湖北省郧西县市政桥梁工程

郧安桥

施工图设计文件

计算书
(Release V1.0)

编 制 : 白 杰
复 核 : 尹 熙 敏
审 核 : 乐 云 祥

2011 年 9 月·武汉

1
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

目 录
1 工程概况 ...................................................................................................................................... - 1 -
2 技术标准 ...................................................................................................................................... - 2 -
2.1 技术标准....................................................................................................................... - 2 -
2.2 设计规范....................................................................................................................... - 2 -
3 设计参数 ...................................................................................................................................... - 3 -
3.1 主要材料及其设计参数............................................................................................... - 3 -
3.1.1 混凝土各项力学指标........................................................................................... - 3 -
3.1.2 低松弛钢绞线....................................................................................................... - 3 -
3.1.3 钢结构部分........................................................................................................... - 3 -
3.2 斜拉索 .......................................................................................................................... - 3 -
3.3 设计荷载取值............................................................................................................... - 4 -
3.3.1 恒载....................................................................................................................... - 4 -
3.3.2 设计斜拉索索力................................................................................................... - 4 -
3.3.3 活载....................................................................................................................... - 4 -
3.3.4 汽车制动力........................................................................................................... - 4 -
3.3.5 温度力................................................................................................................... - 4 -
3.3.6 支座沉降............................................................................................................... - 4 -
3.3.7 地震力................................................................................................................... - 5 -
3.3.8 风荷载................................................................................................................... - 5 -
3.4 剪力滞效应(桥面板的有效宽度)........................................................................... - 5 -
4 计算概述 ...................................................................................................................................... - 6 -
4.1 计算方法....................................................................................................................... - 6 -
4.2 荷载组合....................................................................................................................... - 6 -
4.2.1 承载能力极限状态组合....................................................................................... - 6 -
4.2.2 正常使用极限状态内力组合............................................................................... - 6 -
5 静力计算结果 .............................................................................................................................. - 9 -
5.1 计算模型....................................................................................................................... - 9 -
5.2 确定合理成桥状态....................................................................................................... - 9 -
5.2.1 主要计算方法....................................................................................................... - 9 -
5.2.2 计算结果............................................................................................................... - 9 -
5.3 短暂状况(施工阶段)计算..................................................................................... - 43 -
5.3.1 主要施工步骤划分............................................................................................. - 43 -
5.3.2 正截面压应力..................................................................................................... - 53 -
5.3.3 主压应力............................................................................................................. - 63 -
5.3.4 预应力钢筋应力................................................................................................. - 76 -
5.3.5 施工张拉索力..................................................................................................... - 90 -
5.3.6 短暂状况计算小结............................................................................................. - 91 -
5.4 持久状况承载能力极限状态计算............................................................................. - 91 -
5.4.1 计算方法............................................................................................................. - 91 -
5.4.2 正截面抗弯承载力计算..................................................................................... - 91 -
5.4.3 斜截面抗剪承载力计算..................................................................................... - 92 -
5.4.4 小结..................................................................................................................... - 93 -

I
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

5.5 正常使用极限状态..................................................................................................... - 93 -
5.5.1 正截面抗裂......................................................................................................... - 93 -
5.5.2 斜截面抗裂......................................................................................................... - 95 -
5.5.3 挠度验算............................................................................................................. - 96 -
5.5.4 小结..................................................................................................................... - 96 -
5.6 持久状况构件应力计算............................................................................................. - 97 -
5.6.1 正截面压应力..................................................................................................... - 97 -
5.6.2 斜拉索应力......................................................................................................... - 98 -
5.6.3 主压应力............................................................................................................. - 99 -
5.6.4 预应力钢筋应力............................................................................................... - 101 -
5.6.5 支反力计算结果............................................................................................... - 102 -
5.7 小结 .......................................................................................................................... - 105 -
6 横梁计算 .................................................................................................................................. - 106 -
6.1 计算方法和计算模型............................................................................................... - 106 -
6.2 恒载 .......................................................................................................................... - 106 -
6.3 活载 .......................................................................................................................... - 107 -
6.4 计算工况................................................................................................................... - 108 -
6.5 主要计算结果........................................................................................................... - 108 -
7 结构动力特性分析................................................................................................................... - 110 -
8 稳定计算 ....................................................................................................................................... 117
8.1 稳定计算(结构线弹性屈曲分析)............................................................................ 117
8.1.1 计算模型................................................................................................................ 117
8.1.2 稳定系数................................................................................................................ 117
8.1.3 稳定性小结............................................................................................................ 119
8.2 空气动力稳定计算........................................................................................................ 119
8.2.1 基本风速................................................................................................................ 119
8.2.2 设计基准风速........................................................................................................ 119
8.2.3 空气静力稳定性验算............................................................................................ 119
8.2.4 颤振稳定性............................................................................................................ 119
9 桥梁地震荷载分析................................................................................................................... - 121 -
9.1 计算结果................................................................................................................... - 121 -
10 主桥基础下部结构计算................................................................................................... - 122 -
10.1 主塔承台计算........................................................................................................... - 122 -
10.1.1 坐标系定义....................................................................................................... - 122 -
10.1.2 荷载信息........................................................................................................... - 122 -
10.1.3 主墩处地质钻孔资料....................................................................................... - 123 -
10.1.4 承台正截面承载力计算................................................................................... - 123 -
10.1.5 承台斜截面抗剪承载力计算........................................................................... - 124 -
10.1.6 承台冲切承载力计算....................................................................................... - 125 -
10.1.7 承台局部承压承载力计算............................................................................... - 127 -
10.2 桥塔桩基计算........................................................................................................... - 129 -
10.2.1 群桩基础 m 法计算参数.................................................................................. - 129 -
10.2.2 桩基单桩轴向受压承载力验算....................................................................... - 129 -
10.2.3 桩基单桩轴向受拉承载力验算....................................................................... - 129 -

II
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

10.2.4 桩基截面抗裂性验算....................................................................................... - 130 -


10.2.5 单桩截面应力最不利验算结果汇总基底应力计算 ....................................... - 130 -
10.3 桥台承台桩基计算................................................................................................... - 130 -
10.3.1 荷载信息........................................................................................................... - 130 -
10.3.2 钻孔地质资料................................................................................................... - 131 -
10.3.3 承台底中心单项荷载位移............................................................................... - 132 -
10.3.4 短期效应标准值组合桩顶内力最值............................................................... - 132 -
10.3.5 承台正截面承载力验算结果汇总................................................................... - 133 -
10.3.6 承台斜截面抗剪承载力验算结果汇总........................................................... - 133 -
10.3.7 承台冲切承载力验算结果汇总....................................................................... - 134 -
10.3.8 承台局部承压承载力验算结果汇总............................................................... - 134 -
10.3.9 群桩基础 m 法计算参数.................................................................................. - 134 -
10.3.10 群桩验算汇总描述................................................................................... - 135 -
10.3.11 群桩整体基础沉降量计算....................................................................... - 135 -
10.3.12 单桩轴向受压承载力最不利验算结果汇总 ........................................... - 135 -
10.3.13 单桩轴向受拉承载力最不利验算结果汇总 ........................................... - 135 -
10.3.14 单桩截面承载力最不利验算结果汇总................................................... - 136 -
10.3.15 单桩截面应力最不利验算结果汇总....................................................... - 136 -
10.3.16 单桩截面裂缝最不利验算结果汇总....................................................... - 136 -
11 结论 .................................................................................................................................. - 137 -
12 附录 .................................................................................................................................. - 138 -
12.1 恒载及可变荷载工况内力值................................................................................... - 138 -
12.2 标准组合内力值....................................................................................................... - 138 -
12.3 短期组合内力........................................................................................................... - 138 -

III
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

湖北省郧西县市政桥梁工程郧安桥
施工图设计文件计算书

1 工程概况
本工程为xx 线跨越xx省xx县xx镇xx河的一座桥梁。该桥处在xx
县xx镇中心区域,属于城市桥梁。根据建设单位的选定方案,本桥采用独塔
双索面斜拉桥的桥型,满足造型美观,安全适用的要求,以作为xx县的一个城市
景观亮点。
本桥采用独塔双索面塔梁固结体系,竖琴形索面,跨径组合为
39.5+39.5=79.0m。由于采用双索面斜拉桥的型式,主梁采用双主梁(π 型)截面,
预应力混凝土结构,混凝土标号 C50。梁高 1.372m,顶板厚度 28cm,肋宽 2.2m,
桥面宽度 26.8m。为了加强桥面横向抗弯刚度,沿纵桥向每隔 5m 设置一道内横梁,
横梁腹板厚度 28cm。在梁端和中支点处各设置一道大横梁,梁肋厚度 150cm 和
200cm。梁上索距 5m。
主塔为两曲线形单柱式的预应力钢筋混凝土实心柱状结构,混凝土 C50。塔高
27m,横桥向宽度及间距保持恒定,顺桥向尺寸根据受力及景观需要从塔底处的
2.86m 渐变为塔顶处的 1.8m,塔宽 2.2m。
本桥为双索面斜拉桥,斜拉索采用竖琴形布置,全桥共 14 对。梁上索距为 5m,
塔上索距为 3m(由于塔为曲线形,略有出入)
。拉索倾角大致为 30 度。斜拉索采
用φ7 镀锌高强平行钢丝(标准强度 1670MPa,II 类松弛)
,两端采用冷铸锚具,索
外包挤黑色和彩色 PE 防护套各一层。其中左侧采用 2 根 PESFD7-55,右侧采用 1
根 PESFD7-109,每根斜拉索均设减震器。
主塔下接承台基础,在桥侧面主墩与主塔共同形成天鹅的造型。主墩采用两个
分离的矩形承台,每个主墩承台基础采用 4 根直径 1.5m 钻孔灌注桩,桩长 25m。
桥台采用一字墙式桥台,台后填土高度 4.86m。桥台承台布置 8 根直径 1.5m 的钻孔
灌注桩,桩长 18m。本桥桩基均按摩擦桩设计。

-1-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

2 技术标准

2.1 技术标准

(1)设计基准期:100 年;
(2)道路等级:二级公路;
(3)设计行车速度:40 km/h;
(4)设计荷载:公路-Ⅰ级,人群荷载按规范取 3.0KN/m2;
(5)桥面宽度:(沿路线前进方向从左往右布置)
3.7m(人行道含栏杆)+2.2m(布索区)+0.5m(防撞栏)+14.0m(车行
道)+0.5m(防撞栏)+2.2m(布索区)+3.7m(人行道含栏杆)=26.8m;
(6)桥面横坡:双向 2.0%;
(7)桥面纵坡:3%、-3%。

2.2 设计规范

(1)《公路路线设计规范》(JTG D20-2006);
(2)《公路工程技术标准》(JTG B01-2003);
(3)《公路桥涵设计通用规范》(JTG D60-2004);
(4)《公路钢筋混凝土及预应力混凝土桥涵设计规范》(JTG D62-2004);
(5)《公路桥涵地基与基础设计规范》(JTG D63-2007);
(6)《公路斜拉桥设计细则》(JTG/T D65-01—2007);
(7)《公路沥青路面设计规范》(JTG D50-2006);
(8)《公路桥梁抗震设计细则》(JTG/T B02-01-2008);
(9)《公路桥梁抗风设计规范》(JTG/T D60-01-2004);
(10)《钢结构设计规范》(GB50017-2003);
(11)
《铁路桥梁钢结构设计规范》(TB10002.2-2005);
(12)《钢-混凝土组合结构设计规程》(DL/T5085-1999);
(13)《铁路钢桥制造规范》
(TB10212-2009);
(14)《桥梁用结构钢》(GB/T714-2008)。

-2-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3 设计参数

3.1 主要材料及其设计参数

3.1.1 混凝土各项力学指标
表1
强 度
项 目
等 级 C50 C40 C30
弹性模量(MPa) 34500 32500 30000
剪切模量(MPa) 13800 13000 12000
泊桑比 0.2 0.2 0.2
轴心抗压强度标准值(MPa) 32.4 26.8 20.1
轴心抗拉强度标准值(MPa) 2.65 2.40 2.01
轴心抗压强度设计值(MPa) 22.4 18.4 13.8
轴心抗拉强度设计值(MPa) 1.83 1.65 1.39
热膨胀系数 0.00001 0.00001 0.00001

3.1.2 低松弛钢绞线

直径:15.2mm
弹性模量:195000MPa
标准强度:1860MPa
抗拉强度设计值:1260MPa
抗压强度设计值: 390MPa
张拉控制应力:1395MPa
热膨胀系数:0.000012

3.1.3 钢结构部分

主要采用 Q235 钢材
弹性模量: 210000 MPa
屈服强度: 235 MPa
热膨胀系数:0.000012

3.2 斜拉索

Ф7 镀锌高强度钢丝,锚具:冷铸锚。

-3-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

其主要力学性能:
弹性模量 Ey=200000MPa;标准强度 fpk=1670MPa。

3.3 设计荷载取值

3.3.1 恒载

(1)一期恒载
一期恒载包括主梁材料重量,混凝土容重取 25KN/m3。

(2)二期恒载
按设计文件所示桥面系结构进行计算,得到二恒为 89KN/m

3.3.2 设计斜拉索索力
索编号 3008 3018 3028 3038 3048 3058 3068
成桥索力(kN) 1954.66 1804.09 1715.90 1722.35 1810.23 2011.32 2227.80
索编号 4008 4018 4028 4038 4048 4058 4068
成桥索力(kN) 1918.34 1673.41 1562.75 1569.47 1643.29 1805.49 1808.38

注 : 3XXX 索 力 为 单 侧 两 根 PESFD7-55 索 力 之 和 ; 4XXX 索 力 为 单 根


PESFD7-109 之索力。

3.3.3 活载

计算荷载:双向四车道,公路-Ⅰ级,人群荷载按规范取用 3.5kN/m2

3.3.4 汽车制动力

计算荷载:汽车制动力为 4.125kN/m

3.3.5 温度力

①体系整体升温 20℃;体系整体降温 20℃


②主梁、主塔局部温差按现行《公路桥涵设计通用规范》(JTG D60-2004)的
规定取值
③斜拉索与混凝土主梁、索塔间的温差取±15℃
④索塔左右侧面温差取±5℃。

3.3.6 支座沉降

主、边墩沉降均按 10mm 计。

-4-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3.3.7 地震力

抗震设防类别 B 类,抗震烈度 6 度;抗震设防措施等级 7 度;基本地震动加速


度峰值 0.05g;参考同类桥型经验,地震力不控制设计,本次计算不予考虑。

3.3.8 风荷载

本桥桥位处基本风速为 V10 = 25 m s ,由于本桥跨径较小且主梁截面较矮,参考

同类桥型经验,风荷载不控制设计,本次计算不予考虑。

3.4 剪力滞效应(桥面板的有效宽度)

本桥主梁标准断面如下图所示。

主梁标准断面
按《公路钢筋混凝土及预应力混凝土桥涵设计规范》(JTG D62-2004)4.2.2 条
规定进行计算,取悬臂有效宽度为
B = 2.68m
对于中间部分的桥面板的有效宽度计算,由于斜拉桥的主梁非纯弯构件,且其
轴向力沿轴向是累计的,相关的实验与研究成果表明:在密横梁情况下,横梁使得
集中力能较快地分布到整个断面上,从而使得索力这样的集中力与自重均布力的剪
力滞沿纵桥向的分布较相似(呈锯齿状),设计中按平面系计算的结果与实际情况
的偏差较小。而 P.C.斜拉桥在成桥若干年后,由于砼的收缩徐变作用,截面正应力
沿宽度方向的不均匀分布将逐步减小,而施工期间的剪力滞效应较大些(1.0~1.4)。
成桥后的剪力滞效应会减小许多,接近均布,故本桥不考虑中间部分的剪力滞影响,
仅对施工阶段的应力进行控制。

-5-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4 计算概述

4.1 计算方法

总体静力计算根据有限位移理论建立三维有限元模型,采用考虑全部几何非线
性的空间有限元方法进行计算。计算程序采用 TDV™ RM9.81.02®。依据现行公路
规范考虑了混凝土结构的收缩徐变、P-△效应、大变形、索垂度效应、梁体剪切变
形、主塔压缩补偿、温变、温度梯度及剪力滞等。
结构稳定性分析和动力特性分析也采用 TDV™ RM9.81.02®计算。

