Professional Documents
Culture Documents
Submitted By
Under Supervision of
Supervisor(s) Name(s)
to
Expected
Percent
S. No. List of project milestones Deliverable(s) number of days
Completed
to complete
1.
2.
3.
4.
5.
6. Executed work
Describe in detail the works along with the obtained results and deliverables that have been
completed until now and how. Note that very general information about topics is NOT
required so try to be specific. The sequence, as already described in Methodology (Sec. 5),
should be followed as possible. Maximum 2 pages including equations, figures and tables
etc.
7. Remaining work
8. Gantt chart
A detailed and neat Gantt chart should be attached separately after this page. Gantt chart
should be listing all the major and minor activities, indicating executed and remaining tasks,
along with the time spans. Make sure that the Gantt chart is reflecting all the project
milestones as described in Sec 5-7.
9. Conclusions/Recommendation
10. References
11. Appendices