You are on page 1of 3

COMITÉ DE CONSTRUCCIÓN DE LA TORRE DE SOCARTE

PLANILLA DE AVANCE DE OBRA N° 14


OBRA: "CONSTRUCCIÓN DE TORRE"
CONTRATISTA: SR. NARCISO LOJA
MONTO CONTRATADO: 33,437.08
CANTÓN: CAÑAR
FECHA: 13 DE ABRIL DEL 2019
CANTIDAD VALOR
Item Descripcion Unidad Cantidad P.Unitario P.Total ESTE MES ANTERIOR ACOMULADO ESTE MES
1 REPLANTEO Y NIVELACION m2 61.91 0.28 17.33 6.81 0 6.81 1.91
EXCAVACION A MANO EN SUELO SIN CLASIFICAR PROFUNDIDAD DE 0
2 a2m m3 58.15 10.81 628.60 3.75 1.2 4.83 40.54

3 RELLENO COMPACTADO CON MAT. CLASIF. OBRA m3 52.50 7.46 391.65 0.00 0.00 0.00 0.00

4 HORMIGON fc= 210 kg/cm2 m3 66.79 47.64 3,181.88 5.86 6.32 11.82 279.17
5 LOSA ALIVIANADA fc= 210kg/cm2, e = 20 cm. m2 203.19 7.59 1,542.21 18.62 0.00 18.62 141.33
6 ENCOFRADO RECTO m2 579.86 5.35 3,102.25 27.67 37.15 64.82 148.03
7 ACERO DE REFUERZO fy=4200 kg/cm2 Kg 9,502.51 0.48 4,561.20 309.56 435.8 745.36 148.59
8 MAMPOSTERIA DE BLOQUE e=15cm m2 346.80 7.73 2,680.76 63.30 283 346.30 489.31

9 ENLUCIDOS 1:2 m2 693.60 5.95 4,126.92 58.57 293.76 352.33 348.49


10 ENLUCIDO DE FILOS m 1,789.20 3.47 6,208.52 133.65 937.18 1,070.83 463.77
11 ENLUCIDOS ALTOS m2 203.19 12.98 2,637.41 0.00 95.02 95.02 0.00
12 EMPASTADO INT - EXT (2 MANOS) m2 346.80 6.08 2,108.54 172.60 392.03 563.63 1049.41
13 PINTURA LATEX INT-EXT (dos manos)INCL. FONDO m2 693.60 2.67 1,851.91 220.01 392.03 612.04 587.43
14 VENTANAS HIERRO, VIDRIO 6mm (sum y colocado) m2 13.12 5.84 76.62 0.00 0.00 0.00 0.00
15 Puerta de Seike de 90cm (sum Y colocadao en sitio) u 4.00 0.00 0.00 0.00 0.00 0.00 0.00
16 CONTRAPISO H.S. f"c=210 kg/cm2 e=7cm. m2 62.75 5.12 321.28 10.00 93.25 103.25 51.20

SUBTOTAL 33,437.08 3749.17


RESUMEN PLANILLA TRABAJO EXTRA
DESCRIOCION TOTAL ANTICIPO DESCONTADO SALDO
ANTICIPO 6,687.42 6,687.42 0.00
DESCUENTO ANTICIPO ESTE MES ANTERIOR TOTAL
0.00 6,687.42 6,687.42
PLANILLA 3724.67 42,209.14 45933.81
DESCUENTO ANTICIPO 0.00 6,687.42 6,687.42
VALOR A PAGAR 3749.17 42,209.14 45958.31
SON: TRES MIL CETECIENTOS VEINTE Y CUATRO CON 67/100 DOLARES AMERICANOS
T1 3749.17

PRESENTADO POR T2 1146.21


(T1) + (T2) 4895.38

_______________________________
SR. NARCISO LOJA

CONTRATISTA

RIBOS NUEVOS
Item Descripcion Unidad Cantidad P.Unitario P.Total
1 COLOCACIÓN DE PERFIL + BLOQUE + MALLA m2 18.62 3.38 62.94

2 PICADO + UBICADO D MANGERA + CELLADO ml 6.00 5.00 30.00

3 ENCOFRADO CURVO ml 27.87 13.70 381.82


4 ROTURA m3 4.60 127.02 584.29
REPLANTILLO m2 6.81 10.45 71.16
5 CERÁMICA m2 2.00 8.00 16.00

TOTAL 2 1146.21
VALOR
ANTERIOR ACOMULADO
0 1.9100
53.5095
12.972

0.0000
0.00

301.08 580.2504
0.00 141.3258
198.75 346.7845
209.18 357.7688
2187.59 2676.8990

1747.87 2096.3615
3252.01 3715.7755
1233.36 1233.3600
2383.54 3432.9480
1046.72 1634.1467
0.00 0.0000
0.00 0.0000
477.44 528.6400

13050.53 16799.68