4.2 荷载组合

4.2.1 承载能力极限状态组合

一、组合Ⅰ(Comb11):基本组合。按规范 JTG D60—2004 第 4.1.6 条规定。


按此组合计算结构的承载能力极限状态的强度(抗弯)。
二、组合Ⅱ(Comb12):基本组合。按规范 JTG D60—2004 第 4.1.6 条规定。
按此组合计算结构的承载能力极限状态的强度(抗剪)。

4.2.2 正常使用极限状态内力组合

一、组合Ⅰ(Comb3):长期效应组合。按规范 JTG D60—2004 第 4.1.7 条规定。


二、组合Ⅱ(Comb2/Comb6):短期效应组合。按规范 JTG D60—2004 第 4.1.7
条规定。其中 Comb6 相比 Comb2 考虑了剪力的影响,用于正常使用极限状态斜截
面抗裂计算。
三、组合Ⅲ(Comb1/Comb5):弹性阶段截面应力计算标准值组合。其中 Comb5
相比 Comb1 考虑了剪力的影响。
类别 名称 用途 组合名称
SLS 标准组合(1.0Pk) 正压应力验算 Comb1
短期组合(A 类\1.0Pk) 正拉应力验算 Comb2
长期组合 长期作用 Comb3
长期组合(只包含直接作用) 正拉应力验算(A 类构件长期) Comb4
标准组合(1.2Pk) 主压应力验算、反力结果 Comb5
短期组合(1.2Pk) 主拉应力验算 Comb6
短期组合(1.0Pk) 挠度验算 Comb7
短期组合力的结果 短期组合力的结果(用于裂缝计算) Comb8

-6-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

长期组合力的结果 长期组合力的结果(用于裂缝计算) Comb9


承截能力极限 承截能力极限 Comb11
承截能力极限(1.2Pk) 承截能力极限剪力 Comb12
ULS 承载能力极限-钢结构 承载能力极限-钢结构 Comb13
承载能力极限-钢结构(1.2Pk) 承载能力极限-钢结构剪力 Comb14
偶然组合、地震 偶然组合、地震 Comb15

上述荷载组合具体如下表示
Comb1 Comb2 Comb3 Comb4
LC/Envelope I+ I- II+ II- III+ III- IV+ IV-
SW-SUM(自重) 1 1 1 1 1 1 1 1
SDL-SUM(二恒) 1 1 1 1 1 1 1 1
PT-SUM(预应力) 1 1 1 1 1 1 1 1
CS-SUM(施工期收缩徐变) 1 1 1 1 1 1 1 1
CS-INF(运营期收缩徐变) 1 1 1 1 1 1 1 1
settle.sup(支座沉降) 1 1 1 1 1 1 0 0
traffic-SLS.sup(不计冲击汽车荷载) 0 0 0.7 0.7 0.4 0.4 0.4 0.4
traffic-SLS-shear.sup(不计冲击计剪切汽车
荷载) 0 0 0 0 0 0 0 0
traffic-ULS.sup(计冲击汽车荷载(看内力)) 1 1 0 0 0 0 0 0
traffi-ULS-shear.sup(计冲击计剪切汽车荷
载(看内力)) 0 0 0 0 0 0 0 0
Brake.sup(汽车制动力) 1 1 1 1 1 1 1 1
pedestrian.sup(人群荷载) 1 1 1 1 0.4 0.4 0.4 0.4
temp-const.sup(均匀升降温) 1 1 1 1 1 1 0 0
temp-grad.sup(梯度温度(看应力)) 1 1 0.8 0.8 0.8 0.8 0 0
temp-grad2.sup(梯度温度(看内力)) 0 0 0 0 0 0 0 0
ULS-ADD.sup(按中国规范组合) 0 0 0 0 0 0 0 0

Comb5 Comb6 Comb7 Comb8 Comb9


LC/Envelope VIII+ VIII- IX+ IX- VII+ VII- V+ V- VI+ VI-
SW-SUM 1 1 1 1 1 1 1 1 1 1
SDL-SUM 1 1 1 1 1 1 1 1 1 1
PT-SUM 1 1 1 1 1 1 1 1 1 1
CS-SUM 1 1 1 1 1 1 1 1 1 1
CS-INF 1 1 1 1 1 1 1 1 1 1
settle.sup 1 1 1 1 1 1 1 1 1 1
traffic-SLS.sup 0 0 0 0 0.7 0.7 0.7 0.7 0.4 0.4
traffic-SLS-shear.sup 0 0 0.7 0.7 0 0 0 0 0 0
traffic-ULS.sup 0 0 0 0 0 0 0 0 0 0
traffi-ULS-shear.sup 1 1 0 0 0 0 0 0 0 0

-7-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

brake.sup 1 1 1 1 1 1 1 1 1 1
pedestrian.sup 1 1 1 1 1 1 1 1 0.4 0.4
temp-const.sup 1 1 1 1 1 1 1 1 1 1
temp-grad.sup 1 1 0.8 0.8 0.8 0.8 0 0 0 0
temp-grad2.sup 0 0 0 0 0 0 0.8 0.8 0.8 0.8
ULS-ADD.sup 0 0 0 0 0 0 0 0 0 0
earthquake.sup 0 0 0 0 0 0 0 0 0 0

Comb11 Comb12
LC/Envelope XI+ XI- XII+ XII-
SW-SUM 1 1.2 1 1.2
SDL-SUM 1 1.2 1 1.2
PT-SUM 0 0 0 0
CS-SUM 1 1 1 1
CS-INF 1 1 1 1
settle.sup 0.5 0.5 0.5 0.5
traffic-SLS.sup 0 0 0 0
traffic-SLS-shear.sup 0 0 0 0
traffic-ULS.sup 1.4 1.4 0 0
traffi-ULS-shear.sup 0 0 1.4 1.4
brake.sup 0 0 0 0
pedestrian.sup 0 0 0 0
temp-const.sup 0 0 0 0
temp-grad.sup 0 0 0 0
temp-grad2.sup 0 0 0 0
ULS-ADD.sup 1.4 1.4 1.4 1.4
earthquake.sup 0 0 0 0

-8-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

5 静力计算结果

5.1 计算模型

总体静力计算采用 TDV™ RM9.81.02®程序,根据有限位移理论建立三维有限


元模型,主梁划分为 183 个节点和 182 个单元,单侧塔肢划分为 23 个节点和 22 个
单元,单根拉索细分为 8 段,具体见下图。计算模型中主梁、主塔用空间梁单元模
拟,拉索采用空间悬链线索单元模拟。
本桥为塔梁固结体系,全桥的支座布置如图示,边界条件均按此进行模拟,其
中以一具有较大刚度的弹簧( E = 1e10kN / m )模拟支承。

计算采用 kN,m 制,应力单位为 kN m 2 。

计算模型图(含预应力)

5.2 确定合理成桥状态

5.2.1 主要计算方法

合理成桥状态的确定是利用 TDV™ RM9.81.02®软件提供的斜拉桥成桥找形功


能(Addcon 优化)实现的,主要是求解拉索的无应力长度。

5.2.2 计算结果

Legend :

---------

-9-
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

Nx ....... Cable normal force (begin and end)

Sig....... Cable stresses (begin and end)

Alpha1.... Angle in vertical cable plane (from XZ-Plane to cable, anticlockwise positive)

AlphaXY... Angle in global XY plane (from X-Axise to projection of cable, anticlockwise positive)

AlphaZY... Angle in global ZY plane (from Y-Axis to projection of cable, anticlockwise positive)

AlphaXZ... Angle in global XZ plane

L(Inp) ... Length of the cable, calculated from structural model nodes (with ecctricities)

L(LC) .... Length of displaced cable in given load case

L(0) ..... Stressfree length, calculated from L(LC) and Nx, Ax and E-mod

L(N1,N2).. Straight distance between first and last displaced points of cable

SUM ...... Summation of L(Inp), L(LC), L(0)

MEAN...... Mean values of Nx, and Sig values

Ax ....... Cable area

E-mod..... Cable young's modulus

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3001 135 3001 2282.875 2283.069 5.39e+005 5.39e+005 31.567 1.11056 1.11047

1.10741

3002 3001 3002 2283.069 2283.264 5.39e+005 5.39e+005 31.575 1.11056 1.11047

1.10741

3003 3002 3003 2283.264 2283.458 5.39e+005 5.39e+005 31.583 1.11056 1.11048

1.10741

3004 3003 3004 2283.458 2283.653 5.39e+005 5.4e+005 31.591 1.11056 1.11048

1.10741

3005 3004 3005 2283.653 2283.848 5.4e+005 5.4e+005 31.599 1.11056 1.11048

1.10741

- 10 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3006 3005 3006 2283.848 2284.042 5.4e+005 5.4e+005 31.607 1.11057 1.11048

1.10741

3007 3006 3007 2284.042 2284.237 5.4e+005 5.4e+005 31.615 1.11056 1.11048

1.10741

3008 3007 204 2284.237 2284.432 5.4e+005 5.4e+005 31.623 1.11057 1.11048

1.10741

-------------------------------------------------------------------------------------------------

MEAN/SUM 2283.653 5.4e+005 8.88452

8.88380 8.85929

Startnode 135 : (X/Y/Z)inp. = ( 33.00000 / -0.55069 / -8.60000) [M]

(X/Y/Z)disp. = ( 33.00076 / -0.54666 / -8.60000) [M]

AlphaXY = 31.567? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 204 : (X/Y/Z)inp. = ( 40.56450 / 4.10903 / -8.60000) [M]

(X/Y/Z)disp. = ( 40.56774 / 4.10766 / -8.60000) [M]

AlphaXY = 31.623? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 135, 204)= 8.88380 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3011 130 3011 2285.719 2286.043 5.4e+005 5.4e+005 30.865 1.88993 1.88979

1.88457

3012 3011 3012 2286.043 2286.368 5.4e+005 5.4e+005 30.879 1.88993 1.88979

1.88457

3013 3012 3013 2286.368 2286.692 5.4e+005 5.4e+005 30.893 1.88993 1.88979

1.88457

- 11 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3014 3013 3014 2286.692 2287.017 5.4e+005 5.4e+005 30.906 1.88993 1.88979

1.88457

3015 3014 3015 2287.017 2287.341 5.4e+005 5.4e+005 30.920 1.88993 1.88979

1.88457

3016 3015 3016 2287.341 2287.666 5.4e+005 5.4e+005 30.933 1.88993 1.88979

1.88457

3017 3016 3017 2287.666 2287.991 5.4e+005 5.41e+005 30.947 1.88993 1.88979

1.88457

3018 3017 207 2287.991 2288.316 5.41e+005 5.41e+005 30.961 1.88994 1.88979

1.88457

-------------------------------------------------------------------------------------------------

MEAN/SUM 2287.017 5.4e+005 15.11946

15.11831 15.07654

Startnode 130 : (X/Y/Z)inp. = ( 28.00000 / -0.57546 / -8.60000) [M]

(X/Y/Z)disp. = ( 28.00115 / -0.56839 / -8.60000) [M]

AlphaXY = 30.865? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 207 : (X/Y/Z)inp. = ( 40.96670 / 7.20033 / -8.60000) [M]

(X/Y/Z)disp. = ( 40.97188 / 7.19842 / -8.60000) [M]

AlphaXY = 30.961? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 130, 207)= 15.11831 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3021 125 3021 2303.196 2303.649 5.44e+005 5.44e+005 30.609 2.65957 2.65942

2.65202

- 12 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3022 3021 3022 2303.649 2304.102 5.44e+005 5.44e+005 30.628 2.65957 2.65942

2.65202

3023 3022 3023 2304.102 2304.556 5.44e+005 5.44e+005 30.647 2.65957 2.65943

2.65202

3024 3023 3024 2304.556 2305.009 5.44e+005 5.45e+005 30.666 2.65957 2.65943

2.65202

3025 3024 3025 2305.009 2305.463 5.45e+005 5.45e+005 30.685 2.65957 2.65943

2.65202

3026 3025 3026 2305.463 2305.917 5.45e+005 5.45e+005 30.704 2.65957 2.65943

2.65202

3027 3026 3027 2305.917 2306.372 5.45e+005 5.45e+005 30.723 2.65958 2.65943

2.65202

3028 3027 210 2306.372 2306.826 5.45e+005 5.45e+005 30.742 2.65958 2.65943

2.65202

-------------------------------------------------------------------------------------------------

MEAN/SUM 2305.010 5.45e+005 21.27658

21.27542 21.21617

Startnode 125 : (X/Y/Z)inp. = ( 23.00000 / -0.61689 / -8.60000) [M]

(X/Y/Z)disp. = ( 23.00152 / -0.60809 / -8.60000) [M]

AlphaXY = 30.609? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 210 : (X/Y/Z)inp. = ( 41.29310 / 10.24843 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.29988 / 10.24609 / -8.60000) [M]

AlphaXY = 30.742? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 125, 210)= 21.27541 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

- 13 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

L(0)

-------------------------------------------------------------------------------------------------

3031 120 3031 2325.230 2325.810 5.49e+005 5.49e+005 30.495 3.41992 3.41982

3.41021

3032 3031 3032 2325.810 2326.391 5.49e+005 5.5e+005 30.519 3.41992 3.41982

3.41021

3033 3032 3033 2326.391 2326.972 5.5e+005 5.5e+005 30.544 3.41992 3.41983

3.41021

3034 3033 3034 2326.972 2327.554 5.5e+005 5.5e+005 30.568 3.41992 3.41983

3.41021

3035 3034 3035 2327.554 2328.136 5.5e+005 5.5e+005 30.592 3.41993 3.41983

3.41021

3036 3035 3036 2328.136 2328.718 5.5e+005 5.5e+005 30.616 3.41993 3.41983

3.41021

3037 3036 3037 2328.718 2329.301 5.5e+005 5.5e+005 30.641 3.41993 3.41984

3.41021

3038 3037 213 2329.301 2329.884 5.5e+005 5.5e+005 30.665 3.41993 3.41984

3.41021

-------------------------------------------------------------------------------------------------

MEAN/SUM 2327.555 5.5e+005 27.35940

27.35864 27.28171

Startnode 120 : (X/Y/Z)inp. = ( 18.00000 / -0.67500 / -8.60000) [M]

(X/Y/Z)disp. = ( 18.00187 / -0.66591 / -8.60000) [M]

AlphaXY = 30.495? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 213 : (X/Y/Z)inp. = ( 41.54750 / 13.25523 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.55543 / 13.25258 / -8.60000) [M]

AlphaXY = 30.665? AlphaZY = 180.000? AlphaXZ = 0.000?

- 14 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 120, 213)= 27.35863 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3041 115 3041 2349.481 2350.188 5.55e+005 5.55e+005 30.446 4.17143 4.17144

4.15959

3042 3041 3042 2350.188 2350.895 5.55e+005 5.55e+005 30.475 4.17143 4.17144

4.15959

3043 3042 3043 2350.895 2351.603 5.55e+005 5.56e+005 30.505 4.17144 4.17144

4.15959

3044 3043 3044 2351.603 2352.312 5.56e+005 5.56e+005 30.534 4.17144 4.17145

4.15959

3045 3044 3045 2352.312 2353.021 5.56e+005 5.56e+005 30.563 4.17144 4.17145

4.15959

3046 3045 3046 2353.021 2353.731 5.56e+005 5.56e+005 30.592 4.17145 4.17145

4.15959

3047 3046 3047 2353.731 2354.442 5.56e+005 5.56e+005 30.622 4.17145 4.17146

4.15959

3048 3047 216 2354.442 2355.153 5.56e+005 5.56e+005 30.651 4.17145 4.17146

4.15959

-------------------------------------------------------------------------------------------------

MEAN/SUM 2352.314 5.56e+005 33.37152

33.37159 33.27676

Startnode 115 : (X/Y/Z)inp. = ( 13.00000 / -0.74978 / -8.60000) [M]

(X/Y/Z)disp. = ( 13.00217 / -0.74181 / -8.60000) [M]

AlphaXY = 30.446? AlphaZY = 180.000? AlphaXZ = 0.000?

