.25 .25 .

25

3.38
.15
ESPECIFICACIONES TECNICAS
3.35 SOBRECIMIENTO SOBRECIMIENTO SOBRECIMIENTO SOBRECIMIENTO LAS DISCREPANCIAS ENTRE LOS PLANOS Y LAS ESPECIFICACIONES
C-8 C:H 1:8 + 25 % PM C:H 1:8 + 25 % PM C:H 1:8 + 25 % PM C:H 1:8 + 25 % PM
7 3.40
SERAN EN EL SIGUIENTE ORDEN DE PRIORIDAD:
C-8 NPT +0.45 .20 NPT +0.45 .20 NPT +0.45 .20 NPT +0.45 NPT +0.45 .20
PRIMERO: PLANOS DE DISEÑO.
PISO .05 PISO .05 PISO .05 PISO PISO .05
NPT +0.30 SEGUNDO: ESPECIFICACIONES.
C-8 FALSO PISO .10 FALSO PISO .10 FALSO PISO .10 FALSO PISO FALSO PISO .10

7 6 PISO
CONCRETO CICLOPEO
2.61

FALSO PISO TERRENO NATURAL TERRENO NATURAL .20


C-8
7 7 LOSA DE FONDO
.45
TERRENO NATURAL
.45
TERRENO NATURAL TERRENO NATURAL
.45
-FALSA CIMENTACION : CONCRETO CICLOPEO 1:14 (CEMENTO-HORMIGON)
N.F : -1.70m NPT ± 0.00 MAS 40% PIEDRA GRANDE, 8" MAXIMO
NFP. - 0.05
H. : 0.15m
6 -CIMIENTOS CORRIDOS : CONCRETO CICLOPEO 1:10 (CEMENTO-HORMIGON)
C-8
NFP. + 0.25
6 6 TERRENO NATURAL .80 MAS 30% PIEDRA GRANDE, 6" MAXIMO
f'c = 80 Kg/cm²

2.45
TERRENO NATURAL .80 TERRENO NATURAL .80 TERRENO NATURAL .80 -SOBRECIMIENTOS : CONCRETO CICLOPEO 1:8 (CEMENTO-HORMIGON)
1.25

MAS 25% PIEDRA MEDIANA, 3" MAXIMO

.90
C-1
5 C-1 C-1 f'c = 100 Kg/cm²
C-8 C-8
CIMIENTO
V-C V-C -SOLADO DE CONCRETO: f'c = 80 Kg/cm²
3 C:H 1:10 + 30 % PG 0.50

CIMIENTO CIMIENTO CIMIENTO


5 C:H 1:10 + 30 % PG 0.50 C:H 1:10 + 30 % PG 0.50 C:H 1:10 + 30 % PG 0.50
CORTE 4-4 CONCRETO ARMADO
7 7 CORTE 1-1 CORTE 2-2 CORTE 3-3 -CONCRETO : f'c = 210 Kg/cm²
Z-1 Z-1 Z-2
2.20

CONFINAMIENTO -CEMENTO : TIPO I


1.60 .15 a) Zona de Confinamiento (LO)
(Mayor de los siguientes valores)
C-8 - H/6 ACERO DE REFUERZO
NFP. + 0.40
SOBRECIMIENTO - Mayor de (h,b)
NPT +0.45 -CORRUGADO GRADO 60 ASTM A615 : f'y = 4,200 Kg/cm²
3 3 1 1 PISO .05
C:H 1:8 + 25 % PM
.15 H/6
L0 - 45 cm.
NPT +0.30

PISO
FALSO PISO .10 NPT +0.30 .20
b) Espaciamiento dentro de L0: RECUBRIMIENTOS
PISO .05 SOBRECIMIENTO (Menor de los siguientes valores)
V-C

V-C

V-C
FALSO PISO
2H/3 -SUPERFICIE EN CONTACTO CON TERRENO 7.50 cm.
NFP. + 0.40 4 TERRENO NATURAL
.45
FALSO PISO .10 C:H 1:8 + 25 % PM
- Mínimo (h/2,b/2)
-SUPERFICIE SOBRE SOLADO 5.00 cm.
7 7 C-3
NPT ± 0.00
.20
NPT ± 0.00 NPT ± 0.00
.25
- 10 cm.
-COLUMNAS Y VIGAS PERALTADAS 4.00 cm.

7.00
L0 c) Espaciamiento fuera de L0: -LOSAS MACIZAS, MUROS, ESCALERAS, VIGAS CHATAS 2.50 cm.
CIMENTACION
3.45

H/6
DE ESCALERA (Menor de los siguientes valores) -ELEMENTOS DE CONFINAMIENTO Y ARRIOSTRE DE TABIQUERIA 2.00 cm.
4 - 16 Øb
- Mínimo (h,b) ALBAÑILERIA
1.2

- 30 cm.
2 2
0

NFP. + 0.40 1 1 .80 TERRENO NATURAL .80 TERRENO NATURAL .80


d) Espaciamiento dentro del nudo:
-UNIDAD DE ALBAÑILERIA : HUECA TIPO V ( ITINTEC )
-MORTERO : 1:7 ( CEMENTO-ARENA )
NFP. - 0.05 .50 - 15 cm. -ALBAÑILERIA : f'm = 45 Kg/cm²
C-8 CONFINAMIENTO POR DUCTILIDAD EN COLUMNAS Y MUROS -ESPESOR DE JUNTA : 1.5cm. maximo

CIMIENTO CIMIENTO CIMIENTO


C:H 1:10 + 30 % PG 0.50 C:H 1:10 + 30 % PG 0.50 C:H 1:10 + 30 % PG 0.50
TRASLAPES Y EMPALMES ESTRIBOS CUADRO DE COLUMNETAS
CORTE 5-5 CORTE 6-6 CORTE 7-7 LOSAS COLUM

C-1
5 C-1 C-1
Ø VIGAS
(cm) (cm)
LOSAS Y VIGAS
TIPO SECCION ARMADURA F'C CANT.

