You are on page 1of 4

PT.

SWADAYA ABDI MANUNGGAL - JEREH ENERGY CONSORTIUM


SMF-1 OPERATION
CONTRACT No. C1324599
Zul : WEEKLY PUMPING REPORT
TOTAL For OCT = 194.31 M3
Tgl, 04/10/18 = 37.95
PERIOD : 29 Oct - 04 Nov, 2018 Tgl. 09/10/18 = 15.18 SAM JEREH- SMF-1 :
SUPERVISOR : Andi Raffiwan Tgl. 12/10/18 = 36.43 OPERATOR : 1. Jimmi 4. Tega Ilham 7. Oko Sulhendra 10. Simson 13. Edi Azmi
Tgl. 16/10/18 = 7.59
Nico Shalvano Tgl. 21/10/18 = 33.40 2. Yusrizal 5. Nurul Hidayat 8. Febriyan R 11. Junaidi 14. Yandhi Lubis
Muktinal Tgl 23/10/18 = 9.11 3. M. Zaini 6. Yulhendri 9. M. Zaini Anuar 12. Adi Gunawan 15. Suhendri
Tgl 26/10/18 = 39.47

INJECTION SUMMARY Tgl 31/10/18 = 15.18

For NOV 2018 = 154.84 M3


Tgl : 01/11/2018 = 106.26 INJECTION PARAMETERS ACTUAL
Tgl : 03/11/2018 = 48.58
CYCLE :
Zul :
0 Cycle
DAY WITHIN CYCLE :
TOTAL for OCT ; 1900M3
Day AVERAGE PRESSURE GRADIENT (MAX. 0.8 psi/ft) : 0.00 psi/ft
Tgl : 05/10/2018.= 90 M3
CUMM. INJECTION DURATION SLURRY THIS WEEK : 0.00 Hours
Tgl : 12/10/2018 = 20 M3
AVERAGE SURFACE PRESSURE/WHP (1500 psi) : 0.00 psi
CUMM. IDLE TIME THIS WEEK Tgl: : 23/10/2018 =0.00
40M3Hours AVERAGE INJECTION SLURRY RATE (MAX. 2.6 M3/MIN) : 0.00 m3/min
Tgl : 31/10/2018 = 40 M3
CUMM. SLURRY VOLUME FOR THIS WEEK : 0.00 M³ AVERAGE DENSITY (0. 9- 1.1 Kg/liter) : 0.00 kg/liter
CUMM. WATER FOR FLUSH + IDLE THIS WEEK : NOV 2018 = 0.00
For M³
120 M3 AVERAGE WASTE CONCENTRATION (MAX. 25 %) : 0.00 %
Tgl : 04/11/2018 = 120 M3
CUMM. WATER FOR MIX SLURRY THIS WEEK : 0.00 M³ AVERAGE VISCOSITY (MAX. 3000 cP) : 0.00 cP
CUMM. TOTAL WATER VOLUME THIS WEEK : 0.00 M³ AVERAGE TPH SLURRY (MAX. 5 %) : 0.00 %
CUMM. INJECTION OIL SAND FOR THIS WEEK : 0.00 M³ AVERAGE SOLID CONCENTRATION (From Waste) : 0.00 %
CUMM. RAIN SCALE THIS WEEK : 170.02 M³ AVERAGE BHP (MAX. 1050 psi) : 0.00 psi
CUMM. UNCHARGABLE WASTE DELIVERED TO SAND PIT : 0.00 M³ AVERAGE BHT : 0.00 ˚F
CUMM.INJECTION OVF FOR THIS WEEK : 0.00 M³ AVERAGE PUMP PRESSURE (PSV 1450 psi) : 0.00 psi
CUMM. INJECTION WASTE FOR THIS WEEK : 0.00 M³ AVERAGE CASING / ANNULUS PRESSURE : 0.00 psi
CUMM. WASTE HAULING TO SAND PIT FOR THIS WEEK : 0.00 M³
CUMM. WASTE HAULING FROM SAND PIT FOR THIS WEEK : 160.00 M³

Surface Press. (Psi) Injection Rate (m3/min) TOTAL VOLUME


TPH ( Total
Annulus / Slurry Sand Pit
Slurry Viscosity Pertoleum
Date BHP (Psi) Press. Grad. ( Psi/ft ) BHT (˚F) Casing Press. Produced Density
(Centipoise) Hydrocarbon )
Level COMMENTS
(Psi) WHP Pump Pressure Oily Sand Oily Sand (Kg/Liter) (ft)
Water Flow Slurry Flow Rate Water (m3) Slurry (m3) [%]
Flow Rate (m3)
Rate

5-Nov-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4'.4'' Imeco Injection to 8N-78A
6-Nov-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4'.6'' Imeco Injection to 8N-78A
7-Nov-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4'.4'' Imeco Injection to 8N-78A
8-Nov-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4'.4'' Imeco Injection to 8N-78A
9-Nov-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4'.7'' Imeco Injection to 8N-78A
10-Nov-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4'.9'' Imeco Injection to 8N-78A
11-Nov-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4'.2'' Imeco Injection to 8N-78A

Reported by : Review by : Acknowladge by : Acknowladge by :

Zulfahmi #171011 Nadjmi #171063 Daslan Tambunan Rio Alfianus Ginting


SO Manager Project Manager CPI Analyst CPI Facility Reps.
d
4
A (x) B (y) C (z) 3.5
2 2.5 2.3
3
3 2.4 2.6
4 2.6 2.6 Data 2.5
Data 1
5 2.9 2.9 2
A
6 3 3 1.5
7 3.5 3.2
1
8 3.2 3.2
0.5
9 3.4 2.9
10 3.1 3.1 0
1 2
Cara membuat grafik dari tabel diatas
1 klik insert pilih scatter, sudah muncul tabel kosong
2 kemudian klik kanan pilih select data, kemudian buat atau ketik judul, kolom bawahnya masukkan axis sum
3 dan jika ada data secondari buat klik kanan diatas grafik buat data yang seperti antara sumbu x dan y, sela
4 Buat judul klik diatas grafik pilih layout dan ambil chart title grafik
5 Buat keterangan axis sumbu x, y dan z, klik grafik pilih layout dan kemudian pilih chart axis
6 peletakan legend klik layout, kemudian legend dan pilih salah satu item yang sesuai
data plot B
4 13.5
3.5 3
3
2.5
Data 2.5
Data 1 2
2
A 1.5
1.5
1
1
0.5 0.5

0 0
1 2 3 4 5 6 7 8 9 10 11

om bawahnya masukkan axis sumbu x dari tabel diatas. Dan sumbu y juga
eperti antara sumbu x dan y, selanjutnya jika sdh muncul grafik yang kedua klik kanan pada grafik tersebut atau kedua pilih format data ser

an pilih chart axis


atau kedua pilih format data series kemudia secondary axis

You might also like