- 15 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

Endnode 216 : (X/Y/Z)inp. = ( 41.73310 / 16.22273 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.74174 / 16.21987 / -8.60000) [M]

AlphaXY = 30.651? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 115, 216)= 33.37157 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3051 110 3051 2375.481 2376.313 5.61e+005 5.61e+005 30.431 4.91450 4.91467

4.90056

3052 3051 3052 2376.313 2377.146 5.61e+005 5.62e+005 30.465 4.91451 4.91468

4.90056

3053 3052 3053 2377.146 2377.980 5.62e+005 5.62e+005 30.500 4.91451 4.91468

4.90056

3054 3053 3054 2377.980 2378.815 5.62e+005 5.62e+005 30.534 4.91452 4.91469

4.90056

3055 3054 3055 2378.815 2379.651 5.62e+005 5.62e+005 30.568 4.91452 4.91469

4.90056

3056 3055 3056 2379.651 2380.488 5.62e+005 5.62e+005 30.602 4.91453 4.91470

4.90056

3057 3056 3057 2380.488 2381.325 5.62e+005 5.63e+005 30.636 4.91453 4.91470

4.90056

3058 3057 219 2381.325 2382.163 5.63e+005 5.63e+005 30.670 4.91454 4.91471

4.90056

-------------------------------------------------------------------------------------------------

MEAN/SUM 2378.818 5.62e+005 39.31617

39.31750 39.20452

- 16 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

Startnode 110 : (X/Y/Z)inp. =( 8.00000 / -0.84123 / -8.60000) [M]

(X/Y/Z)disp. = ( 8.00243 / -0.83564 / -8.60000) [M]

AlphaXY = 30.431? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 219 : (X/Y/Z)inp. = ( 41.85280 / 19.15243 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.86184 / 19.14943 / -8.60000) [M]

AlphaXY = 30.670? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 110, 219)= 39.31747 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3061 105 3061 2402.754 2403.711 5.68e+005 5.68e+005 30.437 5.64952 5.64989

5.63349

3062 3061 3062 2403.711 2404.669 5.68e+005 5.68e+005 30.476 5.64952 5.64990

5.63349

3063 3062 3063 2404.669 2405.628 5.68e+005 5.68e+005 30.515 5.64953 5.64991

5.63349

3064 3063 3064 2405.628 2406.589 5.68e+005 5.69e+005 30.554 5.64954 5.64991

5.63349

3065 3064 3065 2406.589 2407.550 5.69e+005 5.69e+005 30.592 5.64954 5.64992

5.63349

3066 3065 3066 2407.550 2408.513 5.69e+005 5.69e+005 30.631 5.64955 5.64993

5.63349

3067 3066 3067 2408.513 2409.476 5.69e+005 5.69e+005 30.670 5.64956 5.64993

5.63349

3068 3067 222 2409.476 2410.441 5.69e+005 5.69e+005 30.708 5.64956 5.64994

5.63349

- 17 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

-------------------------------------------------------------------------------------------------

MEAN/SUM 2406.592 5.69e+005 45.19631

45.19934 45.06794

Startnode 105 : (X/Y/Z)inp. =( 3.00000 / -0.94936 / -8.60000) [M]

(X/Y/Z)disp. = ( 3.00262 / -0.94709 / -8.60000) [M]

AlphaXY = 30.437? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 222 : (X/Y/Z)inp. = ( 41.90910 / 22.04593 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.91840 / 22.04286 / -8.60000) [M]

AlphaXY = 30.708? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 105, 222)= 45.19929 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3101 135 3101 2282.875 2283.069 5.39e+005 5.39e+005 31.567 1.11056 1.11047

1.10741

3102 3101 3102 2283.069 2283.264 5.39e+005 5.39e+005 31.575 1.11056 1.11047

1.10741

3103 3102 3103 2283.264 2283.458 5.39e+005 5.39e+005 31.583 1.11056 1.11048

1.10741

3104 3103 3104 2283.458 2283.653 5.39e+005 5.4e+005 31.591 1.11056 1.11048

1.10741

3105 3104 3105 2283.653 2283.848 5.4e+005 5.4e+005 31.599 1.11056 1.11048

1.10741

3106 3105 3106 2283.848 2284.042 5.4e+005 5.4e+005 31.607 1.11057 1.11048

1.10741

- 18 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3107 3106 3107 2284.042 2284.237 5.4e+005 5.4e+005 31.615 1.11056 1.11048

1.10741

3108 3107 304 2284.237 2284.432 5.4e+005 5.4e+005 31.623 1.11057 1.11048

1.10741

-------------------------------------------------------------------------------------------------

MEAN/SUM 2283.653 5.4e+005 8.88452

8.88380 8.85929

Startnode 135 : (X/Y/Z)inp. = ( 33.00000 / -0.55069 / 8.60000) [M]

(X/Y/Z)disp. = ( 33.00076 / -0.54666 / 8.60000) [M]

AlphaXY = 31.567? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 304 : (X/Y/Z)inp. = ( 40.56450 / 4.10903 / 8.60000) [M]

(X/Y/Z)disp. = ( 40.56774 / 4.10766 / 8.60000) [M]

AlphaXY = 31.623? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 135, 304)= 8.88380 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3111 130 3111 2285.719 2286.043 5.4e+005 5.4e+005 30.865 1.88993 1.88979

1.88457

3112 3111 3112 2286.043 2286.368 5.4e+005 5.4e+005 30.879 1.88993 1.88979

1.88457

3113 3112 3113 2286.368 2286.692 5.4e+005 5.4e+005 30.893 1.88993 1.88979

1.88457

3114 3113 3114 2286.692 2287.017 5.4e+005 5.4e+005 30.906 1.88993 1.88979

1.88457

- 19 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3115 3114 3115 2287.017 2287.341 5.4e+005 5.4e+005 30.920 1.88993 1.88979

1.88457

3116 3115 3116 2287.341 2287.666 5.4e+005 5.4e+005 30.933 1.88993 1.88979

1.88457

3117 3116 3117 2287.666 2287.991 5.4e+005 5.41e+005 30.947 1.88993 1.88979

1.88457

3118 3117 307 2287.991 2288.316 5.41e+005 5.41e+005 30.961 1.88994 1.88979

1.88457

-------------------------------------------------------------------------------------------------

MEAN/SUM 2287.017 5.4e+005 15.11946

15.11831 15.07654

Startnode 130 : (X/Y/Z)inp. = ( 28.00000 / -0.57546 / 8.60000) [M]

(X/Y/Z)disp. = ( 28.00115 / -0.56839 / 8.60000) [M]

AlphaXY = 30.865? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 307 : (X/Y/Z)inp. = ( 40.96670 / 7.20033 / 8.60000) [M]

(X/Y/Z)disp. = ( 40.97188 / 7.19842 / 8.60000) [M]

AlphaXY = 30.961? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 130, 307)= 15.11831 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3121 125 3121 2303.196 2303.649 5.44e+005 5.44e+005 30.609 2.65957 2.65942

2.65202

3122 3121 3122 2303.649 2304.102 5.44e+005 5.44e+005 30.628 2.65957 2.65942

2.65202

- 20 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3123 3122 3123 2304.102 2304.556 5.44e+005 5.44e+005 30.647 2.65957 2.65943

2.65202

3124 3123 3124 2304.556 2305.009 5.44e+005 5.45e+005 30.666 2.65957 2.65943

2.65202

3125 3124 3125 2305.009 2305.463 5.45e+005 5.45e+005 30.685 2.65957 2.65943

2.65202

3126 3125 3126 2305.463 2305.917 5.45e+005 5.45e+005 30.704 2.65957 2.65943

2.65202

3127 3126 3127 2305.917 2306.372 5.45e+005 5.45e+005 30.723 2.65958 2.65943

2.65202

3128 3127 310 2306.372 2306.826 5.45e+005 5.45e+005 30.742 2.65958 2.65943

2.65202

-------------------------------------------------------------------------------------------------

MEAN/SUM 2305.010 5.45e+005 21.27658

21.27542 21.21617

Startnode 125 : (X/Y/Z)inp. = ( 23.00000 / -0.61689 / 8.60000) [M]

(X/Y/Z)disp. = ( 23.00152 / -0.60809 / 8.60000) [M]

AlphaXY = 30.609? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 310 : (X/Y/Z)inp. = ( 41.29310 / 10.24843 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.29988 / 10.24609 / 8.60000) [M]

AlphaXY = 30.742? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 125, 310)= 21.27541 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

- 21 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3131 120 3131 2325.230 2325.810 5.49e+005 5.49e+005 30.495 3.41992 3.41982

3.41021

3132 3131 3132 2325.810 2326.391 5.49e+005 5.5e+005 30.519 3.41992 3.41982

3.41021

3133 3132 3133 2326.391 2326.972 5.5e+005 5.5e+005 30.544 3.41992 3.41983

3.41021

3134 3133 3134 2326.972 2327.554 5.5e+005 5.5e+005 30.568 3.41992 3.41983

3.41021

3135 3134 3135 2327.554 2328.136 5.5e+005 5.5e+005 30.592 3.41993 3.41983

3.41021

3136 3135 3136 2328.136 2328.718 5.5e+005 5.5e+005 30.616 3.41993 3.41983

3.41021

3137 3136 3137 2328.718 2329.301 5.5e+005 5.5e+005 30.641 3.41993 3.41984

3.41021

3138 3137 313 2329.301 2329.884 5.5e+005 5.5e+005 30.665 3.41993 3.41984

3.41021

-------------------------------------------------------------------------------------------------

MEAN/SUM 2327.555 5.5e+005 27.35940

27.35864 27.28171

Startnode 120 : (X/Y/Z)inp. = ( 18.00000 / -0.67500 / 8.60000) [M]

(X/Y/Z)disp. = ( 18.00187 / -0.66591 / 8.60000) [M]

AlphaXY = 30.495? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 313 : (X/Y/Z)inp. = ( 41.54750 / 13.25523 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.55543 / 13.25258 / 8.60000) [M]

AlphaXY = 30.665? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 120, 313)= 27.35863 M

- 22 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3141 115 3141 2349.481 2350.188 5.55e+005 5.55e+005 30.446 4.17143 4.17144

4.15959

3142 3141 3142 2350.188 2350.895 5.55e+005 5.55e+005 30.475 4.17143 4.17144

4.15959

3143 3142 3143 2350.895 2351.603 5.55e+005 5.56e+005 30.505 4.17144 4.17144

4.15959

3144 3143 3144 2351.603 2352.312 5.56e+005 5.56e+005 30.534 4.17144 4.17145

4.15959

3145 3144 3145 2352.312 2353.021 5.56e+005 5.56e+005 30.563 4.17144 4.17145

4.15959

3146 3145 3146 2353.021 2353.731 5.56e+005 5.56e+005 30.592 4.17145 4.17145

4.15959

3147 3146 3147 2353.731 2354.442 5.56e+005 5.56e+005 30.622 4.17145 4.17146

4.15959

3148 3147 316 2354.442 2355.153 5.56e+005 5.56e+005 30.651 4.17145 4.17146

4.15959

-------------------------------------------------------------------------------------------------

MEAN/SUM 2352.314 5.56e+005 33.37152

33.37159 33.27676

Startnode 115 : (X/Y/Z)inp. = ( 13.00000 / -0.74978 / 8.60000) [M]

(X/Y/Z)disp. = ( 13.00217 / -0.74181 / 8.60000) [M]

AlphaXY = 30.446? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 316 : (X/Y/Z)inp. = ( 41.73310 / 16.22273 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.74174 / 16.21987 / 8.60000) [M]

- 23 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

AlphaXY = 30.651? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 115, 316)= 33.37157 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3151 110 3151 2375.481 2376.313 5.61e+005 5.61e+005 30.431 4.91450 4.91467

4.90056

3152 3151 3152 2376.313 2377.146 5.61e+005 5.62e+005 30.465 4.91451 4.91468

4.90056

3153 3152 3153 2377.146 2377.980 5.62e+005 5.62e+005 30.500 4.91451 4.91468

4.90056

3154 3153 3154 2377.980 2378.815 5.62e+005 5.62e+005 30.534 4.91452 4.91469

4.90056

3155 3154 3155 2378.815 2379.651 5.62e+005 5.62e+005 30.568 4.91452 4.91469

4.90056

3156 3155 3156 2379.651 2380.488 5.62e+005 5.62e+005 30.602 4.91453 4.91470

4.90056

3157 3156 3157 2380.488 2381.325 5.62e+005 5.63e+005 30.636 4.91453 4.91470

4.90056

3158 3157 319 2381.325 2382.163 5.63e+005 5.63e+005 30.670 4.91454 4.91471

4.90056

-------------------------------------------------------------------------------------------------

MEAN/SUM 2378.818 5.62e+005 39.31617

39.31750 39.20452

Startnode 110 : (X/Y/Z)inp. =( 8.00000 / -0.84123 / 8.60000) [M]

(X/Y/Z)disp. = ( 8.00243 / -0.83564 / 8.60000) [M]

- 24 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

AlphaXY = 30.431? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 319 : (X/Y/Z)inp. = ( 41.85280 / 19.15243 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.86184 / 19.14943 / 8.60000) [M]

AlphaXY = 30.670? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 110, 319)= 39.31747 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

3161 105 3161 2402.754 2403.711 5.68e+005 5.68e+005 30.437 5.64952 5.64989

5.63349

3162 3161 3162 2403.711 2404.669 5.68e+005 5.68e+005 30.476 5.64952 5.64990

5.63349

3163 3162 3163 2404.669 2405.628 5.68e+005 5.68e+005 30.515 5.64953 5.64991

5.63349

3164 3163 3164 2405.628 2406.589 5.68e+005 5.69e+005 30.554 5.64954 5.64991

5.63349

3165 3164 3165 2406.589 2407.550 5.69e+005 5.69e+005 30.592 5.64954 5.64992

5.63349

3166 3165 3166 2407.550 2408.513 5.69e+005 5.69e+005 30.631 5.64955 5.64993

5.63349

3167 3166 3167 2408.513 2409.476 5.69e+005 5.69e+005 30.670 5.64956 5.64993

5.63349

3168 3167 322 2409.476 2410.441 5.69e+005 5.69e+005 30.708 5.64956 5.64994

5.63349

-------------------------------------------------------------------------------------------------

MEAN/SUM 2406.592 5.69e+005 45.19631

- 25 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

45.19934 45.06794

Startnode 105 : (X/Y/Z)inp. =( 3.00000 / -0.94936 / 8.60000) [M]

(X/Y/Z)disp. = ( 3.00262 / -0.94709 / 8.60000) [M]

AlphaXY = 30.437? AlphaZY = 180.000? AlphaXZ = 0.000?

Endnode 322 : (X/Y/Z)inp. = ( 41.90910 / 22.04593 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.91840 / 22.04286 / 8.60000) [M]

AlphaXY = 30.708? AlphaZY = 180.000? AlphaXZ = 0.000?

