You are on page 1of 2
TO CONTRACT DATA SHEET ~ : File alphabetical "Contract No, 03197 Bosttey shoot dated DISTRICT OFFICE CREDITED WITH | CONTRACT DATE: fos June 21, 1991 International PURCHASER | — National Power Corporation (NAPOCOA), Philippines USER. National Power Corporation PLANT NAME ‘CONS. ENGINEER INDUSTRY Batangas Coal Fired Thermal Newjec, Hokuden Kogyo, Monen- Utility Power Project Il co and internal x : SQ. FT.HS. PER UNIT DESIGN 2890 DESIGNATION OPER. 5.0. 46'-5-3/16" 243 - 1-3/4" 2531 CC+RR mala Die 1a TURBINE THROTTLE 144" E 2404 VOLUME (CU.FT.TO- |TYPEOF BOTTOM | WIDTH FRONT TO REAR TAL) Hopper 46' - 5-3/16" 45' — 1-1/4" ee 307,000 Fusion Welded Walls, Balanced Draft TYPE Multi-Stage Panels & Platens [TPE _| Multi-Stage with Radiant Wall on Front and Side nor [We Plain Tube 110 wide x 64 high (4 Banks) TYPE WAKE 2 - 24-1/2 VI-68 (12 Future Surface) MHI 2-27-1/2 VI-86 TYPE TT Fuel Nozzles, Five (5) 1103 H.P. Pulverizers | erase [aman] ay, PHILIPPINE onee — % Moisture, 28.8% Volitile Matter, 26.9% Fixed Carbon, 14.9% Ash eae 7 OPERATING CONDITIONS oe es a a LB STEAMPER [PRIMARY Tarioo | 2080100 | 2t67000 | 206,600 HOUR ACTUAL TREHEAT 183,000 | 1718a00 | 7,966,000 | 7,906,000 STEAM TEMP > | SUPERHEATER 7005 To0s i005 7005 ros REHEATER 7005 1005 1008 1005 camoma SETS se po 2 om ENTERING PRESS. 38 466 3a Sa FEEDWATER TEMP (F) a) 526 aa 340 TEMP, AIR TO AIR HEATER PALSEC.(F)| 102/02 T0282 Tame 022 TEMP. GAS FROM AIR HEATER (°F) Un- 15701974 249/275 287/283 312/308 ‘OVERALL EFFICIENCY (%) “Guaranteed 8475 BOF 3455 06 330,000 PLANT ELEV. Sea Level ‘ONAL arat ERMAL POW PRO EMS CONTR 03 cCtR ‘ASEA BROWN BOVER)

You might also like