Professional Documents
Culture Documents
7 Additional Resources
1-866-777-1360 | creativesafetysupply.com
Creative Safety Supply is the leader in visual safety. We aim to
help you create a safer, more efficient and compliant workplace
using visual tools such as floor marking tapes, signs, labels, 5S
& Lean products, and safety merchandise.
Find and follow us
©2017 Creative Safety Supply, All Rights Reserved
Introduction
Marking pipes in industrial, commercial, and institutional facilities can
help make a workplace safer and more efficient. When pipes are clearly
labeled, fewer accidents involving injuries and damage to property occur.
This pipe marking guide will explain the best practices for creating a
visual pipe marking system to increase safety and efficiency in your
workplace.
Chapter 1 creativesafetysupply.com/guides
Where labels are required
The first step to proper pipe labeling is to understand where labels are
needed. This step is actually fairly straightforward, as you only need to
place pipe markers in four main places:
Chapter 2 creativesafetysupply.com/guides
ASME/ANSI pipe marking standards recommend
labeling all pipes, but at the very least you must label
pipes under the following circumstances:
Chapter 2 creativesafetysupply.com/guides
Assess your facility
With the key requirements for pipe marking in mind, do a walkthrough
of your facility to document your pipe systems. Use your facility’s
blueprints to help you identify any areas that may not be easily visible.
Chapter 3 creativesafetysupply.com/guides
Label formatting requirements
The design of a label must comply with pipe marking regulations, which
aim to make labels as visible as possible. Your labels must incorporate
three main elements: label color, label size, and text size.
COLOR GUIDELINES
Chapter 4 creativesafetysupply.com/guides
LABEL AND TEXT SIZE GUIDELINES
The size of a label should correspond to the size of a pipe; larger pipes
will always require larger labels. When you size labels according to
ASME/ANSI standards, people will notice them and be able to see them
from an appropriate distance.
Chapter 4 creativesafetysupply.com/guides
COMMON LABEL ABREVIATIONS
When labeling the contents of your pipes, some text may be too long
to fit on a label. When that is the case, use standardized abbreviations
from the following list.
Chapter 4 creativesafetysupply.com/guides
CSR Cable Spreading Room GRP Group
CST Condensate Storage Tank GSC Gland Steam Condenser
CW Circulating Water GV Governor Valve
CWP Circulating Water Pump HG(A) Mercury (absolute)
CYL Cylinder HGHT Height
D/G Diesel Generator HIDP High Differential Pressure
DEG Degrees HL Hot Leg
DEMIN Demineralizer HOV Hydraulic Operated Valve
DET Detector HP High Pressure
DEV Deviation HR(S) Hour
DIV Division HRSG Heat Recovery Steam
DO Diesel Fuel Oil Generator
DOT Dirty Oil Tank HT RT Heat Rate
DSCH Discharge HTNG Heating
DT Delta Temperature HU/CD Heatup/Cooldown
ECCS Emergency Core Cooling HUT Hold up Tank
System HYD Hydraulic
EDT Equipment Drain Tank I/P Current to Pressure
EFCT Effect I/V Current to Voltage
EFLNT Effluent IA Instrument Air
EHC Electro Hydraulic Control ID Identification/Inside
ELEC Electrical Diameter
EQ Equipment INBO Inboard
EQUIP Equipment INC Increase
ES Extraction Steam ESS INF Influent
Essential Service INIT Initial
ESF Engineered Safety Feature INL Inlet
EXH Exhaust/Exhauster INSERTIN Insertion
EXPANS Expansion INST Instrument/Instantaneous
EXTR Extracted Extractor/ INT Internal
Extraction INTERM Intermediate
F Fahrenheit IOD Iodine
FCV Flow Control Valve ISOL Isolation
FD Forced Draft JUNCT Junction
FH Fuel Handling K Kilo
FLW Flow LNG Long/Liquified Natural
FO Fuel Oil Gas
FREQ Frequency LO FLW Low Flow
FRNT Front M/G Motor Generator Sets
FW Feed Water MAINT Maintenance
GOV Governor MAX Maximum
GPM Gallons Per Minute
Chapter 4 creativesafetysupply.com/guides
MCR Main Control Room PMG Permanent Magnet