Ax= 0.00423 M2 E= 1.950e+008 KN/M2 L( 105, 322)= 45.19929 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4001 149 4001 2147.488 2147.682 5.12e+005 5.12e+005 36.015 0.99459 0.99434

0.99174

4002 4001 4002 2147.682 2147.875 5.12e+005 5.12e+005 36.022 0.99459 0.99434

0.99174

4003 4002 4003 2147.875 2148.069 5.12e+005 5.12e+005 36.029 0.99459 0.99434

0.99174

4004 4003 4004 2148.069 2148.263 5.12e+005 5.12e+005 36.036 0.99459 0.99434

0.99174

4005 4004 4005 2148.263 2148.457 5.12e+005 5.12e+005 36.043 0.99459 0.99434

0.99174

4006 4005 4006 2148.457 2148.651 5.12e+005 5.12e+005 36.050 0.99459 0.99434

0.99174

4007 4006 4007 2148.651 2148.845 5.12e+005 5.12e+005 36.057 0.99459 0.99434

0.99174

- 26 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4008 4007 204 2148.845 2149.039 5.12e+005 5.12e+005 36.064 0.99459 0.99434

0.99174

-------------------------------------------------------------------------------------------------

MEAN/SUM 2148.263 5.12e+005 7.95669

7.95474 7.93390

Startnode 149 : (X/Y/Z)inp. = ( 47.00000 / -0.57000 / -8.60000) [M]

(X/Y/Z)disp. = ( 47.00003 / -0.57246 / -8.60000) [M]

AlphaXY = 143.985? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 204 : (X/Y/Z)inp. = ( 40.56450 / 4.10903 / -8.60000) [M]

(X/Y/Z)disp. = ( 40.56774 / 4.10766 / -8.60000) [M]

AlphaXY = 143.936? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 149, 204)= 7.95474 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4011 154 4011 2087.457 2087.781 4.98e+005 4.98e+005 35.259 1.68964 1.68910

1.68480

4012 4011 4012 2087.781 2088.104 4.98e+005 4.98e+005 35.271 1.68964 1.68910

1.68480

4013 4012 4013 2088.104 2088.427 4.98e+005 4.98e+005 35.284 1.68964 1.68910

1.68480

4014 4013 4014 2088.427 2088.751 4.98e+005 4.98e+005 35.296 1.68964 1.68910

1.68480

4015 4014 4015 2088.751 2089.074 4.98e+005 4.98e+005 35.309 1.68964 1.68910

1.68480

- 27 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4016 4015 4016 2089.074 2089.398 4.98e+005 4.98e+005 35.321 1.68964 1.68910

1.68480

4017 4016 4017 2089.398 2089.722 4.98e+005 4.98e+005 35.334 1.68964 1.68910

1.68480

4018 4017 207 2089.722 2090.046 4.98e+005 4.98e+005 35.346 1.68964 1.68910

1.68480

-------------------------------------------------------------------------------------------------

MEAN/SUM 2088.751 4.98e+005 13.51712

13.51282 13.47840

Startnode 154 : (X/Y/Z)inp. = ( 52.00000 / -0.60857 / -8.60000) [M]

(X/Y/Z)disp. = ( 51.99984 / -0.61057 / -8.60000) [M]

AlphaXY = 144.741? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 207 : (X/Y/Z)inp. = ( 40.96670 / 7.20033 / -8.60000) [M]

(X/Y/Z)disp. = ( 40.97188 / 7.19842 / -8.60000) [M]

AlphaXY = 144.654? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 154, 207)= 13.51281 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4021 159 4021 2073.040 2073.492 4.94e+005 4.94e+005 34.736 2.39068 2.38988

2.38383

4022 4021 4022 2073.492 2073.943 4.94e+005 4.94e+005 34.754 2.39068 2.38988

2.38383

4023 4022 4023 2073.943 2074.395 4.94e+005 4.95e+005 34.772 2.39068 2.38988

2.38383

- 28 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4024 4023 4024 2074.395 2074.847 4.95e+005 4.95e+005 34.790 2.39068 2.38988

2.38383

4025 4024 4025 2074.847 2075.299 4.95e+005 4.95e+005 34.808 2.39068 2.38988

2.38383

4026 4025 4026 2075.299 2075.752 4.95e+005 4.95e+005 34.826 2.39069 2.38988

2.38383

4027 4026 4027 2075.752 2076.204 4.95e+005 4.95e+005 34.844 2.39069 2.38988

2.38383

4028 4027 210 2076.204 2076.657 4.95e+005 4.95e+005 34.862 2.39069 2.38989

2.38383

-------------------------------------------------------------------------------------------------

MEAN/SUM 2074.848 4.95e+005 19.12547

19.11905 19.07068

Startnode 159 : (X/Y/Z)inp. = ( 57.00000 / -0.66380 / -8.60000) [M]

(X/Y/Z)disp. = ( 56.99965 / -0.66515 / -8.60000) [M]

AlphaXY = 145.264? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 210 : (X/Y/Z)inp. = ( 41.29310 / 10.24843 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.29988 / 10.24609 / -8.60000) [M]

AlphaXY = 145.138? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 159, 210)= 19.11905 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4031 164 4031 2081.435 2082.014 4.96e+005 4.96e+005 34.301 3.09750 3.09649

3.08863

- 29 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4032 4031 4032 2082.014 2082.592 4.96e+005 4.96e+005 34.324 3.09750 3.09650

3.08863

4033 4032 4033 2082.592 2083.172 4.96e+005 4.97e+005 34.347 3.09750 3.09650

3.08863

4034 4033 4034 2083.172 2083.751 4.97e+005 4.97e+005 34.371 3.09751 3.09650

3.08863

4035 4034 4035 2083.751 2084.331 4.97e+005 4.97e+005 34.394 3.09751 3.09650

3.08863

4036 4035 4036 2084.331 2084.911 4.97e+005 4.97e+005 34.417 3.09751 3.09650

3.08863

4037 4036 4037 2084.911 2085.492 4.97e+005 4.97e+005 34.440 3.09751 3.09651

3.08863

4038 4037 213 2085.492 2086.072 4.97e+005 4.97e+005 34.464 3.09752 3.09651

3.08863

-------------------------------------------------------------------------------------------------

MEAN/SUM 2083.752 4.97e+005 24.78006

24.77201 24.70906

Startnode 164 : (X/Y/Z)inp. = ( 62.00000 / -0.73571 / -8.60000) [M]

(X/Y/Z)disp. = ( 61.99948 / -0.73644 / -8.60000) [M]

AlphaXY = 145.699? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 213 : (X/Y/Z)inp. = ( 41.54750 / 13.25523 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.55543 / 13.25258 / -8.60000) [M]

AlphaXY = 145.536? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 164, 213)= 24.77200 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

- 30 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

L(0)

-------------------------------------------------------------------------------------------------

4041 169 4041 2100.956 2101.661 5.01e+005 5.01e+005 33.913 3.80996 3.80882

3.79906

4042 4041 4042 2101.661 2102.366 5.01e+005 5.01e+005 33.941 3.80997 3.80882

3.79906

4043 4042 4043 2102.366 2103.071 5.01e+005 5.01e+005 33.970 3.80997 3.80882

3.79906

4044 4043 4044 2103.071 2103.777 5.01e+005 5.02e+005 33.998 3.80997 3.80883

3.79906

4045 4044 4045 2103.777 2104.484 5.02e+005 5.02e+005 34.027 3.80998 3.80883

3.79906

4046 4045 4046 2104.484 2105.191 5.02e+005 5.02e+005 34.055 3.80998 3.80883

3.79906

4047 4046 4047 2105.191 2105.898 5.02e+005 5.02e+005 34.084 3.80998 3.80884

3.79906

4048 4047 216 2105.898 2106.606 5.02e+005 5.02e+005 34.112 3.80999 3.80884

3.79906

-------------------------------------------------------------------------------------------------

MEAN/SUM 2103.779 5.02e+005 30.47979

30.47063 30.39246

Startnode 169 : (X/Y/Z)inp. = ( 67.00000 / -0.82428 / -8.60000) [M]

(X/Y/Z)disp. = ( 66.99934 / -0.82454 / -8.60000) [M]

AlphaXY = 146.087? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 216 : (X/Y/Z)inp. = ( 41.73310 / 16.22273 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.74174 / 16.21987 / -8.60000) [M]

AlphaXY = 145.888? AlphaZY = 180.000? AlphaXZ = 180.000?

- 31 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 169, 216)= 30.47061 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4051 174 4051 2124.017 2124.846 5.06e+005 5.07e+005 33.556 4.52792 4.52669

4.51496

4052 4051 4052 2124.846 2125.676 5.07e+005 5.07e+005 33.589 4.52792 4.52669

4.51496

4053 4052 4053 2125.676 2126.507 5.07e+005 5.07e+005 33.623 4.52793 4.52670

4.51496

4054 4053 4054 2126.507 2127.339 5.07e+005 5.07e+005 33.657 4.52793 4.52670

4.51496

4055 4054 4055 2127.339 2128.171 5.07e+005 5.07e+005 33.690 4.52794 4.52671

4.51496

4056 4055 4056 2128.171 2129.004 5.07e+005 5.08e+005 33.724 4.52794 4.52671

4.51496

4057 4056 4057 2129.004 2129.838 5.08e+005 5.08e+005 33.757 4.52795 4.52671

4.51496

4058 4057 219 2129.838 2130.672 5.08e+005 5.08e+005 33.791 4.52795 4.52672

4.51496

-------------------------------------------------------------------------------------------------

MEAN/SUM 2127.341 5.07e+005 36.22349

36.21363 36.11969

Startnode 174 : (X/Y/Z)inp. = ( 72.00000 / -0.92954 / -8.60000) [M]

(X/Y/Z)disp. = ( 71.99925 / -0.92945 / -8.60000) [M]

AlphaXY = 146.444? AlphaZY = 180.000? AlphaXZ = 180.000?

- 32 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

Endnode 219 : (X/Y/Z)inp. = ( 41.85280 / 19.15243 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.86184 / 19.14943 / -8.60000) [M]

AlphaXY = 146.209? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 174, 219)= 36.21359 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4061 179 4061 2146.075 2147.028 5.12e+005 5.12e+005 33.222 5.25127 5.24998

5.23624

4062 4061 4062 2147.028 2147.983 5.12e+005 5.12e+005 33.260 5.25127 5.24999

5.23624

4063 4062 4063 2147.983 2148.938 5.12e+005 5.12e+005 33.299 5.25128 5.24999

5.23624

4064 4063 4064 2148.938 2149.894 5.12e+005 5.13e+005 33.338 5.25128 5.25000

5.23624

4065 4064 4065 2149.894 2150.852 5.13e+005 5.13e+005 33.377 5.25129 5.25000

5.23624

4066 4065 4066 2150.852 2151.810 5.13e+005 5.13e+005 33.415 5.25130 5.25001

5.23624

4067 4066 4067 2151.810 2152.769 5.13e+005 5.13e+005 33.454 5.25130 5.25002

5.23624

4068 4067 222 2152.769 2153.730 5.13e+005 5.13e+005 33.493 5.25131 5.25002

5.23624

-------------------------------------------------------------------------------------------------

MEAN/SUM 2149.897 5.13e+005 42.01029

42.00000 41.88990

- 33 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

Startnode 179 : (X/Y/Z)inp. = ( 77.00000 / -1.05147 / -8.60000) [M]

(X/Y/Z)disp. = ( 76.99919 / -1.05117 / -8.60000) [M]

AlphaXY = 146.778? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 222 : (X/Y/Z)inp. = ( 41.90910 / 22.04593 / -8.60000) [M]

(X/Y/Z)disp. = ( 41.91840 / 22.04286 / -8.60000) [M]

AlphaXY = 146.507? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 179, 222)= 41.99995 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4101 149 4101 2147.488 2147.682 5.12e+005 5.12e+005 36.015 0.99459 0.99434

0.99174

4102 4101 4102 2147.682 2147.875 5.12e+005 5.12e+005 36.022 0.99459 0.99434

0.99174

4103 4102 4103 2147.875 2148.069 5.12e+005 5.12e+005 36.029 0.99459 0.99434

0.99174

4104 4103 4104 2148.069 2148.263 5.12e+005 5.12e+005 36.036 0.99459 0.99434

0.99174

4105 4104 4105 2148.263 2148.457 5.12e+005 5.12e+005 36.043 0.99459 0.99434

0.99174

4106 4105 4106 2148.457 2148.651 5.12e+005 5.12e+005 36.050 0.99459 0.99434

0.99174

4107 4106 4107 2148.651 2148.845 5.12e+005 5.12e+005 36.057 0.99459 0.99434

0.99174

4108 4107 304 2148.845 2149.039 5.12e+005 5.12e+005 36.064 0.99459 0.99434

0.99174

- 34 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

-------------------------------------------------------------------------------------------------

MEAN/SUM 2148.263 5.12e+005 7.95669

7.95474 7.93390

Startnode 149 : (X/Y/Z)inp. = ( 47.00000 / -0.57000 / 8.60000) [M]

(X/Y/Z)disp. = ( 47.00003 / -0.57246 / 8.60000) [M]

AlphaXY = 143.985? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 304 : (X/Y/Z)inp. = ( 40.56450 / 4.10903 / 8.60000) [M]

(X/Y/Z)disp. = ( 40.56774 / 4.10766 / 8.60000) [M]

AlphaXY = 143.936? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 149, 304)= 7.95474 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4111 154 4111 2087.457 2087.781 4.98e+005 4.98e+005 35.259 1.68964 1.68910

1.68480

4112 4111 4112 2087.781 2088.104 4.98e+005 4.98e+005 35.271 1.68964 1.68910

1.68480

4113 4112 4113 2088.104 2088.427 4.98e+005 4.98e+005 35.284 1.68964 1.68910

1.68480

4114 4113 4114 2088.427 2088.751 4.98e+005 4.98e+005 35.296 1.68964 1.68910

1.68480

4115 4114 4115 2088.751 2089.074 4.98e+005 4.98e+005 35.309 1.68964 1.68910

1.68480

4116 4115 4116 2089.074 2089.398 4.98e+005 4.98e+005 35.321 1.68964 1.68910

1.68480

- 35 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4117 4116 4117 2089.398 2089.722 4.98e+005 4.98e+005 35.334 1.68964 1.68910

1.68480

4118 4117 307 2089.722 2090.046 4.98e+005 4.98e+005 35.346 1.68964 1.68910

1.68480

-------------------------------------------------------------------------------------------------

MEAN/SUM 2088.751 4.98e+005 13.51712

13.51282 13.47840

Startnode 154 : (X/Y/Z)inp. = ( 52.00000 / -0.60857 / 8.60000) [M]

(X/Y/Z)disp. = ( 51.99984 / -0.61057 / 8.60000) [M]

AlphaXY = 144.741? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 307 : (X/Y/Z)inp. = ( 40.96670 / 7.20033 / 8.60000) [M]

(X/Y/Z)disp. = ( 40.97188 / 7.19842 / 8.60000) [M]

AlphaXY = 144.654? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 154, 307)= 13.51281 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4121 159 4121 2073.040 2073.492 4.94e+005 4.94e+005 34.736 2.39068 2.38988

2.38383

4122 4121 4122 2073.492 2073.943 4.94e+005 4.94e+005 34.754 2.39068 2.38988

2.38383

4123 4122 4123 2073.943 2074.395 4.94e+005 4.95e+005 34.772 2.39068 2.38988

2.38383

4124 4123 4124 2074.395 2074.847 4.95e+005 4.95e+005 34.790 2.39068 2.38988

2.38383

- 36 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4125 4124 4125 2074.847 2075.299 4.95e+005 4.95e+005 34.808 2.39068 2.38988

2.38383

4126 4125 4126 2075.299 2075.752 4.95e+005 4.95e+005 34.826 2.39069 2.38988

2.38383

4127 4126 4127 2075.752 2076.204 4.95e+005 4.95e+005 34.844 2.39069 2.38988

2.38383

4128 4127 310 2076.204 2076.657 4.95e+005 4.95e+005 34.862 2.39069 2.38989

2.38383

-------------------------------------------------------------------------------------------------

MEAN/SUM 2074.848 4.95e+005 19.12547

19.11905 19.07068

Startnode 159 : (X/Y/Z)inp. = ( 57.00000 / -0.66380 / 8.60000) [M]

(X/Y/Z)disp. = ( 56.99965 / -0.66515 / 8.60000) [M]

AlphaXY = 145.264? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 310 : (X/Y/Z)inp. = ( 41.29310 / 10.24843 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.29988 / 10.24609 / 8.60000) [M]

AlphaXY = 145.138? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 159, 310)= 19.11905 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4131 164 4131 2081.435 2082.014 4.96e+005 4.96e+005 34.301 3.09750 3.09649

3.08863

4132 4131 4132 2082.014 2082.592 4.96e+005 4.96e+005 34.324 3.09750 3.09650

3.08863

- 37 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4133 4132 4133 2082.592 2083.172 4.96e+005 4.97e+005 34.347 3.09750 3.09650

3.08863

4134 4133 4134 2083.172 2083.751 4.97e+005 4.97e+005 34.371 3.09751 3.09650

3.08863

4135 4134 4135 2083.751 2084.331 4.97e+005 4.97e+005 34.394 3.09751 3.09650

3.08863

4136 4135 4136 2084.331 2084.911 4.97e+005 4.97e+005 34.417 3.09751 3.09650

3.08863

4137 4136 4137 2084.911 2085.492 4.97e+005 4.97e+005 34.440 3.09751 3.09651

3.08863

4138 4137 313 2085.492 2086.072 4.97e+005 4.97e+005 34.464 3.09752 3.09651

3.08863

-------------------------------------------------------------------------------------------------

