 030415F00057
Project name Flood Control Projects in Central Luzon - Diversion of Pasig-Potrero
River to its Original Alignment, Bacolor CONSTRUCTION /
Bacolor,Pampanga 1st District Engineering Office,Region III
Contractor EDISON DEVELOPMENT CONSTRUCTION
Implementing Office PMO-MFCD-I, Cluster I
Source Of Funds: FMSD
Estimated Cost 124,635,000
Date Started 7/26/2016
Original completion 4/1/2018
Actual Completion
Status

Project ID 030814H00002
Project name Arterial Road Bypass Project, Phase II, C.P. IV, Plaridel Bypass Road,
Sta. 049+625 to Sta. 057+365.73, located in the Province of Bulacan
PAVED (CONCRETE) TO PAVED (CONCRETE) / DistrictWide,Inter-
District,Region III
Contractor C.M. PANCHO CONSTRUCTION, INCORPORATED
Implementing Office PMO-PJHL
Source Of Funds: FANR
Estimated Cost 562,322,000
Date Started 5/23/2016
Original completion 7/11/2018
Actual Completion
Status

Project ID 039915F00001
Project name Flood Control Projects in Central Luzon - Clearing of High Water
Channel of Pampanga Delta 1, Bulacan & Pampanga
DREDGING/DESILTING / DistrictWide,Regional Office,Region III
Contractor EDDMARI CONSTRUCTION & TRADING
Implementing Office PMO-MFCD-I, Cluster I
Source Of Funds: DDCD
Estimated Cost 91,265,000
Date Started 3/22/2016
Original completion 6/16/2018
Actual Completion
Status

Project ID 020214F00026
Project name Flood Risk Management Project (FRIMP) in Cagayan CONSTRUCTION
/ DistrictWide,Cagayan 3rd District Engineering Office,Region II
Contractor E. GUADIZ CONSTRUCTION
Implementing Office Cagayan 3rd District Engineering Office,Region II
Source Of Funds: FAFC
Estimated Cost 34,803,000
Date Started 3/31/2016
Original completion 12/31/2016
Actual Completion 1/31/2018
Status 100%

Project ID 020215W00006
Project name Construction of Water Supply project in Sta. Teresita, Cagayan
CONSTRUCTION / Sta. Teresita,Cagayan 1st District Engineering
Office,Region II
Contractor CAMIA CONST. DEVELOPMENT CORPORATION
(FORMERLY:CAM
Implementing Office Cagayan 1st District Engineering Office,Region II
Source Of Funds: VILP
Estimated Cost 16,953,000
Date Started 12/27/2016
Original completion 7/16/2017
Actual Completion 5/15/2018
Status 100%

Project ID 020315H00162
Project name Construction of Santiago Bypass Road, Daang Maharlika, Sinsayon to
Santiago-Tuguegarao Road, Rizal, Santiago City, Isabela 4th LD
GRAVEL TO PAVED / Santiago City,Isabela 4th District Engineering
Office,Region II
Contractor ST. GERRARD CONSTRUCTION
Implementing Office Regional Office,Region II
Source Of Funds: CBPR
Estimated Cost 153,372,000
Date Started 3/30/2015
Original completion 3/23/2016
Actual Completion 1/8/2018
Status 100%

Project ID 020514H00080
Project name Natl Bridge Const./Repl Program (Design & Build Bridges)-Bridge
Const. & Repl Program I-Design & Build Bridges for Luzon, Didungo
Bridge & Appr along NRJ Sur-San, Pedro Cabuan Ysmael-D, Quirino
Bdry(Isabela-Jct Dumabato), Quirino RETROFITTING/REHABILIT /
DistrictWide,Quirino District Engineering Office,Region II
Contractor R.D. INTERIOR JUNIOR CONSTRUCTION
Implementing Office Regional Office,Region II
Source Of Funds: BCR1
Estimated Cost 39,401,000
Date Started 1/19/2016
Original completion 4/22/2017
Actual Completion 6/20/2018
Status 100%