MFP Main Feed Pump Generator
MIN Minutes/Minimum PNEU Pneumatic
MOIST Moisture PORV Power Operated Relief
Valve
MPH Miles Per Hour
POS Positive
MPS Miles Per Second
POT Potentiometer
MS Main Steam/Moisture
Separator PPB Parts per Billion
MSIV Main Steam Isolation PPM Parts per Million
Valve PR58 Process Radiation Monitor
MSR Moisture Separator 58
Reheater PREAMP Preamplifiers
MTR Motor PRG Purge
MU Makeup PRI Primary
MVBL Movable PROC Process
NAOH Sodium Hydroxide PRT Pressurizer Relief Tank
NAR Narrow PS Power Supply
NAR RNG Narrow Range PSI Lbs Per Square Inch
NBL Noble PSIA Lbs Per Square Inch
NEG Negative Absolute
NEUT Neutron PSIG Lbs Per Inch Gauge
NIS Nuclear Instrumentation PSIO Lbs Per Square Inch
System Differential
NR Narrow Range PT Point
NUC Nuclear PTL Pull-To-Lock
OG Off-Gas PUL Pulverizer
OOS Out of Service PW Primary Water
OP Over Pressure PWR RNG Power Range
OPER Operator/Operating PRV Pressure Relief Valve
OT Over Temperature PZR Pressurizer Relief Tank
OT-OP Over Temp-Over RC Reactor Coolant
Pressure RCDT Reactor Coolant Drain Tank
OUT Output RCFC Reactor Containment Fan
OUTBD Outboard Cooler
OUTLT Outlet RCL Reactor Coolant Loop
OVERLD Overload RCS Reactor Coolant System
OVERTEMP Over Temperature RDT Reheater Drain Tank
OVRPWR Overpower RECOMB Recombiner
PART Partial REGEN Regenerative
PARTIC Particulate REL Relative
PCT Percent RESID Residual
PCV Pressure Control Valve RH Residual Heat
PENET Penetration
Chapter 4 creativesafetysupply.com/guides
RHR Residual Heat Removal THST Thrust
RHT Reheat TREP Reference Temperature
RLY Relay TRNA Train A (B, C, etc.)
RNG Range/Running TRNSNT Transient
ROC Rate of Change TRP Trip
RTD Resistance Temp. TTD Terminal Temp. Difference
Detector TURBS Turbines
RTN Return UNCONT Uncontrolled
RVLIS Reactor Vessel Level VAC Vacuum
Indication System
VALS Values
RW Radwaste
VAP Vapor
RWST Refueling Water Storage Tank
VAR Variance
S/G Steam Generator
VCT Volume Control Tank
SA Service Air
VIB Vibration
SB Service Building
VNT Vent
SEC Second
VOL Volume
SEL Select
WR Wide Range
SEP Separator
XFR Transfer
SERV Service
XMTR Transmitter
SFP Service Fuel Pump
SGTR Steam Generator Tube
Rupture
SI Safety Injection
SPEC Specification
STDY Steady
STNBY Standby
STOR Storage
SUPPR Suppressed
SUPRESS Suppression
SW Service Water/Switch
SWST Secondary Water Storage
Tank
T/C Thermocouples
TAMB Temperature Ambient
TAVG Average Temperature
TB Turbine Building/Terminal
Box/Block
TC Cold Leg Temperature
TCV Temperature Control Valve
TD Turbine Drain
TG Turbine Generator
THER Thermal
THRT Throttle
Chapter 4 creativesafetysupply.com/guides
INDUSTRY-SPECIFIC LABEL GUIDELINES
To learn more about these guidelines, visit our Pipe Marking Standards article at
www.creativesafetysupply.com/articles/guide-to-pipe-marking-standards/
Chapter 4 creativesafetysupply.com/guides
How to place labels for maximum
visibility
Pipe marking labels should be positioned in such a way that they are
visible from most people's line of sight. A few guidelines about visibilty/
placement are:
The label should be visible at every entry point in the floor or wall
When a pipe is located below normal line of sight, put the label
above the pipe’s horizontal centerline.
When a pipe is located above normal line of sight, put the label
below the pipe’s horizontal centerline.
Chapter 5 creativesafetysupply.com/guides
How to make pipe labels
Choose from 1 of 3 options:
Chapter 6 creativesafetysupply.com/guides
Get everything you need to create
weatherproof vinyl pipe labels in one
simple bundle.
learn more at
www.creativesafetysupply.com/labeltac-4-pro-pipe-marking-package/
Additional resources
Related Products
Related Guides
Shop our full selection of pipe marking products (and more!) online at
creativesafetysupply.com
Chapter 7 creativesafetysupply.com/guides
BECOME AN EXPERT.
visit creativesafetysupply.com/resources
Chapter x
CREATE A
SAFER,
SMARTER
FACILITY.