MEAN/SUM 2083.752 4.97e+005 24.78006

24.77201 24.70906

Startnode 164 : (X/Y/Z)inp. = ( 62.00000 / -0.73571 / 8.60000) [M]

(X/Y/Z)disp. = ( 61.99948 / -0.73644 / 8.60000) [M]

AlphaXY = 145.699? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 313 : (X/Y/Z)inp. = ( 41.54750 / 13.25523 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.55543 / 13.25258 / 8.60000) [M]

AlphaXY = 145.536? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 164, 313)= 24.77200 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

- 38 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

4141 169 4141 2100.956 2101.661 5.01e+005 5.01e+005 33.913 3.80996 3.80882

3.79906

4142 4141 4142 2101.661 2102.366 5.01e+005 5.01e+005 33.941 3.80997 3.80882

3.79906

4143 4142 4143 2102.366 2103.071 5.01e+005 5.01e+005 33.970 3.80997 3.80882

3.79906

4144 4143 4144 2103.071 2103.777 5.01e+005 5.02e+005 33.998 3.80997 3.80883

3.79906

4145 4144 4145 2103.777 2104.484 5.02e+005 5.02e+005 34.027 3.80998 3.80883

3.79906

4146 4145 4146 2104.484 2105.191 5.02e+005 5.02e+005 34.055 3.80998 3.80883

3.79906

4147 4146 4147 2105.191 2105.898 5.02e+005 5.02e+005 34.084 3.80998 3.80884

3.79906

4148 4147 316 2105.898 2106.606 5.02e+005 5.02e+005 34.112 3.80999 3.80884

3.79906

-------------------------------------------------------------------------------------------------

MEAN/SUM 2103.779 5.02e+005 30.47979

30.47063 30.39246

Startnode 169 : (X/Y/Z)inp. = ( 67.00000 / -0.82428 / 8.60000) [M]

(X/Y/Z)disp. = ( 66.99934 / -0.82454 / 8.60000) [M]

AlphaXY = 146.087? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 316 : (X/Y/Z)inp. = ( 41.73310 / 16.22273 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.74174 / 16.21987 / 8.60000) [M]

AlphaXY = 145.888? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 169, 316)= 30.47061 M

- 39 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4151 174 4151 2124.017 2124.846 5.06e+005 5.07e+005 33.556 4.52792 4.52669

4.51496

4152 4151 4152 2124.846 2125.676 5.07e+005 5.07e+005 33.589 4.52792 4.52669

4.51496

4153 4152 4153 2125.676 2126.507 5.07e+005 5.07e+005 33.623 4.52793 4.52670

4.51496

4154 4153 4154 2126.507 2127.339 5.07e+005 5.07e+005 33.657 4.52793 4.52670

4.51496

4155 4154 4155 2127.339 2128.171 5.07e+005 5.07e+005 33.690 4.52794 4.52671

4.51496

4156 4155 4156 2128.171 2129.004 5.07e+005 5.08e+005 33.724 4.52794 4.52671

4.51496

4157 4156 4157 2129.004 2129.838 5.08e+005 5.08e+005 33.757 4.52795 4.52671

4.51496

4158 4157 319 2129.838 2130.672 5.08e+005 5.08e+005 33.791 4.52795 4.52672

4.51496

-------------------------------------------------------------------------------------------------

MEAN/SUM 2127.341 5.07e+005 36.22349

36.21363 36.11969

Startnode 174 : (X/Y/Z)inp. = ( 72.00000 / -0.92954 / 8.60000) [M]

(X/Y/Z)disp. = ( 71.99925 / -0.92945 / 8.60000) [M]

AlphaXY = 146.444? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 319 : (X/Y/Z)inp. = ( 41.85280 / 19.15243 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.86184 / 19.14943 / 8.60000) [M]

- 40 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

AlphaXY = 146.209? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 174, 319)= 36.21359 M

CABLE N-Beg N-End Nx-Beg Nx-End Sig-Beg Sig-End Alpha1 L(inp) L(LC)

L(0)

-------------------------------------------------------------------------------------------------

4161 179 4161 2146.075 2147.028 5.12e+005 5.12e+005 33.222 5.25127 5.24998

5.23624

4162 4161 4162 2147.028 2147.983 5.12e+005 5.12e+005 33.260 5.25127 5.24999

5.23624

4163 4162 4163 2147.983 2148.938 5.12e+005 5.12e+005 33.299 5.25128 5.24999

5.23624

4164 4163 4164 2148.938 2149.894 5.12e+005 5.13e+005 33.338 5.25128 5.25000

5.23624

4165 4164 4165 2149.894 2150.852 5.13e+005 5.13e+005 33.377 5.25129 5.25000

5.23624

4166 4165 4166 2150.852 2151.810 5.13e+005 5.13e+005 33.415 5.25130 5.25001

5.23624

4167 4166 4167 2151.810 2152.769 5.13e+005 5.13e+005 33.454 5.25130 5.25002

5.23624

4168 4167 322 2152.769 2153.730 5.13e+005 5.13e+005 33.493 5.25131 5.25002

5.23624

-------------------------------------------------------------------------------------------------

MEAN/SUM 2149.897 5.13e+005 42.01029

42.00000 41.88990

Startnode 179 : (X/Y/Z)inp. = ( 77.00000 / -1.05147 / 8.60000) [M]

(X/Y/Z)disp. = ( 76.99919 / -1.05117 / 8.60000) [M]

- 41 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

AlphaXY = 146.778? AlphaZY = 180.000? AlphaXZ = 180.000?

Endnode 322 : (X/Y/Z)inp. = ( 41.90910 / 22.04593 / 8.60000) [M]

(X/Y/Z)disp. = ( 41.91840 / 22.04286 / 8.60000) [M]

AlphaXY = 146.507? AlphaZY = 180.000? AlphaXZ = 180.000?

Ax= 0.00419 M2 E= 1.950e+008 KN/M2 L( 179, 322)= 41.99995 M

上述的计算结果中单元与图纸中对应关系如下:

图纸中索单元编号图

单元号 对 应 图 纸 备注 单元号 对应图纸中 备注


中索号 索号
30X0/31X0 LX 单个索单元 40X0/41X0 RX 单个索单元
30X1/31X1 用 8 段索模拟单 40X1/41X1 用 8 段索模
30X2/31X2 根拉索 40X2/41X2 拟单根拉索

30X3/31X3 40X3/41X3
30X4/31X4 40X4/41X4
30X5/31X5 40X5/41X5
30X6/31X6 40X6/41X6
30X7/31X7 40X7/41X7
30X8/31X8 40X8/41X8

- 42 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

5.3 短暂状况(施工阶段)计算

根据 5.2 节优化得到的成桥线形(无应力索长),考虑施工顺序进行计算,得到
斜拉索的张拉力(无应力长度)及运营状态结构的内力与线形。

5.3.1 主要施工步骤划分

结合全桥分析需要,本文对全桥主要的施工阶段与运营阶段进行了模拟计算,
如下表示:
施工阶段 计算阶段 施工内容 工期 备注
号 (天)
一 STG11 支架施工主梁与主塔第一段,张拉 90
梁、塔预应力
STG12 施工主塔第二段,接长并张拉主塔 15
预应力
STG13 施工主塔第三段,接长并张拉主塔 15
预应力
STG14 施工主塔第四段,接长并张拉主塔 15
预应力
STG15 挂 索 L1 , 即 模 型 中 单 元 3000
(3001~3008)与 3100(3101~3108)
STG16 挂 索 R1 , 即 模 型 中 单 元 4000
(4001~4008)与 4100(4101~4108)
STG17 张拉第 1 索对 L1、R1
二 STG21 挂 索 L2 , 即 模 型 中 单 元 3010 3
(3011~3018)与 3110(3111~3118)
STG22 挂 索 R2 , 即 模 型 中 单 元 4010 3
(4011~4018)与 4110(4111~4118)
STG23 张拉第 2 索对 L2、R2 3
︰ ︰ ︰ ︰
︰ ︰ ︰ ︰

- 43 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

︰ ︰ ︰ ︰
七 STG71 挂 索 L7 , 即 模 型 中 单 元 3060 3
(3061~3068)与 3160(3161~3168)
STG72 挂 索 R7 , 即 模 型 中 单 元 4060 3
(4061~4068)与 4160(4161~4168)
STG73 张拉第 7 索对 L7、R7 3
八 STG81 拆除主梁支架 30
九 STG82 10000 按规范考虑
施工桥面系(上二恒)
长期徐变
STG90~S
成桥阶段计算
TG150

相应的计算模型如下(显示激活单元部分):

STG11

STG12

- 44 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG13

STG14

STG15

- 45 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG16

STG17

STG21

- 46 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG22

STG23

STG31

- 47 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG32

STG33

STG41

- 48 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG42

STG43

STG51

- 49 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG52

STG53

STG61

- 50 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG62

STG63

STG71

- 51 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG72

STG73

STG81

- 52 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

STG82

STG90~STG150

5.3.2 正截面压应力

为便于直观察看结果,撷取图形方式表示。

- 53 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段一主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段一主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 54 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段二主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段二主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 55 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段三主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段三主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 56 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段四主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段四主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 57 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段五主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段五主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 58 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段六主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段六主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 59 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段七主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段七主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 60 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段八主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段八主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 61 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段九主梁截面正应力(红色表示上缘,绿色表示下缘,单位:kPa)

施工阶段九主塔截面正应力(红色表示左侧,绿色表示右侧,单位:kPa)

- 62 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

5.3.3 主压应力

为便于直观察看结果,撷取图形方式表示。

施工阶段一主梁截面主压应力(压为负,单位:kPa)

- 63 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段一主塔左肢截面主压应力(压为负,单位:kPa)

施工阶段一主塔右肢截面主压应力(压为负,单位:kPa)

施工阶段二主梁截面主压应力(压为负,单位:kPa)

- 64 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段二主塔左肢截面主压应力(压为负,单位:kPa)

施工阶段二主塔右肢截面主压应力(压为负,单位:kPa)

- 65 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段三主梁截面主压应力(压为负,单位:kPa)

施工阶段三主塔左肢截面主压应力(压为负,单位:kPa)

- 66 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段三主塔右肢截面主压应力(压为负,单位:kPa)

施工阶段四主梁截面主压应力(压为负,单位:kPa)

- 67 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段四主塔左肢截面主压应力(压为负,单位:kPa)

施工阶段四主塔右肢截面主压应力(压为负,单位:kPa)

- 68 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段五主梁截面主压应力(压为负,单位:kPa)

施工阶段五主塔左肢截面主压应力(压为负,单位:kPa)

- 69 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段五主塔右肢截面主压应力(压为负,单位:kPa)

施工阶段六主梁截面主压应力(压为负,单位:kPa)

- 70 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段六主塔左肢截面主压应力(压为负,单位:kPa)

施工阶段六主塔右肢截面主压应力(压为负,单位:kPa)

- 71 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段七主梁截面主压应力(压为负,单位:kPa)

施工阶段七主塔左肢截面主压应力(压为负,单位:kPa)

- 72 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段七主塔右肢截面主压应力(压为负,单位:kPa)

施工阶段八主梁截面主压应力(压为负,单位:kPa)

- 73 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段八主塔左肢截面主压应力(压为负,单位:kPa)

施工阶段八主塔右肢截面主压应力(压为负,单位:kPa)

- 74 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段九主梁截面主压应力(压为负,单位:kPa)

施工阶段九主塔左肢截面主压应力(压为负,单位:kPa)

- 75 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段九主塔右肢截面主压应力(压为负,单位:kPa)

5.3.4 预应力钢筋应力

为便于直观察看结果,撷取图形方式表示。

- 76 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段一主梁部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段一主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段一主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

- 77 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段二主梁部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段二主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

- 78 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段二主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段三主梁部分预应力钢筋应力(拉为正,单位:kPa)

- 79 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段三主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段三主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

- 80 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段四主梁部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段四主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

- 81 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段四主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段五主梁部分预应力钢筋应力(拉为正,单位:kPa)

- 82 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段五主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段五主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

- 83 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段六主梁部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段六主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

- 84 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段六主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段七主梁部分预应力钢筋应力(拉为正,单位:kPa)

- 85 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段七主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段七主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

- 86 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段八主梁部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段八主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

- 87 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段八主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段九主梁部分预应力钢筋应力(拉为正,单位:kPa)

- 88 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

施工阶段九主塔左肢部分预应力钢筋应力(拉为正,单位:kPa)

施工阶段九主塔右肢部分预应力钢筋应力(拉为正,单位:kPa)

- 89 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

5.3.5 施工张拉索力

由于本桥规模较小,采取一次落架法施工主梁,即主梁在支架上一次施工完成
后再张拉拉索,为方便施工,本桥斜拉索采用一次张拉法施工,各施工阶段索力如
下表,其中黑斜体部分为各号索的施工张拉力值。
(单位:kN)
索编号 阶段一 阶段二 阶段三 阶段四 阶段五 阶段六 阶段七 成桥索力
3008 2305.02 2226.00 2111.92 2000.55 1887.68 1808.30 1775.74 1975.61
3018 0.00 2277.97 2137.57 1976.21 1791.28 1649.57 1589.04 1830.04
3028 0.00 0.00 2221.78 2034.04 1791.93 1592.36 1501.51 1747.44
3038 0.00 0.00 0.00 2173.22 1898.27 1652.06 1530.65 1751.81
3048 0.00 0.00 0.00 0.00 2084.01 1811.55 1662.97 1837.02
3058 0.00 0.00 0.00 0.00 0.00 2089.40 1922.48 2035.29
3068 0.00 0.00 0.00 0.00 0.00 0.00 2187.47 2233.81
3108 2305.02 2226.00 2111.92 2000.55 1887.68 1808.30 1775.74 1975.61
3118 0.00 2277.97 2137.57 1976.21 1791.28 1649.57 1589.04 1830.04
3128 0.00 0.00 2221.78 2034.04 1791.93 1592.36 1501.51 1747.44
3138 0.00 0.00 0.00 2173.22 1898.27 1652.06 1530.65 1751.81
3148 0.00 0.00 0.00 0.00 2084.01 1811.55 1662.97 1837.02
3158 0.00 0.00 0.00 0.00 0.00 2089.40 1922.48 2035.29
3168 0.00 0.00 0.00 0.00 0.00 0.00 2187.47 2233.81
4008 2063.36 2019.34 1971.98 1926.04 1843.75 1767.08 1724.69 1937.90
4018 0.00 1903.25 1834.27 1753.27 1630.44 1508.70 1445.89 1698.45
4028 0.00 0.00 1788.29 1705.39 1563.05 1413.56 1341.81 1594.02
4038 0.00 0.00 0.00 1730.62 1595.79 1443.35 1378.36 1599.02
4048 0.00 0.00 0.00 0.00 1674.27 1550.37 1511.05 1677.23
4058 0.00 0.00 0.00 0.00 0.00 1727.12 1733.72 1831.38
4068 0.00 0.00 0.00 0.00 0.00 0.00 1790.84 1815.72
4108 2063.36 2019.34 1971.98 1926.04 1843.75 1767.08 1724.69 1937.90
4118 0.00 1903.25 1834.27 1753.27 1630.44 1508.70 1445.89 1698.45
4128 0.00 0.00 1788.29 1705.39 1563.05 1413.56 1341.81 1594.02
4138 0.00 0.00 0.00 1730.62 1595.79 1443.35 1378.36 1599.02
4148 0.00 0.00 0.00 0.00 1674.27 1550.37 1511.05 1677.23
4158 0.00 0.00 0.00 0.00 0.00 1727.12 1733.72 1831.38
4168 0.00 0.00 0.00 0.00 0.00 0.00 1790.84 1815.72