L
7 7 V-C V-C
2 6 mm 0.30 -
3.45

1.85
.20 2 Ø 1/4" @ 3 Hiladas 8 mm
Ø 3/8" @ .20 Ø 1/2" @ 0.20 3/8" 0.40 0.30
L 16 Ø 3/8"

L
NPT.+0.15
5 1/2" 0.50 0.40 C-4 Ø 1/4" ,@ .20 175 kg/cm² 01

.15
Z-1 Z-1 Z-2 .15 2 Ø 1/4" NO SE PERMITIRAN
5/8" 0.60 0.50 EMPALMES DEL REFUERZO
SUPERIOR (NEGATIVO) EN
V-C

V-C

V-C

3/4" 0.80 0.80 UNA LONGITUD DE 1/4 Ø L Rmax


DE LUZ DE LA LOSA O .40
1/4" 7.5 cm 2.0 cm
3.30

C-8 5 5 NFP. + 0.35 1" 1.00 1.00 VIGA A CADA LADO DE


LA COLUMNA O APOYO 3/8" 8.5 cm 3.0 cm 4 Ø 1/2"
2 Ø 1/4" C-5 Ø 1/4" ,@ .20 175 kg/cm² 01

.15
1.80
1.26

.25

C-8 C-2
5 C-2 C-2 1.65
2 Ø 1/4"
Ø 1/2" @ 0.20 Ø 1/2" @ 0.20 Ø 5/8"@.175 4 Ø 1/2"
V-C V-C 1 C-6 Ø 1/4" ,@ .20 175 kg/cm² 02

.25
C-8
5 2 Ø 1/4"

Ø 5/8"@.175
Z-1 Z-1 Z-2 .45

2.20
1.60 Ø 1/2" @ 0.20 3 Ø 3/8"
NPT. -1.65 175 kg/cm² 02
C-7

.10
Ø 1/4" ,@ .20

7 7 7 7
3.60

.20
3.98

DETALLE DE MURO
0.50 - 0.40
CISTERNA ENDENTADO 0.50
.25

4 Ø 3/8"
NFP. - 1.10
C-8 Ø 1/4" ,@ .20 175 kg/cm² 17

.15
C-8 ZAPATA 1
.25

C-8
V-C CUADRO DE COLUMNAS
4 Ø 1/2"
Ø 3/8" ,1 @ .05
.45
VER CUADRO
DE COLUMNAS
,4 @ .10 VER CUADRO
DE COLUMNAS
TIPO SECCION ARMADURA F'C CANT.
,R @ .20 c/ext.
4.75 2.975 0.50
6 Ø 5/8"
A
3.60

B C 2 Ø 1/2"
7 7 NPT. + 0.45 NPT. + 0.45 NPT. + 0.45
C-1 Ø 3/8" ,1 @ .05 210 kg/cm² 06
3.65

.25
PISO PISO PISO ,4 @ .10
NFP. - 0.05 .15 .15
FALSO PISO FALSO PISO FALSO PISO ,2 @ .15
NPT. ± 0.00
7 7 ,R @ .20 c/ext.

0.40
C-8 6 Ø 5/8"
RELLENO CON MATERIAL RELLENO CON MATERIAL RELLENO CON MATERIAL 2 Ø 1/2"
C-8 DE PRESTAMO COMPACTADO DE PRESTAMO COMPACTADO DE PRESTAMO COMPACTADO
Ø 3/8" ,1 @ .05 03
EN CAPAS DE 0.20cm 1.00 EN CAPAS DE 0.20cm Ø 3/8" @ .20 EN CAPAS DE 0.20cm 1.00
C-2 210 kg/cm²

.25
,4 @ .10
,2 @ .15
Ø 3/8" ,1 @ .05 2 Ø 1/2" Ø 3/8" ,1 @ .05 ,R @ .20 c/ext.
Ø 3/8" @ .20
2 Ø 1/2" ,4 @ .10 ,4 @ .10
,R @ .20 c/ext. ,R @ .20 c/ext.
7 7
0.40 6 Ø 1/2"
3.63

2.40 2.05 2.40


Ø 3/8" ,1 @ .05
7 7 VC-2 V-C V-C V-C
,4 @ .10 210 kg/cm² 01
.45 .45
C-3

.15
,2 @ .15
7
3.77

C-4 ,R @ .20 c/ext.


7

.80
2 Ø 1/2" 2 Ø 1/2"
C-8 PROYECTO:
C-6 C-6 C-5
.40
Ø 5/8" @ .175 .60
.40 .40
Ø 5/8" @ .175 .60
VIVIENDA FAMILIAR
.80

C-7 PROPIETARIO:
JOSE HENRIQUE ALZAMORA MACO
ELENA YRENE REBAZA SORIA
2.775 3.75 3.475 .20 .20 .20 DIRECCION: MARCAC
DIST.: INDEPENDENCIA - PROV. : HUARAZ - DPTO. : ANCASH
SOLADO DADO DE SOLADO DADO DE
C:H 1:10 CONCRETO C:H 1:10 CONCRETO PLANO : LAMINA :
2.20 .20 .20 2.20 .20

CIMIENTO CORRIDO DETALLE DE ZAPATA CORRIDA DETALLE DE ZAPATA CENTRAL


ELABORADO

DIBUJO CAD
---------

RICHARD MEDINA FECHA


CIMENTACION Y ZAPATAS
JUNIO - 2018 ESCALA 1 / 75 E-1