Dimensiones
Partida Descripción Und N° Veces
L A H
02 MOVIMIENTO DE TIERRAS
02.01 Excavacion de zanjas para cimentacion m3
2.00 2.20 2.20 2.60
2.00 2.20 2.20 3.60
03 CONCRETO SIMPLE
Concreto f'c=120kg/cm2 + 25% P.M. para
03.01 falsa zapata m3
4.00 2.20 2.20 0.50
03 CONCRETO ARMADO
3.01 ZAPATAS
03.01 Concreto F'C=210KG/CM2 para zapatas m3
V-1 4.00 2.20 2.20 0.60
3.01 COLUMNAS
03.01 Concreto F'C=210KG/CM2 para columnas m3
C-1 1.00 0.40 0.60 11.95
1.00 0.50 0.70 11.95
2.00 0.50 0.70 12.95
Parcial Total
60.02
25.17
34.85
40.46
15.39
25.07
-
-
24.44
9.68
9.68
11.62
11.62
21.12
21.12
295.41
-
-
-
-
295.41
-
-
-
16.12
2.87
4.18
9.07
87.60
7.20
10.80
9.00
12.60
20.00
28.00
2,094.59
-
-
416.30
-
-
416.78
1,261.51
-
66 2.3 151.8
66 2.7 178.2
70 2.7 189
70 2.7 189
708
13.2 1 4 52.8
13.2 1 4 52.8
13.2 1 6 79.2
13.2 1 3 39.6
14.2 2 6 170.4
14.2 2 3 85.2
302.4 177.6