3XXX 系列索为 OVM PESFD7-55 型,两根组合成一根,相应的面积为

A = 42.34cm2 ,其破断强度为 [σ k ] = 1670MPa ,该系列施工阶段最大应力为


2305.02kN
σ max = = 544.407 MPa
42.34cm 2
施工阶段,3XXX 系列索最小安全系数为

- 90 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

[σ k ] 1670
K min = = = 3.068
σ max 544.407

4XXX 系列索为 OVM PESFD7-109 型,相应的面积为 A = 41.95cm2 ,其破断强

度为 [σ k ] = 1670MPa ,该系列施工阶段最大应力为

2063.36kN
σ max = = 491.862MPa
41.95cm 2
施工阶段,4XXX 系列索最小安全系数为

[σ k ] 1670
K min = = = 3.395
σ max 491.862

5.3.6 短暂状况计算小结

可见,各主要施工阶段,结构正截面压应力、主压应力、预应力钢筋应力及拉
索索力均满足规范要求,结构是安全的。

5.4 持久状况承载能力极限状态计算
5.4.1 计算方法

如 5.2.1 节所述,根据合理成桥状态计算得到的线形(无应力索长),考虑施工
顺序及材料时变特性进行施工过程的计算后,考虑运营阶段各类载荷的作用,按现
行规范进行计算。

5.4.2 正截面抗弯承载力计算

本文相应于规范《公路钢筋混凝土及预应力混凝土桥涵设计规范》( JTG
D62-2004)5.1.5 条的组合为 Comb11(见 5.2.1 节),进行了梁、塔正截面抗弯承载
力计算。以包络图表示。

- 91 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

主梁

左塔 右塔

梁、塔正截面抗弯承载力包络图(红色与绿色表示作用效应,青色与蓝色表示抗力)

5.4.3 斜截面抗剪承载力计算

主肋抗剪钢筋面积

- 92 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

本文相应于规范《公路钢筋混凝土及预应力混凝土桥涵设计规范》( JTG
D62-2004)5.1.5 条的组合为 Comb12(见 5.2.1 节),按规范 5.2.11 条所述进行了主

梁斜截面抗剪承载力配筋设计。如上图示,所需最大箍筋面积为 Aq = 19.2cm 2 / m 。

由本桥施工图设计知,主梁单侧主肋内设有Ф16 的三肢闭合箍,顺桥向间距
15cm,可见,单位长度(1m)箍筋面积为:

Asv = 6 × 2.011 × (int (1.0 / 0.15) − 1) = 60.33cm 2 / m ≥ Aq = 19.2cm 2 / m

可见,主梁斜截面抗剪承载力是满足要求的。

5.4.4 小结

可见,结构承载能力极限状态满足规范相关要求。

5.5 正常使用极限状态
5.5.1 正截面抗裂

本桥按全预应力构件设计主梁与主塔。相应地,构件在作用(或荷载)短期效
应组合下控制的正截面的受拉边缘不允许出现拉应力(不得消压)。

短期效应组合下主梁正截面上下缘应力(红、蓝色为上缘,绿、青色为下缘,压为负,单位:kPa)

- 93 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

可见,正常使用短期效应组合下,主梁上、下缘均不出现拉应力;主梁正截面
抗裂计算满足《公路钢筋混凝土及预应力混凝土桥涵设计规范》要求。

短期效应组合下主塔左肢正截面上下缘应力(红、蓝色为上缘,绿、青色为下缘,压为负,单位:kPa)

可见,正常使用短期效应组合下,主塔上、下缘均不出现拉应力;主塔正截面
抗裂计算满足《公路钢筋混凝土及预应力混凝土桥涵设计规范》要求。

- 94 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

5.5.2 斜截面抗裂

正常使用极限状态主梁主拉应力(压为负,单位:kPa)

可见,主梁主拉应力满足规范要求。

- 95 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

正常使用极限状态主塔左肢主拉应力(压为负,单位:kPa)

正常使用极限状态主塔右肢主拉应力(压为负,单位:kPa)

可见,主塔肢最大主拉应力为:

σ tpmax = −0.0349 MPa ≤ 0.5 f tk = −1.325MPa ,

满足规范要求。

5.5.3 挠度验算

本桥主梁采用 C50 砼,按《公路钢筋混凝土及预应力混凝土桥涵设计规范》


(JTG

D62-2004)6.5.3 条计算挠度长期增长系数为ηθ = 1.425 。

主梁在使用阶段的长期挠度为:
L 39.5 L
Δ long −term = 0.0126m ×1.425 = 0.0180m << = = 0.0658m < = 0.079m
600 600 500
同时,自然满足《公路斜拉桥设计细则》(JTG/T D65-01—2007)4.4.1 条之规定。

5.5.4 小结

可见,结构持久状况正常使用极限状态计算满足规范要求。

- 96 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

5.6 持久状况构件应力计算
5.6.1 正截面压应力

计算结果以图形化方式简明地表达如下。

持久状况主梁正压应力(压为负,单位:kPa)

- 97 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

持久状况主塔正压应力(压为负,单位:kPa)

主梁与塔设计均采用 C50 砼,可见,主梁与塔最大正压应力为

σ kc + σ pt = 15.916MPa ≤ 0.5 f ck = 16.2 MPa ,满足。

5.6.2 斜拉索应力

弹性组合及短期组合下,斜拉索的内力及应力列于下表中。
标准组 标准组 标准组合 短期组 短期组 短期组合 标准组合 短期组合
索编号 合 Min 合 Max 应力幅值(MPa) 合 Min 合 Max 应力幅值(MPa) 安全系数 安全系数
3008 1734.40 2418.79 161.68 1750.60 2331.90 137.33 2.92 3.03
3018 1663.82 2250.01 138.49 1671.72 2164.81 116.49 3.14 3.27
3028 1584.90 2157.24 135.21 1589.49 2076.37 115.03 3.28 3.40
3038 1552.91 2140.33 138.78 1556.98 2070.33 121.28 3.30 3.41
3048 1574.88 2190.25 145.38 1580.08 2137.74 131.74 3.23 3.31
3058 1683.46 2363.15 160.58 1693.89 2326.50 149.45 2.99 3.04
3068 1744.25 2611.74 204.94 1770.74 2570.51 188.94 2.71 2.75
3108 1733.72 2419.48 162.01 1750.06 2332.46 137.59 2.92 3.03
3118 1662.56 2250.64 138.93 1670.72 2165.31 116.85 3.14 3.26
3128 1583.19 2158.10 135.82 1588.12 2077.06 115.51 3.28 3.40
3138 1550.69 2141.44 139.56 1555.21 2071.21 121.91 3.30 3.41
3148 1572.04 2191.66 146.38 1577.82 2138.87 132.55 3.23 3.30
3158 1679.86 2364.95 161.85 1691.01 2327.94 150.47 2.99 3.04

- 98 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

3168 1741.31 2612.99 205.93 1768.39 2571.50 189.73 2.71 2.75


4008 1716.29 2391.90 161.07 1732.61 2298.10 134.81 2.93 3.05
4018 1560.31 2116.23 132.53 1567.81 2025.49 109.11 3.31 3.46
4028 1457.18 1996.67 128.61 1461.98 1911.89 107.26 3.51 3.66
4038 1422.21 1976.46 132.13 1426.95 1904.51 113.85 3.54 3.68
4048 1431.04 2016.57 139.59 1437.77 1964.09 125.47 3.47 3.57
4058 1480.86 2153.07 160.26 1496.19 2115.55 147.66 3.25 3.31
4068 1308.61 2204.33 213.54 1345.08 2159.17 194.08 3.18 3.24
4108 1716.21 2391.94 161.09 1732.55 2298.13 134.84 2.93 3.05
4118 1559.73 2116.52 132.74 1567.35 2025.72 109.28 3.31 3.46
4128 1456.13 1997.19 128.99 1461.14 1912.31 107.56 3.51 3.66
4138 1420.58 1977.27 132.71 1425.65 1905.16 114.32 3.54 3.68
4148 1428.70 2017.74 140.43 1435.90 1965.02 126.14 3.47 3.56
4158 1477.62 2154.69 161.42 1493.60 2116.85 148.58 3.25 3.31
4168 1306.86 2203.33 213.72 1343.68 2158.37 194.22 3.18 3.25

目前,成品拉索应力变幅为 220~250MPa,可见,拉索是安全的。

5.6.3 主压应力

主梁与主塔的主压应力如下。

标准组合主梁主压应力(压为负,单位:kPa)

- 99 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

标准组合主塔主压应力(压为负,单位:kPa)

主梁与塔设计均采用 C50 砼,可见,主梁与塔最大主压应力为

σ cp = 10.147 MPa ≤ 0.6 f ck = 19.44MPa ,满足。

- 100 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

5.6.4 预应力钢筋应力

标准组合主梁预应力钢筋应力(拉为正,单位:kPa)

标准组合主塔左肢预应力钢筋应力(拉为正,单位:kPa)

- 101 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

标准组合主塔右肢预应力钢筋应力(拉为正,单位:kPa)

可见,主梁及塔部预应力束标准组合下最大永存应力为

σ max = 1201.635MPa ≤ 0.65 f pk = 1209MPa ,

满足规范要求。

5.6.5 支反力计算结果

全桥支反力如下表示。
(单位:kN,kN·m)
支座编号 工况 N Qy Qz Mx My Mz
1100 MaxNx -1956.01 0.00 1.19 0.00 19.93 0.00
1100 MinNx -5669.28 0.00 -2.39 0.00 -39.82 0.00
1100 MaxQy -2890.94 0.00 0.00 0.00 0.00 0.00
1100 MinQy -2890.94 0.00 0.00 0.00 0.00 0.00
1100 MaxQz -3333.60 0.00 134.33 0.00 2109.54 0.00
1100 MinQz -3341.76 0.00 -134.33 0.00 -2109.57 0.00
1100 MaxMx -1956.01 0.00 0.00 0.00 0.00 0.00
1100 MinMx -5669.28 0.00 0.00 0.00 0.00 0.00
1100 MaxMy -2890.94 0.00 47.06 0.00 6142.84 0.00
1100 MinMy -2890.94 0.00 -47.06 0.00 -6142.86 0.00
1100 MaxMz -3333.60 0.00 0.00 0.00 0.00 0.00

- 102 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

1100 MinMz -3341.76 0.00 0.00 0.00 0.00 0.00


1101 MaxNx -960.48 0.00 0.00 0.00 0.00 0.00
1101 MinNx -2883.38 0.00 0.00 0.00 0.00 0.00
1101 MaxQy -1445.47 0.00 0.00 0.00 0.00 0.00
1101 MinQy -1445.47 0.00 0.00 0.00 0.00 0.00
1101 MaxQz -1445.47 0.00 0.00 0.00 0.00 0.00
1101 MinQz -1445.47 0.00 0.00 0.00 0.00 0.00
1101 MaxMx -960.48 0.00 0.00 0.00 0.00 0.00
1101 MinMx -2883.38 0.00 0.00 0.00 0.00 0.00
1101 MaxMy -1445.47 0.00 0.00 0.00 0.00 0.00
1101 MinMy -1445.47 0.00 0.00 0.00 0.00 0.00
1101 MaxMz -1445.47 0.00 0.00 0.00 0.00 0.00
1101 MinMz -1445.47 0.00 0.00 0.00 0.00 0.00
1102 MaxNx -958.35 0.00 31.59 0.00 0.00 0.00
1102 MinNx -2887.63 0.00 -39.39 0.00 0.00 0.00
1102 MaxQy -1445.47 0.00 0.00 0.00 0.00 0.00
1102 MinQy -1445.47 0.00 0.00 0.00 0.00 0.00
1102 MaxQz -1554.87 0.00 134.33 0.00 0.00 0.00
1102 MinQz -1782.81 0.00 -134.33 0.00 0.00 0.00
1102 MaxMx -958.35 0.00 0.00 0.00 0.00 0.00
1102 MinMx -2887.63 0.00 0.00 0.00 0.00 0.00
1102 MaxMy -1445.47 0.00 0.00 0.00 0.00 0.00
1102 MinMy -1445.47 0.00 0.00 0.00 0.00 0.00
1102 MaxMz -1554.87 0.00 0.00 0.00 0.00 0.00
1102 MinMz -1782.81 0.00 0.00 0.00 0.00 0.00
1200 MaxNx -35422.08 -333.35 4.46 -1.55 82.69 457.44
1200 MinNx -42319.30 326.71 -2.23 0.78 -41.37 -448.32
1200 MaxQy -37450.75 331.70 -2.23 0.78 -41.37 -455.17
1200 MinQy -36040.13 -338.34 4.46 -1.55 82.69 464.28
1200 MaxQz -39872.94 -3.27 267.18 -88.97 -13934.34 4.49
1200 MinQz -39889.26 -3.28 -267.18 88.97 13934.40 4.50
1200 MaxMx -35422.08 -3.28 -20.08 462.37 -300.02 4.50
1200 MinMx -42319.30 -3.30 17.25 -462.38 303.51 4.52
1200 MaxMy -37450.75 -3.30 -232.17 -3.30 14676.12 4.52
1200 MinMy -36040.13 -3.28 229.34 3.29 -14672.63 4.50
1200 MaxMz -39872.94 -338.34 4.46 -1.55 82.69 464.28
1200 MinMz -39889.26 331.70 -2.23 0.78 -41.37 -455.17
1201 MaxNx -17615.13 -166.51 0.00 0.00 0.00 0.00
1201 MinNx -21317.31 162.20 0.00 0.00 0.00 0.00
1201 MaxQy -19738.61 192.73 0.00 0.00 0.00 0.00
1201 MinQy -19131.41 -196.04 0.00 0.00 0.00 0.00
1201 MaxQz -18534.32 -1.64 0.00 0.00 0.00 0.00
1201 MinQz -18534.32 -1.64 0.00 0.00 0.00 0.00

- 103 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

1201 MaxMx -17615.13 -1.64 0.00 0.00 0.00 0.00


1201 MinMx -21317.31 -1.64 0.00 0.00 0.00 0.00
1201 MaxMy -19738.61 -1.64 0.00 0.00 0.00 0.00
1201 MinMy -19131.41 -1.64 0.00 0.00 0.00 0.00
1201 MaxMz -18534.32 -1.64 0.00 0.00 0.00 0.00
1201 MinMz -18534.32 -1.64 0.00 0.00 0.00 0.00
1202 MaxNx -17606.22 -166.69 -123.24 0.00 0.00 0.00
1202 MinNx -21321.76 162.29 196.64 0.00 0.00 0.00
1202 MaxQy -19746.76 192.73 -20.08 0.00 0.00 0.00
1202 MinQy -19045.81 -196.05 17.25 0.00 0.00 0.00
1202 MaxQz -20767.92 -6.81 267.18 0.00 0.00 0.00
1202 MinQz -19113.17 3.53 -267.18 0.00 0.00 0.00
1202 MaxMx -17606.22 -1.64 0.00 0.00 0.00 0.00
1202 MinMx -21321.76 -1.64 0.00 0.00 0.00 0.00
1202 MaxMy -19746.76 -1.64 0.00 0.00 0.00 0.00
1202 MinMy -19045.81 -1.64 0.00 0.00 0.00 0.00
1202 MaxMz -20767.92 -1.64 0.00 0.00 0.00 0.00
1202 MinMz -19113.17 -1.64 0.00 0.00 0.00 0.00
1300 MaxNx -2102.11 0.00 1.19 0.00 18.44 0.00
1300 MinNx -5889.86 0.00 -2.39 0.00 -36.86 0.00
1300 MaxQy -3084.80 0.00 0.00 0.00 0.00 0.00
1300 MinQy -3084.80 0.00 0.00 0.00 0.00 0.00
1300 MaxQz -3221.62 0.00 132.15 0.00 1389.78 0.00
1300 MinQz -3229.78 0.00 -132.15 0.00 -1389.80 0.00
1300 MaxMx -2102.11 0.00 0.00 0.00 0.00 0.00
1300 MinMx -5889.86 0.00 0.00 0.00 0.00 0.00
1300 MaxMy -3084.80 0.00 37.72 0.00 6052.31 0.00
1300 MinMy -3084.80 0.00 -37.72 0.00 -6052.32 0.00
1300 MaxMz -3221.62 0.00 0.00 0.00 0.00 0.00
1300 MinMz -3229.78 0.00 0.00 0.00 0.00 0.00
1301 MaxNx -1037.48 0.00 0.00 0.00 0.00 0.00
1301 MinNx -2987.75 0.00 0.00 0.00 0.00 0.00
1301 MaxQy -1542.40 0.00 0.00 0.00 0.00 0.00
1301 MinQy -1542.40 0.00 0.00 0.00 0.00 0.00
1301 MaxQz -1542.40 0.00 0.00 0.00 0.00 0.00
1301 MinQz -1542.40 0.00 0.00 0.00 0.00 0.00
1301 MaxMx -1037.48 0.00 0.00 0.00 0.00 0.00
1301 MinMx -2987.75 0.00 0.00 0.00 0.00 0.00
1301 MaxMy -1542.40 0.00 0.00 0.00 0.00 0.00
1301 MinMy -1542.40 0.00 0.00 0.00 0.00 0.00
1301 MaxMz -1542.40 0.00 0.00 0.00 0.00 0.00
1301 MinMz -1542.40 0.00 0.00 0.00 0.00 0.00
1302 MaxNx -1035.52 0.00 16.32 0.00 0.00 0.00

