Aim: To perform Sumpner's back to back test for single phase transformers
Apparatus:
0-1A
A Transformer T1
1-φ
50Hz 150V, 5A V
230V 0-150V
AC Transformer T2
V 0-50/75V
75V, 5A
0-5A A
1-φ
50Hz
230V
AC
Observations:-
Calculations:-
Precautions:-
1. Before applying the 1-phase supply, make sure of the polarity of the trans-
former windings.
2. In the secondary windings, the current should not go beyond the rated value.
Questions:
1. What is the need of Sumpner’s test when there is already SC and OC test?