TASKS STATUS START FINISH DURATION COST PREDECESSORS NOTES

BASEMENT AREA
A. Structural Works
Rebars and Slab
Stair Repairs
Ramp Construction
Columns and beams for Tanks
Elevator Shaft
B. Mechanical Works
Fire and Domestic tanks
STP excavation and concreting
Fire Pump
Water Pump
Fire pro system
Ventilation System
C. Electrical Works
Electrical Panels
Electrical wiring layout
Lighting layout
D. Plumbing Works
Rainwater Harvesting
E. Architectural Works
Wall Partition
Wheel Curb
Plastering of walls
Waterproofing
Painting works
installation of doors and hardwares
Installation of louvers
GROUND FLOOR
A. Structural Works
Lintel beams
Stair Repairs and stair beams
Elevator Shaft
B. Mechanical Works
Fire pro system
Elevator installation
Ventilation System
C. Electrical Works
Electrical Panels
Electrical Wiring Layout
Lighting layout
D. Plumbing Works
Waterline layout
E. Architectural Works
Window System Installation
Window Curb
Louvered, entrance and main canopy construction
Brick Cladding installation
Painting works
Fire exit, Main stair entrance, Ramp railings and guardrails
Eaves spandrel ceilings
Installation of ACP
installation of doors and hardwares for fire exits
Installation of louvers
SECOND TO SIXTH FLOOR
A. Structural Works
Lintel beams
Stair Repairs and stair beams ( 2nd to 3rd)
Elevator Shaft
B. Mechanical Works
Fire pro system
Elevator installation
Ventilation System
C. Electrical Works
Electrical Panels
Lighting layout
D. Plumbing Works
Waterline layout
E. Architectural Works
Window/Curtain wall System Installation
Window Curb
Louvered, entrance and main canopy construction
Brick Cladding installation
Painting works
Fire exit, Main stair entrance, Ramp railings and guardrails
Eaves spandrel ceilings
Installation of ACP
installation of doors and hardwares for fire exits
Installation of louvers
Balcony Guardrails
Firewall Painting for waterproofing
Wall Partition for fire exit and lobby area
ROOF DECK
A. Structural Works
Parapet walls
Elevator Shaft
Elevator, Stairs and roof columns for rebars and concreting
Wall Partition for proposed restroom
B. Mechanical Works
Fire pro system
Elevator installation
Ventilation System
C. Electrical Works
Electrical Panels
Lighting layout
D. Plumbing Works
Waterline layout
Roof Drain
E. Architectural Works
Glass Railing installation/ parapet design
Plastering of walls
Waterproofing
Painting works
installation of doors and hardwares
Rainwater harvesting system
Brick Cladding installation
Name

STRUCTURAL WORKS
1 Rebars and Slab
l
ra
tuc

2
ru

Ramp Construction
St

3 Fire and Domestic tanks ( columns and beams)


4 STP excavation and concreting
l
ca

5 Fire Pump
ni
ha

6 Water Pump
ec
M

7 Fire pro system


8 Ventilation System
9 Electrical Panels
l
ca
tri

10
ec

Lighting layout
El
ng

11 none
bi
um
Pl

12
13
14
al
ur

15
ct
ite

16
ch
Ar

17
18
Duration Start Finish Predecessors Notes
ID Name Initials Type Material L Group Email AddrUser LogonMax Units Standard R
Cost Per UNotes
Task NameResource % Work CoWork Units