- 104 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

1302 MinNx -2991.66 0.00 -22.76 0.00 0.00 0.00


1302 MaxQy -1542.40 0.00 0.00 0.00 0.00 0.00
1302 MinQy -1542.40 0.00 0.00 0.00 0.00 0.00
1302 MaxQz -1540.55 0.00 132.15 0.00 0.00 0.00
1302 MinQz -1685.15 0.00 -132.15 0.00 0.00 0.00
1302 MaxMx -1035.52 0.00 0.00 0.00 0.00 0.00
1302 MinMx -2991.66 0.00 0.00 0.00 0.00 0.00
1302 MaxMy -1542.40 0.00 0.00 0.00 0.00 0.00
1302 MinMy -1542.40 0.00 0.00 0.00 0.00 0.00
1302 MaxMz -1540.55 0.00 0.00 0.00 0.00 0.00
1302 MinMz -1685.15 0.00 0.00 0.00 0.00 0.00

5.7 小结

综上,本桥结构在短暂状况与持久状况各项验算均满足规范相关要求。

- 105 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

6 横梁计算
本桥共布置有两道端横梁、一道中横梁、标准梁段无索区横梁及标准梁段有索区
横梁,共四类,其中有索区横梁为斜拉索所在横梁,受力相对复杂,且数量占绝大多
数,故本报告以该类横梁为例对其受力进行详细分析,其余横梁受力与其类似,不再
赘述。

6.1 计算方法和计算模型

本桥主梁标准段,有索区横梁处,横梁将两分离式主肋接成整体共同受力,斜拉
索锚固在两主肋上。据此,本次进行受力分析时,将其简化为支撑在两侧斜拉索上的
简支梁,采用 TDV RM V08.09.81.02®进行计算。横梁计算为局部计算,汽车荷载按
规范采用车辆荷载。选取包含一道横梁在内的一个索距内的标准梁段(5m 长)为研
究对象,翼缘板的横向宽度按规范计算为 4.24m,建立计算模型如下图所示。整个横
梁离散为 53 个节点,52 个单元。
计算采用 kN,m 制,应力单位为 kN/m2。

计算模型简图

计算模型三维效果图

6.2 恒载

结构自重:由程序根据单元断面自行计算(混凝土容重 25.0kN/m3)。由于计算
模型仅包含有效宽度内的主梁自重,研究对象内剩余梁段自重简化为均布荷载进行
加载。

- 106 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

铺装及内侧栏杆:一个索距长度梁段内的桥面铺装及内侧防撞栏杆重量。桥面
铺装为 10cm 的沥青混凝土,其容重取 23kN/m3。按设计图所示结构经计算,取
12.7kN/m。

人行道板及外侧栏杆:一个索距长度梁段内的人行道板及外侧栏杆重量。按均
布荷载加载。按设计图所示结构经计算,取 26.3kN/m。
预应力:φj15.24 预应力钢绞线,fpk=1860MPa, 考虑横梁自身预应力束效应。
依照设计文件预应力束布置输入,由程序自动加载。

6.3 活载

活载按以下两种类型分别加载,取横梁跨中弯距大者:
Ⅰ类:将主梁节段两侧剪力差及横梁所在斜拉索索力(活载)之和,按适当比
例加载到主梁腹板所在位置的横梁上;
Ⅱ类:由于横梁计算为桥梁结构的局部加载,采用公路-Ⅰ级车辆荷载,按六
车道进行加载。
经比较,第Ⅱ类控制设计,故活载按第Ⅱ类型加载加载。车辆活载横向加载布
置详见下图。

车辆荷载:采用公路-Ⅰ级车辆荷载,按四车道进行加载;

- 107 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

汽车荷载冲击力:按规范考虑局部加载的汽车荷载冲击系数。
人群荷载:按规范取 3.5kN/m2;
温变:体系整体升温 20℃;体系整体降温 20℃;
温度梯度:《公路桥涵设计通用规范》(JTG D60-2004)的规定取值。

6.4 计算工况

工况 1:恒载+人群荷载+汽车荷载+汽车荷载冲击力+温变+温度梯度
恒载按照结构重力,预加应力,二期恒载的顺序进行加载。

6.5 主要计算结果

对横梁按上述工况进行持久状况下的应力计算,主要计算结果详见下图示。

持久状况横梁上下缘正应力图(红、蓝色为上缘,绿、青色为下缘,压为负,单位:kPa)

- 108 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

持久状况横梁预应力钢筋应力(拉为正,单位:kPa)

可见,在持久状况下,除两端翼缘顶面有不到 1MPa 的拉应力外,其余均为压


应力,最大压应力为 7.6MPa;钢束的永存应力也满足规范要求。
同理计算中横梁、端横梁均满足规范要求。

- 109 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

7 结构动力特性分析
本文进行了结构动力特性分析,如下表。
结构动力特性表
振型 频率(Hz) 振型特性
1 1.342 桥面系面内一阶反对称振动
2 1.754 桥塔面外一阶侧倾振动
3 2.033 桥塔面外一阶对称振动
4 2.209 主梁一阶扭转振动
5 2.475 主梁面内二阶竖向对称振动
6 2.518 拉索面外侧倾振动

- 110 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

第 1 阶振型图

- 111 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

第 2 阶振型图

- 112 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

第 3 阶振型图

- 113 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

第 4 阶振型图

- 114 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

第 5 阶振型图

- 115 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

第 6 阶振型图

- 116 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

8 稳定计算

(JTG/T D65-01—2007)与《公路桥梁抗
本文根据《公路斜拉桥设计细则》
(JTG/T D60-01—2004)进行了本桥的静力稳定及空气动力稳定计
风设计规范》
算。

8.1 稳定计算(结构线弹性屈曲分析)

Pcr
结构稳定安全系数 K 定义为: K = ,式中:K—结构稳定安全系数, Pcr
PT

—结构的极限承载力, PT 在成桥状态为结构恒载与活载之和, PT 在施工阶段仅

为结构恒载,实际上,K 为结构达到极限承载力时 PT 的加载倍数。成桥状态的

活载按公路Ⅰ级计算。

8.1.1 计算模型

本文采用特征值屈曲理论对结构进行了线弹性屈曲分析。计算模型同静力
分析模型。

8.1.2 稳定系数

经计算,其特征值屈曲荷载因子及其失稳模态如下:
稳定系数表

工况 稳定系数

恒载(可变) 14. 107

恒载(固定)+活载满布(可变) 65.203

117
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

失稳模态图

118
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

8.1.3 稳定性小结

(JTG/T D65-01—2007)中斜拉桥的“结
可见,满足《公路斜拉桥设计细则》
构稳定安全系数应不小于 4”的要求。

8.2 空气动力稳定计算

8.2.1 基本风速

由于桥位处历史风速观测资料缺乏,查规范知 V10 = 25 m s , K1 = 0.86 。

8.2.2 设计基准风速

Vd = 21.5 m s 。

8.2.3 空气静力稳定性验算

由于本桥跨径小,根据规范相关条文从略。

8.2.4 颤振稳定性

(1) 颤振检验风速

[Vcr ] = 1.2μ f Vd = 1.2 × 1.43 × 21.5 = 36.894 m s

(2) 颤振稳定性指数

扭转基频 f t = 2.209 Hz

If =
[Vcr ] =
36.894
= 0.623 < 2.5
ft ⋅ B 2.209 × 26.8

119
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

(3) 颤振临界风速

Vcr = η s ⋅ηα ⋅ Vc 0

r
Vc 0 = 2.5 μ ⋅ ⋅ ft ⋅ B
b

μ = 1.43

Ix 2.128
r= = = 0.4287 m
A 11.58

b = 1.372m
B = 26.8m

0.4287
Vc 0 = 2.5 × 1.43 × × 2.209 × 26.8 = 98.9m / s
1.372

Vcr = η s ⋅ η d ⋅ Vc 0 = 0.75 × 0.7 × 98.9 = 51.94 m s

(4) 颤振稳定性

可见, Vcr ≥ [Vcr ],满足抗风稳定性要求。

120
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

9 桥梁地震荷载分析

9.1 计算结果

本桥地震基本烈度 6 度,场地类别 IV,综合影响系数 0.35,结构重要性修正系


数 1.7。由于本桥为斜拉桥结构,结构较柔,参考同类桥型经验,地震荷载不控制
设计,此处略去。

- 121 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

10 主桥基础下部结构计算

10.1 主塔承台计算

10.1.1 坐标系定义

z 轴竖直,向上为正;x 轴为横桥向,水平向右,y 轴根据 x 轴、z 轴由右手螺


旋法则确定;坐标原点位于标高 0.0m 处。

整体坐标系示意图

10.1.2 荷载信息

集中荷载汇总表
荷载名称 荷载类型 荷载位置(m) 集中力(kN) 集中矩(kN*m)
X 0 HX 0 MX -350
支反力 结构重力 Y -0.3 HY 200 MY 0
Z 3.8 P -2.2e4 MZ 0
X 0 HX 0 MX 0
摩阻力 支座摩阻 Y -0.3 HY -1342 MY 0
Z 3.8 P 0 MZ 0
X 0 HX 0 MX 815
墩自重 结构重力 Y 0 HY 0 MY 0
Z -3.5 P -1155 MZ 0
X 0 HX 0 MX 0
覆土重 土的重力 Y 0 HY 0 MY 0
Z -3.5 P -536 MZ 0
承台自重 结构重力 X 0 HX 0 MX 0
Y 0 HY 0 MY 0

- 122 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

Z -1.8 P -3981.3 MZ 0
注:
1、此处力的坐标原点为承台底中心处。
2、支反力为上构计算提取的最不利值;摩阻力为上构反力的 0.06 倍。

10.1.3 主墩处地质钻孔资料
土层工程地质物理力学参数表
天然重 饱和重
m值 压缩模
土层 层顶标 qik fa0 度 度 内摩擦
(kN/m4 量
名称 高(m) (kPa) (kPa) (kN/m3 (kN/m3 角(o)
) (MPa)
) )
2 0 3e4 150 500 20.3 20.5 16 23
3 -3.2 8000 140 300 23 23.5 20 16
4 -9.4 8000 180 400 23.5 24 25 20
5 -18.6 1e4 220 650 24 24.5 25 24

10.1.4 承台正截面承载力计算

计算方法:承台正截面承载力按照《公路钢筋混凝土及预应力混凝土桥涵设计
规范》第 8.5.2、8.5.3 条计算。
x=-1.350m(桩位:-2m)正截面承载力验算

承台正截面承载力(撑系杆体系)计算图示

基本组合撑杆抗压、系杆抗拉承载力验算表
参数名称 参数值
γ0 1
承台有效高度 h0(mm) 3354.3
a mm)
撑杆压力线在承台顶面的作用点至墩台边缘的距离 ( 503.1

- 123 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

桩中心至墩台边缘的距离 x(mm) 650


撑杆压力线与系杆拉力线的夹角 θ(rad) 1.24
桩排最大竖向力之和 γ0Nd(kN) 2.1e4
撑杆压力 γ0Dd(kN) 2.2e4
系杆拉力 γ0Td(kN) 7254.6
系杆钢筋的顶层钢筋中心至承台底的距离 s(mm) 200
系杆钢筋直径 d(mm) 27.5
ha(mm) 364.8
桩的支撑宽度 b(mm) 1200
撑杆计算高度 t(m) 1.3
撑杆计算宽度 bs(m) 7
撑杆计算宽度 bs 范围内系杆钢筋截面面积 As(mm2) 5.45e4
钢筋弹性模量 Es(MPa) 2e5
ε1 3.15e-4
(MPa) 14.4

(kN) 1.3e5
2.2e4
撑杆抗压承载力是否满足 是
钢筋抗拉强度设计值 fsd(MPa) 280

(kN) 1.5e4
7254.6
系杆抗拉承载力是否满足 是
最小配筋率验算表
配筋率 最小配筋率 配筋率是否满足
0.23% 0.22% 是

10.1.5 承台斜截面抗剪承载力计算

计算方法:承台斜截面抗剪承载力按照《公路钢筋混凝土及预应力混凝土桥涵
设计规范》第 8.5.4 条计算。

- 124 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

x=-1.35m(桩位:-2m)斜截面抗剪承载力验算

承台斜截面抗剪验算计算图示

基本组合承台斜截面承载力验算表
参数名称 参数值
γ0 1
γ0Vd(kN) 2.1e4
承台计算宽度内纵向受拉钢筋截面面积 As(mm2) 5.45e4
承台有效高度 h0(mm) 3354.3
斜截面内纵向受拉钢筋的配筋率 ρ 2.32e-3
斜截面内纵向受拉钢筋的配筋百分率 P 0.23
混凝土立方体抗压强度标准值 fcu.k(MPa) 30
墩台边缘至斜截面外侧桩边缘的距离 a(mm) 50
剪跨比 m 0.5
承台计算宽度 bs(mm) 7000
抗剪承载力(kN) 5e4
抗剪承载力是否满足 是

10.1.6 承台冲切承载力计算

计算方法:承台冲切承载力按照《公路钢筋混凝土及预应力混凝土桥涵设计规
范》第 8.5.5 条计算。

- 125 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

(1)墩柱向下冲切承载力验算
墩柱 1 承载力验算

墩柱1

承台墩柱冲切计算图示

柱或墩台向下冲切承载力计算表
参数名称 参数值
柱或墩台作用面的横桥向边长 bx(mm) 2700
柱或墩台作用面的顺桥向边长 by(mm) 4950
柱或墩台边缘到桩边缘的横桥向水平距离 ax(mm) 50
1024.3,
柱或墩台边缘到桩边缘的顺桥向水平距离 ay(mm)
1025.7
3354.3,
承台有效高度 h0(mm)
3353.9
冲跨比 λx 0.2
冲跨比 λy 0.31
与冲跨比 λx 对应的冲切承载力系数 αpx 3
与冲跨比 λy 对应的冲切承载力系数 αpy 2.37, 2.37
混凝土轴心抗拉强度设计值 ftd(MPa) 1.4
冲切承载力(kN) 1.4e5
基本组合柱或墩台向下冲切承载力验算表
参数名称 参数值
γ0 1
柱或墩台的竖向力 γ0F(kN) 0
冲切锥范围内桩的反力 γ0F0(kN) 0
冲切力 γ0Fld=γ0(F- (kN) 0
冲切承载力是否满足 是

(2) 角桩向上冲切承载力验算
承载力验算

- 126 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

承台角桩冲切计算图示

角桩向上冲切承载力计算表
计算参数 参数值
承台边缘至桩内边缘的横桥向水平距离 bx(mm) 1850
承台边缘至桩内边缘的顺桥向水平距离 by(mm) 1850
桩边缘至相应柱或墩台边缘的横桥向水平距离 ax(mm) 3354.3
桩边缘至相应柱或墩台边缘的顺桥向水平距离 ay(mm) 3353.9
承台有效高度 h0(mm) 3354.3, 3353.9
冲跨比 λx 1
冲跨比 λy 1
与冲跨比 λx 对应的冲切承载力系数 αpx’ 0.67
与冲跨比 λy 对应的冲切承载力系数 αpy’ 0.67
混凝土轴心抗拉强度设计值 ftd(MPa) 1.4
冲切承载力(kN) 1.3e4
基本组合角桩向上冲切承载力验算表
计算参数 参数值
γ0 1
角桩竖向力 γ0Fld(kN) 1.1e4
冲切承载力是否满足 是

