3 RELLENO COMPACTADO CON MAT. CLASIF. OBRA m3 52.50 7.46 391.65 0.00 0.00 0.00 0.00
4 HORMIGON fc= 210 kg/cm2 m3 66.79 47.64 3,181.88 5.86 6.32 11.82 279.17
5 LOSA ALIVIANADA fc= 210kg/cm2, e = 20 cm. m2 203.19 7.59 1,542.21 18.62 0.00 18.62 141.33
6 ENCOFRADO RECTO m2 579.86 5.35 3,102.25 27.67 37.15 64.82 148.03
7 ACERO DE REFUERZO fy=4200 kg/cm2 Kg 9,502.51 0.48 4,561.20 309.56 435.8 745.36 148.59
8 MAMPOSTERIA DE BLOQUE e=15cm m2 346.80 7.73 2,680.76 63.30 283 346.30 489.31
_______________________________
SR. NARCISO LOJA
CONTRATISTA
RIBOS NUEVOS
Item Descripcion Unidad Cantidad P.Unitario P.Total
1 COLOCACIÓN DE PERFIL + BLOQUE + MALLA m2 18.62 3.38 62.94
TOTAL 2 1146.21
VALOR
ANTERIOR ACOMULADO
0 1.9100
53.5095
12.972
0.0000
0.00
301.08 580.2504
0.00 141.3258
198.75 346.7845
209.18 357.7688
2187.59 2676.8990
1747.87 2096.3615
3252.01 3715.7755
1233.36 1233.3600
2383.54 3432.9480
1046.72 1634.1467
0.00 0.0000
0.00 0.0000
477.44 528.6400
13050.53 16799.68