10.1.7 承台局部承压承载力计算

计算方法:配置间接钢筋时按照《公路钢筋混凝土及预应力混凝土桥涵设计规
范》第 8.5.6 条计算,不配置间接钢筋时按照《公路圬工桥涵设计规范》第 4.0.11
条计算。

- 127 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

(1)墩柱 1 局部承压承载力验算

墩柱1

承台局部承压计算图示

基本组合承台局部承压承载力验算表
参数名称 参数值
γ0 1
局部压力 γ0Nd(kN) 0
局部受压时的计算底面积 Ab(mm2) 4.55e7
混凝土局部受压面积 Al(mm2) 1.34e7
混凝土局部承压强度提高系数 β 1.84
混凝土轴心抗压强度设计值 fcd(MPa) 11.7
局部承压承载力( )(kN) 2.6e5
局部承压承载力是否满足 是

(2)局部承压承载力验算

承台局部承压计算图示

基本组合承台局部承压承载力验算表
参数名称 参数值
γ0 1
局部压力 γ0Nd(kN) 1.1e4
局部受压时的计算底面积 Ab(mm2) 4.91e6
混凝土局部受压面积 Al(mm2) 1.77e6
混凝土局部承压强度提高系数 β 1.67
混凝土轴心抗压强度设计值 fcd(MPa) 11.7
局部承压承载力( )(kN) 3.1e4
局部承压承载力是否满足 是

- 128 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

10.2 桥塔桩基计算

10.2.1 群桩基础 m 法计算参数


桩侧地基水平系数 m (kN/m4):8000
桩端处地基水平系数 m0(kN/m4) 1e4
桩端处地基竖向系数 C0(kN/m3):2.5e5
m 法计算参数表
局部 X 向 局部 Y 向
桩号 -1 -1
1 m) 变形系数 (m ) 计算宽度 b(
计算宽度 b( 1 m) 变形系数 (m )

1 1.95 0.3044 1.85 0.3013


2 1.95 0.3044 1.85 0.3013
3 1.95 0.3044 1.85 0.3013
4 1.95 0.3044 1.85 0.3013

10.2.2 桩基单桩轴向受压承载力验算
桩基单桩轴向受压承载力验算结果表
桩身最大 单桩轴向受压承载力容 NR/ 是否
桩号 组合
竖向力 许值 N 满足
长期效应组合 7469.3 1.2e4 1.55 是
1
短期效应组合 8856.8 1.4e4 1.63 是
长期效应组合 7469.3 1.2e4 1.55 是
2
短期效应组合 8856.8 1.4e4 1.63 是
长期效应组合 6674.3 1.2e4 1.73 是
3
短期效应组合 6674.3 1.4e4 2.16 是
长期效应组合 6674.3 1.2e4 1.73 是
4
短期效应组合 6674.3 1.4e4 2.16 是

10.2.3 桩基单桩轴向受拉承载力验算
桩基单桩轴向受拉承载力验算结果表
桩身最小竖 单桩轴向受拉承载力容 NR/ 是否
桩号 组合
向力 许值 N 满足
长期效应组合 8511 0 0 是
1
短期效应组合 8511 -6587.9 -0.77 是
2 长期效应组合 8511 0 0 是

- 129 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

短期效应组合 8511 -6587.9 -0.77 是


长期效应组合 7716 0 0 是
3
短期效应组合 6328.5 -6587.9 -1.04 是
长期效应组合 7716 0 0 是
4
短期效应组合 6328.5 -6587.9 -1.04 是

10.2.4 桩基截面抗裂性验算
桩基截面裂缝最不利验算汇总表
截面轴 裂缝宽度限
截面弯矩 裂缝宽度 是否 对应 断面位置
力N 值
M(kN*m) (mm) 满足 桩号 Z(m)
(kN) (mm)
8794.1 412.4 0 0.2 是 1 0

10.2.5 单桩截面应力最不利验算结果汇总基底应力计算
桩基截面应力验算汇总表
对应钢 对
混凝土 断面
组合 混凝土应力 筋 钢筋应力 最值 应
最大压应力 位置
类型 是否满足 拉应力 是否满足 工况 桩
(MPa) z(m)
(MPa) 号
短期
混凝
效应
土最
标准 4.2 是 19.1 是 3 0
大应
值组

10.3 桥台承台桩基计算

10.3.1 荷载信息
集中荷载汇总表
荷载名称 荷载类型 荷载位置(m) 集中力(kN) 集中矩(kN/m)
X 0 HX 0 MX 0
支反力 结构重力 Y 0.2 HY 0 MY 0
Z -2.2 P -7682 MZ 0
X 0 HX 0 MX 1e4
台身填土
结构重力 Y 0 HY 0 MY 0

Z -2.2 P -9636 MZ 0
X 0 HX 0 MX 0
支座摩阻
支座摩阻 Y 0.2 HY 461 MY 0

Z 3 P 0 MZ 0

- 130 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

X 0 HX 0 MX 0
侧压力 土侧压力 Y 0 HY 2154 MY 0
Z 1.5 P 0 MZ 0
X 0 HX 0 MX 0
承台自重 结构重力 Y 0 HY 0 MY 0
Z -1.2 P -8375 MZ 0
注:
1、支反力为上构计算提取的最不利值。
2、台身、填土等荷载由来见下表:

陨安桥桥台力计算表
偏心距
名称 自重(kN) 弯矩(kN*m)
(m)
台身 4636.856 -0.065 -301.396
耳墙 281.684 -1.998 -562.805
填土 4717.84 -1.998 -9426.24
合计 9636.379 -10290.4

3、支座摩阻力偏大的取为上构反力的 0.06 倍。
4、土侧压力计算按照通用规范上规定的土压力的计算公式进行计算,按 4 车道
考虑汽车土侧压力,并将其与摩阻力同向的最不利加载方向进行加载。
5、此处力的坐标原点位于桥台承台底中心处。X 轴为横桥向,向右为正;Y 轴
为顺桥向;Z 轴为竖直向上为正。坐标系如下图所示:

10.3.2 钻孔地质资料
土层工程地质物理力学参数表
m值 fa0 天然重 饱和重 压缩模
土层 层顶标 qik 内摩擦
(kN/m4 (kPa) 度 度 量
名称 高(m) (kPa) 角(o)
) (kN/m3 (kN/m3 (MPa)

- 131 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

) )

2 0 3e4 150 0 20.3 20.5 16 23


3 -5.3 8000 140 0 23 23.5 20 16
4 -14.2 8000 180 400 23.5 24 25 20

10.3.3 承台底中心单项荷载位移
承台底中心单项位移表
竖向位移 水平位移 水平位移 转角 RX 转角 RY 转角 RZ
荷载类型
DZ(m) DX(m) DY(m) (rad) (rad) (rad)
支反力 -7.668e-4 0 8.082e-5 -3.47e-5 0 0
台身填土
-9.618e-4 0 -5.281e-4 2.27e-4 0 0

支座摩阻
0 0 3.688e-4 -7.65e-5 0 0

侧压力 0 0 1.563e-3 -2.88e-4 0 0
承台自重 -8.36e-4 0 0 0 0 0

10.3.4 短期效应标准值组合桩顶内力最值
短期效应标准值组合桩顶内力最值表
最大 N 最小 N 最大 MX 最小 MX 最大 MY 最小 MY
桩号
(kN) (kN) (kN·m) (kN·m) (kN·m) (kN·m)
1 2985 2805.5 2805.5 2805.5 2805.5 2985
2 2985 2805.5 2805.5 2805.5 2805.5 2985
3 2985 2805.5 2805.5 2805.5 2805.5 2985
4 2985 2805.5 2805.5 2805.5 2805.5 2985
5 3617.7 3438.2 3438.2 3438.2 3617.7 3438.2
6 3617.7 3438.2 3438.2 3438.2 3617.7 3438.2
7 3617.7 3438.2 3438.2 3438.2 3617.7 3438.2
8 3617.7 3438.2 3438.2 3438.2 3617.7 3438.2
承台强度验算结果汇总表
验算项目 验算结果(是否满足)
正截面承载力 是
斜截面承载力 是
冲切承载力 是
局部承压承载力 是

- 132 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

10.3.5 承台正截面承载力验算结果汇总
基本组合撑杆抗压、系杆抗拉承载力验算汇总表
撑杆压力 撑杆抗压 系杆拉力 系杆抗拉
验算 撑杆抗压 系杆抗拉
γ0Dd 承载力 γ0Td 承载力
位置 是否满足 是否满足
(kN) (kN) (kN) (kN)
y=-0.8
75m
(桩
1.9e4 3.1e5 是 1.1e4 3.113e4 是
位:-1.
875m

y=0.9
25m
(桩 1.9e4 3.1e5 是 1.1e4 3.113e4 是
位:1.8
75m)

最小配筋率验算汇总表
验算位置 配筋率(%) 最小配筋率(%) 配筋率是否满足
y=-0.875m(桩
0.33 0.22 是
位:-1.875m)
y=0.925m(桩
0.33 0.22 是
位:1.875m)

10.3.6 承台斜截面抗剪承载力验算结果汇总
基本组合承台斜截面抗剪承载力验算汇总表
配筋 剪力 抗剪承载
验算 计算宽度 有效高度 剪跨 是否
百分率 γ0Vd 力
位置 bs(mm) h0(mm) 比 m 满足
P (kN) (kN)
y=-0.8
75m
(桩 0.33 1.8e4 1853 0.5 1.5e4 7.2e4 是
位:-1.8
75m)
y=0.92
5m(桩
0.33 1.8e4 1853 0.5 1.6e4 7.2e4 是
位:1.8
75m)

- 133 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

10.3.7 承台冲切承载力验算结果汇总
基本组合承台冲切承载力验算汇总表
破坏锥的编 冲切力 γ0Fld 冲切承载力 冲切承载力
冲切破坏类型
号 (kN) (kN) 是否满足
墩柱向下冲切 墩柱 1 0 2.6e5 是
角桩向上冲切 1 3841.6 9378.4 是
角桩向上冲切 4 3841.6 9378.4 是
角桩向上冲切 5 4030.7 9378.4 是
角桩向上冲切 8 4030.7 9378.4 是
边桩向上冲切 2 3841.6 1.3e4 是
边桩向上冲切 3 3841.6 1.3e4 是
边桩向上冲切 6 4030.7 1.4e4 是
边桩向上冲切 7 4030.7 1.4e4 是

10.3.8 承台局部承压承载力验算结果汇总
基本组合承台局部承压承载力验算汇总表
局部压力 γ0Fld 局部承压承载力 承载力是否满
验算位置
(kN) (kN) 足
墩柱 1 0 8.8e5 是
1 3841.6 3.1e4 是
2 3841.6 3.1e4 是
3 3841.6 3.1e4 是
4 3841.6 3.1e4 是
5 4030.7 3.1e4 是
6 4030.7 3.1e4 是
7 4030.7 3.1e4 是
8 4030.7 3.1e4 是

10.3.9 群桩基础 m 法计算参数

桩侧地基水平系数 m (kN/m4):2.6e4
桩端处地基水平系数 m0(kN/m4):8000
桩端处地基竖向系数 C0(kN/m4):1.4e5

m 法计算参数表
局部 X 向 局部 Y 向
桩号 -1 -1
1 m) 变形系数 (m ) 计算宽度 b(
计算宽度 b( 1 m) 变形系数 (m )

1 1.8 0.3793 2.14 0.3927

- 134 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

局部 X 向 局部 Y 向
桩号 -1 -1
1 m) 变形系数 (m ) 计算宽度 b(
计算宽度 b( 1 m) 变形系数 (m )

2 1.8 0.3793 2.14 0.3927


3 1.8 0.3793 2.14 0.3927
4 1.8 0.3793 2.14 0.3927
5 1.8 0.3793 2.14 0.3927
6 1.8 0.3793 2.14 0.3927
7 1.8 0.3793 2.14 0.3927
8 1.8 0.3793 2.14 0.3927

10.3.10 群桩验算汇总描述
群桩验算结论
验算项目 验算结果(是否满足)
单桩轴向承载力 是
单桩截面承载力 是
单桩截面应力 是
单桩截面抗裂性 是
群桩整体基础沉降量(mm) 16.1

10.3.11 群桩整体基础沉降量计算
沉降量计算表
整体基础合计沉降量(mm) 16.1
沉降计算深度(m) 13.1

10.3.12 单桩轴向受压承载力最不利验算结果汇总
轴向受压承载力验算成果汇总表
轴向受压承载力容许
桩身竖
值 是否 对应
组合 向力
满足 桩号
N(kN) (kN)

长期效应组合 3511.3 7283 2.07 是 5


短期效应组合 3690.9 9103.7 2.47 是 5

10.3.13 单桩轴向受拉承载力最不利验算结果汇总
轴向受拉承载力验算成果汇总表
桩身竖向 轴向受拉承载力容许
是否 对应
组合 力 值 NR/N
满足 桩号
N(kN) NR(kN)
长期效应组合 3780.2 0 0 是 1
短期效应组合 3600.7 -3945.7 -1.1 是 1

- 135 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

10.3.14 单桩截面承载力最不利验算结果汇总
桩基截面承载力验算成果汇总表
截面
截面 截面 断面
抗力 是否 最值 对应
组合类型 轴力 N 弯矩 M 位置
NR 满足 工况 桩号
(kN) ( ) z(m)
(kN)
NRN
基本组合 4512.7 709.3 2.3e4 是 5 0
min

10.3.15 单桩截面应力最不利验算结果汇总
桩基截面应力验算汇总表
混凝土 对应钢 钢筋应 对 断
混凝土应
最大压应 筋 力 最值 应 面
组合类型 力
力 拉应力 是否满 工况 桩 位
是否满足
(MPa) (MPa) 足 号 置
短期效应 混凝土最
2.9 是 2.3 是 1 0
标准值组 大应力

10.3.16 单桩截面裂缝最不利验算结果汇总
桩基截面裂缝验算汇总表
截面弯矩 截面轴 裂缝宽度限
裂缝宽度 是否 对应 断面位置
力N 值
M( ) (mm) 满足 桩号 z(m)
(kN) (mm)
2805.5 541.5 5.95e-3 0.2 是 4 0

- 136 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

11 结论
1. 持久状况,承载能力极限状态正截面抗弯及斜截面抗剪承载能力均满足规范要

求。
2. 短暂状况各主要施工阶段,结构正截面压应力、主压应力、预应力钢筋应力及

拉索索力均满足规范要求。
3. 持久状况,正常使用组合下主梁正截面和斜截面抗裂计算满足规范要求。

4. 在弹性阶段标准组合下,主梁正截面最大压应力、最大主压应力及预应力钢筋

应力均满足规范要求。
5. 正常使用极限状态斜拉索索力最大值均小于 0.4*破断荷载,满足《公路斜拉桥

设计细则》
(JTG/T D65-01-2007)3.4.1 条规定。
6. 经计算,纵梁竖向挠度:
L 39.5
Δ = 0.0126m × 1.425 = 0.0180m << = = 0.0658m ,
600 600
满足《公路斜拉桥设计细则》(JTG/T D65-01—2007)4.4.1 条规定。结构刚度满足
规范要求。
7. 由横梁计算结果知,正常使用短期效应组合下,横梁正截面和斜截面抗裂计算

满足规范要求。在弹性阶段标准组合下,横梁正截面最大压应力和最大主压应
力均满足规范要求。通过汽车荷载产生的结构竖向挠度的计算结果,结构刚度
满足规范要求。同理计算中横梁功能端横梁均满足规范要求。
8. 主塔承台经计算符合规范规定。

9. 通过主塔桥墩基础单桩承载力计算和计算桩反力,主塔桥墩处单桩最大设计反

力小于单桩承载力,符合规范规定。
10. 通过桥台基础单桩承载力计算,桥墩单桩最大设计反力小于单桩承载力,符合

规范规定。
11. 桥梁静力与动力稳定性均满足规范要求。

- 137 -
湖北省郧西县市政桥梁工程郧安桥 施工图设计文件计算书

12 附录

12.1 恒载及可变荷载工况内力值

见《LC_FORCE.XLS》

12.2 标准组合内力值

见《COMB1_FORCE.xls》

12.3 短期组合内力

见《COMB1_FORCE.xls》

- 138 -